← Back to Directory
Andhra Pradesh Electricity Reform (Transfer Scheme) Rules, 1999
Andhra Pradesh Electricity Reform (Transfer Scheme) Rules, 1999
Sections
1. Short title and extent.
Section 12. Definitions.
Section 23. Transfer of assets etc. to the State.
Section 34. Classification of assets etc., into Undertakings.
Section 45. Transfer of assets, liabilities, etc., by the State.
Section 56. Transfer from APGENCO and APTRANSCO.
Section 67. Transfer of Personnel.
Section 78. Rights and obligations of third parties restricted.
Section 89. Pending suits. Proceedings, etc.
Section 910. Classifications and transfer of assets, liabilities and Proceedings provisional in the first instance.
Section 1011. Decision of State Government final.
Section 111. Power Stations.
Section 11. The Government of Andhra Pradesh, APSEB and APSEB Employees Union (Regd. No. 327-Recognised)
Section 12. The Government of Andhra Pradesh, APSEB and the Telugunadu Vidyut Karmika Sangham (Regd. No. B-1245 - Recognised)
Section 23. The Government of Andhra Pradesh, APSEB and the A.P.S.E.B. Secretariat (P & G Services) Employees Association (Regd. No. 54/1969).
Section 34. The Government of Andhra Pradesh, .APSEB and the A. P. State Electricity Board Junior Accounts Officers'Association (Regd. No. B-880).
Section 45. The Government of Andhra Pradesh, APSEB and the A.P. State Electricity Board Accounts Officers Associaton (Regd. No. C-5)
Section 56. The Government of Andhra Pradesh, APSEB and the A.P. Power Diploma Engineers Association (Regd. No. B-173 - Recognised)
Section 67. The Government of Andhra Pradesh, APSEB and the APSEB Assistant Engineers Association (Regd.No. 1185).
Section 78. The Government of Andhra Pradesh, APSEB and the A.P. State Electricity Board Engineers Association (Regd. No. 874 of 1975).
Section 8
andhra-pradesh-electricity-reform-transfer-scheme-rules-1999.json
•
20 Sections
•
Andhra Pradesh
{
"id": 14446,
"slug": "andhra-pradesh-electricity-reform-transfer-scheme-rules-1999",
"title": "Andhra Pradesh Electricity Reform (Transfer Scheme) Rules, 1999",
"short_title": "Andhra Pradesh Electricity Reform (Transfer Scheme) Rules, 1999",
"act_number": "Published vide Notification No. G.O.Ms.No. 9, Ener",
"act_year": 1999,
"act_type": "STATE",
"location": "Andhra Pradesh",
"law_status": "unknown",
"enactment_date": null,
"description": "Andhra Pradesh Electricity Reform (Transfer Scheme) Rules, 1999",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title and extent.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"ACT\" means the Andhra Pradesh Electricity Reform Act, 1998;\n(b) \"APDISTCOs\" means the distribution companies which may be incorporated with the principal object of engaging in the business of distribution and supply of electricity In different areas in the State;\n(c) \"APGENCO\" means Andhra Pradesh Power Generation Corporation Limited, a company established by the Government of Andhra Pradesh with the principal object of engaging in the business of Generation of Electricity;\n(d) \"APTRANSCO\" means the Transmission Corporation of Andhra Pradesh Limited established by the Government of Andhra Pradesh, as envisaged under Section 13 of the Act, with the principal object of engaging in the business of procurement, transmission, distribution and supply of electricity;\n(e) \"Asset\" Includes dams, tunnels, in take and outlet structures of water conductor systems, generating stations with associated plant, machinery equipment, transmission and distribution systems, land, building, offices, stores, furniture, fixtures, vehicles, residential quarter and guesthouses and amenities and installations pertaining thereto and other movable and immovable assets, cash in hand, cash at bank investments, book debts, corporeal or incorporeal, tangible and intangible assets, benefits, licences, consents, authorities, registrations, liberties, patents trade marks and powers of every kind, nature and description whatsoever, privileges, liberties, easements, advantages, benefits and approvals, contracts, deeds, schemes, bonds, agreements and other Instruments and Interest of whatever nature and wherever situate;\n(f) \"Board\" means the Andhra Pradesh State Electricity Board constituted under the Electricity (Supply) Act, 1948;\n(g) \"effective date of the transfer\" means the relevant date notified by an order made by the Government of Andhra Pradesh for effecting transfer of Assets, Liabilities, Proceedings or Personnel to the APGENCO or the APTRANSCO or the APDISTCOs, as the case may be and different effective dates of the transfer may be notified for different transfers;\n(h) \"Liabilities\" includes all liabilities, debts, duties obligations and other outgoing including statutory Liabilities and Government levies of whatever nature including the contingent Liabilities which may arise in regard to dealings before the effective date in respect of the specified Undertakings excluding however personnel and personnel related matters;\n(i) \"Personnel\" means workmen, employees, staff and officers of the Board by whatever name called and includes those trainees receiving stipend from the Board including those on deputation to other organisations or institutions:\n(j) \"Proceedings\" includes all Proceedings of whatever nature including suits, appeals, complaints, petitions, applications, conciliatory arbitration whether civil or criminal or otherwise;\n(k) \"Schedule\" means the Schedules appended to these rules:\n(l) \"Transferee\" means APGENCO or other generation company or companies or APTRANSCO or APDISTCOS as the case may be in whom the Undertaking or Undertakings are vested;\n(m) \"Tripartite Agreement\" means the applicable Agreements entered into by the State Government, the Board and the concerned Union or Association of the Personnel as listed in Schedule D and as may be modified by the parties to the said agreements from time to time.\n(n) \"Undertaking\" means a block or blocks of assets, liabilities, proceedings and personnel;\n(o) Words and expressions used and defined in the Act but not specifically defined in these rules shall have the same meaning as assigned in the Act.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Transfer of assets etc. to the State.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Classification of assets etc., into Undertakings.",
