← Back to Directory
A.P. Farmers Organisation Rules, 1997
A.P. Farmers Organisation Rules, 1997
Sections
1. Short Title.
Section 12. Definition.
Section 23. Every Farmers Organisation shall be a body corporate having a distinct name, an office, a common seal and shall by the said name sue and be sued.
Section 34. The objects of the Farmers Organisation shall be as follows:
Section 45. The rights of the Farmers Organisation shall be as follows:
Section 56. The responsibility of Farmers Organisation shall be as follows:
Section 67. The rights of the member users shall be as follows:
Section 78. The responsibilities of the member users shall be as follows:
Section 89. General Body.
Section 910. The General Body Meetings.
Section 1011. Notice for General Body.
Section 1112. Quorum for the General Body.
Section 1213. Minutes of the Meeting.
Section 1314. The General Body shall have the following powers and functions, namely.
Section 1415. The composition and functions of the Managing Committee shall be as follows:
Section 152. While nominating the Rajya sabha members, and Members of Legislative Counsel, the criteria of name of the individual in the voters list of General elections is to be considered for co-option.]
Section 216. The powers and the functions of the Managing Committee shall be as follows.
Section 1617. The duties of the Chairman/ President of a Farmers Organisation shall be as follows.
Section 1717A. The duties of Vice Chairman/ Vice President of a Farmers Organisation shall be as follows.
Section 17A2. Vacancies in a Distributory Committee
Section 23. Vacancies in a Project Committee.
Section 317D. Any dispute or difference touching the constitution, management, powers or functions of a Farmers Organisation arising shall be determined as follows.
Section 17D17E. A Party to a dispute or difference aggrieved by any decision made or order passed under Rule 17 D, may prefer appeal in the manner detailed below.
Section 173. Appeals in Minor Irrigation System
Section 34. Time limit for Preferring an appeal.
Section 45. Time limit for settlement of appeals.
Section 517F. Inspection of records of a Farmers Organisation shall be as follows.
Section 17F2. Distributory Committee.
Section 23. Project Committee.
Section 317G. The following are the authorities to remove the erring office bearers of the Farmers Organisations.
Section 17G2. Authority for Appeal.
Section 217H. Transitional arrangements for the Farmers Organisation are as follows.
Section 17H17I. The Water Users Associations shall maintain the feeder channels on the upstream of tank bed as follows.
Section 17I19. The procedure for taking up the works shall be as follows.
Section 191. Normal Operation and Maintenance Works
Section 12. Deferred Maintenance Works
Section 23. Original Works.
Section 34. System Diagnosis for maintenance works.
Section 45. Prioritizing works.
Section 56. Preparation of Estimates.
Section 67. Administrative Approval.
Section 78. Technical sanction.
Section 89. Manner of Taking up works.
Section 910. Maintenance and Adherence to the Designed Hydraulic Particulars.
Section 1011. Limitation on Works.
Section 11Section 23 and also prosecution under Section 24
Section 2312. Publication of List of Works to be taken up.
Section 1213. Freedom to add other Funds or Extra Contributions.
Section 1314. Proof of works done.
Section 1415. Payment for the Works done.
Section 1516. Quality control.
Section 1620. At the end of each crop season the Farmers Organisation shall conduct social audit as detailed below.
Section 2021. Water Budget for Farmers Organisation.
Section 2122. After a water budget is prepared, the Farmers Organisation shall draw up a plan of water regulation as follows:
Section 2223. Accounts Finance.
Section 2324. Each of the Farmers Organisation shall maintain the following records, other than the records specifically mentioned in the Act and the rules.
Section 2425. Levy & Collection of Fees.
Section 2526. At the end of each financial year, and not later than three months after the commencement of the new financial year, each of the Farmers Organisation shall cause its accounts to be audited as follows:
Section 2627. Offences and Penalties.
Section 2728A. The following officers shall be Competent Authority (Engineering) for different tiers of Farmers Organisation.
Section 28A2. Distributory Committee level.
Section 23. Project Committee level.
Section 328B. The following officers shall be competent Authority (Agriculture) for different tiers of Farmers Organisations.
Section 28B2. Distributory Committee level:
Section 23. Project Committee level:
Section 31. Attend General Body meetings convened by the managing committee (M.C) or members through requisition, at least twice in a year, one before Kharif and another before Rabi season.
Section 12. Assist the Managing Committee in the preparation of Action Plan for Agriculture production and also contingent plans in case of contingency.
Section 23. Provide literature on irrigated agriculture published by the department or any other reputed organizations.
Section 34. Arrange trainings on irrigated agriculture in consultation with Deputy Director of Agriculture (DDA) Farmers Training Centre (FTC), District Irrigation Agronomist (DIAs), Acharya N.G. Ranga Agricultural University (ANGRAU), Non Government Organization (NGO) or any other organization.
Section 45. Organise on farm Demonstrations (OFDs) in the holdings of Water Users Association members with or without Government aid (selection should be made in the General Body Meetings).
Section 56. Conduct interaction meetings at 2 or 3 critical stages of the crop.
Section 67. Celebrate field day in the presence of farmers, Water Resources Department & Revenue Department officials and record the yields.
Section 78. Record the yields of crop cutting (CC) Experiments conducted by the Directorate of Economics Statistics, if the experiments happen to fall in the area of Water Users Association.
Section 89. If there are no crop cutting experiments in the WUA area, conduct special crop cutting experiments for each crop and season with the help of Assistant Statistical Officer from the office of the Tahsildar.
Section 910. Guide the farmers in the maintenance of the following Records and Registers.
Section 1011. Collect success stories of the farmers who got good yields and display at prominent places of the village and introduce the farmers in the General Body meetings.
Section 1112. Provide technical inputs regularly to all the members of Farmers Organisation for increasing productivity of irrigated crops.
Section 1213. Ensure to grow Irrigated Dry (I.D) crops in the tail end areas of canals in the place of paddy for increasing crop intensity.
Section 1314. Educate Farmers Organisations on reduction of cost of cultivation of irrigation of irrigated and I.D, crops for getting economical returns by adopting Integrated Nutrient Management (INM) & Integrated Pest Management (IPM) etc.,
Section 141. Sri./Smt....................
Section 1
a-p-farmers-organisation-rules-1997.json
•
80 Sections
•
Andhra Pradesh
{
"id": 14883,
"slug": "a-p-farmers-organisation-rules-1997",
"title": "A.P. Farmers Organisation Rules, 1997",
"short_title": "A.P. Farmers Organisation Rules, 1997",
"act_number": "Published vide Notification No. G.O.Ms.No.541, Irr",
"act_year": 1997,
"act_type": "STATE",
"location": "Andhra Pradesh",
"law_status": "unknown",
"enactment_date": null,
"description": "A.P. Farmers Organisation Rules, 1997",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short Title.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definition.",
"chapter": null,
"content": "(i) \"Act\" means the Andhra Pradesh Farmers Management of Irrigation Systems Act, 1997.\n(ii) \"Farmers Organisation\" means water users association at the primary level, Distributory Committee at the secondary level and project committee at the project level.\n[(iii) \"Commissioner\" means an officer appointed by the Government as Commissioner, Command Area Development Authority.]",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Every Farmers Organisation shall be a body corporate having a distinct name, an office, a common seal and shall by the said name sue and be sued.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. The objects of the Farmers Organisation shall be as follows:",
"chapter": null,
"content": "(i) with due regard to the rights of members shall function in [a] democratic manner through consensus respecting the rights and duties of all members;\n(ii) to make their organization a viable, vibrant, and functioning entity;\n[(iii) To assist the Water Resources Department in effective Water management with the objective of equitable distribution of water in the entire command with special focus on supplying water to farmers at the tail end areas;\n(iv) To assist the Water Resources Department for the upkeep of the Irrigation Systems and protecting them against any damages and to assist the Government in collection of Water Tax and dues, make prudent investment of their resources;\n(v) To motivate all the stake holders for achieving the objectives of Participatory Irrigation Management;]\n(vi) to work in close coordination with Government departments and its agencies;\n(vii) to strive for sustainable water resources management and development;\n(viii) to ensure in dissemination of information;\n(ix) to build up a reliable database;\n(x) in areas of high water requirement like cropped areas, effective soil and water conservation techniques should be adopted with the guidance of departmental agencies;\n(xi) sustainable and effective land use system should be followed;\n(xii) implementation of agro-forest ecosystem wherever water erosion is a serious threat;\n(xiii) adoption of integrated watershed management system and integrated balanced nutrient management system;\n(xiv) to ensure that hydraulic structures are preserved and protected, without any modification unless otherwise approved by an authority vested with such powers;\n(xv) to work towards maintaining and sustaining an ecological balance and prevent degradation of the environment particularly soils and quality of water;\n(xvi) to strive towards becoming sustainable institution through a process of capacity building, skill up gradation and recovery of costs, wherever necessary; and xvii) to optimize productivity and production consistent with the availability of water supplies.\nRights of Farmers Organisation",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. The rights of the Farmers Organisation shall be as follows:",
