    "act_title": "West Bengal Electrical Licensing Rules, 2017",
    "act_slug": "west-bengal-electrical-licensing-rules-2017",
    "section_label": "Section",
    "section": {
        "number": "51",
        "title": "51. Savings.",
        "chapter": null,
        "content": "(a) all licences or permits granted under the repealed regulations shall be deemed to be valid till the date of Expiry, the renewal of which is subject to fulfilling of the conditions of licenses under these rules;\n(b) all the candidates declared to have been passed the examination conducted by the Board under the repealed regulations shall be deemed to have passed the examination under these rule.\nAnnexure-I\nAnnexure-I\nSyllabus For Workman Permit (W.P)\nSyllabus For Workman Permit (W.P)\n( See rule 16)\n(a) Ascertaining the sizes of wires of solid and stranded conductors.\n(b) Use of test lamps.\n(c) Use of bell and battery for sorting out circuits.\n(d) Methods of testing polarity and phasing out circuits.\n(e) Connections and diagrams for distribution boards, ceiling roses, plugs and sockets, lamp holders, Alternating (A.C) and Direct Current (D.C) fans with regulators, and switches (including two-way).\n(f) Wiring of fittings and other domestic consuming devices.\n(g) Installation work of the classes and with the kinds of cables and wires set out below :-\nPart/Class\nPart/Class\nDescription\nDescription\nFor Voltages not exceeding 650 volts:-\nFor Voltages not exceeding 650 volts:-\n(i)\nWiring of buildings (for lights, fans and small motors)\n(a) Cleat, Wood/Polyvinyl Chloride (P. V.C) casing and capping\n\t\t\t\tsystems, employing wires and cables\n(b) Metal sheathed, tough rubber, Polyvinyl Chloride (P.V.C)\n\t\t\t\tand conduit systems, (also any other system as permitted under\n\t\t\t\tthe Electricity Act 2003 and Central Electricity Authority\n\t\t\t\t(Measures relating to Safety and Electric supply) Regulatons,\n\t\t\t\t2010 as amended up to date using wires and cables other than\n\t\t\t\tpaper insulated cables.\n(ii)\nMotor wirings (including generator), in conduit or lead\n\t\t\t\tsheathed, with wires and cables, other than armoured cables.\n(iii)\nMotor wirings with cables (laying and jointing).\n(iv)\nOverhead line work with cable connections.\n(v)\nCable connections (laying and jointing)\nFor \"High Pressure\" Voltages exceeding 650 volts\nFor \"High Pressure\" Voltages exceeding 650 volts\n(vi)\nOverhead lines only.\n(vii)\nOverhead lines with cable connections.\n(viii)\nCable laying and jointing.\n(h) Methods of erecting aerial lines, bare and covered with insulating material\n(i) The installation of electric bells and indicators operated from electric supply lines.\n(j) Jointing and soldering-\n(i) Making Straight and Tee joints in solid and stranded conductors and soldering them.\n(ii) Making Britannia and other approved joints in bare aerial lines and soldering them.\n(k) Solderinglugs and sockets on wires and cables and finishing off and insulating.\n(l) Testing for faults and measuring insulation resistance.\n(m) Action to be taken and method of treatment in case of a person suffering from electric shock.\nNote : (i) Permits endorsed for any of the clauses (vi), (vii) and (viii) shall be divided into sections\n\"a\" for voltage upto 33,000 volts and \"b\" for voltages exceeding 33,000 volts. Permits granted to successful candidates shall be endorsed to denote the section or sections in which the candidate has qualified\".\n(ii) The syllabus may be altered, modified or amended from time to time as considered necessary by the Board.\nAnnexure-II\nAnnexure-II\nSyllabus for Supervisors\nSyllabus for Supervisors\n( See rule 24)\nGeneral Notes. - (1) The Board reserves the right to amend, alter, or add to, the undermentioned Syllabuses at any time, and without notice.\nGeneral Notes.\n(2) Candidates are not expected to have a memorized knowledge of the Central Electricity Authority (Measures relating to Safety and Electric supply) Regulation, 2010, but they are expected to be able to apply them and give a reasoned explanation of their meaning in any particular case, so far as electrical installation work is concerned. In the examinations they will be permitted to use a copy of the Regulations.