(a) to enter upon the survey and take levels of any land specified in the notification;
(b) to dig or bore into the sub-soil;
(c) to set out the intended line of work;
(d) to mark such levels, boundaries and line by placing marks and cutting trenches;
(e) to cut down and clear away any part of any standing crop, fence or jungle where otherwise survey cannot be completed and levels taken and the boundaries and line marked;
(f) to do all other acts necessary to ascertain whether pipelines can be laid under the land:
Section 5 • A.P. Domestic, Irrigation and Industrial Water Grid Pipelines (Acquisition of Right of User in Land) Act, 2018
5. Power of officers to enter, survey and excavate.
a-p-domestic-irrigation-and-industrial-water-grid-pipelines-acquisition-of-right-of-user-in-land-act-2018-sec-5.json
•
Section 5
{
"act_title": "A.P. Domestic, Irrigation and Industrial Water Grid Pipelines (Acquisition of Right of User in Land) Act, 2018",
"act_slug": "a-p-domestic-irrigation-and-industrial-water-grid-pipelines-acquisition-of-right-of-user-in-land-act-2018",
"section_label": "Section",
"section": {
"number": "5",
"title": "5. Power of officers to enter, survey and excavate.",
"chapter": null,
"content": "(a) to enter upon the survey and take levels of any land specified in the notification;\n(b) to dig or bore into the sub-soil;\n(c) to set out the intended line of work;\n(d) to mark such levels, boundaries and line by placing marks and cutting trenches;\n(e) to cut down and clear away any part of any standing crop, fence or jungle where otherwise survey cannot be completed and levels taken and the boundaries and line marked;\n(f) to do all other acts necessary to ascertain whether pipelines can be laid under the land:",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
"prev_section": "4",
"next_section": "6"
}