    "id": 24742,
    "slug": "the-tamil-nadu-electricity-supply-code-2004",
    "title": "The Tamil Nadu Electricity Supply Code, 2004",
    "short_title": "The Tamil Nadu Electricity Supply Code, 2004",
    "act_number": "Published vide Notification No. TNERC/SC/7/1, date",
    "act_year": 2004,
    "act_type": "STATE",
    "location": "Tamil Nadu",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "The Tamil Nadu Electricity Supply Code, 2004",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(a) \"Act\" means the Electricity Act, 2003 (Act No.36 of 2003);\n[(aa) \"Board\" means, a State Electricity Board, constituted before the commencement of the Act, under sub-section(l) of section 5 of the Electricity (Supply) Act, 1948 (54 of 1948)]\n(b) \"Code\" means the Tamil Nadu Electricity Supply Code;\n(c) \"Commission\" means the Tamil Nadu Electricity Regulatory Commission;\n(d) \"Connected Load\" means the aggregate of the manufacturer's rating of all equipments connected to the consumer's installation and of all portable equipments and also the capacity of the power source required to test manufactured products and repaired equipment in the installation;\n(e) \"Contracted Load\" means the load specified in the agreement between the consumer and the Licensee engaged in the business of supplying electricity to him.\n(f) \"Contracted Demand\" means the demand specified in the agreement between the consumer and the licensee engaged in the business of supplying electricity to him;\n(g) \"Consumer\" means any person who is supplied with electricity for his own use by a Licensee, the Government or by any other person engaged in the business of supplying electricity to the public under the Act or any other law for the time being in force and includes any person whose premises are for the time being connected for the purpose of receiving electricity with the works of a licensee, the Government or such other person, as the case may be;\n(h) \"Consumer Meter Card\" means a card provided at the low tension consumer's premises for the purpose of recording the measurements relating to consumption of electricity and the charges for electricity consumed and other related charges. It shall also serve the purpose of a notice to the consumer of the due dates for payment and notice period for disconnection;\n[(hh) \"Distribution licensee\" means a licensee authorised to operate and maintain a distribution system for supplying electricity to the consumers in his area of supply.]\n[i) \"Engineer\" means an engineer, by whatever name designated, employed by the licensee and is in charge of the local area of supply and includes any other person duly authorized by him or his superiors, to exercise any power of an engineer under this Code.\"]\n(j) \"Extra High Tension (EHT) consumer\" means a consumer who obtains supply from the Licensee at Extra High Voltage;\n(k) \"High Tension (HT) consumer\" means a consumer who obtains supply from the Licensee at High Voltage;\n(l) \"Low Tension (LT) consumer\" means a consumer who obtains supply from the Licensee at Low or Medium Voltage;\n(m) \"Load\" means connected load or contracted load, as the case may be;\n(n) \"Load Factor\" means the ratio of the Average Demand for the month in terms of kilowatts to the maximum demand for the month in terms of kilowatts and the 'Load Factor' shall be calculated to three decimal places and rounded off to two decimal places;\n(o) \"Month\" unless the context otherwise requires, shall mean a month reckoned according to the British Calendar. With reference to billing and payment, it shall mean the period between the date of meter reading in a particular month and the corresponding date of meter reading of the immediately succeeding or preceding month as the context requires;\n(p) \"Occupier\" means the person in occupation (whether as owner or otherwise) of the premises where electricity is used or intended to be used;\n[(pp) \"Person\" shall include any company or body Corporate or association or body of individuals, whether incorporated or not, or artificial juridical person.]\n(q) \"Power Factor\" means the ratio of the real power to the apparent power and average power factor means the ratio of the Kilowatt-hours to the Kilovolt-ampere-hours consumed during the billing month;\n(r) \"State Transmission Utility\" means the Board or the Government Company specified as such by the State Government:\n(s) \"Supply\", in relation to electricity, means the sale of electricity to a Licensee or consumer.\nChapter 2\nElectricity Charges - Billing and Recovery",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Categories of supply.",
            "chapter": null,
            "content": "(a) Single-phase 2 wire 240 volts between phase and neutral for supply to a total connected load not exceeding 4,000 watts (including power loads).\n(b) three-phase 4 wire 415 volts between phases and 240 volts between phase and neutral for supply to a total connected load exceeding 4,000 watts but not exceeding a demand of 112 KW.\n(c) The consumer may elect to avail supply under any one of the above categories where the connected load does not exceed 4,000 watts.\n(d) Three-phase 3 wire, 11,000 volts and above between phases for power installation exceeding a demand of 112 KW, the minimum demand however being 63 KVA.\n(e) The consumer shall avail supply at 33 KV and above when the demand is 5 MVA and above.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Charges recoverable by the licensee.",
            "chapter": null,
            "content": "(1) Tariff related charges, namely:\n(i) The price of electricity supplied by him to the consumer which shall be in accordance with the tariff rates as the Commission may fix, from time to time, for HT supply, LT supply, temporary supply and for different categories of consumers. In case, the [***] supply is for construction of residential houses, housing complexes, the tariff shall be commercial tariff till the completion of construction and to be changed to appropriate tariff on completion. Where it is intended to use floor polishing equipments, welding equipments for repairs/maintenance and such other portable equipments temporarily in a premises having permanent supply, such use shall not be treated as temporary supply for the purpose oi levying charges. It shall be construed as regular consumption under the permanent supply tariff.\n(ii) Demand charges for HT supply and fixed charges for LT supply shall be payable by the consumer in accordance with the rates as the Commission may fix, from time to time, for different categories of consumers.\n(iii) Disincentive for power factor:\nEvery consumer shall maintain a power factor:\nIn case of LT supply, of 0.85 lag, and\nIn case of HT supply, of 0.90 lag failing which he shall be liable to pay compensation by way of disincentive at such rates as the Commission may declare, from time to time. Likewise, the consumer, who maintains the power factor above a specified level may be rewarded by way of incentive at such rates as the Commission may declare, from time to time, which shall be adjusted in the bill.\n(iv) Additional charges for harmonics dumping Where any equipment installed by a consumer generates harmonics, the consumer shall provide adequate harmonic suppression units to avoid dumping of harmonics into licensee's distribution system and the licensee is at liberty to provide suitable metering equipment to measure the harmonic level pursuant to such harmonic. Where the consumer fails to provide such units, he shall be liable to pay compensation at such rates as the Commission may declare, from time to time.\n(v) The tax or duty, if any, on electricity supplied or consumed as may be levied by the State Government which shall be credited to the Government account as per the directions received from the Government, from time to time.\n(vi) At the time of extension of period of temporary supply, it shall ensured that the advance current consumption (CC) charges are adequate. The CC charges shall be adjusted against the advance t CC charges.\n[(2) Miscellaneous charges, namely, -\n(i) Capacitor compensation charge\n(ii) Excess demand charge\n(iii) Excess contracted load charge\n(iv) Belated payment surcharge\n(v) Additional security deposit, when so called upon\n(vi) Service/line/structure/equipments shifting charges\n(a) Charges for dismantling temporarily or permanently\n(b) Charges for re-erection in case of temporary dismantling\n(vii) Name transfer charge\n(viii) Reconnection charge\n(ix) Consumer meter card replacement charge\n(x) Dishonored cheque service charge\n(xi) Meter related charges\n(xii) Application registration charge\n(xiii) Service connection charges\n(xiv) Excess demand and excess energy charges during Restriction and  Control of supply\n(xv) Charges for restoration of cheque payment facility\n(xvi) Charges for testing of equipments/installations.]\n(3) Minimum charges where applicable .",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Miscellaneous charges.",
            "chapter": null,
            "content": "(a) No new LT service with a connected load of motors of 3 HP and above or for using welding transformers shall be given unless capacitors of adequate ratings with 1S1 marking are installed; [The licensee shall specify appropriate capacitor ratings for different capacity Motors/welding transformers] .\n(b) In case of existing LT service connections (which are not coming under the purview of power factor incentive/disincentive scheme) with connected load of motors of 3 HP and above or for using welding transformers (irrespective of their rating), the consumer shall install adequate capacitors within a period of two months [(from the date of issue of notice issued by the licensee in this connection] and shall be liable to pay a compensation charge of ten per cent of the price of electricity supplied to him for the preceding four months of consumption till such time adequate capacitors are installed; and where inadequate capacitors are installed or where some of the capacitors are defective, the ten percent shall be reckoned proportionate to the extent of inadequacy or defect, as the case may be;\n(c) Where it is found that the capacitors installed are either inadequate or defective, the licensee shall, in addition to the levy and collection of capacitor compensation charges, by notice in writing, call upon the consumer to install adequate capacitors or to rectify or to replace the defective capacitors, as the case may be, within two months from the date of notice.