\nPart-I\nElementary Principles\nElementary Principles\nPart-2\nWiring of Systems Upto 650 Volts\nWiring of Systems Upto 650 Volts\nPart-3\nDirect Current (D.C) Apparatus Upto 650 Volts\nDirect Current (D.C) Apparatus Upto 650 Volts\nGenerators upto 650 volts\n:\nSeries, Shunt, Compound wound types. Elementary\n\t\t\t\ttheory, installation, operation and maintenance. Parallel\n\t\t\t\toperation and balancing of loads.\nMotors upto 650 volts\n:\nSeries, Shunt, Compound wound types. Elementary\n\t\t\t\ttheory, installation, operation and maintenance. Various methods\n\t\t\t\tof speed control.\nCells and Batteries\n:\nLead acid cell/battery (container, plates,\n\t\t\t\tseparators, cover, electrolyte) Chemical reaction; Ratings;\n\t\t\t\tcharging of batteries; Float, Boost & Trickle charging;\n\t\t\t\tChecking of charged battery; Sulphation; Internal short\n\t\t\t\tcircuiting; Installation and maintenance of Battery & Battery\n\t\t\t\tcharger.\nGenerator, Motor\n:\nTypes of Enclosures, Earthing.\nPart-4\nAlternating Current (A.C) Apparatus Upto 650 Volts\nAlternating Current (A.C) Apparatus Upto 650 Volts\nGenerators upto 650 volts\n:\nAlternating (AC) single and three phase,\n\t\t\t\tElementary theory; Installation, Operation and Maintenance.\n\t\t\t\tParallel running; Control Panels and Sychronising Panels.\nMotors upto 650 volts\n:\nAkemating (A.C) single and three phase,\n\t\t\t\tInduction & Synchronous Machines, Elementary theory.\n\t\t\t\tInstallation, operation and maintenance. Various methods of speed\n\t\t\t\tcontrol and application of variable speed drive.\nPart-5\nInstallations Exceeding 650 Volts\nInstallations Exceeding 650 Volts\nGenerators & Motors above\n:\nElementary theory, Installation, operation &\n\t\t\t\tmaintenance. 650 volts including H .V. Protective devices.\nTransformers above\n:\nTypes, Methods of cooling, Vector Groups,\n\t\t\t\tParallel operation,650 volts (including High Voltage Installation\n\t\t\t\t(indoor & outdoor). Substation layout; Selection of High\n\t\t\t\tVoltage & Extra High Voltage) Cables; Neutral Earthing. Code\n\t\t\t\tof practice for selection, installation, maintenance &\n\t\t\t\tprotection of Transformers.\nCircuit Breakers above 650 Volts\n:\nTypes, operation, Marking & Breaking\n(Including High Voltage & Extra High Voltage\ncurrent, Selection, Maintenance, Various types\n\t\t\t\tof Control gears.\nOther High Voltage/Extra High Voltage equipments\n:\nInstallation & maintenance in Plants and\n\t\t\t\tSwitch yards\nPower factor improvement\n:\nCapacitor bank, reactors; Installation,\n\t\t\t\tmaintenance & protection of such equipment.\nTesting/Voltage\n:\nof High Voltage/Extra High Voltage equipments\n\t\t\t\tprior to commissioning; Current transformers; Potential\n\t\t\t\ttransformers; various types of protective relays.\nPart-6\nOverhead Lines Exceeding 250 Volts\nOverhead Lines Exceeding 250 Volts\nFor (A) Voltages upto 650 volts.\nFor (B) Voltages upto 33000 volts.\nFor (C) Voltages exceeding 3 3000 volts.\nPart-7\nUnderground Cables\nUnderground Cables\nFor (A) Voltages upto 1100 volts.\nFor (B) Voltages upto 33000 volts.\nFor (C) Voltages exceeding 33000 volts.\nPart-8\nMining Installations\nMining Installations\n• Type of power and trailing cable used both in underground and open cast mines. Maintenance practice and cable jointing.\n• Basic knowledge on Electrical shovel, dragline and field switches.\n• Installation and maintenance of electrical winder, haulage, pump and electrical equipments in Coal cutting machine, loader, conveyor, road header, shearer and continuous miner, drill machine and their gate and box.\n• Flameproof (FLP), intrinsically safe circuit, voltage limits tor surface and underground installation, specific provision for gassy mines.\n• General familiarity of Central Electricity Authority Regulations and Chapter IX related to mines.\nNote : (1) Those candidates who desire a certificate for supervising high pressure work below ground must also qualify in part 5.\nNote : (2) Any person who holds a certificate for Mining Installations (Below ground) shall also be entitled to supervise surface installations of the nature covered by the syllabus for the parts in which he was qualified.\nNote : (3) For the supervision of Electrical installation below ground in gassy mines, persons who hold certificates for supervising electrical installations in mines below ground shall have their certificates endorsed for supervising such installations in \"gassy mines\" if they can produce satisfactory evidence that they have a minimum of six months' practical experience of electrical installation in \"gassy mines\" underground.