"chapter": null,
"content": "(i) to obtain information in time about water availability, opening / closing of main canal, periods of supply and quantity of supply, closure of canals etc.;\n[(ii) To assist the Water Resources Department for distribution among the water users on agreed terms of equity and social justice;]\n(iii) to receive water according to an approved time schedule;\n(iv) to allocate water to non-members;\n(v) to levy separate fees for maintenance of the system;\n(vi) to levy any other fee or service charges, to meet management costs and any other expenses;\n(vii) to utilize the canal bunds as long as such use is not obstructive, or destructive to hydraulic structures - by planting timber, fuel, or fruit trees or grass for augmenting the income of the Farmers Organisation;\n(viii) to obtain the latest information about new crop varieties, and their pattern, package of practices, weed control, etc., for agriculture extension service, and purchase inputs such as seeds, fertilizers and pesticides; for use of its members;\n(ix) to have full freedom to grow any crop other than those expressly prohibited by a law and adjust crop areas within the total water allocated without causing injury to neighboring lands;\n(x) to participate in planning, and designing of micro-system;\n(xi) To suggest improvements / modifications in the layout of Field Channels/Field Drains to supply water to all the farmers in the command; and\n(xii) to plan and promote use of the ground water.\nResponsibility of The Farmers Organisation",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. The responsibility of Farmers Organisation shall be as follows:",
"chapter": null,
"content": "(i) to prepare the schedules of water deliveries and communicate to the concerned;\n(ii) to organize preparation of crop plan to match water deliveries with crop requirements;\n(iii) to supply water to all members in the command area as per the approved terms;\n(iv) to carry out timely maintenance and repairs to the distributory system including drains and other properties;\n(v) to organize repairs of the system by the farmers free of cost or on payment;\n(vi) to avoid and prevent misuse and wastage of water;\n(vii) to use water economically and judiciously and furnish data, to the Water Resources Department on water use, irrigated area, irrigation efficiency, and crop yields;\n(viii) to inspect water utilisation by the farmers in the command; assess irrigated crop areas and collect data on crop yields;\n(ix) to impose and recover penalties or fines for misuse and wastage of water and tampering or damaging with the irrigation network controls, sluices, outlets etc., as per the provision of the Act;\n(x) to educate farmers on preparing fields and adopting modern methods of field irrigation, such as borders, furrows, graded bunding for all round efficiency;\n(xi) to educate farmers on new crop varieties, packages of practices, pesticides, weedicides, etc.;\n(xii) to procure and hire implements and gadgets for agricultural operation where feasible and needed.;\n(xiii) to improve the system for efficient and economical use of available / allocated water, for efficient production of crops; and\n(xiv) to minimize conveyance and operational losses.\nRights of Member Users",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. The rights of the member users shall be as follows:",
"chapter": null,
"content": "(i) to suggest improvements/ modifications in water deliveries;\n(ii) to get information relating to water availabilities, allocations, opening /closing of canals and outlets, period of supply, frequency, etc.;\n(iii) to receive water as per specified quota for use;\n(iv) to have the freedom of growing any crop, other than those prohibited by law, adjusting the areas within the water allocated and without causing adverse effect to the crops of other farmers;\nwithout causing adverse effect to the crops of other farmers;\n(v) to sell or transfer the water share to any other water user within the operational area of water users association;\n(vi) to participate in the General body meeting and receive annual reports; and;\n(vii) to receive equitable benefits from the activities of the organization;\nResponsibility of Member Users",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. The responsibilities of the member users shall be as follows:",
"chapter": null,
"content": "(i) to maintain the micro-level system particularly the turn outs, field channels, structures, and field drains;\n(ii) to be aware of the rules of operation of water supply framed by the Farmers Organisation for each season;\n(iii) to adhere to the water delivery schedules;\n(iv) not to tamper with the system by breaching, cross bunding, damaging the structure in the minor or field channel;\n(v) to close the turnout fully after the allotted turn or time is over;\n(vi) to conserve water and make judicious use of the irrigation supply;\n(vii) to divert water if not required during the turn or time allotted, so as not to damage other farmers field;\n(viii) to follow proper irrigation methods like borders, furrows, check basins etc.;\n(ix) to get the lands leveled /shaped for efficient utilization of land and water and to prevent deep percolations leading to water logging and salinity in the downstream areas;\n(x) to-pay the irrigation fees, water tax and service charges regularly and in time;\nwater tax\n(xi) to avoid misuse/wastage of water, taking water out of turn, taking more time than allotted;\n(xii) to avoid trampling of Field Channels/ Field Drains, by crossing at unauthorised points by men and cattle;\n(xiii) to maintain Field Channels/Field Drains in the reaches specified by the Water User Association, or contribute to labour /cost for maintenance, whenever required;\n(xiv) to permit inspection of :\n(a) irrigated area;\n(b) measurement of irrigated area;\n(c) observation of water levels in dug wells/ bores/ tube wells;\n(d) crop - cutting experiments for assessing productivity / production; and\n(xv) to respect easementary rights and other customary practices in vogue in the system.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. General Body.",
"chapter": null,
"content": "(ii) The General Body shall be assisted by the Competent Authorities as notified under Section 21 of the Act. The Competent Authority (Engineering) shall have the right to attend the meeting and record his views, but shall have no right to vote.\nAuthorities\n(Engineering)",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. The General Body Meetings.",
"chapter": null,
"content": "as the case may be.\n(ii) The General Body may also be called at any time by the President or Managing Committee members through a majority resolution or by Members of the Organisation through a requisition signed by not less than 1/3rd of the Members with voting rights.\n(iii) A General Body meeting shall be held on receipt of a direction to do so from the Government or from the Commissioner, or by the next higher tier of the Farmers Organisation in respect of matters relating to urgent public importance and for any specific purpose.",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Notice for General Body.",
"chapter": null,
"content": "(ii) Notice for the General Body meeting shall be sent at least 7 days in advance of the date of the meeting along with the Agenda. Notice may be sent by hand/ post / publication /beat of tom-tom and display on the notice board of the Organization.",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Quorum for the General Body.",
"chapter": null,
"content": "(ii) If there is no quorum for the meeting, the meeting shall be adjourned and be convened again at a date and time not later than two days of the first/original meeting;\n(iii) For the adjourned General Body Meeting, no quorum is required and resolutions would be carried by a majority of the members present and voting; and iv) At a requisitioned General Body Meeting, the items specified in the agenda alone will be discussed. No other subjects will be discussed without the express permission of the Chairman/President or the majority decision of the members present in the meeting.",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Minutes of the Meeting.",
"chapter": null,
"content": "Powers and Functions of General Body of Farmers Organisation",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. The General Body shall have the following powers and functions, namely.",
"chapter": null,
"content": "as per the directions of the Government (or) Commissioner;\n[(ia) to identify their Representatives by convening meetings as per the directions of the Government (or) Commissioner.]\n(ii) to approve the Operational Plan for each crop season and review its implementation in the area of operation;\n(iii) to allocate water amongst various main canals distributaries /minors/outlets, according to the operational plan approved;\n(iv) to decide on the manner of regulation and distribution of water;\n(v) to prepare annual and long-term financial and works plans and prioritize works for maintenance/repairs/ upkeep, rehabilitation of the irrigation system as per the directions of the Government (or) Commissioner;\n(vi) to approve annual financial budget and review performance of the previous year budget;\n(vii) to appoint auditors for the annual audit and/or concurrent audit and to fix fees for the same;\n(viii) to set up sub-committees of Members for various activities and functions of the Organisation;\n(ix) to create or/setup such fund as may be required for different activities/works;\n(x) to levy a fees as defined under Section 20 of the Act;\n(xi) to decide on permissible administrative expenses within the ceilings prescribed, from time to time by the Government (or) Commissioner; and\nby the Government (or) Commissioner;\n(xii) to carry out the recall proceedings as per Section 10 of the Act.\nNote. - The Sub-Rule No:9 is omitted earlier as per G.O.Ms.No.53, Dt:11-4-2008 and\nNote.\nSub-Rule 11 is now omitted (in view of omission of section 22 (iii) of Act and also due to newly adding of one more sub-Rule as sl.No.1. Hence, the Sl.Nos are corrected accordingly.\nComposition and Functions of Managing Committee",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. The composition and functions of the Managing Committee shall be as follows:",