\n(i) in the case of HT supply, the maximum demand charges for any month shall be based on the KVA demand recorded in that month at the point of supply or such percentage of sanctioned demand as maybe declared by the Commission, from time to time, whichever is higher The exceeded demand shall alone be charged at double the normal rate;\n(ii) in case of LT supply:\n(a) for domestic and agricultural category of service, the excess demand charges shall not be applicable;\n[(b) For other categories of LT services with contracted demand equal to or less than 18.6 KW (25 HP), the excess demand charges shall not be applicable where the connected load is equal to or less than the contracted demand.\nNote: For services with contracted demand less than or equal to 18.6 KW (25 HP), whenever the consumer's connected load exceeds the contracted demand, the licensee shall install meters with demand recording facility and bring the consumer under the scope of excess demand chargeable category. After installation of the meter, if the recorded demand is in excess of contracted demand, the existing demand, shall, after intimation to the consumer, be revised to the level of recorded demand and all relevant charges applicable for extension of additional demand shall be included in the next bill. No excess demand charge is leviable till such time the licensee installs meter with demand recording facility and bring the consumer under the scope of excess demand chargeable category.]\nNote:\n(c) for the remaining LT services other than those service connections covered in (a) and (b) above, when the contracted demand is in excess of 18.6KW (25HP) and for such of those consumers whose contracted demand is less than 18.6 KW (25HP) but opted for having meters with demand recording facility, the excess demand charges shall be, -\n(I) where the recorded demand does not exceed 112 KW, for every KW or part thereof in excess of the sanctioned demand, at the rate of 1% of the total energy charges;\n(II) where the recorded demand exceeds 112KW, for every KW or part thereof in excess of sanctioned demand -\n- for the first two occurrences, at the rate of 1 % of the charges for electricity supplied upto 112 KW;\n- and 1.5% for every KW or part thereof over and above 112KW,\n- and thereafter, that is, the third and subsequent occurrences at the rate of three per cent for every KW or part thereof over and above 112KW.\n(III) where the recorded demand exceeds the sanctioned demand for the second and subsequent times -\n(A) in case the recorded demand has not exceeded 112 KW, the existing load sanction shall, after intimation to the consumer, be revised within one month of the second occurrence to the level of recorded demand and all the relevant charges applicable to the additional load shall be included in the next bill;\n(B) in case the recorded demand has exceeded 112 KW, the existing load sanction shall, after intimation to the consumer, be revised within one month of the second occurrence, to the level of 112 KW and all relevant charges applicable to the additional load shall be included in the next bill; if, however, the recorded demand has exceeded 112KW for the third or more number of times, it is open to the consumer to opt for HT service.\n(iii) in the case of temporary supply, the excess demand charges shall be the difference between the minimum charge for temporary supply computed at the rate notified, for a back period of six months or date of supply whichever is lesser, and the corresponding current consumption charges already recovered from the consumer.\n[(iv) No addition or reduction of load in case of LT service and no addition or reduction of demand in case of HT service, may be sanctioned unless the outstanding dues in the same service connection had been paid.]\n(i) comply with the contracted load until the cross subsidy from other sources are eliminated and a viable tariff is implemented for agricultural services;\n(ii) comply with the directives of the Government towards restriction on exploitation of ground water for irrigation and environmental constraints.\n(a) No electric motor shall be used in agricultural service connections without its manufacturer's name plate indicating its rating/ capacity permanently affixed on it.\n[(b) If, at the time of effecting service connections under Agricultural category, it is found that the assessed capacity is in excess of the capacity applied for by the consumer, the Engineer shall refuse to effect supply. If the intending consumer challenges the decision regarding the assessed capacity of the motor made by the Engineer, he may make an appeal to the next higher officer, furnishing certificate regarding capacity of motor issued by Government /Government Laboratory/any agency accredited/approved by Bureau of Energy Efficiency. The decision of the next higher officer shall be final and binding on the consumer.]\n(c) If during periodical check or inspection of an existing agricultural service connection by the engineer, it is found that the name plate of any motor does not show the correct capacity of the motor or filename plate is missing or the rating of such motor as assessed by the engineer authorised in this behalf is in excess of the rating noted in the Test Report, action shall be taken under this Code [to recover the excess contracted load charges on the basis of the assessed capacity of the motor] .\n[(d) If the existing consumer challenges the decision regarding the assessed capacity of tire motor made by the Engineer, a letter may be issued to the consumer asking him to test the motor for its capacity at Government Laboratory or by any other agency accredited by Bureau of Energy Efficiency at the cost of the consumer and produce the test report of such Government Laboratory or agency to the officer concerned within two months from the date of issue of such letter. However, after producing such test report, the charges shall be adjusted to the certified load in the subsequent Consumption Charge bills.]\n(i) All bills are to be paid in the case of HT consumers, within the due date specified in the bill and in the case of LT consumers, within the due date and notice period specified in the consumer meter card.\n[(ii) (a) Where any HT consumer neglects to pay any bill by the due date, he shall be liable to pay belated payment surcharge from the day following the due date for payment. Where any LT consumer (except services relating to Public lighting and water supply and other services belonging to Local Bodies) neglects to pay any bill by the last day of the notice period, he shall be liable to pay belated payment surcharge from the day following the last day of the notice period.\n(b) Where the local bodies neglect / fail to pay any bills in respect of LT services for Public Lighting and Public Water Works, and other services of Local Bodies the belated payment surcharge shall be applicable for the payments made beyond 60 days from the date of demand. In case of payment made beyond 60 days from the date of demand, the belated payment surcharge shall be payable from the day following the 60th day of demand.\n(c) The surcharge shall be for a minimum period of fifteen days and where the delay exceeds fifteen days but does not exceed one month, it shall be for the number of whole months, and for any fraction of a month, it shall be proportionate to the number of days.]\n(iii) If the due date in the case of HT consumers and the last day of the notice period in the case of LT consumers falls on a holiday, the surcharge is payable from the day following the next working day.\n[(iv) In the case of LT Consumers (except Local Bodies) the surcharge shall be 1.5% per month for the outstanding arrears towards the price of electricity supplied. In respect of LT services belonging to Local Bodies, the surcharge shall be 0.5% per month for the outstanding arrears towards the price of electricity supplied]\n[(v) In the case of HT consumers except Local Bodies and Government Departments the surcharge shall be 1.5% per month for the notice period. In the case of Local Bodies and Government Departments, the surcharge shall be 1% per month for the notice period.\n(vi) In case of sums other than price of electricity supplied which are outstanding, surcharge shall be leviable at the discretion of the licensee at a rate not exceeding 1.5 % per month.\n(vii) In the case of short assessment included in a subsequent bill, surcharge shall accrue in the case of HT consumers, after the due date for the payment of the subsequent bill wherein the short assessment is included and in the case of LT consumers, it shall accrue from the day following the last day of the notice period.\n(viii) In the case of short assessment permitted to be payable in instalments, the surcharge shall accrue only when there is default in the payment schedule and the surcharge shall be worked out from the day following the day on which the instalment fell due and shall be payable along with the amount of instalment due.\n(ix) Where the service connection stands terminated, the amount of security deposit and the interest accrued thereon shall first be adjusted against belated payment surcharge and the remainder, if any, against other dues.\n(x) The belated payment surcharge is payable only on any outstanding amount excluding belated payment surcharge component.\n(xi) The belated payment surcharge shall not be levied on electricity tax and electricity tax shall not be levied on the belated payment surcharge.\n(i) The adequacy of security deposit may be reviewed and re-fixed once in a year in case of HT consumers and once in every two years in case of LT consumers taking into account the interest due for credit. Such reviews shall be made in the month of April / May. The rate of interest on the security deposit shall be on the basis of the commission's directive to the licensees in this regard.\n(ii) The adequacy of security deposit shall be based on the periodicity of billing for the respective category.\n(a) For the categories of consumer under monthly billing, the security deposit is equivalent to two times of the monthly average of the electricity charges for the preceding twelve months prior to April.\n(b) For the categories of consumer under bi-monthly billing, the security deposit is equivalent to three times of the monthly average of the electricity charges for the preceding twelve months.\n(c) For the categories of consumer under half-yearly billing, the security deposit is equivalent to seven times of the average charges per month.\n(iii) Interest at Bank rate or more as specified by the Commission shall .be calculated and credited to the security deposit accounts of the consumers at the beginning of every financial year i.e. April and the credit available including the interest shall be informed to each consumer before the end of June of every year.\n(iv) If available deposit is less than the revised security deposit, the balance shall be collected as additional security deposit either through a separate notice or by a distinct entry in the consumer meter card for LT services. Thirty days notice period shall be allowed for the payment. If the payment is not received within the above period of thirty days, the service is liable for dis-connection.