"chapter": null,
"content": "(a) Generation Undertakings as set out in Schedule A. and\n(b) Transmission and Distribution Undertakings as set out in Schedule B.",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Transfer of assets, liabilities, etc., by the State.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Transfer from APGENCO and APTRANSCO.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Transfer of Personnel.",
"chapter": null,
"content": "(a) that the terms and conditions of the services applicable to them on the effective date of the transfer notified for the purpose, shall not in anyway be less favourable than or inferior to those applicable to them immediately before the said effective date;\n(b) all such personnel shall have continuity of service in all respects;\n(c) all benefits of service accrued before the said effective date shall be fully recognised and protected and taken into account for all purposes including the payment of terminal benefits;\n(d) subject to orders that may be passed by the Courts in the Proceedings pending on the said effective date of the transfer in regard to seniority or other matters concerning the service conditions of the Personnel;\n(e) subject to the above, the personnel shall cease to be in the service of the Board or the Transferor Companies, as the case maybe, and it shall not assert or claim any benefit of service under the State Government or the Board or the TRANSFEROR COMPANIES, except as provided in the Andhra Pradesh Electricity Reform Act, 1998, these Rules and in the Tripartite Agreements;\n(f) all other terms and conditions as specified in the Tripartite agreements.\n(i) \"Existing Pensioner\" means all the persons eligible for the pension as on the effective date of transfer from the Board and shall include family members of the personnel as per the applicable scheme, and\n(ii) \"Terminal Benefits\" means the gratuity, pension, dearness and other applicable relief, medical benefit and other applicable benefits including the right to have the appropriate revisions in the above benefits consistent with the practice that were prevalent in the Board.",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Rights and obligations of third parties restricted.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Pending suits. Proceedings, etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Classifications and transfer of assets, liabilities and Proceedings provisional in the first instance.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Decision of State Government final.",
"chapter": null,
"content": "Schedule - 'A' - Part I\n[See Rule 4(1) (a)]\nGeneration Undertakings",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "1",
"title": "1. Power Stations.",
"chapter": null,
"content": "(a) Kothagudem Thermal Power Station \"A\" with 4 generating units of 60 MW capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation. Railway sidings coal handling system, ash handling system, ash pond, raw water supply and treatment system, cooling towers, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc., and works in progress.\n(b) Kothagudem Thermal Power Station 'B' with 2 generating units of 110 MW (derated to 2x 105 MW) capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation, Railway Sidings coal handling system, ash handling system, ash pond, raw water supply and treatment system, cooling towers, Secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, Stores, spare parts, consumables, raw materials etc., and works in progress.\n(c) Kothagudem Thermal Power Station C' with 2 generating units of 110 MW capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation, Railway Sidings coal handling system, ash handling system, ash pond, raw water supply and treatment system, cooling towers, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, Stores, spare parts, consumables, raw materials etc., and works in progress.\n(d) Kothagudem Vth Stage with 2 generating units of250 MW each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation, Railway Sidings coal handling system, ash handling system, ash pond, raw water supply and treatment system, cooling towers, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc., and works in progress.\n(e) Ramagundam Thermal Power Station 'B' with one unit of 62.5 MW capacity along with all associated and related equipment such as generators, turbines, boilers auxiliary units with controls and instrumentation. Railway Sidings coal handling system, ash handling system ash pond, raw water supply and treatment system, cooling towers, secondary fuel oil storage facilities and its handling system and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc., and works in progress.\n(f) Nellore Thermal Power Station with one unit of 30 MW capacity along with all associated and related equipment such as generators, turbines, boilers auxiliary units with controls and instrumentation. Railway Sidings coal handling system, ash handling system ash pond, raw water supply and treatment system, cooling towers, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc. and works in progress.\n(g) Vijayawada Thermal Power Station with 6 units of 210 MW capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation. Railway Sidings coal handling system, ash handling system, ash pond, rawwater supply and treatment system, cooling water canal system, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc., and works in progress.