"chapter": null,
"content": "(i) [The Managing Committee in respect of Farmers Organisations shall comprise of (i) the President, Vice-President and the members of Territorial Constituencies in respect of Water Users Association as specified in sub-section (1) of Section 4 of the Act; (ii) the President and Vice-President and Members in respect of Distributory Committee as specified in sub-section (1) of Section (6) of the Act; and (iii) the Chairman and Vice-Chairman and members in respect of Project Committee as specified in sub-section (1) of Section 8 of the Act.;]\n(ii) The Meetings of the Managing Committee shall be held at least once in every month at the office of the Organization. The meeting may however, be held more frequently if it so required. A meeting requisitioned, shall be held within 7 days of the receipt of requisition for such a meeting by the Chairman/President;\nif it so required.\n(iii) Notice for the meeting shall be sent by hand/post/ delivery or published on the Notice Board;\n(iv) The Chairman / President shall preside over the meetings of the Managing Committee.\n(v) Every proceedings of the Managing Committee shall be recorded in the minutes book maintained for the purpose, by the person chairing the meeting. A copy of the minutes shall be sent to the authority of the next higher tier and to the concerned Executive Engineer in respect of Water Users Associations in Minor Irrigation Systems;\nand to the concerned Executive Engineer in respect of Water Users Associations in Minor Irrigation Systems;\n(vi) The quorum for the meeting shall be 1/3rd of the members. All resolutions shall be carried by a majority of the members present and voting; and\n(vii) If there is no quorum for the meeting, the meeting shall be adjourned to a date and time not later than three days and be convened again. For an adjourned meeting no quorum is required.\nto a date and time not later than three days\nCo-Option of Members\n[15A. Co-option of members in to Managing Committee of Farmers Organisation shall be as follows.\n(ii) Managing committee of Distributory Committee: All the Mandal Presidents in the area of operation of Distributory Committee shall be nominated to the Managing Committee of the Distributory Committee. The nomination shall be made by the District Collector.\n(iii) Managing Committee of Medium Irrigation Project Committee: All the Mandal Presidents, Members of Legislative Assembly, [Members of Legislative Counsel] , and Members of Parliament in the area of Operation of Medium Project shall be nominated to the Managing Committee of the Project committee. The nomination shall be made by the District Collector.\n(iv) Managing Committee of Major Irrigation Project Committee: all the Members of Legislative assembly, [Members of Legislative Counsel] , Members of Parliament and ZillaParishad Chairpersons in the area of operation of Major Project shall be nominated to the Mangaing Committee of the Project committee. The nomination shall be made by the Government.\nNote. - 1. The members co-opted to the Managing Committee of Farmers Organisations shall not have any voting right.\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "2",
"title": "2. While nominating the Rajya sabha members, and Members of Legislative Counsel, the criteria of name of the individual in the voters list of General elections is to be considered for co-option.]",
"chapter": null,
"content": "Powers and Functions of The Managing Committee",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "16",
"title": "16. The powers and the functions of the Managing Committee shall be as follows.",
"chapter": null,
"content": "(ii) to prepare and implement Kharif and Rabi plans for various crops to be grown;\n(iii) to prepare budget and allocate resources for various activities;\n(iv) to prepare and implement annual and long term plans for repairs , maintenance, rehabilitation for development of the irrigation and drainage systems and to accord administrative sanction as per the orders given by the Government from time to time and taking up works as per availability of resources on priority;\nas per the orders given by the Government from time to time and\n(v) to prepare or cause to be prepared annual accounts of incomes and expenditures, and assets and liabilities;\n(vi) to ensure equitable distribution of water among various water users;\n(vii) to evolve and implement systems of regulation control, monitoring and reporting of water use and land use;\n(viii) to recommend appointment of auditors for annual audit or concurrent audit to General Body;\n(ix) to organize execution of works as per Orders issued by the Government (or) Commissioner from time to time;\n[***]\n(xi) to settle disputes amongst the members;\n(xii) to nominate one of its members to operate the funds of the organization when the post of President (or) Vice-President falls vacant.\nwhen the post of President (or) Vice-President falls vacant.\n(xiii) to provide developmental services to the Members related to irrigation and agriculture;\n(xiv) to take up training programme for members;\n(xv) to prepare annual list of all Water Users and Members with voting rights;\n(xvi) to assist the Revenue, Water Resources and Agriculture Departments in the preparation and Maintenance of basic records;\n(xvii) to maintain and operate a Reserve fund as per directions of the Government (or) Commissioner;\nas per directions of the Government (or) Commissioner;\n(xviii) to scrutinize the audit reports and rectify defects and report to the General Body;\n(xix) to carry out and implement all decisions of the General Body; and\n(xx) to establish a management information system and submit periodical report as may be prescribed by Government.\nDuties of Chairman / President",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "17",
"title": "17. The duties of the Chairman/ President of a Farmers Organisation shall be as follows.",
"chapter": null,
"content": "(ii) to sign and authenticate the minutes of the meetings and also other records of the Farmers Organisation as may be required;\n(iii) to have only a casting vote in the event of equality of votes on any matter being decided upon by the General Body or the Managing Committee, as the case may be;\n(iv) to be the custodian of all records, properties of the Farmers Organisation;\n(v) render full and complete accounts of all transactions of the Farmers Organisation;\n(vi) to sign all contracts and documents on behalf of the Farmers Organisation;\n(vii) to have powers to operate the accounts of Farmers Organisation jointly with Vice-Chairman / Vice-President;\n(viii) to represent the case of the Farmers Organisation in any dispute before Distributory Committee or Project Committee or Apex committee or the Government, as the case may be;\n(ix) to be an authorized representative of the Farmers Organisation at all other forums, meetings called by any authority;\n(x) to be accountable for all transactions;\n(xi) to conduct the affairs of the Farmers Organisation in a democratic, free, fair and transparent manner; and\nNote. - In view of omission of Sub-Rule 10, the sl.nos of next sub-rules are changed and arranged in sequence order xii) to submit annual reports to the General Body on the activities of the Farmers Organisation.\nNote.\nDuties of Vice-Chairman and Vice-President",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "17A",
"title": "17A. The duties of Vice Chairman/ Vice President of a Farmers Organisation shall be as follows.",
"chapter": null,
"content": "(ii) to sign and authenticate the minutes of meeting where Vice Chairman / Vice President presides over the meeting as in Sub-Rule (1);\n(iii) to be the joint account holder along with the Chairman / President provided that, in case of difference of opinion in the matter of signing the cheques, the matter shall be placed before the Managing Committee, whose decision shall be final;\n(iv) to be the convener of water management sub-committee;\n(v) To carry out all the functions of the water management sub-committee and such other decisions of General Body and Managing Committee on water regulation and schedule of water release.\nResignations\n17B.\n(ii) The President and Vice President of Distributory Committee of a Major Irrigation system may resign his office by tendering resignation in writing to the Chief Engineer concerned directly in person or through registered post with acknowledgement due.\n(iii) Any Chairman / Vice Chairman of a Project Committee of Major/ Medium Irrigation system may resign his/ her office by tendering resignation in writing to the Commissioner directly in person or through Registered post with acknowledgement due.\n(iv) The Authority accepting the resignation shall cause to enquire through the concerned Competent Authority of the Farmers Organisation whether the person resigning has\n(a) any dues to the Farmers Organisation;\n(b) indulged in any financial irregularities;\n(c) abused his power during his incumbency; and\n(d) misappropriated the assets of Farmers Organisation.\n(v) Any resignation shall be accepted within 30 calendar days including the day of receipt of letter of resignation and day of acceptance of resignation and such order of acceptance of resignation shall be served to the person resigned in writing and acknowledgement obtained for taking necessary action.\nFilling Up of Vacancies\n17C.\n1.\n(i) President\nPresident\n(a) In the event of a vacancy of President in a Water Users Association, the Vice-President of that Water Users Association shall discharge the functions of the President from the date of occurrence of such vacancy, till the vacancy is filled in by election.\n(b) In Major Irrigation Projects, the Vice-President so discharging the functions of President is eligible to represent his Water Users Association in the Distributory Committee. However, he is not eligible to contest for the post of the President or the Vice-President of the Distributory Committee.\n(c) In a Medium Irrigation Project, the Vice- President so discharging the functions of President is eligible to represent his Water Users Association in the Project Committee of that Medium Irrigation Project. However he is not eligible to contest for the post of a Chairman or Vice-Chairman in the Project Committee.