\n(v) Where, on review, the amount of security deposit held is found to be in excess of the requirement, the excess shall be adjusted against two future demands for the electricity supplied. Where, after such adjustment in future of two demands, there is balance to be refunded, the refund shall be made by cheque before the due date for payment of the third demand.\n(vi) In the event of the consumer failing to pay to the licensee any sum that may become due for payment to the licensee on the dates fixed for payment thereof, the licensee may, in addition to and without prejudice to the other rights of the licensee, appropriate a part or whole of the security deposit and interest thereon towards the sum due from the consumer.\n[(1) The cost of shifting service/line, structure and equipments shall be borne by the consumer. The consumer shall pay the estimated cost of shifting in advance in full. The copy of the estimate shall be given to the consumer. The shifting work will be taken up only after the payment is made.\nThe estimate will cover the following:\n(i) Materials dismantled in the old site and reusable shall be used in the new site as far as possible.\n(ii) 10% of the present value of the dismantled and reusable materials towards charges for dismantling and charges for loading, unloading, transport to the new site/store.\n(iii) Cost of the new materials required for the shifting work.\n(vi) Add 5% of the cost of new materials towards loading, unloading and transport to new site.\n(v) Add 10% of the present value of all the materials to be erected in the new site towards erection charges.\n(vi) 5% of the present value of retrievable scrap materials towards transport charges.\n(vii) Due credit shall be given to the consumer / applicant as below but however limited to the total estimated cost of new work:\n(a) Book value/written down value subject to a minimum of 20% of the cost of retrievable and reusable materials but not used in the new site.\n(b) Scrap value on the retrievable but not reusable materials at not less than 10% of its original value.\n(viii) After completion of the work, a revised estimate shall be prepared with a copy to the consumer based on the actual cost of materials, loading, unloading, transport and erection charges. If the original estimate cost is more than the revised estimate, the balance shall be refunded to the applicant/consumer within 3 months. If the original estimate cost is less than the revised estimate, the difference shall be collected from the applicant/consumer.]\n(2) Temporary dismantling and re-erection or shifting of a service connection within the same premises necessitated due to remodelling of premises will be carried out on payment of the required charges for the same.\n(3) Shifting of an existing service connection involving change in door number or sub-door number or survey field number, shall be considered as a new service connection only.\n(a) legal heirship certificate from the Tahsildar concerned or proof of ownership such as local body tax receipts (latest);\n(b) no objection certificate from other legal heirs, if any, (or) an indemnity bond in Form 3 in Appendix to this Code on non-judicial stamp paper for a value of Rs.80/- and a sworn-in affidavit and authenticated by a Notary Public or by a Gazetted Officer to show the status of other legal heirs;\n(c) fresh application with fee to be specified by the Commission and agreement form.\n[(ii)] Every application for transfer of name, in other cases, shall be in Forms 1 and 2 in Appendix to this Code accompanied by:\n(a) the document supporting the transfer with an undertaking in Form 4 in Appendix to this Code;\n(b) consent letter from the consumer for the transfer of the security deposit [if it is not included in the document supporting the transfer] . Where no such consent letter can be produced, the applicant shall pay fresh security deposit;\n(c) fresh application with fee to be specified by the Commission and agreement form.\n(a) Application for new HT/LT services.\n(b) Application for addition/reduction of demand/load in respect of HT and LT services.\n(c) Application for temporary service.\n(d) Application for conversion of a service from L. T. to H. T. and vice versa\n(e) Application for shifting of HT/LT services.\n(f) Application for shifting of lines/structures/equipments under Deposit Contribution Works for LT/HT.\n(g) Application for change of tariff.\n(h) Application for replacement of defective meters.]\n(i) The maximum demand charges for HT supply shall be based on the actual recorded demand at the point of supply or at 90% of the demand quota as fixed from time to time through restriction and control measures whichever is higher. In case the maximum recorded demand is in excess of the quota fixed, the demand in excess of the quota fixed shall be charged at rates specified by the Commission from time to time.\n(ii) The energy consumption over and above the energy quota fixed shall be charged at the rates specified by the Commission from time to time in respect of such class of consumers upon whom the restriction and control measures apply.\n(iii) The services which draw electricity from TNEB Grid for using welding sets during the restricted hours shall be charged at the rates specified by the Commission from time to time.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Minimum charges.",
            "chapter": null,
            "content": "(a) For the H.T. services disconnected as per licensee's right to disconnect supply, the following monthly minimum charges based on the KVA demand shall be collected: -\n(i) If the disconnection is for the full month, then, 20% of the sanctioned demand.\n(ii) If the disconnection is for part of a month, the actual recorded demand or such percentage of sanctioned demand as declared by the Commission whichever is higher.\n(b) For the H.T services disconnected on the request of the consumer, the monthly minimum charges based on the KVA demand shall be the actual recorded demand (when the disconnection is for part of a month) or such percentage of sanctioned demand declared by the Commission whichever is higher:\n(i) the consumer shall produce a certificate from the Labour Officer to that effect, indicating the period of lockout or strike or temporary closure and the date on which it was called off;\n(ii) the consumer shall give prompt intimation of the commencement of the lockout or strike so that the maximum demand meter can be reset. In the case of temporary closure, the consumer shall give intimation of the closure. The consumer shall give intimation to the licensee immediately after lifting of the strike, lockout or temporary closure:\n(c) for the LT services disconnected as per the licensee's right to disconnect the supply or at the request of the consumer to disconnect supply, the monthly minimum charges shall be recovered by the licensee till the agreement is terminated.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Installation of meter.",
            "chapter": null,
            "content": "(i) The average losses in the transformer shall be calculated as follows and added to the energy consumption indicated by the meter: -\n(ii) The transformer loss arrived at by the above formula shall be added to the energy consumption, even when the recorded energy consumption is nil.\n(iii) 1 % of the transformer capacity for transformer above 63 KVA will be added to the recorded maximum demand on the Low Tension side to arrive at the equivalent High Tension demand.]\n(i) It is the responsibility of the licensee to replace all defective meters [belonging to the licensee] at his cost.\n(ii) Since the safe custody of the meter is the consumer's responsibility, replacement of meter due to damages shall be at the cost of consumer.\n(iii) The cost of replacement for burnt meters shall be met by the licensee unless it is proved otherwise that the burning out is due to the fault of the consumer.\n(iv) When the meter is owned by the consumer and becomes defective / damaged or when the meter is burnt due to the fault of the consumer, it is the responsibility of the consumer to replace the meter by a healthy one, if he elects to continue to have his own meter. Otherwise, the licensee shall replace the meter and enter into an agreement for hire and collect the specified deposits.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Meter reading, billing and intervals.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Meter readings when there is changes in sanctioned demand, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Inaccessibility of meter for reading.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Assessment of billing in cases where there is no meter or meter is defective.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Errors in billing.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Servicing of bills.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Due dates and notice periods.",
            "chapter": null,
            "content": "(a) For LT services, the due date shall be not less than 5 days from the date of entry in the consumer meter card. 15 days clear notice period shall be allowed prior to disconnection for non-payment. Belated payment surcharge shall not be levied for LT services during the notice period.\n(b) For HT services, the due date shall be not less than 7 days from the date of billing. If the last day of the due date happens to be a holiday, the due date shall be extended to till the next working day. 15 days clear notice period shall be allowed prior to disconnection for non-payment. [In case the last day of the notice period happens to be a holiday, the period of notice will get extended and the last day for payment to avoid disconnection will be the next working day.] Belated payment surcharge shall be levied for HT services during the notice period as specified in this Code.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. Mode of payment.",
            "chapter": null,
            "content": "(a) Low Tension Consumers - Rs.300/-\n(b) High Tension Consumers - Rs.1000/-.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Option to pay charges in advance.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Agreement with respect to supply: Issues on recovery of charges.",
            "chapter": null,
            "content": "(b) The authorised officer of the licensee may permit such applicant to pay the outstanding dues in instalments and to avail the service on payment of 40% of the total arrears outstanding including BPSC in addition to the charges for reconnection of such service connections or effecting new service connections. The balance 60% of the outstanding dues shall be collected in 10 monthly instalments.\n(c) In case an intending buyer of a premises requests for the details of electricity charges due from the owner / occupier of the premises to the distribution licensee, the distribution licensee shall provide such details on payment of the charges as stipulated in the order of the Commission on non-tariff related miscellaneous charges for the time being in force.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. Consumer grievance Redressal.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "19",
