    "section": {
        "number": "5",
        "title": "5. Application for building permit -",
        "chapter": null,
        "content": "5.1. Building permit required. - No person shall in any area for which a housing or Improvement Scheme has been notified under section 28 of U.P. Avas Evam Vikas Parishad Adhiniyam or in which any such scheme is in force, erect, re-erect or make meterial alteration or demolish any building or cause the same to be done without first obtaining a separate building permit for such building activity from the Authority.\n5.2. Every person who intends to erect, re-erect or make meterial alteration in any place in building or part thereof within the jurisdiction of the Authority shall give application in writing to the Authority in the prescribed form (See Appendix 'B'). Such application shall be accompanied by plans and statement in triplicate, as required under Regulation No. 6.2. The Plans may be of ferro-print, Ammonia print semi-dry or photographic prints of which at least one set of plans shall be cloth-mounted. The mounted set shall be retained in the office of the Authority for record after issue of a permit or a refusal.\n5.2.1. Size of Drawing Sheets. - The sizes of the drawing sheets of key-plan, site-plan, layout plan etc., shall be any of those specified in table no. 1 below:\nTABLE 1 - Drawing Sheet Sizes\nTABLE 1\nSerial No.\nDesignation\nTrimmed Size\n1\nA1\n841 × 11.89\n2\nA2\n594 × 841\n3\nA3\n420 × 594\n4\nA4\n297 × 420\n5\nA5\n210 × 297\nTABLE 2 - Colouring notations of plans\nTABLE 2\nPlan\nS. No.\nItems\nWhite plan\nBlue Print\nAmmonia Print\n1\nPlot lines\nThick Black\nThick Black\nThick Black\n2\nOpen spaces\nNo Colour\nNo Colour\nNo Colour\n3\nExisting works\nBlack\nWhite\nBlue\n4\nWork proposed to be demolished\nYellow hatched\nYellow hatched\nYellow hatched\n5\nProposed work\nRed\nRed\nRed\n6\nDrainage and Sewerage work.\nRed dotted,\nRed dotted\nRed dotted\n7\nWater supply work\nBlack dotted thin\nBlack dotted thin\nBlack dotted thin\n5.3. No application referred to in Regulation No. 5.2 shall be valid unless and until the person giving the application has paid such fees to the Authority as are fixed. An attested copy of receipt of such payment shall be attached with the application.\n5.4. In the event of a building permit not being issued the fees so paid shall not be refunded to the owner, but he shall be allowed to resubmit the plans without any additional fees, after complying with all objections of the Authority within a period of one year from the date of receipt of the objection order, by the owner, after which fees shall have to be paid.\n5.5. No application for building permit is necessary for the following alterations (See Regulation 3.3.4), provided they do not violate any provisions regarding general building requirements, structural stability and fee safety requirements of the Regulations.\n(a) Providing intercommunication doors;\n(b) Providing Non-structural partitions;\n(c) Gardening-excluding garden structures;\n(d) White washing where architectural control regulations are not in force.\n(e) Painting-where architectural control regulations are not in force.\n(f) Re-tiling and re-terracting;\n(g) Plastering and patch work;\n(h) Re-flooring;\n(i) Boundary wall if it is constructed of a design approved by the Authority -\n5.6. No building permit is necessary for carrying out works by any department of the Central/State Government or any local body having jurisdiction of any works for the purpose of inspecting, repairing or renewing any Sewers, mains, pipes, cables or other apparatus.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 5
    },
    "prev_section": "1",
    "next_section": "6"
}