\n(d) The Vice-President discharging the functions of the President shall maintain the Bank account jointly with another Managing Committee member nominated by the Managing Committee for the purpose, till the vacancy of the President is filled in by election.\n(ii) Vice-President.\nVice-President.\n(a) To fill in a vacancy of post of Vice-President in a Water Users Association, the President shall convene a special meeting of the managing committee which shall nominate the Vice-President from among the members of the Managing Committee, in the presence of Competent Authority (Engineering) with in fifteen days from the date of occurrence of such vacancy. Vice-President shall be nominated from upper reach if the President is from lower reach and vice versa.\n(b) The Vice-President so elected in the casual vacancy, shall continue in the office till the vacancy of Vice-President is filled in by elections.\n(iii) Territorial Constituency member\nTerritorial Constituency member\n(a) To fill a vacancy of a Territorial constituency member, the President shall convene a special meeting of the managing committee which shall nominate a water user who is a voter in that territorial constituency, to act as member of managing committee, within 15 days from the date of occurrence of such vacancy. However, such person is not eligible for election for the post of President or Vice President in Water Users Association during the period of such transitional arrangements.\n(b) The nominated member continues to hold the post only till a member of the territorial constituency is selected in the manner prescribed, in the causal vacancy.\n(iv) Convening Special Meeting. - The President shall convene a Special Meeting of the Managing Committee within 15 days from the date of occurrence of vacancy of Vice-President or member of territorial constituency for filling up of any causal vacancy.\nConvening Special Meeting.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "2",
"title": "2. Vacancies in a Distributory Committee",
"chapter": null,
"content": "(i) President\n(i) President\n(a) In the event of vacancy of a president in a Distributory Committee, the Vice- President of the Distributory Committee shall discharge the functions of the President from the date of occurrence of such vacancy till the vacancy is filled in by election.\n(b) The Vice-President discharging the functions of President is eligible to represent his Distributory Committee in the Project Committee. However he is not eligible to contest for the post of Chairman or Vice-Chairman of the Project Committee.\n(c) The Vice-President who is also discharging the functions of the President shall maintain the Bank Account jointly with another Managing Committee member nominated by the Managing Committee for the purpose till the vacancy of the President is filled in by election.\n(ii) Vice President\n(ii) Vice President\n(a) To fill the vacancy of the post of Vice-President in a Distributory Committee, the President shall convene the meeting of the managing committee which shall nominate the Vice-President from among the members of the managing committee in the presence of the Competent Authority (Engineering) within the fifteen days from the date of occurrence of such vacancy.\n(b) The Vice-President so elected shall continue in the office till the vacancy of Vice - President is filled in by elections.\n(iii) Convening Special Meeting. - Convening of Special meeting within 15 days from the date of occurrence of vacancy of Vice-President, shall be the personal responsibility of the President.\n(iii) Convening Special Meeting.",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "3",
"title": "3. Vacancies in a Project Committee.",
"chapter": null,
"content": "(i) Chairman\n(i) Chairman\n(a) In the event of vacancy of a Chairman in a Project committee, the Vice-Chairman of that Project Committee shall discharge the functions of the Chairman from the date of occurrence of such vacancy till the vacancy is filled in by election.\n(b) The Vice-Chairman discharging the functions of the Chairman shall maintain the Bank Account jointly with another Managing Committee member nominated by the Managing Committee for the purpose till the vacancy of the Chairman is filled in by election.\n(ii) Vice Chairman\n(ii) Vice Chairman\n(a) To fill the vacancy of the post of Vice-Chairman in a Project committee, the Chairman shall convene a special meeting of the managing committee which shall nominate the Vice-Chairman from among the members of the managing committee in the presence of the Competent Authority (Engineering) within fifteen days from the date of occurrence of such vacancy.\n(b) The Vice-Chairman so elected shall continue in the office till the vacancy of Vice - Chairman filled in by election.\n(iii) Convening Special Meeting. - Convening of Special meeting within 15 days from the date of occurrence of vacancy of Vice-Chairman, shall be the personal responsibility of the Chairman.\n(iii) Convening Special Meeting.\nSettlement of Disputes",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "17D",
"title": "17D. Any dispute or difference touching the constitution, management, powers or functions of a Farmers Organisation arising shall be determined as follows.",
"chapter": null,
"content": "(a) Any dispute or difference arising between Water users in a Water Users Association shall be determined by the managing committee of Water Users Association concerned.\n(b) Any dispute or difference arising between water users and the managing committee of a water User Association or between two or more Water Users Associations shall be determined by the managing committee or Distributory Committee.\n(c) Any dispute or difference arising between two or more Distributory Committees shall be determined by the Managing Committee of Project Committee.\n(d) Any dispute or differences arising between two or more Project Committees shall be determined by the Apex Committee, whose decision shall be final.\n(2) Dispute in Medium Irrigation Projects\n(a) Any dispute or difference arising between Water users in a Water Users Association shall be determined by the managing committee of the Water Users Associations. Any dispute or difference arising between water users and the Managing Committee of Water Users Association or between two or more Water Users Associations shall be determined by the project committee.\n(b) Any dispute or differences arising between two or more Project Committees shall be determined by the Apex Committee, whose decision shall be final. The Executive Engineer and Superintending Engineer will be the authorities for settlement of disputes in place of Project Committee and Apex Committee respectively when these bodies are not functioning.\n(3) Disputes in Minor Irrigation System:\n(a) Any such disputes or difference arising between in a Water Users Association shall be determined by the managing committee of that Water Users Associations concerned.\n(b) Any such disputes or difference arising between Water Users and the managing committee of Water Users Association or between two or more Water Users Associations shall be determined by the Executive Engineer concerned.\nTime limit for settlement of disputes.\nAppeals",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "17",
"title": "17E. A Party to a dispute or difference aggrieved by any decision made or order passed under Rule 17 D, may prefer appeal in the manner detailed below.",
"chapter": null,
"content": "(a) Any party to a dispute or difference aggrieved by the decision made or order passed by the managing committee of a Water Users Association may appeal to the managing committee of the Distributory Committee, whose decision thereon shall be final.\n(b) Any party to a dispute or difference aggrieved by the decision made or order passed by the managing committee of a Distributory Committee may appeal to a Project committee whose decision thereon shall be final.\n(c) Any party to a dispute or difference aggrieved by the decision made or order passed by the managing committee of a Project Committee may appeal to the Apex Committee whose decision thereon shall be final.\n(2). Appeals in Medium Irrigation System\n(a) Any party to a dispute or difference aggrieved by the decision made or order passed by the managing committee of a Water Users Association may appeal to the managing committee of the Project Committee, whose decision thereon shall be final.\n(b) Any party to a dispute or difference aggrieved by the decision made or order passed by the managing committee of a Project Committee may appeal to the Apex Committee, whose decision thereon shall be final.",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "3",
"title": "3. Appeals in Minor Irrigation System",
"chapter": null,
"content": "(a) Any party to a dispute or difference aggrieved by the decision made or order passed by the managing committee of a Water Users Association may appeal to the Executive Engineer Concerned, whose decision thereon shall be final.\n(b) Any party to a dispute or difference aggrieved by the decision made or order passed by the Executive Engineer may appeal to the Superintending Engineer concerned, whose decision thereon shall be final.",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "4",
"title": "4. Time limit for Preferring an appeal.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "5",
"title": "5. Time limit for settlement of appeals.",
"chapter": null,
"content": "Inspection of Records",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "17F",
"title": "17F. Inspection of records of a Farmers Organisation shall be as follows.",
"chapter": null,
"content": "(a) The Competent Authority shall be the inspecting authority for any Water Users Association in his jurisdiction.\n(b) The inspecting authority shall have access to all records, to be maintained by the Water Users Association and shall affix his signature and date on the records and registers with his remarks, upon inspection.\n(c) Any misappropriation of funds or misuse of power noticed shall be brought to the notice of the Superintending Engineer concerned who shall take further action in accordance with the provisions of the Act and the Rules.",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "2",
"title": "2. Distributory Committee.",
"chapter": null,