            "title": "19. Unauthorised use of electricity - Investigation and enforcement provisions.",
            "chapter": null,
            "content": "(2) The order of provisional assessment shall be served upon the person in occupation or possession or in charge of the place of premises in such manner as may be prescribed.\n[(3) The person, on whom an order has been served under sub-section (2), shall be entitled to file objections, if any, against the provisional assessment before the assessing officer, who shall, after affording a reasonable opportunity of hearing to such person, pass a final order of assessment within thirty days from the date of service of such order of provisional assessment of the electricity charges payable by such person] .\n(4) Any person served with the order of provisional assessment may, accept such assessment and deposit the assessed amount with the licensee within seven days of service of such provisional assessment order upon him:\n[(5) If the assessing officer reaches to the conclusion that unauthorized use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place cannot be ascertained, such period shall be limited to a period of twelve months immediately preceding the date of inspection] .\n(6) The assessment under this section shall be made at a rate equal to [twice] the tariff applicable for the relevant category of services specified in sub-section (5).\n(a) \"assessing officer\" means an officer of a State Government or Board or licensee, as the case may be, designated as such by the State Government;\n(b) \"unauthorised use of electricity\" means the usage of electricity -\n(i) by any artificial means; or\n(ii) by a means not authorised by the concerned person or authority or licensee; or\n(iii) through a tampered meter; or\n[(iv) for the purpose other than for which the usage of electricity was authorised; or\n(v) for the premises or areas other than those for which the supply of electricity was authorised]\n[19A. Procedure for disconnection of supply of electricity and removal of the unauthorized usage of electricity.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "127",
            "title": "20. Appeal under section 127(1) of the Act.",
            "chapter": null,
            "content": "(a) Every appeal petition referred to above shall be verified by an affidavit and every such affidavit shall be in Form 7.\n(b) Every affidavit shall be drawn up in the first person and shall state the full name, age, occupation and address of the deponent and the capacity in which he is signing and shall be signed and sworn before a person lawfully authorised to take and receive affidavits.\n(c) Every affidavit shall clearly and separately indicate statements, which are true to the (i) belief of the deponent, (ii) knowledge of the deponent, and (iii) information received by the deponent.\n(d) Where any statement in the affidavit is stated to be true to the information received by the deponent, the affidavit shall also disclose the source of the information and a statement that the deponent believes that information to be true.\nChapter 3\nDisconnection and Restoration of Electric Supply",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "21",
            "title": "21. Disconnection of supply.",
            "chapter": null,
            "content": "(a) an amount equal to the sum claimed from him, or\n(b) the electricity charges due from him for each calculated on the basis of average charge for electricity paid during the preceding six months, whichever is less, pending disposal of any dispute between him licensee.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "22",
            "title": "22. Restoration of supply of electricity.",
            "chapter": null,
            "content": "Category\nPeriod for reconnection of disconnected service\nHT consumers\nWithin five years from the date of Disconnection\nLT Agricultural consumers\n-do-\nOther LT consumers\nWithin two years from the date of Disconnection\n(ii) In accordance with sub-regulation (4), the authorized Officer of the Licensee may permit such consumer to pay the outstanding in instalments and to avail reconnection on receipt of 40% of the total arrears outstanding after closing of account due to the licensee, which include:\n(a) Arrears on the date of disconnection\n(b) Tariff minimum and meter rent for the period of six months from the date of disconnection (including the notice period)\n(c) The applicable BPSC / interest upto the date of payment.\n(d) The balance 60% of the amount shall be collected in ten monthly instalments.\n(e) In addition to the above, the full amount of Security Deposit adjusted while closing of account shall be collected in one lumpsum before effecting new service connection.]\nChapter 4\nTampering, Distress or Damage to Electrical Plant, Meters, Etc.\n23.\n[(1) Section 135 of the Act, which deals with theft of electricity, reads as follows:\n(1) Whoever, dishonestly, -\n(a) taps, makes or causes to be made any connection with overhead, underground or under water lines or cables, or service wires, or service facilities of a Licensee supplier as the case may be; or\n(b) tampers a meter, installs or uses a tampered meter, current reversing transformer, loop connection or any other device or method which interferes with accurate or proper registration, calibration or metering of electric current or otherwise results in a manner whereby electricity is stolen or wasted; or\n(c) damages or destroys an electric meter, apparatus, equipment, or wire or causes or allows any of them to be so damaged or destroyed as to interfere with the proper or accurate metering of electricity.\n(d) uses electricity through a tampered meter or\n(e) uses electricity for the purpose other than for which the usage of electricity was authorised, so as to abstract or consume or use electricity shall be punishable with imprisonment for a term which may extend to three years or with fine or with both;\n(i) does not exceed 10 kilowatt, the fine imposed on first conviction shall not be less than three times the financial gain on account of such theft of electricity and in the event of second or subsequent conviction the fine imposed shall not be less than six times the financial gain on\n(ii) exceeds 10 kilowatt, the fine imposed on first conviction shall not be less than three times the financial gain on account of such theft of electricity and in the event of second or subsequent conviction, the sentence shall be imprisonment for a term not less than six months, but which may extend to five years and with fine not less than six times the financial gain on account of such theft of electricity:\n(1A) Without prejudice to the provisions of this Act, the licensee or supplier, as the case may be, may, upon detection of such theft of electricity, immediately disconnect the supply of electricity:\nOLD LAW 6\n(a) taps, makes or causes to be made any connection with overhead, underground or under water lines or cables, or service wires, or service facilities of a licensee; or\n(b) tampers a meter, installs or uses a tampered meter, current reversing transformer, loop connection or any other device or method which interferes with accurate or proper registration, calibration or metering of electric current or other wise results in a manner whereby electricity is stolen or wasted; or\n(c) damages or destroys m x electric meter, apparatus, equipment, or wire or causes or allows any of them to be so damaged or destroyed as to interfere with the proper or accurate metering of electricity, so as to abstract or consume or use electricity shall be punishable with imprisonment for a term which may extend to years or with fine or with both:\n(i) does not exceed 10 kilowatt, the fine imposed on first conviction shall not be less than three times the financial gain on account of such theft of electricity and in the event of second or subsequent conviction the fine imposed shall not be less than six times the financial gain on account of such theft of electricity.\n(ii) exceeds 10 kilowatt, the fine imposed on first conviction shall not be less than three times the financial gain on account of such theft of electricity and in the event of second or subsequent conviction, the sentence shall be imprisonment for a term not less than six months but which may extend to five years and with fine not less than six times the financial gain on account of such theft of electricity:\n(2) [Any officer of the licensee or supplier as the case may be] authorise in Hus behalf by the State Government may -\n(a) enter, inspect, break open and search any place or premises in which he has reason to believe that electricity has been or is being used unauthorisedly;\n(b) search, seize and remove all such devices, instruments, wires and any other facilitator or article which has been or is being used for unauthorised use of electricity;\n(c) examine or seize any books of account or documents which % his opinion shall be useful for or relevant to, any proceedings in respect of the offence under sub-section (1) and allow the person from whose custody such books of account or documents are seized to make copies hereof or take extracts therefrom in his presence.\n(3) The occupant of the place of search or any person on his behalf shall remain present during the search and a list of all things seized in the course of such search shall be prepared and delivered to such occupant or person who shall sign the list:\n(4) The provisions of the Code of Criminal Procedure, 1973 (2 of 074), relating to search and seizure shall apply, as for as may be, to searches and seizure under this Act.\"\n(1) The officer authorized under sub-section (2) of section 135 of the Act (hereinafter referred to as the authorized officer), may either suo motu or on receipt of reliable information regarding theft of electricity in any premises, conduct inspection of such place or premises (The provisions of the Code of Criminal Procedure, 1973, relating to search and seizure shall apply, as far as may be, to searches and seizure under this Act.).