\n(h) Rayalaseema Thermal Power Station with 2 units of 210 MW capacity each along with all associated and related equipment such as generators, turbines, boilers auxiliary units with controls and instrumentation, Railway Sidings coal handling system, ash handling system ash pond, raw water supply and treatment system, cooling towers, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc. and works in progress.\nHydel Power Stations:\n(a) Machkund Hydro Electric Project: Inter-State Project of A.P. Govt, and Orissa Govt, with 7 0% share of A. P., on cost and benefits with 3 units of 17 MW and 3 units of 23 MW. All assets are owned by both the Governments in the same ratio. From 1 -4-1979 onwards O & M expenses are being met by both the Electricity Boards and earlier by both the Governments and reaping the power benefits based on their share.\n(b) TBHES (Inter-State Project of A.P. Government and Karnataka Government with 80% share of A.P. run by T.B. Board) with 8 units of 9 MW capacity each (4 at T.B. Dam and 4 at Hampi). All assets are owned by both the Governments and reaping the power benefits based on their share.\n(c) Nizamsagar Power House: Penstocks at the intake structure, penstock gates, powerhouse, draft tube gate, tail race channel with 2 units of 5 MW capacity each along with generators, turbines and all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, pen stock and draft tube gates, overhead cranes, gantry cranes, hydraulic hoists, powerhouse stores, spare parts, consumables, raw materials etc. and works in progress.\n(d) Upper Sileru Project:\n(i) Balimela Dam: 50% of dam cost was borne by A.P.S.E. Board and availing 50% share of water. Power house (2 x 30 MW) excavation works under dispute and resolved recently. Tubo generator equipment, control panels, crane (valued about Rs. 15 Crores) was already received and stored at Upper Sileru Project.\n(ii) Upper Sileru Power House: Weir at Guntawada, Apil way gates, intake gates, water conducting system, forebay dam, penstock gates, power house, tail race channel with 4 units of 60 MW capacity each with generators, turbines along with all associated and related equipment and switchyard including step up transformers, step down transformers, circuit breakers, control and protection system, pen stock and draft tube gates, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc. and works in progress.\n(e) Lower Sileru Project:\n(i) Donkarayi Power House: Donkarai dam, Penstock gate, penstock, power house, draft tube gate, tail race channel with 1 unit of 25 MW capacity with generator, turbine, alongwith all associated and related equipment and switchyard including step up transformers, step down transformers, circuit breakers, controland protection system, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc., and works in progress.\n(ii) Lower Sileru Power House: Intake, power canal, AVP dam, forebay, intake to head race tunnel, surge shaft, valve house, penstock, power house, draft tube gate, tail race channel with 4 units of 115 MW capacity each alongwith generators, turbines and all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc. and works in progress.\n(f) Srisailam Power House : Penstocks and penstock gates, power house, draft tube gates, tail race channel with 7 units of 110 MW capacity each with generators, turbines alongwith all associated and related equipment and switchyard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc.. and works in progress.\n(g) Nagaijunasagar Right Canal Power House: Penstocks and penstock gates, power house, draft tube gates, tail race channel with 3 units of 30 MW capacity each with generators, turbines along with all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc., and works in progress.\n(h) Nagaijunasagar Power house: Penstocks and penstock gates, power house, draft tube gates, tail race channel with 1 unit of 110 MW capacity and 7 units of 100 MW capacity each with generators, turbines along with all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc. and works in progress.\n(i) Nagaijunasagar Left Canal Power House: Head race tunnel, surge, penstock gates, penstock, power house, draft tube, tail race tunnel with 2 units of 30 MW capacity each with generators, turbines along with all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, gantiy cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc., and works in progress.\n(j) Pochampad Power House: Penstocks and penstock gates, power house, draft tube gates, tail race channel with 3 units of 9 MW capacity each with generators, turbines alongwith all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc., and works in progress.\n(k) Penna Ahobilam Power House: Penstocks and penstock gates, power house, draft tube gates, tail race channel with 2 units of 10 MW each with generators, turbines alongwith all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, gantry cranes, hydraulic hoists and power house stores, spare parts, consumables, raw materials etc., and works in progress.\nII. Mini Hydel Projects: (Total 7 MWS)\n(i) 5 Power Houses on Kakatiya Canal near Peddapalli in Karimnagar District with 4 units of500 MW each. 6 units of 220 KW each and 3 units of230 KW each along with all associated and related equipment including step up transformers, step down transformers, circuit breakers, control and protection system, pen stock and draft tube gates, tail race channel and power house stores, spare parts, consumables, raw materials, work in progress.\n(ii) Chettipet Canal Power House in West Godavari District with 2 units of 500 KW each along with all associated and related equipment including step up transformers, step down transformers, circuit breakers, control and protection system, pen stock and draft tube gates, tail race channel and power house stores, spare parts, consumables, raw materials, work in progress.