"content": "(a) The Competent Authority shall be the inspecting authority for any Distributory Committee in his jurisdiction.\n(b) The inspecting authority shall have the access to all records to be maintained by Distributory Committee and shall affix his signature and date on the records and register with his remarks, upon inspection.\n(c) Any misappropriation of funds, or misuse of power noticed, shall be brought to the notice of the Chief Engineer who shall take further action in accordance with the provisions of the Act and the Rules.",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "3",
"title": "3. Project Committee.",
"chapter": null,
"content": "(a) The competent authority shall be the inspecting authority for any Project committee in his jurisdiction.\n(b) The inspecting authority shall have the access to all records to be maintained by Project Committee and shall affix his signature and date on the records and register with his remarks, upon inspection.\n(c) Any misappropriation of funds, or misuse of power noticed, shall be brought to the notice of the Commissioner who shall take further action in accordance with the provisions of the Act and the Rules.\nAuthority To Remove Office Bearers of Farmers Organisation",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "17G",
"title": "17G. The following are the authorities to remove the erring office bearers of the Farmers Organisations.",
"chapter": null,
"content": "(a) The Superintending Engineer concerned shall be the authority to issue directions for proper functioning of the Water Users Association and remove any member of territorial constituency or President or Vice President of any Water Users Association in his jurisdiction under Section 41A of the Act.\n(b) The Chief Engineer concerned shall be the authority to issue directions for proper functioning of the Distributory Committee and remove any president or Vice President of Distributory Committee in his jurisdiction under Section 41A of the Act.\n(c) The Commissioner shall be the authority to issue directions for proper functioning of Project Committee and remove any Chairman or Vice-Chairman of Project committee in his jurisdiction under Section 41A of the Act.\nNote. - The authority mentioned above shall give a reasonable opportunity to the aggrieved party to represent their cases before they are removed from their posts.\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "2",
"title": "2. Authority for Appeal.",
"chapter": null,
"content": "(a) Any party aggrieved by any decision made or order passed by the Superintending Engineer under the rule may appeal to the District Collector concerned, whose decision thereon shall be final.\n(b) Any party aggrieved by any decision made or order passed by the Chief Engineer under the rule may appeal to the Commissioner whose decision thereon shall be final.\n(c) Any party aggrieved by any decision made or order passed by the Commissioner under the rule may appeal to the Government, whose decision thereon shall be final.\nTransitional Arrangements",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "17H",
"title": "17H. Transitional arrangements for the Farmers Organisation are as follows.",
"chapter": null,
"content": "(a) Deputy Executive Engineer concerned shall be the authority to take over the charge of the Water Users Association with all records and exercise the powers and perform the functions of the Farmers Organisations till such time such Water Users Association is constituted or reconstituted.\n(b) The Executive Engineer concerned shall be the authority to take over the charge of the Distributory Committee with all records and exercise the powers and perform the functions of the Farmers Organisations till such time, such Distributory Committee is constituted or reconstituted.\n(c) The Superintending Engineer concerned shall be the authority to take over the charge of the Project committee with all records and exercise the powers and perform the function of the Farmers Organisations till such time the Project Committee is constituted or reconstituted.\nNote. - The Superintending Engineer/ Executive Engineer / Deputy Executive Engineer who has taken over the Farmers Organisation shall be assisted by the subordinate staff under his Administrative / Technical Control.\nNote.\nThe outgoing President or Chairman of the Farmers Organisation and other members having no arrears of water tax payable to Government, who took lot of initiative in water regulation and provided good leadership in discharging their functions may be considered for appointment under the above Rule.\nNote. - 17(H) (1) omitted and 17(H) 2 may be read as 17 (H) 1\nNote.\n17 (H) 2 as per Amendment made to section 34 of act\n17(H) 3 is newly added\nMaintenance of Feeder Channels",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "17I",
"title": "17I. The Water Users Associations shall maintain the feeder channels on the upstream of tank bed as follows.",
"chapter": null,
"content": "(a) Desilting of feeder channels in sectioning.\n(b) Removal of weed growth, trees and the like in the channel bed.\n(c) Breach closing.\n(d) Removal of encroachments with the help of local Revenue authorities,.\n(e) Removal of mounds and maintaining bed slopes of feeder channels.\n(f) All other measures required to insure adequate inflow in to the tank through the feeder channels.\nConstitution and Functions of Sub-Committee\n18.\nSub-Committees\n1.\n2.\n(i) The Convener of a Sub-Committee shall be a member of the Managing Committee other than the Chairman/ President;\n(ii) In the case of a Project committee and their members of the subcommittee, not exceeding four will be selected from Presidents of Water Users Associations in that project;\n(iii) In the case of Distributory Committee and their members of the subcommittee, not exceeding four shall be selected from the Territorial Constituencies of the water Users Associations either in the general body of the Distributory Committee or from its territorial constituencies within its jurisdiction. However, not more than one Territorial Constituency (TC), member of Water Users Association can be co-opted in that Sub-Committee;\n(iv) In the case of Water Users Association the other members not exceeding four shall be drawn from out of members with voting rights, out of four one may be woman preferably; and\nout of four one may be woman preferably;\n(v) No member shall represent more than one subcommittee.\n3.\n(i) Finance and Resources sub-committee;\n(ii) Works sub-commit tee;\n(iii) Water Management sub-committee;\n(iv) Monitoring-Evaluation and Training sub-committee;\nNote. - After Rule 17, the Rules 17 A to 17 I are inserted as per G.O.Ms.No.53, dt:11-4-2008.\nNote.\n4.\n(i) Finance and Resource sub-committee\n(a) to mobilize and collect resources;\n(b) to ensure collection of dues from Members as levied under Section 20 of the Act;\n(c) to recommend the Managing Committee on the use and deployment of resources; and\n(d) to maintain records relating to financial matters.\n(ii) Works sub-committee:\n(a) to recommend estimates of works for administrative approval;.\n(b) to supervise works and ensure quality control; and\n(c) to approve payments for works.\n(iii) Water Management sub-committee:\n(a) to carry out the decisions of the Managing Committee and of the General Body on water regulation, schedule of water release;\n(b) to organise patrolling of the canal, channels and regulate the use of water;\n(c) to check the irrigation and drainage system regularly;\n(d) to record the water deliveries;\n(e) to report to the Managing Committee any violations in the use of water; and\n(f) to maintain records of land owners and water users.\n(g) the Vice-Chairman / Vice-President shall be the Convener of this Sub-Committee under Rule 17(A).\n(g) the Vice-Chairman / Vice-President shall be the Convener of this Sub-Committee under Rule 17(A).\n(iv) Monitoring-Evaluation and Training sub-committee:\n(a) to identify training needs and organize training to the Water Users;\n(b) to educate in optimum use of water;\n(c) to monitor specific items like area irrigated, productivity, disputes settlement and resources building;\n5.\n6.\nProcedure for Taking up Works",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "19",
"title": "19. The procedure for taking up the works shall be as follows.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "1",
"title": "1. Normal Operation and Maintenance Works",
"chapter": null,
"content": "a. Desilting;\nb. Weed removal;\nc. Embankment repairs;\nd. Revetment;\ne. Repairs to shutters;\nf. Repairs to masonry and lining;\ng. Cleaning & Oiling of screw gearing shutters;\nh. Painting of hoists and gates etc.;\ni. Emergent breach closing works;\nj. Maintenance of inspection paths;\nk. Formation of cross bunds; and\nl. Lifting of water by oil Engines / Generators.",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "2",
"title": "2. Deferred Maintenance Works",
"chapter": null,
"content": "a. Reconstruction of sluices;\nb. Reconstruction / repairs to Drops & Regulators;\nc. Reconstruction of measuring devices;\nd. Rehabilitation of the system; and",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "3",
"title": "3. Original Works.",
"chapter": null,
"content": "a. Modernization of the system; and\nb. A Farmers Organisation shall take up the normal Operation & Maintenance and deferred maintenance works i.e., regular works costing up to Rs. 5.00 lakhs or as per the limit prescribed by the Government from time to time and the works shall be executed by the Farmers Organisations under the supervision of the Water Resources Department at the rates not exceeding the estimated rates. The works costing above Rs. 5.00 lakhs or the limit prescribed by the Government are to be entrusted by the Department duly calling tenders.\nThe procedure for the works taken up by the Farmers Organisations is as follows:",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "4",
"title": "4. System Diagnosis for maintenance works.",
"chapter": null,
"content": "(i) Prior to the commencement of every crop season (Kharif & Rabi) the Managing Committee and Competent Authority (Engg) of every Farmers Organisation shall undertake to assess the condition of the system (system diagnosis) through a participatory walk-through exercise.\n(ii) The Farmers Organisation shall inspect each and every hydraulic structure and record its status.\n(iii) They have to identify all the critical reaches which need immediate repair as listed out in above. The Competent Authority (Engg) shall assist the Farmers Organisation in preparation of detailed list of works to be undertaken.",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "5",