\n(2) (a) The authorized officer shall prepare a report at the place or premises giving details such as connected load, condition of seals, working of meter and record, modus operand adopted for theft of energy. Any damage or destruction to the electric meter, metering equipments, apparatus, line, cable or electrical plant of the Licensee or supplier concerned, caused or allowed to be caused by the accused person so as to interfere with the proper or accurate metering of electricity or for theft of electricity shall also be duly recorded in the report indicating whether conclusive evidence substantiating the fact that theft of energy was found or not. The authorized officer may also take photo or prepare a diagram illustrating the arrangements found to have been made for theft of electricity, wherever feasible and such photo or diagram shall form a part of inspection report. Upon detection of such theft of electricity, the officer of the licensee or supplier, as the case may be, as authorized for the purpose by the Commission, may, immediately disconnect the supply line of electricity and a complaint shall be lodged in the police station as per the procedure stipulated in section 135 (1 A) of the Act on the basis of the materials collected by the Assessment officer who has conducted the inspection. The supply to the premises shall be restored only after satisfying the stipulation of the third proviso of section 135 (1A) of the Act.\n(b) To carry out all or any of the above acts specified in sub-section (1A) of section 135 of the Act, the Commission authorises the same officers of the Licensee or the supplier as authorised by the Government of Tamil Nadu to do all or any of the acts specified in clauses (a) to (c) of sub-section (2) of section 135 of the Act.\n(3) In case of suspected theft by tampering of meter or metering equipment, meter connection security seal or by replacing original seal by bogus seal, the meter shall be removed and sealed and a separate report shall be prepared on the condition of the meter and metering equipment removed and sealed. At the time of sealing, signatures of the accused person and also of the officers of licensee or supplier concerned, as the case may be, and any other witness shall be obtained on this report. This report shall also form a part of the inspection report. The supply shall be restored only through a meter tested in an accredited test laboratory and metering equipment of appropriate rating subject to satisfying the condition as specified in sub-regulation (2). In such cases, the licensee or supplier concerned, as the case maybe, shall also verify the connected load at the premises and record details of equipment found in the premises, in the inspection report.\n(4) In cases where the theft of electricity by by-passing the meter or metering equipment is detected and the electrical load, fully or partially, or the accused person's connection is found connected directly with the lines, Cables or electrical plant, electric supply to such premises shall be disconnected forthwith as stipulated in sub-regulation (2) and shall be restored only after the cause of theft is removed to the satisfaction of the licensee or supplier concerned, as the case may be, and subject to satisfying the condition as stipulated in sub-regulation(2).\n(5) In cases of theft by direct tapping from the licensee's or supplier's lines, cables or electrical plant of the licensee or supplier, if the accused person unauthorizedly connects or reconnects any meter of the licensee or supplier in a disconnected service, then electric supply to such premises or place shall be disconnected forthwith as stipulated in sub-regulation (2). The licensee or supplier concerned, as the case may be, may subsequently remove or divert or convert his line, cable or electrical plant to prevent further theft of electricity provided that such action shall not result in any inconvenience in affording quality supply or disruption of supply, to other consumers.\n(6) The authorized officer and any other officer of the licensee or supplier concerned, as the case may be, who accompanied the authorized officer shall sign the inspection report in all the above cases and obtain signatures of the accused person or his representative and the same must be handed over to the accused person or his representative at site immediately under proper receipt. In case of refusal by the accused person either to sign or accept or give a receipt, a copy of inspection report must be pasted at a conspicuous place in or outside the premises and a note recorded on the office copy of the inspection report to the effect that the copy of the report has been pasted at the conspicuous place of the premises. A copy of the report shall be subsequently sent to the accused person of the premises under registered post within three days of inspection.\n(7) Where it is established that there is a case of theft of energy, the authorized officer shall assess the quantum of energy consumption for the past twelve months as per the assessment formula given in Form 8 in Appendix to this code and prepare provisional assessment order for the charges for such consumption at two times of the tariff applicable (i.e the applicable tariff for the purpose for which the pilfered energy was used) and serve on the accused person under proper receipt. The authorized officer may reduce the period for such billing if it is established by the facts or documents submitted in the representation of the accused person or any such other evidence observed by the authorized officer. Wherever electronic meters are installed and the load curves are studied periodically, the period of theft could be limited to the exact period as could be determined scientifically. The authorized officer shall record reasons for such reduction in the period of billing, in the assessment order. The energy consumption arrived at as per the formula referred to in the said Form 8 will be charged excluding the energy consumption recorded by the meter as per the rates specified by the Commission's Tariff Order.\n(8) Within five days of inspection, the authorized officer shall serve on the accused person, provisional assessment order in the Form 9 in Appendix to this code for the charges for the theft of electricity based on the evidence recorded during the course of inspection. The order should clearly state the time, date and place at which the reply has to be submitted and the designation/address of the officer to whom it should be addressed. The accused person shall be required to submit his representation within seven days of issue of the provisional assessment order.\n(9) In case of suspected theft through a tampered meter, such tampered meter taken out and sealed at the time of inspection, as prescribed in sub regulation (3), shall be sent to the third party accredited meter testing laboratory as arranged by the licensee or supplier concerned, as the case may be, or to the Chief Electrical Inspector to the State Government till such time the third party meter testing arrangement is established by the licensee or supplier concerned, as the case may be. The accused person shall be given a notice of seven working days for witnessing the test of such meter at such meter testing laboratory. The notice shall clearly indicate the time, date and place wherein the suspected tampered meter shall be tested and the accused person shall be allowed to witness the test. The accused person shall duly sign the test results report after witnessing it. If such accused person does not turn up at the meter testing laboratory on the appointed date and time indicated in the notice to witness the test or refuses to sign the test results, the licensee or supplier concerned, as the case may be, shall carryout the test in the absence of such accused person and shall send a copy of results to the accused person through registered post within three days of the date of testing.\n(10) In cases where the meter has been tested at such meter testing laboratory and where it is established that there is a case of theft of energy, the procedure for assessment as specified in sub regulation (7) shall be followed.\n(11) In case the accused person does not respond to the provisional order within seven working days, the licensee or supplier concerned, as the case may be, may proceed to initiate the recovery against the provisional assessment order.\n(12) Within seven working days from the date of submission of such accused person's reply, if made within the seven working days from the date of receipt of provisional assessment order, the authorized officer shall arrange a personal hearing with such accused person. For this purpose the authorized officer shall serve a three days notice to such accused person to allow him for a personal hearing and shall also allow any additional submission of new facts or documents if any, during the course of hearing by such accused person. If such accused person does not respond to the notice in the matter, the authorized officer shall proceed to issue the final assessment order, as per the procedure specified herein after.\n(13) Before the personal hearing, the authorized officer before whom personal hearing shall be conducted, shall analyze the case after carefully considering all the documents, submissions by the accused person, facts on record and the consumption pattern, whatever available.\n(14) The authorized officer shall also compute the quantum of energy consumption for the past twelve months. The Assessment Officer may study the energy consumption pattern of the Service Connection concerned for the past one year or more. If necessary, it may also be compared with the load/production pattern or output of the service connection. In case of suspected theft, if consumption pattern is commensurate with the assessed consumption or in case of the decision that the case of suspected theft is not established, no further proceedings shall be taken and the decision shall be communicated to the accused person under proper receipt within three working days and the supply to the premises shall be restored forthwith.\n(15) Considering the facts submitted by the accused person, the authorised officer shall issue, within seven working days from the date of enquiry, a final assessment order in Form 10 in Appendix to this code. If the accused person does not respond to the personal hearing, the authorised officer shall issue a final assessment order within fifteen days from the issuance of provisional assessment order. This speaking order shall contain a brief of inspection report, submissions made by accused person in his written reply as well as during his personal hearing and reasons for acceptance or rejection of the same and the assessment charges as per sub-regulation (12). In the final assessment order, charges, if any, paid by the accused person during the period for which the assessment is done shall be duly credited, if warranted, to avoid duplication of billing for such period.\n(16) The final assessment amount and the last date should be clearly stated in the speaking order. A copy of the speaking order shall be handed over to the accused person under proper receipt on the same day.