\n(iii) Power House on NagSIJuna Sagar left canal at Paleru in Khammam District with 2 units of 1 MW each along with all associated and related equipment including step up transformers, step down transformers, circuit breakers, control and protection system, pen stock and draft tube gates, tail race channel and power house stores, spare parts, consumables, raw materials, work in progress.\nIII. Non-Conventional Energy Generating Units.\nIV. Power Projects Under Construction:\n(a) Srisailam Left Bank Power House envisaging 6 units of 150 MW each in Mahboobnagar district along with associated equipment.\n(b) Singur Hydro Electric Project envisaging 2 units of 7.5 MW each in Medak district along with related equipment.\n(c) A.P. Powerhouse at Balimela envisaging 2 units of 30 MW each alongwith associated equipment (joint project of A.P. and Orissa Governments with 50% share on cost and benefits).\n(d) Joint Venture project with HPCL envisaging 1 unit of 500 MW at Visakhapatnam.\n(e) Mini Hydel schemes envisaging 6 units of 500 KW capacity each. 2 units of 325 KW capacity each and 2 units of 750 KW each on Kakatiya Canal of D-83 Branch canal in Karimnagar District along with associated related equipment.\nV. General Assets/liabilities.\nVI. Other Assets:\nVII. Miscellaneous:\n(1) Contracts, agreements, interest and arrangements to the extent they are associated with or related to Generation activities or to the undertakings or assets referred to in Clauses I to V above.\n(2) Loans, secured and unsecured to the extent they are associated with or related to Generation activities or to the undertakings or assets referred to in Clauses I to V above.\n(3) Cash and bank balance to the extent they are associated with or related to Generation activities or the undertakings or assets referred to in Clause I to V above.\n(4) Provident Fund, Pension Fund, Gratuity Fund and may other Funds based on servicing capacity of the Undertakings.\n(5) Recognition of receivables for sale of energy to APTRANSCO to the extent of acceptable norms of Working Capital.\n(6) Other current assets to the extent they are associated with or related to Generation activities or to the undertakings or assets referred to in Clauses I to V above.\n(7) Other Current liabilities and provisions to the extent they are associated with or related to Generation activities or the Undertakings or Assets referred to in Clauses I to V above.\n(8) Share capital of State Government to the extent required to match the assets and liabilities referred to in Clauses I to V above.\n(9) Other liabilities to the extent they are associated with or releated to Generation activities or to the Undertakings or Assets referred to in Clauses I to V above.\n(10) Proceedings to the extent they are associated with or related to Generation activities or to the Undertakings or Assets referred to in Clauses I to V above.\nVIII.\nSchedule 'A' Part II\nAggregate Value of Assets and Liabilities to be Transferred and vested in APGENCO\nAggregate Value of Assets and Liabilities to be Transferred and vested in APGENCO\n(Provisional)\n(Provisional)\nI.\nI.\nAssets\nAssets\n(Rs. in crores)\n(Rs. in crores)\nA. (1)\nFixed Assets\n(a)\nGross Fixed Assets\n3724.71\n(b)\nLess: Accumulated Depreciation\n1005.00\n(c)\nNet Fixed Assets\n2719.71\n(2)\nCapital works in Progress\n2380.12\nTotal Fixed Assets (1+2)\nTotal Fixed Assets (1+2)\n5099.83\n5099.83\n(Rs. in crores)\nB.\nCurrent Assets\n(1)\nCash and Bank Balances\n-544.44\n(2)\nStock\n393.22\n(3)\nAccrued Revenue\n180.06\n(4)\nLoans and Advances\n1333.39\nOther Current Assets\n144.20\nTotal Current Assets\n1506.43\nTotal Assets (A + B)\nTotal Assets (A + B)\n6606.26\n6606.26\nII\nII\nLiabilities\nLiabilities\nA.\nEquity\n780.21\nB.\nGrants for Capital Assets\n7.45\nC.\nCapital Reserves\n23.29\nD.\nLong Term Debt\n(1)\nState Govt. Loans\n(2)\nOther loans\n1727.93\n(3)\n(a) Loan Funds - Pension Fund\n1194\n(b) Loan Funds - Provident Fund\n207.14\n(c) Loan Funds - Trade default liabilities\n216.7\n(d) Loan Funds - Debt default liabilities\n238\nTotal long term debt (1+2+3)\nTotal long term debt (1+2+3)\n3583.77\n3583.77\nE.\nCurrent Liabilities\n1.\nFuel supplies\n1474.76\n2.\nCapital and O & M Supplies\n454.15\n3.\nDeposits & Retentions\n184.25\n4.\nOther current liabilities\n98.38\nTotal current liabilities\n2211.54\nTotal liabilities (A+B+C+D+E)\nTotal liabilities (A+B+C+D+E)\n6606.26\n6606.26\nSchedule 'B' - Part I\n(See Rule 4(1) (b))\nTransmission and Distribution Undertaking.\nI. Transmission Assets. - All the transmission lines with towers of voltage 132 KV, 220 KV and 400 KV (Under Construction) on double circuit/single circuit/single circuit on double circuit towers with Grid sub-stations of various capacities with all associated and related equipment, including step-up, step-down transformers, circuit breakers, metering arrangements and other protective devices with power-line communication system, allied control rooms, load dispatch centre, lands (including right of way), buildings, roads and other auxiliary assets spread over within and outside the territory of the State including such assets under construction and assets acquired, transferred or rights of which were vested with the Board by transfer, sale, lease or otherwise, but excluding such constructions or installations lawfully owner and operated by others.\nI. Transmission Assets.\nII. Distribution Assets. - All 33 KV, 11 KV, LT (Single phase 2 wire to 3 phase 5 wire) lines (with overhead lines. Aerial Bunched cables and underground cables) on different types of supports with various sizes of conductors and step up/step down transformers, breakers, protective and metering devices and control rooms, testing laboratories, lands (including right of way), buildings, roads, diesel generating sets or other conventional and non-conventional generating units, service connections and installations inside consumer's premises, street lighting and signal systems owned by or leased to the Board but excluding fittings, fixtures and installations owned, by private persons or local authorities.