"title": "5. Prioritizing works.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "6",
"title": "6. Preparation of Estimates.",
"chapter": null,
"content": "Water Resources\n6(i) The proposals for taking up various works under various categories required scrutiny of CAD committee for approval of the annual Action Plan for O & M and deferred maintenance in each of the project that would include tax re-plough, category B and other Capital and Revenue grant.\nCapital and Revenue",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "7",
"title": "7. Administrative Approval.",
"chapter": null,
"content": "(ii) For the works taken up with the funds including government grants other than water tax plough back amounts and own resources, the administrative approval shall be as per the departmental rules in vogue.",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "8",
"title": "8. Technical sanction.",
"chapter": null,
"content": "(ii) The Competent Authority, shall record all the technical sanction in the register of technical sanction; and\nsanction;\n(iii) The technical sanction shall not exceed the Administrative Approval.\nsanction\nExplanation 1.\nsanction",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "9",
"title": "9. Manner of Taking up works.",
"chapter": null,
"content": "(b) Under no circumstances can a Chairman/ President or Managing Committee Member of the Farmers Organisation execute a work directly in his individual capacity;\n(c) The cost of works executed shall not exceed the estimated costs;\n(d) The Competent Authority shall record the pre-measurements and final measurements for quantifying the work done for making payments by the Farmers Organisation. These measurements shall be check measured by higher authorities as per rules and procedure of Water Resources Department;\nWater Resources\n(e) The procedure adopted by the Competent Authority in preparation of estimates, bills etc., shall be subject to verification by higher officials as normally applicable to department;\n(f) In exigencies, when any of the Farmers Organisation is not existing or function by any reason the normal Operation & Maintenance, Deferred Maintenance works i.e., regular works costing up to Rs 5.00 lakhs or the limit as prescribed by the Government from time to time in the jurisdiction of such Farmers Organisation shall also be taken up by the department duly following the rules and procedures in vogue;\ni.e., regular works\nor the limit as prescribed by the Government from time to time",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "10",
"title": "10. Maintenance and Adherence to the Designed Hydraulic Particulars.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "11",
"title": "11. Limitation on Works.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "23",
"title": "Section 23 and also prosecution under Section 24",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "12",
"title": "12. Publication of List of Works to be taken up.",
"chapter": null,
"content": "(b) Along with the lists other particulars of works, estimates, values, and mode of execution should be given wide publicity, and\n(c) If any member wishes to have access to any of the records relating to works to be taken up, he may do so on payment of the fee as fixed by the Farmers Organisation.",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "13",
"title": "13. Freedom to add other Funds or Extra Contributions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "14",
"title": "14. Proof of works done.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "15",
"title": "15. Payment for the Works done.",
"chapter": null,
"content": "Rs. 10,000/-",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "16",
"title": "16. Quality control.",
"chapter": null,
"content": "(ii) In case of special programmes or External Aided projects, the quality control checks shall be as prescribed from time to time.\nNote. - Rule 19 (\"Procedure for taking up works\") is substituted as per the G.O.Ms.No.46, dt:23-2-2007 In sub-Rule 19 (1), k & l are added as per G.O.Ms.No.82, dt: 3-8-2016\nNote.\nThe sub-rule 6(i) is added as per G.O.Ms.no.21, dt:5-3-2010\nSocial Audit of Farmers Organisation",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "20",
"title": "20. At the end of each crop season the Farmers Organisation shall conduct social audit as detailed below.",
"chapter": null,
"content": "(i) Social audit shall be for both water utilization against the water budgeting and expenditure incurred for maintenance of the system with reference to funds available to each of the Farmers Organisation.\n(ii) The social audit shall cover;\n(a) Equity in water distribution;\n(b) Increase in production;\n(c) Increase in productivity;\n(d) Crop diversification;\n(e) Multiple cropping;\n(f) Water use efficiency;\n(g) Utilization of resources for execution of works\n(h) Improvement in the cultivated area of the Farmers Organisation compared to previous season; and\n(i) Quality of works undertaken.\n(iii) The social audit so conducted shall be made known to all the beneficiaries under the Farmers Organisation by way of displaying a list containing the benefits accrued with reference to funds spent on the notice board of the office of each of the Farmers Organisation.\n(iv) Whenever a work is taken up the estimated cost of the work, item of work proposed to be executed, details of the executors of the work etc., are to be exhibited on a board at the place of the work; so that every beneficiary under the Farmers Organisation is aware of the details of the work being executed and expenditures to be incurred.\n(v) The competent authority notified shall render all assistance in the conduct of the social audit. The Revenue and Agriculture Officials shall also render the requisite assistance.\n(vi) The social audit so conducted shall be recorded and copy thereof be sent to the Distributory Committee in the case of water users Association, to the project committee in the case of Distributory Committee; to the Commissioner in the case of Project Committee.\nto the Commissioner\n(vii) The auditor shall incorporate the social audit report in his annual audit report together with his specific observations on rectification of defects, if any, noticed in the social audit.\nOperational Plan and Water Budgeting",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "21",
"title": "21. Water Budget for Farmers Organisation.",
"chapter": null,
"content": "(i) One month before the onset of the Kharif season, the Project Committee shall, subject to such directions as may be given by government from time to time, work out the anticipated inflows and existing availability in the reservoir and work out the water allocation to all the Dist ributory Committees; the Distributory Committees intern shall allocate the water made available to water users association in its jurisdiction:\n(ii) A Farmers Organisation in distributing water to its member constituents shall have regard to allocations meant for drinking waters, or for any specified purpose as may be decided by Government from time to time.\n(iii) For the Rabi season, the Project Committee will determine the area to be thrown open for irrigation based upon the actual availability of water at the beginning of Rabi Season. The water so available shall be allocated equitably among the Distributory Committees and water users associations. In the case of medium or minor irrigation system, equitable distribution shall be achieved by adopting circular rotation over a period.\n(iv) Each of the Farmers Organisation, shall draw up an operational plan which shall specify the quantity of water to be drawn on a fortnightly basis.\n(v) The drawls of water shall be monitored each day at specified gauge points as decided by the Farmers Organisation.\n(vi) Review of the drawls and distribution shall be done by each of the Farmers Organisation at the end of each fortnight and corrective measures taken.\n(vii) At the end of each season the respective Farmers Organisation shall prepare a report of water received and utilized along with the area irrigated, quantity of water supplied and extent of crops.\nsupplied\n(viii) Th e Farmers Organisation shall analyse the short comings and deviations in water budget and report to the next higher tier.\n(ix) In respect of a minor irrigation system the water users association shall decide the operational plan, date of release of water which are to be thrown open for irrigation depending upon the storage/inflows into the system.\nsystem.\nWater Regulation",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "22",
"title": "22. After a water budget is prepared, the Farmers Organisation shall draw up a plan of water regulation as follows:",
"chapter": null,
"content": "(a) the dates of release and closure shall be informed to all members well in advance;\n(b) equitable distribution of water amongst all users shall be the main principle in water regulation;\n(c) a Farmers Organisation shall draw water and monitor flows based on the operational plan prepared;\n(d) a Warabandi Schedule (Turn-Schedule) shall be prepared for each outlet in a Farmers Organisation;\n(e) the Farmers Organisation shall, carryout Azmoish of the ayacut with the assistance of the Competent Authority along with the Agriculture and Revenue personnel; and\n(e)\n(f) a Farmers Organisation may, for the purpose of monitoring, install such devices as may be required within its jurisdiction.\n(f)",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "23",
"title": "23. Accounts Finance.",
"chapter": null,
"content": "Account Registers to be maintained.\n(a) Cash book;\n(b) Bill registers;\n(c) Contingent registers;\n(d) Anamath register (Day book);\n(e) Receipt books; and\n(f) Cheque registers.\nNote. - 1 substituted as per G.O.Ms.no.53\nNote.\nRecords to be Maintained",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "24",
"title": "24. Each of the Farmers Organisation shall maintain the following records, other than the records specifically mentioned in the Act and the rules.",