\n(17) The accused person shall be required to make the payment within seven working days of receipt of final assessment order. On deposit or payment of the assessed amount or electricity charges by the accused person, supply to the premises shall be restored as referred to in the third proviso of section 135 (1A) of the Act.\n(18) In case of default in payment of the assessed amount, the licensee or supplier concerned, as the case may be, shall, after giving a fifteen days' notice in writing, remove meter and service line and also electrical plant for giving supply to this connection. However if the accused person makes payment within notice period, surcharge applicable to that category shall also be payable as prescribed in this code.\n(19) In case where the theft of electricity in the premises which does not have regular electricity connection, has been detected and the licensee or supplier concerned, as the case may be, shall forthwith disconnect the supply to such premises. In such premises supply shall be given only after the accused person has cleared the dues to be paid on account of charges assessed for theft oi electricity in full including surcharge if any and has availed a regular new connection after completing the required formalities.\n(20) If the accused person does not make payment, the licensee or supplier concerned, as the case may be, may proceed to recover its dues against such order and take such further action as is permitted under the Act.\n(21) If no person is available to whom the provisional or final assessment order can be served with reasonable diligence or if any person refuses to accept or avoids to receive such order, it shall be affixed at the inspected premises in the presence of two witnesses and in such case an endorsement to the effect shall be made in the copy of such order. An assessment order so affixed shall be deemed to have been duly served to the person or occupier of the premises.\n(22) In case of compounding the notice as in Form 11 in Appendix to this code may be issued and the amount collected as per section 152 of the Act.\n(a) \"accused person\" shall mean and include the owner or occupier of the premises or his authorized agent or representative or any other person who is in occupation or possession or in charge of the premises at the relevant time of detection of theft of electricity or any other person who has been benefited by the theft of electricity.\n(b) \"authorised officer\", shall in case if he is not an officer of the licensee or supplier, as the case maybe, mean and include an officer designated or appointed as an authorised officer by the State Government for the purpose of dealing with theft of electricity as provided in the Act, including the assessment of theft of energy empowered under this code.\n(c) \"licensee or supplier\" means and includes the licensee or supplier, as the case may be or his franchisee or his authorized agent or representative who alleges the occurrence of theft of electricity.]\n\"(1) Whoever, dishonestly. -\n(a) cuts or removes or takes away or transfers any electric line, material or meter from a tower, pole, any other installation or place of installation or any other place, or site where it may be rightfully or lawfully stored, deposited, kept, stocked, situated or located, including during transportation, without the consent of the licensee or the owner, as the case may be, whether or not the act is done for profit or gain; or\n(b) stores, possesses or otherwise keeps in his premises, custody or control, any electric line, material or meter without the consent of the owner, whether or not the act is committed for profit or gain; or\n(c) loads, carries, or moves from one place to another any electric line, material or meter without the consent of its owner, whether or not the act is done for profit or gain, is said to have committed offence of theft of electric lines and materials, and shall be punishable with imprisonment for a term which may extend to three years fine or with both.\n(2) If a person, having been convicted of an offence punishable under sub-section (1) is again guilty of an offence punishable under this sub-section, he shall be punishable for the second or subsequent for a term of imprisonment which shall not be less than six months but which may extend to five years and shall also be liable to fine which shall not be less than ten thousand rupees.\"\n(1) The licensee shall arrange for routine testing and certification of different meters as stipulated in the Central Electricity Authority (Installation and Operation of Meters) Regulations 2006 and in any other directions issued by the Commission.\n(2) The licensee shall arrange to provide pilfer proof meter boxes and meters with anti tampering features as stipulated in the regulations made by Authority under the Act on Installation and Operation of Meters in all industrial new connections and at least in 10% existing industrial connections every year. This maybe extended to other categories whose load / demand, is more than 18.6 KW.\n(3) All new Industrial, HT and EHT metering systems shall be immune to external influences like magnetic induction, vibration, electrostatic discharge, switching Transients, Surge Voltages, oblique suspension, harmonics or any other factor. This may be extended to other categories whose existing contracted load/demand is more than 18.6 KW.\n(4) The licensee shall arrange for regular and surprise inspection of premises by their officers to ensure prevention of theft or unauthorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter. At least 5% of total connections should be inspected annually and the provisions contained in sections 126 and 135 (2) shall be effectively implemented.\n(5) Priority shall be given to detection of theft of electricity cases by the licensee, particularly in theft prone areas.\n(6) The licensee shall evolve a system and put in place within three months for carrying out regular monthly monitoring of consumption of high value consumer, which shall include all the HT connections and LT connections having contract demand of 18.6 KW and above. Variations in the consumption shall be carefully analyzed. The licensee shall arrange prompt inspection in doubtful cases.\n(7) The licensee shall endeavour to install remote metering devices on all HT connections on priority, and may be implemented over a period of time after analysing cost economics, for the purpose of monitoring of consumption and prevention of theft of electricity. The licensee shall further endeavour to install remote metering devices on high value LT connections.\n(8) The licensee shall arrange to give due publicity through the media, TV, newspaper and by displaying in boards at consumer service related offices of the licensee to bring awareness regarding the level of commercial losses due to theft or unauthorized use of electricity, its implication on the honest consumers and seek the cooperation of the consumers for prevention of theft or  unauthorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter. The licensee shall also display boards containing the information on the above at its consumer service related offices.\n(9) The licensee shall arrange to display feeder wise losses, efforts made for prevention of diversion of electricity, theft or unauthorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter and results obtained during the year, on its website.\n(10) The licensee shall arrange to provide requisite security staff to the inspecting officers for their safety and expenses on such account shall be a pass through in the Annual Revenue Requirement of the licensee. Such security staff shall invariably accompany the inspecting officers in order to ensure safety of the inspecting officer.\n(11) The licensee shall arrange to install meter on distribution transformers of the suspected area where the possibilities of theft of electricity exists and shall monitor the consumption of such meters with the consumption of individual consumer meters connected to the distribution transformer. The licensee shall carryout intensive inspection in areas, if the difference in consumption of the distribution transformers meter and individual consumer meters connected to the distribution transformer is abnormal.\n(12) The licensee may provide HV distribution system in theft prone areas using small capacity distribution transformer, wherever necessary, to prevent theft by direct hooking.\n(13) The licensee is authorized to relocate the meters of existing consumers to an appropriate location so that it is outside the premises but within the boundary wall and easily accessible for reading, inspection/ testing and other related works.\n(14) The licensee shall ensure that meter readers are rotated in such a manner that their area of meter reading is changed at least once in a year.]\n\"(1) Whoever, -\n(a) unauthorisedly connects any meter, indicator or apparatus with any electric line through which electricity is supplied by a licensee or disconnects the same from any such electric line; or\n(b) unauthorisedly re-connects any meter, indicator or apparatus with any electric line or other works being the property of a licensee when the said electric line or other works has or have been cut or disconnected; or\n(c) lays or causes to be laid, or connects up any works for the purpose of communicating with any other works belonging to a licensee; or\n(d) maliciously injures any meter, indicator, or apparatus belonging to a licensee or willfully or fraudulently alters the index of any such meter, indicator or apparatus or prevents any such meter, indicator or apparatus from duly registering, shall be punishable with imprisonment for a term which may extend to three years, or with fine which may extend to ten thousand rupees, or with both, and, in the case of a continuing offence, with a daily fine which may extend to five hundred rupees; and if it is proved that any means exist for making such connection as is referred to in clause (a) or such re-connection as is referred to in clause (6), or such communication as is referred to in clause (c), for causing such alteration or prevention as is referred to in clause (d), and that the meter, indicator or apparatus is under the custody or control of the consumer, whether it is his property or not, it shall be presumed, until the contrary is proved, that such connection, re-connection, communication, alteration, prevention or improper use, as the case may be, has been knowingly and willfully caused by such consumer.\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "24",
            "title": "24. Compounding of offences.",
            "chapter": null,
            "content": "Nature of Service.\nRate at which the sum of money for compounding to\n\t\t\t\tbe collected per Kilowatt (KW) /Horse Power (PIP) or part thereof\n\t\t\t\tfor Low Tension (LT) supply and per Kilo Volt Ampere (KVA) of\n\t\t\t\tcontracted demand for High Tension (HT).\n(1)\n(2)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "1",