\nII. Distribution Assets.\nIII. General Assets/Liabilities. - Special tools and equipments, material handling equipments, earth movers, bulldozers, concrete mixtures, cranes, trailers, heavy and light vehicles, furniture, fixtures, office equipments, air conditioners, refrigerators, computers and signal systems, spares consumables, raw materials, lands and civil works installations including roads, buildings, schools, dispensaries, testing laboratories and equipments, training centres, workshops, works in progress, machineries and equipments sent for repairs, scrap and obsolete materials.\nIII. General Assets/Liabilities.\nIV. Other Assets. - Other assets and movable properties including plant and machinery, motor car, jeeps, trucks, cranes, trailers and other vehicles, furniture, fixtures, air conditioners, computers, etc. to the extent they are utilized and operated by or associated with the assets referred to under Clauses I, II and III above shall also form part of Transmission and Distribution (APTRANSCO) undertakings.\nIV. Other Assets.\nV. Miscellaneous. - (1) Contracts, agreements, interest and arrangements to the extent they are associated with or related toT & D activities or to the undertakings or assets referred to in Clauses I, II, III and IV above.\nV. Miscellaneous.\n(2) Loans, secured and unsecured to the extent they are associated with or related toT & D activities or to the undertakings or assets referred to in Clauses I, II, and IV above.\n(3) Cash and bank balance to the extent they are associated with or related to T & D activities or the undertakings or assets referred to in Clauses I, II, III and IV above.\n(4) Recognition of payables for purchase of Energy from APGENCO to the extent of acceptable norms of the Working Capital.\n(5) Other Current Assets to the extent they are associated with or related to T & D activities or to the undertakings or assets referred to in Clauses I, II, III and IV above.\n(6) Other Current liabilities and provisions to the extent they are associated with or related to T & D activities or the Undertakings or Assets referred to in Clauses I, II, III and IV above.\n(7) Contingent liabilities to the extent they are recognised are are associated I with or related to T & D activities or to the Undertaings or Assets referred to in Clauses I, II. Ill and IV above.\n(8) Share capital of the State Government to the extent required to match the assets and liabilities referred in Clauses I to IV above.\n(9) Other liabilities to the extent they are associated with or related to T & D activities or to the Undertakings or Assets referred to in Clauses I, II, III and IV above.\n(10) Proceedings to the extent they are associated with or related to T & D activities or to the Undertakings or Assets referred to in Clauses. I, II, III and IV above.\nVI. The State Government may however, transfer any of the above assets, liabilities, Proceedings etc., with in one year from the effective date as the State Government may consider appropriate to the APTRANSCO or the APGENCO.\nVI.\nSchedule 'B' Part II\nAggregate Value of Assets and Liabilities to be Transferred and Vested in APTRANSCO\nAggregate Value of Assets and Liabilities to be Transferred and Vested in APTRANSCO\n(Provisional)\n(Provisional)\n(Rs. in Crores)\n(Rs. in Crores)\n1.\n1.\nAssets :\nAssets :\nA.\nFixed Assets\n(1)\n(a) Gross Fixed Assets\n4159.94\n(b) Less Accumulated Depreciation\n1573.76\n(c) Net Fixed Assets\n2586.18\n(2)\nCapital Works in progress\n705.93\n(3)\nInvestments\n44.13\nTotal A Fixed Assets (1+2+3)\nTotal A Fixed Assets (1+2+3)\n3336.24\n3336.24\nB.\nSubsidy receivable from Government of A.P. (Net)\n772.91\nC.\nCurrent Assets\n(1)\nCash and Bank Balances\n143.22\n(2)\nStock\n252.32\n(3)\nSundry Debtors for Electricity\n1346.97\n(4)\nLess Provision for Bad and Doubtful debt\n-254.69\n(5)\nInter-State Receivables\n40.71\n(6)\nNet Debtors (3-4+5)\n1133,09\n(7)\nLoans and Advances\n66.05\n(8)\nOther Current Assets\n499.06\nTotal C Current Assets (1+2+6+7+8)\n2073.74\nTotal Assets (A+B+C)\n6182.89\n2.\n2.\nLiabilities:\nLiabilities:\nA.\nEquity\n540.92\nB.\nConsumer Contribution/Grants\n443.88\nC.\nCapital Reserves\n4.75\nD.\nLong term debt\n(Rs. in Crores)\n(1)\nState Government Loans\n0.00\n(2)\nLoans from others\n2271.55\n(3)\nLoan Funds - Trade default liabilities\n690.66\nTotal (D) Term loans (1 to 3)\n2962.21\nE.\nCurrent Liabilities\n(1)\nPower Purchases\n308.61\n(2)\nPower Purchases (Internal - APGENCO)\n180.06\n(3)\nCapital and O & M Supplies\n173.02\n(4)\nDeposits from consumers\n747.77\n(5)\nDeposits and retentions\n235.67\n(6)\nBank Borrowings for Working Capital\n206.82\n(7)\nOther Current Liabilities\n379.18\nTotal Current Liabilities (1 to 7)\n2231.13\nTotal Liabilities (A+B+C+D+E)\nTotal Liabilities (A+B+C+D+E)\n6182.89\n6182.89\nSchedule -C\nRetained Liabilities\nRetained Liabilities\n(Rs. In Crores)\nSI.No.\nSI.No.\nParticulars\nParticulars\nAs at end of March, 1998\nAs at end of March, 1998\n1.\nSPA Schemes - Banks - Penal interest for\n\t\t\t\t\tdefault of Principal and Interest\n7.98\n2.\nNIPC - Power Purchases - Surcharge for belated\n\t\t\t\t\tpayment of bills\n43.44\n3.\nNPC (MAPP) - Power purchases - Surcharge for\n\t\t\t\t\tbelated payment of bills\n12.13\n4.\n(a) LIC - Penal Interest for default of payment\n\t\t\t\t\tof principal /Interest.\n27.45\n(b) LIC - Interest on Principal Instalments defaulted\n2.52\n5.\nNTPC - Penal Interest at 18% P.A. on default of\n\t\t\t\t\t19 instalments\n6.53\n6.\nN.L.C. - Power Purchases - Surcharge for\n\t\t\t\t\tbelated payments of bills\n254.03\n7.\nPGCIL - Transmission Charges Surcharge for\n\t\t\t\t\tbelated payment of bills\n18.67\n8.\nTNEB - Compensation for over drawal of energy\n\t\t\t\t\tfrom Central Generating Sations\n6.37\n9.\nInsurance Companies - Penal Interest for\n\t\t\t\t\tbelated payment of principal/interest\n0.24\n10.\nUTI - Penal Interest on the defaulted/delayed\n\t\t\t\t\tpayment of Instalment/Interest\n0.08\n11.\nPeerless - Penal Interest for default of\n\t\t\t\t\tPayment of Principal\n1.75\nTOTAL:\nTOTAL:\n381.19\n381.19\nSchedule-D\nList of Tripartite Agreements\nList of Tripartite Agreements",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "1",