"chapter": null,
"content": "(a) The following Maps shall be maintained by each water users association; namely: -\n(i) map showing the boundaries and jurisdiction of the Association, Water conveyance system, within the boundaries of the association;\n(ii) map showing the localized/notified ayacut with S.Nos., (Form-AA) and\n(iii) map showing the areas under irrigation not falling within notified ayacut.\n(b) The following registers shall be maintained; namely:-\n(1) Property Register:\n(i) Inventory Register (Form -I)\n(Form -I)\n(ii) Register of vacant lands and buildings (Form -II)\n(Form -II)\n(iii) Register of income on miscellaneous property (Form-III)\n(Form-III)\n(iv) Register of Machinery (Form-IV)\n(Form-IV)\n(2) Membership Register: Both with voting rights and without voting rights with details of ayacut Localized / Non-localized and area cultivated (Form-V)\n(Form-V)\n(3) Water flow Register: Canal guage Register (Form-VI)\n(Form-VI)\n(4) Sanctions Register: Register of Administrative and Technical sanctions and payments (Form -VII)\n(Form -VII)\n(5) Cash Register: Cash Book (Form-VIII)\n(Form-VIII)\n(6) Special fee and tax collection Register: (Form-IX)\n(Form-IX)\n(7) Minutes Register: (Form X and X.A)\n(Form X and X.A)\n(i) General Body\n(ii) Managing Committee\n(iii) Separate Register for Committees.\nNote. - The sub-rule (b) of 24 is substituted as per G.O.Ms.No.21, dt:30-1-1999\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "25",
"title": "25. Levy & Collection of Fees.",
"chapter": null,
"content": "(i) the purpose of levying a fee shall:\n(a) to provide facilities or ;\n(b) to provide specific services;\n(c) to meet many urgent needs of the Farmers Organisation;\n(d) to build up assets of the Farmers Organisation; and\n(e) to improve the system.\n(ii) The competent authority shall prepare the estimates in case any works are to be taken up under this rule.\nunder this rule.\non\nof\nsend\n(a) where a member has defaulted in payment of such levy levied by a Farmers Organisation, the Managing Committee shall prepare a list of defaulters along with amounts due, which shall be furnished to the Tahsildar of the area in whose jurisdiction the area of operation of a Farmers Organisation lies for recovery under Section 30 of the Act.\nwhich shall be furnished to the Tahsildar of the area in whose jurisdiction the area of operation of a Farmers Organisation lies for recovery under Section 30 of the Act.\nFinancial Audit",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "26",
"title": "26. At the end of each financial year, and not later than three months after the commencement of the new financial year, each of the Farmers Organisation shall cause its accounts to be audited as follows:",
"chapter": null,
"content": "(i) the Managing Committee shall, appoint an Auditor who has adequate experience in normal auditing work;\n(ii) the Auditor so appointed shall be a person of repute in the area of operation of the Farmers Organisation who has reasonable knowledge in accounts or any recognised auditor;\n(iii) the appointment of the Auditor shall be approved by the Managing Committee of the Farmers Organisation;\n(iv) the Auditor so appointed shall take all steps necessary to scrutinise the accounts of receipts and expenditure, within thirty days of his appointment and furnish the audit report along with the statement of accounts and balance sheet to the President of the concerned Farmers Organisation, duly attesting the same;\n(v) the audit report shall be submitted to the general body in its meeting for its approval;\n(vi) the Managing Committee of a Farmers Organisation shall furnish the implementation report to the General Body on all matters as pointed out in the audit report and the Managing Committee shall implement the decisions of the General Body in this regard; and\n(vii) if the overall transactions exceed Rs.20.00 lakhs per annum, the Farmers Organisation shall engage the services of a Chartered Accountant.\nRs.20.00 lakhs",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "27",
"title": "27. Offences and Penalties.",
"chapter": null,
"content": "Competent Authority\nand offences shall be booked in Preliminary Offence Report in Form XI by the Competent Authority.\nCompetent Authority\nthe officer not below the rank of Dy. Executive Engineer having jurisdiction over the area in Form XII\nget it recovered.\nbe more than Rs.10,000/-, the individual (or) group of individuals who indulged in causing damages, alterations (or) obstructions in any irrigation system is/are liable for prosecution under Section 24 of the Act. In such cases, an officer not below the rank of Executive Engineer having jurisdiction over the area is authorized to issue prosecution orders against the individual/individuals.\nNote. - In view of omission of sub-Rule 4 & 9, the sl. nos of the next sub-rule are changed and arranged in sequence order\nNote.\nFunctions of Competent Authority\n28.\n1. attend the meetings convened by the Managing Committee, and participate in the discussions. However, he shall not have any voting right. He is the custodian of all the vital records and Registers of the Government and also in charge of all the Structures and irrigation systems in his jurisdiction;\nHe is the custodian of all the vital records and Registers of the Government and also in charge of all the Structures and irrigation systems in his jurisdiction;\n2. assist in the preparation of maintenance plan;\n3. prepare estimates for works identified for execution; the estimate shall be prepared as per the norms and the rules prescribed by the Water Resources Department from time to time and also obtain approval for action Plan from CAD Committee.\nWater Resources\nfrom time to time and also obtain approval for action Plan from CAD Committee.\n3.a The Competent Authority is primarily responsible for proper upkeep of the Irrigation structures & orderly Water Regulation.\n3.a The Competent Authority is primarily responsible for proper upkeep of the Irrigation structures & orderly Water Regulation.\n4. to accord or obtain technical sanction from the officer competent to the maintenance works, as per the powers delegated. The technical sanction shall be limited to the administrative sanctions for the work;\nto accord or obtain technical sanction from the officer competent\n5. ensure that no alteration or change is made in the irrigation system, with reference to the approved hydraulic particulars;\n6. bring to the notice of higher authorities of Water Resources Department any tampering or changes made in the system, by any Farmers Organisation in contravention of the hydraulic particulars. He shall ensure that action is taken in accordance with the Sections 23, 24 and 25 of the Act as the case may be for the damages caused and also take immediate action for its restoration;\nhigher authorities of Water Resources Department\nSections 23, 24 and 25 of the\nas the case may be for the damages caused and also take immediate action for its restoration;\n7. provide technical details of the system and guidance to the member of the Managing Committee;\nand guidance\n8. record measurements for the work done and pass the bills for payments by Farmers Organisation based on the approval of the works sub-committee.\n9. to conduct recall proceedings of a Chairman or Vice-Chairman or President or Vice-President or member of managing committee of Farmers Organisation.\nto conduct recall proceedings of a Chairman or Vice-Chairman or President or Vice-President or member of managing committee of Farmers Organisation.\nNote. - in view of omission of the sub-rule 8 to 13, the sl. Nos of the next sub-rules are changed and arranged in a sequence order. And also the sub-rule 28(9) is brought from the GO 53, dtd 11-4-2008\nNote.\nCompetent Authority (Engineering)",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "28A",
"title": "28A. The following officers shall be Competent Authority (Engineering) for different tiers of Farmers Organisation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "2",
"title": "2. Distributory Committee level.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "3",
"title": "3. Project Committee level.",
"chapter": null,
"content": "Competent Authority (Agriculture)",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "28B",
"title": "28B. The following officers shall be competent Authority (Agriculture) for different tiers of Farmers Organisations.",
"chapter": null,
"content": "Mandal Agricultural Officer (MAOs) shall be competent authority (Agriculture ) to Water User Association (WUA).",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "2",
"title": "2. Distributory Committee level:",
"chapter": null,
"content": "Assistant Director of Agriculture (Regular) shall be competent authority to the Distributory Committees of major Irrigation Project.",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "3",
"title": "3. Project Committee level:",
"chapter": null,
"content": "(a) Joint Director of Agriculture (JDA) of the District Concerned shall be competent authority to Project committee of Major Irrigation Project.\n(b) Deputy Director of Agriculture (DDA) of the concerned district shall be competent authority to Project committee of Medium Irrigation Project.\nThe Functions of competent authority (Agriculture ) are as follows:-",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "1",
"title": "1. Attend General Body meetings convened by the managing committee (M.C) or members through requisition, at least twice in a year, one before Kharif and another before Rabi season.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "2",
"title": "2. Assist the Managing Committee in the preparation of Action Plan for Agriculture production and also contingent plans in case of contingency.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "3",
"title": "3. Provide literature on irrigated agriculture published by the department or any other reputed organizations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "4",
"title": "4. Arrange trainings on irrigated agriculture in consultation with Deputy Director of Agriculture (DDA) Farmers Training Centre (FTC), District Irrigation Agronomist (DIAs), Acharya N.G. Ranga Agricultural University (ANGRAU), Non Government Organization (NGO) or any other organization.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "5",