            "title": "1. Industrial Service",
            "chapter": null,
            "content": "twenty thousand rupees;",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "2",
            "title": "2. Commercial Service",
            "chapter": null,
            "content": "ten thousand rupees;",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "3",
            "title": "3. Agricultural Service",
            "chapter": null,
            "content": "two thousand rupees;",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "4",
            "title": "4. Other Services",
            "chapter": null,
            "content": "four thousand rupees:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "25",
            "title": "25. Power for licensee to enter premises and to remove fittings or other apparatus of licensee.",
            "chapter": null,
            "content": "\"(1) A licensee or any person duly authorised by a licensee may, at any reasonable time, and on informing the occupier of his intention, enter any premises to which electricity is, or has been, supplied by him, of any premises or land, under, over, along, across, in or upon which the electric supply-lines or other works have been lawfully placed by him for the purpose of:\n(a) inspecting, testing, repairing or altering the electric supply-lines, meters, fittings, works and apparatus for the supply of electricity belonging to the licensee; or\n(b) ascertaining the amount of electricity supplied or the electrical quantity contained in the supply; or\n(c) removing where a supply of electricity is no longer required, or where the licensee is authorised to take away and cut off such supply, any electric supply-lines, meters, fittings, works or apparatus belonging to the licensee.\n(2) A licensee or any person authorised as aforesaid may also, in pursuance of a special order in this behalf made by an Executive\n(a) enter any premises or land referred to in sub-section (1) for any of the purposes mentioned therein;\n(b) enter any premises to which electricity is to be supplied by him, for the purpose of examining and testing the electric wires, fittings, works and apparatus for the use of electricity belonging to the consumer.\n(3) Where a consumer refuses to allow a licensee or any person authorised as aforesaid to enter his premises or land in pursuance of the provisions of sub-section (1) or, sub-section (2), when such licensee or person has so entered, refuses to allow him to perform any act which he is authorised by those sub-sections to perform, or fails to give reasonable facilities for such entry or performance, the licensee may, after the expiry of twenty-four hours from the service of a notice in writing on the consumer, cut off the supply to the consumer for so long as such refusal or failure continues; but for no longer.\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "26",
            "title": "26. Code to be read along with Distribution Code, Electricity Act, 2003 and amendments, etc,.",
            "chapter": null,
            "content": "Chapter 5\nCode Review Panel",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "27",
            "title": "27. Appointment of Code Review Panel.",
            "chapter": null,
            "content": "(a) A Chairperson at the level of Director of the Distribution Licensee.\n(b) A Member Secretary, who shall be the Chief Engineer/Commercial of the Distribution Licensee.\n(c) One Member from the SLDC who is not below the rank of Chief Engineer.\n(d) Three representatives from the Distribution Licensee who are not below the rank of Chief Engineer and one representative from the Distribution Licensee who is not below the rank of Chief Financial Controller.\n(e) One representative from LT domestic consumer sector, one from LT commercial sector, one from LT industry sector and one from LT agricultural consumer sector.\n(f) One member representing the EHT / HT consumers.\n(g) One member representing open access consumers.\n(a) to review the working of various provisions of this Code, [***] and the Distribution Code;\n(b) to consider the suggestions received from the licensees, consumers and other interested persons;\n(c) to consider and offer its views on any specific matter as may be referred to it by the Commission.\n(ii) The panel shall, upon receipt of such proposal or where the Commission has made a reference, forward the same to the STU for its consideration and written comments.\n(iii) The panel shall convene a meeting of its members to consider the comments of the STU, and if necessary at its discretion, invite and hear the person who made the suggestions for change and other interested persons and also the local authorities and tele-communication companies.\n(iv) The panel may, in considering the suggestion and the comments of the STU thereon, set up sub-committees to study the related issues.\n(v) The panel after finalising its views on the modifications to the Code, forward the same to the Commission:\n[Appendix]\n[Appendix]\nForm 1\nForm 1\n[Refer to regulation 5(7)]\n(1) The xerox copy of the sale deed in my favour for the said premises is enclosed, or\n(2) Application and Agreement Form.\n(3) Indemnity Bond on Rs.80/-Non-judicial stamp paper (Applicable in the case of name transfer due to legal succession).\nPlace:\nSignature of transferee.\nDate:\nFull Address:\nForm 2\nForm 2\nName Transfer Forms\nName Transfer Forms\n[Refer to regulation 5 (7)]\n(To be used as a consent letter from transferor in case of sale, etc.)\nPlace:\nSignature of transferee.\nDate:\nFull Address:\n* Strike out the portion not required.\nForm 3\nForm 3\n[Refer to regulation 5(7)]\nIndemnity Bond\nIndemnity Bond\nSignature of the consumer.\nForm 4\nForm 4\n[Refer to regulation 5(7)]\nUndertaking\nUndertaking\nSignature.\n1.\n2.\nForm 5\nForm 5\n[Refer to regulation 22(8)]\nUndertaking For Payment of Dues In Instalments.\nUndertaking For Payment of Dues In Instalments.\nUndertaking\nUndertaking\n(i) to pay the total dues of Rs..........(Rupees..................) in monthly instalments subject to levy of belated payment surcharge in case of default to pay the instalment on the dates specified below:\nFirst instalment Rs...........................payable on or before....................\nSecond instalment Rs......................payable on or before....................\nThird instalment Rs............................payable on or before....................\npayable on or before and so on.\n(ii) to adhere strictly to the schedule of instalments and also to pay before the due dates the monthly / bi-monthly current consumption charges failing which the supply may be disconnected without further notice and the re-connection may be effected only on settlement of the entire (including balance instalment) dues with belated payment surcharge for the instalments not paid on the due date.\nSignature.\nForm 6\nForm 6\n[Refer to regulation 20]\nForm of Appeal to the Prescribed Appellate Authority Under Section 127 (1) of the Act.\nForm of Appeal to the Prescribed Appellate Authority Under Section 127 (1) of the Act.\n(1) Appeal No................of..............\n(2) Name and address of the appellant:\n(3) Designation and address of the Assessing.\nOfficer passing the order\n(4) Date of communication of the order appealed against to the appellant\n(5) Address to which notices may be sent to the appellant\n(6) Amount ordered to be paid\n(7) Whether the [half] of the assessed amount as required under section 127 (2) of the Act is deposited (Documentary proof of the deposit shall be furnished)\n(8) Statement of facts (here state the facts briefly)\n(9) Grounds of appeal\n(Here set out the grounds on which the appeal is made by the appellant)\n(10) Whether the appellant wishes to be heard in person or through an advocate or authorised representative (In case if the appellant wishes to be rep resented by his authorised representative or by an advocate then a letter of authority authorising the authorised representative to represent on his behalf or as the case may be a vakkalat authorising the advocate to represent his case shall be furnished.)\n(11) Relief prayed for\nSignature of the authorised representative, if any.\nForm 7 Affidavit In Support (Refer to regulation 20) Before The Appellate Authority Under Section 127(1) of The Act. Appeal No...................\nForm 7\nAffidavit In Support\nAffidavit In Support\n(Refer to regulation 20)\nBefore The Appellate Authority Under Section 127(1) of The Act.\nName and address of the appellant\n...... Appellant\nDesignation and address of the Assessing Officer\n.......Respondent",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "1",
            "title": "1. I am the appellant / authorised representative of the appellant in the Appeal Petition filed by me against the orders of the Assessing Officer referred to above as the respondent in my Appeal Petition and as such I am competent to verify the facts set out in my Appeal Petition.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "2",
            "title": "2. I solemnly affirm at.............on this day of............. that................",
            "chapter": null,
            "content": "(i) the contents of the above appeal petition are true to my knowledge and I believe that no part of it is false and no material has been concealed therefrom;\n(ii) the statement made in paragraphs...................of the appeal petition herein now shown to me and marked with the letter 'A' are true to my knowledge; and\n(iii) the statements made in paragraphs ............ marked with the letter 'B' are based on information received from ...................and I believe them to be true.\nSignature of the Appellant\nList of Abbreviations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "1",
            "title": "1. DD - Demand Draft.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "2",
            "title": "2. HP - Horse Power",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "3",
            "title": "3. ISI - Indian Standards Institute",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "4",
            "title": "4. KVA - Kilo Volt Ampere",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "5",
            "title": "5. KW-Kilo Watt",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "6",
            "title": "6. SLDC - State Load Despatch Centre",
            "chapter": null,