\nPart-9\nElectric Lifts & Escalators\nElectric Lifts & Escalators\nPart-10\nElectric Signs, Electronic Devices Conservation of Electrical Energy\nElectric Signs, Electronic Devices Conservation of Electrical Energy\nElectronic Components\n:\nResistor, Capacitor, Inductor; Colour Codes.\nSemi-conductor devices\n:\nDiode, Transistor, Thyrislors/Silicon Controlled\n\t\t\t\tRectifier (SCR); Behaviour of diode, p-n- p & n-p-n\n\t\t\t\ttransistors, SCR; Diac. Triac, Testing & applications.\nAssembly and Testing of Electronic Apparatus\n:\nElectronic ballasts, Electric fan regulatory,\n\t\t\t\tFull wave bridge rectifies and Filter circuits. Poly phase\n\t\t\t\tAlternating Current (A.C.) to Direct Current (D.C.) bridge\n\t\t\t\trectifier, inverter. Voltage stabilizer.\nU. P. S.\n:\nComponents and Applications.\nComputer\n:\nInstallation & special earthing requirement.\nPart-11\nWiring For Systems Not Exceeding 250 Volts\nWiring For Systems Not Exceeding 250 Volts\nPart-12\nInstallation of Transformer Exceeding 650 Volts but Rating Upto 125 KVA\nInstallation of Transformer Exceeding 650 Volts but Rating Upto 125 KVA\nTransformer\n:\nGeneral Principle, elementary calculations, name\n\t\t\t\tplate details as per Indian Standard (I.S) Codes of practice,\n\t\t\t\twinding connections, parallel operations, off-load tap changing,\n\t\t\t\tinstallation & maintenance of outdoor & indoor type\n\t\t\t\ttransformer including load break switch fuse unit, isolator and\n\t\t\t\tlightning arresters, safety precautions, equipment & neutral\n\t\t\t\tEarthing.\nAnnexure-III\nAnnexure-III\nCommon Syllabus for National Certificate of Supervisor\nCommon Syllabus for National Certificate of Supervisor\n( See Rule 31 & 47)\nPart I (Paper-1)\nElectricity.\nPrinciples of Electricity.\nElectromagnetism.\nMaterial.\nGeneration of Electricity.\nAlternating Current (A. C) Generators (Alternators).\nDirect Current (D.C.) Generators.\nInterpoles.\nBatteries.\nAlternating Current (A.C.) Motors.\nDirect Current (D.C.) Motor.\nAlternating Current (AC) circuits.\nControlling and Regulating Gear.\nTransformation.\nTransmission & Distribution-\n(a) Overhead lines. - Simple calculations and general principles of construction of low-medium and high pressure lines, size of conductors, length of spans, sag, strength of poles, spacing of conductors, cross area, effects of temperature, wind pressure', ice and snows tension on wire. Insulation brackets, stays, struts, guard wire/and other protective device, Earthing, Lightning arresters and lightning conductors and their testing. Testing and fault location.\n(a) Overhead lines.\n(b) Underground cables. - Simple calculations and general principles of Laying cables direct in ground, in troughs and pipes, handling, bending jointing, plumbing, under- ground and above ground junction boxes, Distribution board and pillars. Joint box compound, melting of compounds, and filling boxes with compounds. Testing and fault location.\n(b) Underground cables.\nSafety Rules - Working knowledge of-\n(i) The Central Electricity Authority (Measures relating to Safety and Electric supply) Regulation. 2010, as amended upto date;\n(ii) Wiring Rules;\n(iii) Other Act & Rules such as Disaster Management Act;\n(iv) Working knowledge of computers & computer applications in relevant field;\nPart II (Paper-II)\nElectricity-Utilization\nElectricity-Utilization\nDomestic Installations-\nWiring.\nCircuit Diagrams.\n(i) house wiring including those for main and sub-distribution Boards, switches and cut-out etc., together with the load statement for each circuit.\nand\n(ii) Lifts with their safety devices.\nApparatus.\nEnergy Measurement and Charges.\nTesting and Fault Attendance.\nProtective Devices.\nIndustrial installations,-\nWiring.\nCircuit Diagrams.\n(i) Direct Current (D.C.) and Alternating Current (A.C.) Generators, Switch-Boards, transformers etc.;\n(ii) Main and sub-distributing boards with circuit breakers, Switch-fuse units, with load statement for each circuit;\n(iii) Direct Current (D.C.) and Alternating Current (A.C.) motors, their starters, regulators;\n(iv) Battery charging equipment;\n(v) Converting machinery;\n(vi) Lifts with their safety devices.