"title": "5. Organise on farm Demonstrations (OFDs) in the holdings of Water Users Association members with or without Government aid (selection should be made in the General Body Meetings).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "6",
"title": "6. Conduct interaction meetings at 2 or 3 critical stages of the crop.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 70
},
{
"number": "7",
"title": "7. Celebrate field day in the presence of farmers, Water Resources Department & Revenue Department officials and record the yields.",
"chapter": null,
"content": "Water Resources",
"footnote": "",
"is_definition": false,
"sort_order": 71
},
{
"number": "8",
"title": "8. Record the yields of crop cutting (CC) Experiments conducted by the Directorate of Economics Statistics, if the experiments happen to fall in the area of Water Users Association.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
{
"number": "9",
"title": "9. If there are no crop cutting experiments in the WUA area, conduct special crop cutting experiments for each crop and season with the help of Assistant Statistical Officer from the office of the Tahsildar.",
"chapter": null,
"content": "Assistant Statistical Officer\noffice of the Tahsildar.",
"footnote": "",
"is_definition": false,
"sort_order": 73
},
{
"number": "10",
"title": "10. Guide the farmers in the maintenance of the following Records and Registers.",
"chapter": null,
"content": "• On Farm Demonstration (OFD Register)\n• Soil Map and Soil Testing results\n• Statistical register including yield data of preceding 5 years i.e., Crop wise normal areas, yield , Yield potentiality of crops etc.,\n• Agricultural literature.",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
{
"number": "11",
"title": "11. Collect success stories of the farmers who got good yields and display at prominent places of the village and introduce the farmers in the General Body meetings.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
{
"number": "12",
"title": "12. Provide technical inputs regularly to all the members of Farmers Organisation for increasing productivity of irrigated crops.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
{
"number": "13",
"title": "13. Ensure to grow Irrigated Dry (I.D) crops in the tail end areas of canals in the place of paddy for increasing crop intensity.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 77
},
{
"number": "14",
"title": "14. Educate Farmers Organisations on reduction of cost of cultivation of irrigation of irrigated and I.D, crops for getting economical returns by adopting Integrated Nutrient Management (INM) & Integrated Pest Management (IPM) etc.,",
"chapter": null,
"content": "General\n29.\nForm \"B\"\nother water users such as industrial units, bathing ghats, fishermen societies and such other categories will be maintained in Form 'C'.\n(a) the General Body of Association may take a decision not to supply water or provide benefits to such person;\n(b) the General Body may order for recovery of damages and cause them to reimburse the loss caused to the assets or income of the Farmers Organisation;\n(c) the General Body may take a decision to prosecute such persons in a court of law.\n(1) Property Register\n(1) Property Register\nGovernment of Andhra Pradesh\nGovernment of Andhra Pradesh\nIrrigation and Command Area Development Department\nIrrigation and Command Area Development Department\nForm - I\nForm - I\nInventory Register Form\nInventory Register Form\nDetails Of System And Command Structures\nDetails Of System And Command Structures\nSl. No\nDetails of canal at off take Minor\nDetails of canal / F.C\nDetails of structure\nBed Width\nOther details Dimensions/ Lined / unlined\nStructure Name / Nature\nDetails / Dimensions / Hydraulic stractures\nForm - II\nForm - II\nRegister of Vacant Lands and Buildings\nRegister of Vacant Lands and Buildings\nSl.No\nLocation\nSy. No. of Land extent /Details of Buildings\nDescription of Building R.C.C/ Tails etc,\nExtent of land\nClassification\nRemarks\nMandal\nVillage\nSy. No of land Extent\nWet\nI.D./Dry\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\nForm III\nForm III\nRegister of Income on Miscellaneous Property\nRegister of Income on Miscellaneous Property\nSl. No\nYear\nIncome of fishing\nIncome on Trees\nIncome on Grass\nArea of Tank/ Kunta\nAuction Amount\nAmount Received\nDue\nArea of Tank/ Kunta\nAuction Amount\nAmount Received\nDue\nDetails\nAuction Amount\nAmount Received\nDue\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\n12\n13\n14\nIncome on Lease / Rent of Land/ Structures\nIncome from Machinery/ Mechanical Equipment\nOthers Income\nDetails\nAuction Amount\nAmount Received\nDue\nDetails\nAuction Amount\nAmount Received\nDue\nDetails\nAuction Amount\nAmount Received\nDue\n15\n16\n17\n18\n19\n20\n21\n22\n23\n24\n25\n26\nForm - IV\nForm - IV\nRegisteer of Machinery\nRegisteer of Machinery\nSl. No\nDetails of Machine Make/ Model /Engine No. etc\nDate Purchase procurement\nReceived From\nValue of Machine\nRemarks\nBook value\nPresent Assessed Value\n1\n2\n3\n4\n5\n6\n7\nForm V\nForm V\nRegister of Membership\nRegister of Membership\nDetails of Members With Voting Rights\nDetails of Members With Voting Rights\n(Form-A)\n(Form-A)\nSl.No\nDetails of voter\nMandal\nVillage\nSy.No\nExtent of Land\nArea cultivated\nName\nFathers' Name\nWET\nI.D\nWET\nI.D\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\nDetails of Members Without Voiting Rights\nDetails of Members Without Voiting Rights\n(Form-B)\n(Form-B)\nSl.No\nDetails of voter\nMandal\nVillage\nSy.No\nExtent of Land\nArea cultivated\nName\nFathers' Name\nWET\nI.D\nWET\nI.D\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\nWua-Details of Other Members\nWua-Details of Other Members\n(Form-C)\n(Form-C)\nSl. No\nOrganisation / Name\nWater Use\nMembers Name\nAddress\n1\n2\n3\n4\n5\nForm-VI\nForm-VI\nWater Flow Register\nWater Flow Register\nCanal Gauge Register\nCanal Gauge Register\nBed width:\nSupply depth at end:\nGuage:\nDischarge:\nDate\nTime\nGauge depth at start of Association Jurisdiction\nDischarge in Cusecs\nGauge depth at end of Association Jurisdiction\nDischarge in cusecs\nWater Used\nIn cusecs\nIn M.C.ft\n1\n2\n3\n4\n5\n6\n7\n8\nForm-VII\nForm-VII\nSanctions Register\nSanctions Register\nRegister of Administrative and Technical Sanctions and Payments\nRegister of Administrative and Technical Sanctions and Payments\nSl.No\nSl.No\nDetails of works\nDetails of works\nAdministrative Sanction\nAdministrative Sanction\nTechnical sanction by competent Authorities\nDate of Commencement\nPeriod/ Target Date of Completion\nFinancial Details\nFinancial Details\nCompleted Work\nCompleted Work\nDetails of Inspection of works/Remarks\nM.C. Resolution No. & Date\nEstimate Value\nDate of Sanction\nDate / Amount 1st Advance payment\nDate / Amount Subsequent payment\nDate\nFinal value of work/ Payment\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\n12\n13\nForm - VIII\nForm - VIII\nCash Book\nCash Book\nCash Register : -\nCash Register : -\nRecepts\nRecepts\nPayments\nPayments\nCash Book of_____________ Water Users'\n\t\t\t\tAssociations_____________Village_____________Mandal,______________District\n\t\t\t\tfor the Month of__________\nCash Book of_____________ Water Users'\n\t\t\t\tAssociations_____________Village_____________Mandal,______________District\n\t\t\t\tfor the Month of__________\nDate No. of Receipts Particulars of Receipt Opening Balance Amount Remarks 1 2 3 4 5 6\nDate\nNo. of Receipts\nParticulars of Receipt\nOpening Balance\nAmount\nRemarks\n1\n2\n3\n4\n5\n6\nDate Voucher No Particulars of Payment Payment by Cheque No. Remarks Cash cheque 1 2 3 4 5 6 7\nDate\nVoucher No\nParticulars of Payment\nPayment by\nCheque No.\nRemarks\nCash\ncheque\n1\n2\n3\n4\n5\n6\n7\nForm - IX\nForm - IX\nSpecial Fee / Tax Collection Register\nSpecial Fee / Tax Collection Register\nSl.No\nDetails of Resolution\nCollected From\nLevy Amount\nAmount Paid\nDue\nCash Book reference\nRemarks\nDate\nSl.No\n1\n2\n3\n4\n5\n6\n7\n8\n9\nForm-X\nForm-X\nAgenda\nAgenda\nDate\nItem No.\n1\n2\nForm - X.A\nForm - X.A\nMinutes Register\nMinutes Register\nDate\nAgenda Item No.\nDiscussions and Resolutions\n1\n2\n3\nForm -XI\nForm -XI\n[See Rule 27(1) of A.P. Farmers Organization Rules]\nPrelimenary Offences Report\nPrelimenary Offences Report\n(Under Section 23 of APFMIS Act 1997)\n1.\nName and address of the person(s)who committed\n\t\t\t\toffence\n:\n2.\nNature of offence\n:\n3.\nPlace where offence occurred\n:\n4.\nEstimated value of the damage caused by offence\n:\n5.\nName and address of the witness\n:\nSignature of the Competent Authority\nForm -XII\nForm -XII\n[See rule 27(5) of A.P. Farmers Organization Rules]\nComposition Form\nComposition Form\n(under Section 25 of APFMIS Act 1997)\n1\nName and address of the person(s)who committed offence\n:\n2\nNature of offence\n:\n3\nPlace where offence occurred\n:\n4\nEstimated value of the damage caused by offence\n:\n5\nWhether notice served to the accused giving\n\t\t\t\topportunity (i.e., within 7 days) to explain his point of view,\n\t\t\t\tif so the date and time.\n:\n6\nWhether explanation of the accused received\n:\n7\nDecision of the Competent Authority\n:\n8\nWhether offence proved beyond doubt, if so the\n\t\t\t\tdetails\n:\n9\nFine imposed by the Deputy Exective Engineer /\n\t\t\t\tRecommended to the next higher for prosecution.\n:\nSignature of Deputy Executive Engineer\n[See Rule 27(8)]\nProceedings of The Executive Engineer,.......................\nDated. ..............",
"footnote": "",
"is_definition": false,
"sort_order": 78
},
{
"number": "1",
"title": "1. Sri./Smt....................",
"chapter": null,
"content": "2. ....................\n3. ....................\nThe Dy. E.E. is requested to file the charge sheet in the Hon,ble Judicial first class Magistrate Court, .................... immediately and report compliance.\nExecutive Engineer,\n........................",
"footnote": "",
"is_definition": false,
"sort_order": 79
}
],
"metadata": {
"Act ID": "Last Updated 12th June, 2018 [ap293]",
"Act Number": "Published vide Notification No. G.O.Ms.No.541, Irrigation & Command Area Development (CAD.IV) Department, dated 27.12.2018",
"Enactment Date": "",
"Act Year": "1997",
"Short Title": "A.P. Farmers Organisation Rules, 1997",
"Type": "STATE",
"Location": "Andhra Pradesh"
},
"updated_at": "2026-09-29 21:55:18"
}