"title": "1. The Government of Andhra Pradesh, APSEB and APSEB Employees Union (Regd. No. 327-Recognised)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "2",
"title": "2. The Government of Andhra Pradesh, APSEB and the Telugunadu Vidyut Karmika Sangham (Regd. No. B-1245 - Recognised)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "3",
"title": "3. The Government of Andhra Pradesh, APSEB and the A.P.S.E.B. Secretariat (P & G Services) Employees Association (Regd. No. 54/1969).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "4",
"title": "4. The Government of Andhra Pradesh, .APSEB and the A. P. State Electricity Board Junior Accounts Officers'Association (Regd. No. B-880).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "5",
"title": "5. The Government of Andhra Pradesh, APSEB and the A.P. State Electricity Board Accounts Officers Associaton (Regd. No. C-5)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "6",
"title": "6. The Government of Andhra Pradesh, APSEB and the A.P. Power Diploma Engineers Association (Regd. No. B-173 - Recognised)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "7",
"title": "7. The Government of Andhra Pradesh, APSEB and the APSEB Assistant Engineers Association (Regd.No. 1185).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "8",
"title": "8. The Government of Andhra Pradesh, APSEB and the A.P. State Electricity Board Engineers Association (Regd. No. 874 of 1975).",
"chapter": null,
"content": "Schedule-E Section I\nConditions of Transfer\nConditions of Transfer\nCategory Of Service Workmen\nCategory Of Service Workmen\nTransfer Arrangements\nTransfer Arrangements\n1.\nAPSEB Engineering Service\nShall stand transferred to the APGENCO or the\n\t\t\t\tAPTRANSCO as the case may be, on as-is where-is basis i.e., based\n\t\t\t\ton the place they are working on the effective date and shall be\n\t\t\t\tsubject to further transfer to any other successor entity in\n\t\t\t\taccordance with the applicable Tripartite Agreement listed at\n\t\t\t\tSchedule-D.\n2.\nAPSEB O & M and Construction Establishment\nShall stand transferred to the APGENCO or the\n\t\t\t\tAPTRANSCO as the case may be, on as-is where-is basis i.e., based\n\t\t\t\ton the place they are working on the effective date and shall be\n\t\t\t\tsubject to further transfer to any other successor entity in\n\t\t\t\taccordance with the applicable Tripartite Agreement listed at\n\t\t\t\tSchedule-D.\n3.\nAPSEB Accounts Service other than those working\n\t\t\t\tas Headquarters staff\nShall stand transferred to the APGENCO or the\n\t\t\t\tAPTRANSCO as the case may be, on as-is where-is basis i.e., based\n\t\t\t\ton the place they are working on the effective date and shall be\n\t\t\t\tsubject to further transfer to any other successor entity in\n\t\t\t\taccordance with the applicable Tripartite Agreement listed at\n\t\t\t\tSchedule-D.\n4.\nAPSEB General Service other than those working\n\t\t\t\tas Headquarters staff\nShall stand transferred to the APGENCO or the\n\t\t\t\tAPTRANSCO as the case may be, on as-is where-is basis i.e., based\n\t\t\t\ton the place they are working on the effective date and shall be\n\t\t\t\tsubject to further transfer to any other successor entity in\n\t\t\t\taccordance with the applicable Tripartite Agreement listed at\n\t\t\t\tSchedule-D.\n5.\nAPSEB Medical Service\nShall stand transferred to the APGENCO on as-is\n\t\t\t\twhere-is basis i.e., based on the place they are working on the\n\t\t\t\teffective date and shall be subject to further transfer to any\n\t\t\t\tother successor entity in accordance with the applicable\n\t\t\t\tTripartite Agreement listed at Schedule-D.\n6.\nAPSEB Educational Service\nShall stand transferred to the APGENCO on as-is\n\t\t\t\twhere-is basis i.e., based on the place they are working on the\n\t\t\t\teffective date and shall be subject to further transfer to any\n\t\t\t\tother successor entity in accordance with the applicable\n\t\t\t\tTripartite Agreement listed at Schedule-D.\n7.\nAPSEB Accounts Service working as Headquarters\n\t\t\t\tstaff\nShall stand transferred to the APTRANSCO. Such\n\t\t\t\tpersonnel then shall be allocated on as as-is where-is basis\n\t\t\t\ti.e., based on the place they are working on the effective date\n\t\t\t\tor in such other manner as the APTRANSCO may decide taking into\n\t\t\t\taccount the seniority, work experience, suitability and other\n\t\t\t\trelevant consideration and transferred to and absorbed in the\n\t\t\t\tAPGENCO or any successor entity of the APTRANSCO or the APGENCO\n\t\t\t\tin accordance with the applicable Tripartite Agreement listed at\n\t\t\t\tSchedule-D.\n8.\nAPSEB General Service working as Headquarters\n\t\t\t\tstaff\nShall stand transferred to the APTRANSCO. Such\n\t\t\t\tpersonnel then shall be allocated on an as-is where-is basis\n\t\t\t\ti.e., based on the place they are working on the effective date\n\t\t\t\tor in such other manner as the APTRANSCO may decide taking into\n\t\t\t\taccount the seniority, work experience, suitability and other\n\t\t\t\trelevant consideration and transferred to and absorbed in the\n\t\t\t\tAPGENCO or any successor entity of the APTRANSCO or the APGENCO\n\t\t\t\tin accordance with the applicable Tripartite Agreement listed at\n\t\t\t\tSchedule-D.\n9.\nWorkmen of the APSEB Personnel and General\n\t\t\t\tService\nShall stand transferred to the APTRANSCO and\n\t\t\t\tallocated on as as-is where-is basis i.e., based on the place\n\t\t\t\tthey are working on the effective date or in such other manner as\n\t\t\t\tthe APTRANSCO may decide to serve on deputation in the APGENCO or\n\t\t\t\tany successor entiry of the APTRANSCO or the APGENCO till final\n\t\t\t\tabsorption in the APGENCO or such successor entity of the\n\t\t\t\tAPTRANSCO or the APGENCO, as the case may be, in accordance with\n\t\t\t\tthe applicable Tripartite Agreement listed at Schedule-D.