Appendix - 1 (A)
Appendix - 1 (A)
Format for the Day-ahead Wheeling Schedule for each 15 minute time block of the day
Format for the Day-ahead Wheeling Schedule for each 15 minute time block of the day
Date:
Declared capacity for the day
Name of the Generator;
Time block Available Capacity
Time block
Available Capacity
Address of the
Generating Station:
Entry point voltage:
DISCOM
Name of the Consumer
Voltage level of Exist point
Time Blocks
Allocated capacity at Entry point Kw
Net capacity at Exit point kW
Signature of the OA Generator /Scheduled Consumer/OA Consumer
Note. - An example each for computation of Net capacity at Exit point is given in Appendix -1(b) and examples for Settlement are given in Appendix-2
Note.
Appendix -1 (B)
Appendix -1 (B)
Computation of Net capacity at the Exit point
Date:
Declared capacity for the day
Name of the Generator: Z in SPDCL Entry point voltage: 132 kV
Time block Available Capacity
Time block
Available Capacity
DISCOM
Name of the consumer
Voltage level of Exit point
Time Blocks
Allocated capacity at Entry point kW
Net capacity at Exit point kW
Section 17 • Andhra Pradesh Electricity Regulatory Commission (Interim Balancing and Settlement Code) Regulation, 2006
17. Power to Amend.
andhra-pradesh-electricity-regulatory-commission-interim-balancing-and-settlement-code-regulation-2006-sec-17.json
•
Section 17
{
"act_title": "Andhra Pradesh Electricity Regulatory Commission (Interim Balancing and Settlement Code) Regulation, 2006",
"act_slug": "andhra-pradesh-electricity-regulatory-commission-interim-balancing-and-settlement-code-regulation-2006",
"section_label": "Section",
"section": {
"number": "17",
"title": "17. Power to Amend.",
"chapter": null,
"content": "Appendix - 1 (A)\nAppendix - 1 (A)\nFormat for the Day-ahead Wheeling Schedule for each 15 minute time block of the day\nFormat for the Day-ahead Wheeling Schedule for each 15 minute time block of the day\nDate:\nDeclared capacity for the day\nName of the Generator;\nTime block Available Capacity\nTime block\nAvailable Capacity\nAddress of the\n\t\t\t\tGenerating Station:\nEntry point voltage:\nDISCOM\nName of the Consumer\nVoltage level of Exist point\nTime Blocks\nAllocated capacity at Entry point Kw\nNet capacity at Exit point kW\nSignature of the OA Generator /Scheduled Consumer/OA Consumer\nNote. - An example each for computation of Net capacity at Exit point is given in Appendix -1(b) and examples for Settlement are given in Appendix-2\nNote.\nAppendix -1 (B)\nAppendix -1 (B)\nComputation of Net capacity at the Exit point\nDate:\nDeclared capacity for the day\nName of the Generator: Z in SPDCL Entry point voltage: 132 kV\nTime block Available Capacity\nTime block\nAvailable Capacity\nDISCOM\nName of the consumer\nVoltage level of Exit point\nTime Blocks\nAllocated capacity at Entry point kW\nNet capacity at Exit point kW",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
"prev_section": "16",
"next_section": "1"
}