\nPump installations.\nApparatus.\nTesting and Fault Attendance.\nProtective Devices.\nPaper III\nPaper III\nMine Installations\nMine Installations\nWiring.\nCircuit Diagrams.\n(i) Direct Current (D.C.) and Alternating Current (A.C.) generators, switch boards, transformers etc.,\n(i) Distribution boards with circuit breakers, switch fuse units and gate-end switches.\n(iii) Direct Current (D.C.) and Alternating Current (A.C.) Motors, their starters and regulators.\nApparatus\n(a) Electrical, winders, haulages and pump units, their control gears and starters.\n(b) Rectifiers, rotary convertors and electric locomotives.\n(c) Portable and transportable machineries-Coal cutting machines, loaders, conveyers. Gate-end switches, drill panels with drill units and their control systems.\n(ii) General principles and elementary calculations of load. Power and energy consumption in pumping, hauling and winding installations and other working face machineries.\nPower and Energy Measurement and Charges.\nTesting and Fault Attendance.\nProtective Devices.\nElectricity Regulations.\nNotes: Candidates desiring to qualify only for electrical installations in Mines need not appear for compulsory section under part - II, however, Part -1 is compulsory for such candidates also:\nNotes:\nAnnexure - IV Fees Sl. No Particulars Rules Applicable Fees in INR A New 1. Licence to Electrical Contractor (For 5 years) Rule 38 10,000/- Electrical\n\t\t\t\tSupervisor's Certificate of Competency (For 10 years) (a) For 2 parts at a\n\t\t\t\ttime - (b) For each additional part - Rule 13 800/- 400/- 2. National Certificate of Supervisor (For 10\n\t\t\t\tyears) Rule 29(2) 5,000/- 3. Workman's Permit (For 10 years) for each part Rule 13 200/- B Renewal 1. Licence to Electrical Contractor (For 5 years) Rule 41 5,000/- 2. Electrical Supervisor's Certificate of\n\t\t\t\tCompetency (For 10 years) Rule 27 500/- 3. National Certificate of Supervisor (For 10\n\t\t\t\tyears) Rule 34 4,000/- 4. Workman's Permit(For 10 years) Rule 19 200/-\nAnnexure - IV\nFees\nFees\nSl. No\nSl. No\nParticulars\nParticulars\nRules Applicable\nRules Applicable\nFees in INR\nFees in INR\nA\nA\nNew\nNew\n1.\nLicence to Electrical Contractor (For 5 years)\nRule 38\n10,000/-\nElectrical\n\t\t\t\tSupervisor's Certificate of Competency (For 10 years)\n(a) For 2 parts at a\n\t\t\t\ttime -\n(b) For each additional part -\nRule 13\n800/-\n400/-\n2.\nNational Certificate of Supervisor (For 10\n\t\t\t\tyears)\nRule 29(2)\n5,000/-\n3.\nWorkman's Permit (For 10 years) for each part\nRule 13\n200/-\nB\nB\nRenewal\nRenewal\n1.\nLicence to Electrical Contractor (For 5 years)\nRule 41\n5,000/-\n2.\nElectrical Supervisor's Certificate of\n\t\t\t\tCompetency (For 10 years)\nRule 27\n500/-\n3.\nNational Certificate of Supervisor (For 10\n\t\t\t\tyears)\nRule 34\n4,000/-\n4.\nWorkman's Permit(For 10 years)\nRule 19\n200/-\nSl. No\nSl. No\nParticulars\nParticulars\nRules Applicable\nRules Applicable\nFees in INR\nFees in INR\nC\nC\nPenalty for late submission (For Renewal)\nPenalty for late submission (For Renewal)\n1.\nLicence to Electrical Contractor\nUpto one month\nRule 41\nNo extra charge\nAfter one month, upto six months\nRule 41\n5,000/-\n2\nElectrical Supervisor's Certificate of\n\t\t\t\tCompetency\nUpto one month\nRule 27\nNo extra charge\nAfter one month, upto six months\nRule 27\n200/-\n3.\nNational Certificate of Supervisor\nUpto one month\nRule 34\nNo extra charge\nAfter one month, upto six months\nRule 34\n3000/-\n4.\nWorkman's Permit\nUpto one month\nRule 19\nNo extra charge\nAfter one month, upto six months\nRule 19\n200/-\nD .\nD\nOthers\nOthers\n1.\nFor duplicate Contractor's Licence\nRule 42\n1000/-\n2.\nFor duplicate Supervisor, National Supervisor,\n\t\t\t\tworkman Permit.\nRule28, 35&20\n100/-\n3.\nFor endorsement of any kind/updation/entry of\n\t\t\t\tlegacy records\n200/-\n4.\nFor induction of new supervisor/intermediate\n\t\t\t\tchange of supervisors\nRule 40(3)\n500/-\n5.\nIR Tester/Meggar(500V/2.5 KV or above)\nRule 41(1)(d)\n500/-\n6.\nEarth Tester(1-10 ohms)\nRule 41(I)(d)\n500/-\nNote: - 1. For Electrical Contractor, Meggar testing to be done once in five years at the time of renewal of Contractor Licence.\nNote:",
        "footnote": "",
        "is_definition": false,
        "sort_order": 50
    },
    "prev_section": "50",
    "next_section": "2"
}