\n10.\nWorkmen In the APSEB Security Service\nShall stand transferred to the APGENCO. Such\n\t\t\t\tpersonnel then shall be allocated on an as-is where-is basis\n\t\t\t\ti.e., based on the place they are working on the effective date\n\t\t\t\tor in such other manner as the APGENCO may decide taking into\n\t\t\t\taccount the seniority, work experience, suitability and other\n\t\t\t\trelevant consideration and transferred to and absorbed in the\n\t\t\t\tAPTRANSCO or any successor entity of the APGENCO or the APTRANSCO\n\t\t\t\tin accordance with the applicable Tripartite Agreement listed at\n\t\t\t\tSchedule D.\nPersonnel Other Than Workmen:\nPersonnel Other Than Workmen:\n11.\nAPSEB Engineering Service\nShall stand transferred to the APTRANSCO and\n\t\t\t\tallocated on an as-is where-is basis i.e., based on the place\n\t\t\t\tthey are working on the effective date or in such other manner as\n\t\t\t\tthe APTRANSCO may decide to serve on deputation in the APGENCO or\n\t\t\t\tany successor entity of the APTRANSCO or the APGENCO till final\n\t\t\t\tabsorption in the APGENCO or such successor entity of the\n\t\t\t\tAPTRANSCO or the APGENCO, as the case may be, in accordance with\n\t\t\t\tthe applicable Tripartite Agreement listed at Schedule-D.\n12.\nAPSEB Accounts Service\nShall stand transferred to the APTRANSCO and\n\t\t\t\tallocated on an as-is where-is basis i.e., based on the place\n\t\t\t\tthey are working on the effective date or in such other manner as\n\t\t\t\tthe APTRANSCO may decide to serve on deputation in the APGENCO or\n\t\t\t\tany successor entity of the APTRANSCO or the APGENCO till final\n\t\t\t\tabsorption in the APGENCO or such successor entity of the\n\t\t\t\tAPTRANSCO or the APGENCO, as the case may be, in accordance with\n\t\t\t\tthe applicable Tripartite Agreement listed at Schedule-D.\n13.\nAPSEB Personnel and General Service\nShall stand transferred to the APTRANSCO and \n\t\t\t\tallocated on an as-is where-is basis i.e., based on the place\n\t\t\t\tthey are working on the effective date or in such other manner as\n\t\t\t\tthe APTRANSCO may decide to serve on deputation in the APGENCO or\n\t\t\t\tany successor entity of the APTRANSCO or the APGENCo till final\n\t\t\t\tabsorption in the APGENCO or such successor entity of the\n\t\t\t\tAPTRANSCO or the APGENCO, as the case may be, in accordance with\n\t\t\t\tthe applicable Tripartite Agreement listed at Schedule-D.\n14.\nAPSEB Medical Service\nShall stand transferred to the APGENCO on as-is\n\t\t\t\twhere-is basis i.e., based on the place they are working on the\n\t\t\t\teffective date.\n15.\nAPSEB Educational Service\nShall stand transferred to the APGENCO on as is\n\t\t\t\twhere-is basis i.e., based on the place they are working on the\n\t\t\t\teffective date.\n16.\nAPSEB Security\nShall stand transferred to the APGENCO and\n\t\t\t\tallocated on an as-is where-is basis i.e., based on the place\n\t\t\t\tthey are working on the effective date or in such other manner as\n\t\t\t\tthe APGENCO may decide to serve on deputation in the APTRANSCO or\n\t\t\t\tany successor entity of the APGENCO or the APTRANSCO till final\n\t\t\t\tabsorption in the APTRANSCO or such successor entity of the\n\t\t\t\tAPGENCO or the APTRANSCO, as the case may be.\nSchedule Section 2\nArrangements for the Transfer of Units\nArrangements for the Transfer of Units\nHeadquarters Units\nHeadquarters Units\nName of the Unit\nName of the Unit\nDuties & Functions of the Unit\nDuties & Functions of the Unit\nOrganisation to which unit is to be\n\t\t\t\tTransferred\nOrganisation to which unit is to be\n\t\t\t\tTransferred\nChairman's Peshi\nAssisting Chairman, APSEB\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P & G -Per) Ms.No. 275, dt. 30-1-99\nCE/Technical to Chairman\nAssisting Chairman in discharging his duites and\n\t\t\t\tco-ordination on Energy Audit etc. at Board level\nAPTRANSCO\nMember (Projects) Peshi\nAssisting Member (Projects)\nAPGENCO\nCE/TPC. Hyderabad\nCo-ordinating Construction activity of Thermal\n\t\t\t\tPower Stations\nAPGENCO\nCE/Projects, Hyderabad\nCo-ordinating the Hydel Power Projects,\n\t\t\t\tincluding O & M\nAPGENCO\nCE/Planning, Hyderabad\nPlanning for load forecast and generation\n\t\t\t\tplanning\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P & G - Per) Ms.No. 273 dt. 29-1-1999.\nCE/Civil/TP, Hyderabad\nCivil construction works of new Thermal Power\n\t\t\t\tStations\nAPGENCO\nCE/Investment Promotion Cell, Hyderabad\nPPA Administration\nAPTRANSCO\nCE/Civil O & M, Hyderabad\nCivil O & M works of Power Stations and PSCC\n\t\t\t\tpole centres\nAPGENCO /APTRANSCO as decided by the Board vide\n\t\t\t\tB.P. (P & G - Per) Ms.No. 273 dt. 29-1-1999.\nMembers (Genearation) Peshi\nAssisting Member (Generation)\nAPGENCO\nCE/Generation, Hyderabad\nCo-ordinating the Thermal Power Stations\nAPGENCO\nCE/Gas Station, Hyderabad\nCo-ordinating and including O & M of Gas\n\t\t\t\tPower Stations\nAPGENCO\nCTM Railways\nClearance of Coal Wagons\nAPGENCO\nMember (D) Peshi\nAssisting Member (D)\nAPTRANSCO\nCE (O), Hyderabad\nCo-ordination at Headquarter's level on\n\t\t\t\toperational activities and apprising the Board.\nAPTRANSCO\nCE/P&MM, Hyderabad\nProcurement of material for operation zones\nAPTRANSCO\nCE/RE, Hyderabad\nFormulation of schemes for obtaining loan\n\t\t\t\tassistance from REC and correspondence with REC on earlier\n\t\t\t\tschemes\nAPTRANSCO\nCE/C&SS, Hyderabad\nIn-charge of computers and system studies and\n\t\t\t\tload forecasting\nAPTRANSCO\nMember (Transmission) Peshi\nAssisting the Member (Transmission)\nAPTRANSCO\nCE/Transmission\nCo-ordination and policy formulation with regard\n\t\t\t\tto transmission net work in the State\nAPTRANSCO\nCE/TC, Hyderabad\nCommunication network in generating stations and\n\t\t\t\tdistribution Zones in the State\nAPTRANSCO\nCE/Power Systems, Hyderabad\nIn-charge of power systems including grid and\n\t\t\t\tsystem protection\nAPTRANSCO\nCE/Reforms, Hyderabad including Working Groups\nIn-charge of A.P. Power Reforms Project\nAPTRANSCO\nCE/R&T\nIn-charge of Research, Development and Training\n\t\t\t\tprogrammes in the State\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G - Per) Ms.No.273, dt.29-1-1999.\nMember-Secretary Peshi\nAssisting the Member-Secretary in discharging\n\t\t\t\this duties\nAPTRANSCO\nDirector Personnel\nIn-charge of personnel matters\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 271 dated 28-1-1999\nAdditional Secretary\nIn-charge of Industrial relations, legal matters\n\t\t\t\tand personnel matters\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 27L -dated 28-1-1999\nJoint Secretary\nIn-charge of regulations and Protocol\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 271 dated 28-1-1999\nCE/Commercial\nIn-charge of tariff and allied matters.\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 273 dated 29-1-1999\nCE/Disciplinary cases\nIn-charge of Disciplinary cases at Board level\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 273 dated 29-1-1999\nCE/Assessments, Hyderabad\nFinalisation of pilferage of energy and\n\t\t\t\tmalpractice cases and energy audit\nAPTRANSCO\nSE/Enquiries\nConducting of departmental inquiries against\n\t\t\t\terring officers\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 273 dated 29-1-1999\nDS (Public Relations)\nIn-charge of Public Relations\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 271 dated 28-1-1999\nMember (Accounts)\nAssisting the Member Peshi (Accounts) in\n\t\t\t\tdischarging his duties\nAPTRANSCO\nSE/Energy Audit\nIn-charge of Energy Audit\nAPTRANSCO\nFA & CCA/RE\nIn-charge of Accounts relating to Revenue\n\t\t\t\tExpenditure\nAPTRANSCO/APGENCO & as decided by the Board \n\t\t\t\t vide B.P. (P&G- Per) Ms.No. 272 Dated 29-1-1999\nFA & CCA/Accounts\nIn-charge of Annual Accounts\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 272 Dated 29-1-1999\nFA & CCA/Financial Analysis\nIn-charge of financial analysis of tenders, etc.\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 272 Dated 29-1-1999\nFA & CCA/Resources\nIn-charge of Budget etc.\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 272 Dated 29-1-1999\nFA & CCA/Audit\nIn-charge of Audit\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 272 Dated 29-1-1999\nIG & A (V & S)\nIn-charge of Vigilance & Security\nAPTRANSCO/APGENCO as decided by the Board vide\n\t\t\t\tB.P. (P&G- Per) Ms.No. 273 Dated 29-1-1999\nSecurity wing\nSecurity arrangements of generating stations and\n\t\t\t\tvulnerable installations etc.\nAPTRANSCO\nField Offices\nField Offices\nCE/ Construction KTPS V Stage. Paloncha\nEngaged in construction of Generating Stations.\nAPGENCO\nCE/O & M, KTPS V Stage\nEngaged in Generation of Thermal Power (Unit No.\n\t\t\t\tI & II of Stage V)\nAPGENCO\nSE/E & M, Srisailam Left Bank PH\nConstruction of Hydel Power Station\nAPGENCO\nCE/Civil/Hydro Projects, Srisailam\nConstruction of Hydel Power Station\nAPGENCO\nSE/O & M, LSHES, Mothugudem\nIn-charge of generation of hydel power at Sileru\nAPGENCO\nSE/Civil O & M Upper\nSileru Civil O & M works of Hydel Power\n\t\t\t\tStations at Sileru\nAPGENCO\nCE/O & M/RTPP\nGeneration of Thermal power at RTPP\nAPGENCO\nCE/O&M, SSLM\nGeneration of Hydel power at Srisailam and\n\t\t\t\tNagaijunasagar\nAPGENCO\nCE/R & M/RTS, Rgm\nGeneration of Thermal power at RTS\nAPGENCO\nPlant Manager/GTPS, Vijjeswaram\nO & M of Gas Power Station at Vijieswaram\nAPGENCO\nCE/O & M, KTPS\nGeneration of Thermal power at KTPS\nAPGENCO\nCE/O & M, VTPS\nGeneration of Thermal power at VTPS\nAPGENCO\nTBHES (Joint Project)\nGeneration of Hydel power at TBHES\nAPGENCO\nMHES (Joint Project)\nGeneration of Hydel power at Machkund\nAPGENCO\nPlant Engineer/NTS\nGeneration of Thermal power at NTS\nAPGENCO\nDE/O&M/Pochampad\nGeneration of Hydel power at Pochampad and\n\t\t\t\tNizamsagar\nAPGENCO\nEE/O&M, PABRHES\nGeneration of Hydel power at Penna Ahobilam\nAPGENCO\nCE/VSP Zone. VSP (exclusive of generation wing\n\t\t\t\tof SE (Operation) VSP)\nEngaged in maintenance & construction of 33\n\t\t\t\tKV, 11KV, LT net work and connected equipment and distribution of\n\t\t\t\telectrical energy.\nAPTRANSCO\nCE/Vijayawada Zone\n-do-\nAPTRANSCO\nCE/Nellore Zone (exclusive of generation wing of\n\t\t\t\tSE/O/Nellore\n-do-\nAPTRANSCO\nCE/Cuddapah Zone (exclusive of generation wing\n\t\t\t\tof SE/O/Ananthapur)\n-do-\nAPTRANSCO\nCE/Hyderabad Zone\n-do-\nAPTRANSCO\nCE/Metro Zone, Hyderabad\n-do-\nAPTRANSCO\nCE/Warangal Zone\n-do-\nAPTRANSCO\nCE/Nizamabad Zone (Exclusive of generation wing\n\t\t\t\tof SE/O/Ni-zamabad)\n-do-\nAPTRANSCO\nSE/Master Plan, Hyderabad\nEngaged in Construction of HT Lines &\n\t\t\t\tSubstations in twin cities of Hyderabad & Secunderabad\nAPTRANSCO\nSE/SCADA\nExecution of SCADA works in Hyderabad and Metro\n\t\t\t\tZones\nAPTRANSCO\nCE/400KV Lines, Hyderabad\nConstruction of400 KV lines and sub-stations in\n\t\t\t\this jurisdiction\nAPTRANSCO\nCE/TL & SS,\nHyderabad Construction and O & M of EHT\n\t\t\t\tlines & substations in his jurisdiction\nAPTRANSCO\nCE/TL&SS/Cuddapah\nConstruction and O & M of EHT lines &\n\t\t\t\tsubstations in his jurisdiction\nAPTRANSCO\nCE/TL & SS, Vijayawada\n-do-\nAPTRANSCO\nSE/DPE, Hyderabad\nDetection of pilferage of energy\nAPTRANSCO\nSE/DPE/VJA\n-do-\nAPTRANSCO\nSE/DPE/Cuddapah\n-do-\nAPTRANSCO",
"footnote": "",
"is_definition": false,
"sort_order": 19
}
],
"metadata": {
"Act ID": "Last Updated 22nd August, 2019 [ap492]",
"Act Number": "Published vide Notification No. G.O.Ms.No. 9, Energy (Power-III), dated 29.1.1999",
"Enactment Date": "",
"Act Year": "1999",
"Short Title": "Andhra Pradesh Electricity Reform (Transfer Scheme) Rules, 1999",
"Type": "STATE",
"Location": "Andhra Pradesh"
},
"updated_at": "2026-09-29 21:55:18"
}