            "content": "[Form 8] [See Regulation 23 (AA) (7)] Formula To Assess The Quantum of Energy In Case of Theft of Electricity The following factors are to be considered to arrive at a formula for the assessment of quantum of energy in case of theft of electricity.\n[Form 8]\n[See Regulation 23 (AA) (7)]\nFormula To Assess The Quantum of Energy In Case of Theft of Electricity\nFormula To Assess The Quantum of Energy In Case of Theft of Electricity\n(i) Nature of Service\n(ii) Connected load / Contracted demand\n(iii) Load factor\n(iv) Nature of feeder (Rural / Urban / Industrial) and supply restrictions in the feeder\n(iv) Per day usage hours for which assessment has to be made.\ni. for the period of twelve months\nii. for the period from the date of prior inspection if any by the Enforcement or meter testing wing to the date of detection\niii. from the date of service connection to the date of detection\niv. wherever electronic meters are installed and the load curves are studied periodically the period of theft could be limited to the exact period as could be determined scientifically.\nv. Based on the document produced by the accused person.\nvi. For any other reasonable period as assessed by the authorized officer to the best of his judgment\nTable-A\nTable-A\nUsage Categories of pilfered energy\nUsage Categories of pilfered energy\nDiversity Factor\nDiversity Factor\nLoad Factor\nLoad Factor\nNumber of hours per day\nNumber of hours per day\nDomestic (without Air conditioning load) and\n\t\t\t\tHuts\n1\n30%\n12\nDomestic (with Air conditioning load)\n1 March to September\n70%\n12\nOther months .\n30%\n12\nIndustrial including cottage industries\n1\n80%\nAs per Table-B\nPower looms etc Public lighting and water supply\n1\n100%\n8\nAgricultural\n1\n100%\n10\nAll other categories\n1.1\n90%\n12\nTable B\nTable B\nCategory\nCategory\nNumber of hours per day\nNumber of hours per day\n1\nFed by High Tension rural feedershaving only 14\n\t\t\t\thours of supply per day:-\ni. Day Shift only\n6\nii. Night Shift only\n8\niii. Both day and night shifts\n14\n2\nFed by High Tension feeders having 24 hours of\n\t\t\t\tsupply:-\ni. Day shift only\n8\nii. 2 Shifts\n16\niii. 3 Shifts\n24\ni. The term \"Usage Categories\" given in Table - A refers to the purpose for which the suspected pilfered energy is used. For example if the pilfered energy in a hut service connection is used for domestic purpose, the assessment shall be made under \"domestic category\", if it is used for commercial purpose, it shall be assessed under \"all other categories\" as mentioned in the above Table - A.\nii (a) For High Tension Service connections, the maximum demand shall be assessed as 75% of the total connected load at the time of inspection subject to a minimum of the contracted demand. A power factor of 0.90 lag may be used for conversion of KVA or KW.\n(b) Assessment of demand charges: -\nTwice the appropriate H.T. tariff rate for maximum demand.\n[Form 9]\n[Form 9]\n[See Regulation 23 (AA) (8)]\nProvisional Assessment Order For Theft of Energy Under Section 135/138 of The Electricity Act, 2003\nProvisional Assessment Order For Theft of Energy Under Section 135/138 of The Electricity Act, 2003\nFrom (The Authorised Officer),\nTo Full address of the person in whose name the service connection stands (or) occupier (or) enjoyer, etc.)\nRef: Inspection Report dated\n1.0. On.............(the day, month, year of inspection) at...(time) hours the service connection in SC No ............ located at Door No ......., in SF No ........... (Full address of the service connection) which is/was in the name of Thiru /Thirumathy...............was inspected by me in the presence of you/your representative Thiru/Thirumathy...............\n2.0. During the inspection it was found that an offence of theft of energy has been comitted................................(describe actual mode of theft with details of artificial means found in the service/unauthorized reconnection of a disconnected service connection). By committing the said offence, you have dishonestly abstracted, consumed and used energy with the intention to defraud the licensee.\nThe above said illegal abstraction, consumption and use of energy is punishable under section 135 of the Electricity Act 2003.\n3.0. The approximate loss caused by you due to dishonest abstraction/illegal restoration of supply is assessed at Rs ................ (Rupees.................) in accordance with the regulations of the Tamil Nadu Electricity Supply Code, and a working sheet is enclosed herewith.\n4.0. The assessment amount as referred to above shall be paid within 7 working days from the date of receipt of this order.\n5.0. If you are desirous of filing objections, if any, against the provisional assessment, you may send your explanation to the address of the undersigned with sufficient proof, within seven days from the date of receipt of this order. You may also choose to appear in person or through an authorised representative with relevant documents for an enquiry before the undersigned.\n6.0. You are requested to acknowledge the receipt of. this order immediately.\nYours faithfully, Authorised Officer......",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "1",
            "title": "1. Report",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "2",
            "title": "2. Statement Recorded (if any)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "3",
            "title": "3. Mahazar",
            "chapter": null,
            "content": "[Form 10]\n[Form 10]\n[ See Regulation 23 (AA) (15)]\nFinal Assessment Order For Theft Of Energy Under Section 135 Of The Electricity Act, 2003\nFinal Assessment Order For Theft Of Energy Under Section 135 Of The Electricity Act, 2003\nFrom (The Authorised Officer), Letter No.........dated......\nTo (Full address of the person in whose name the service connection stands (or) occupier (or) enjoyer, etc.)\nSub: Theft of energy - Detected in SC No Final Assessment\nRef: 1. Provisional Assessment Order.......",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "2",
            "title": "2. Your reply ...........",
            "chapter": null,
            "content": "*****\n1.0. On.......(the day, month, year of inspection) at...............(time) hours the service connection in SC No located at Door No in SF No.  (Full address of the service connection) which is/was in the name of Thiru/Thirumathy ............... was inspected by me in the presence of you/your representative Thiru/Thirumathy.................\n2.0 During the inspection it was found that an offence of theft of energy has been committed.............................(describe the actual mode of theft with details of artificial means found in the service/unauthorized reconnection of a disconnected service connection).\n3.0. A provisional assessment was issued to you in the reference cited and you were allowed to file your objections and to appear for a hearing as per the Tamil Nadu Electricity Supply Code.\n4.0. On a detailed examination and on consideration of your explanation offered, facts and records furnished in your letter / during the personal hearing, it is found that the theft of electricity has been committed by you as described below: -\n(A reasoned/detailed order to be passed by the Officer concerned taking into consideration the theft of electricity noticed, explanation and the findings. Reference to be made to the materials in support of the claim of the licensee about the existence of theft, the involvement or the role of the consumer with reference to the said theft of energy, submissions made by accused person in his written reply as well as during his personal hearing and reasons for acceptance or rejection of the same).\n5.0 The loss caused by you due to dishonest* abstraction/*illegal restoration of supply is assessed at Rs ............. (Rupees.......................) in accordance with the regulations of the Tamil Nadu Electricity Supply Code, and a working sheet is enclosed herewith. The assessment amount referred to above shall be paid within seven working days from the date of receipt of this order.\nYours faithfully, Authorised Officer............",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "1",
            "title": "1. Report",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "2",
            "title": "2. Statement Recorded (if any)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "3",
            "title": "3. Mahazar",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "4",
            "title": "4. Provisional Assessment Order.",
            "chapter": null,
            "content": "He is instructed to arrange to serve the order to the accused person with dated acknowledgement and send the same to this office.\n* Strike out whichever is not applicable.\nFORM 11 [ See Regulation 23(AA) (22)] Compounding of Offence Under Section 152 of The Electricity Act, 2003. From (The Authorised Officer), Letter No..............dated.... To (Full address of the person in whose name the service connection stands (or) occupier (or) enjoyer, etc)\nFORM 11\n[ See Regulation 23(AA) (22)]\nCompounding of Offence Under Section 152 of The Electricity Act, 2003.\nCompounding of Offence Under Section 152 of The Electricity Act, 2003.\nFrom (The Authorised Officer), Letter No..............dated....\nTo (Full address of the person in whose name the service connection stands (or) occupier (or) enjoyer, etc)\nSub: Theft of energy - Detected in SC No Order on Compounding\nAmount - Reg.\n****\n1.0. On.............(the day, month, year of inspection) at .............. (time) hours the service connection in SC No ............ located at Door No.................. in SF No..............(Full address of the service connection) which is/was in the name of Thiru / Thirumathy.............was inspected by me in the presence of you/your representative.............................................Thiru/Thirumathy.............................\n2.0. *During the inspection it was found that an offence of theft of energy has been committed................................... (describe the actual mode of theft with details of artificial means found in the service/ unauthorized reconnection of a disconnected service connection). By committing the said offence, you have dishonestly abstracted, consumed and used energy with the intention to defraud the licensee.\n3.0 The above said illegal abstraction, consumption and use of energy is punishable under section 135 of the Electricity Act 2003.\n4.0 As you have opted for compounding of offence under section 152 of the Electricity Act, 2003, you are requested to pay Rs..........(Rupees .................) towards the compounding of the offence as mentioned above.\nYours faithfully, Authorized officer",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        }
    ],
    "metadata": {
        "Act ID": "tn353",
        "Act Number": "Published vide Notification No. TNERC/SC/7/1, dated 21.7.2004 - No. 6 (2)72484/2004",
        "Enactment Date": "",
        "Act Year": "2004",
        "Short Title": "The Tamil Nadu Electricity Supply Code, 2004",
        "Type": "STATE",
        "Location": "Tamil Nadu"
    },
    "updated_at": "2026-09-29 21:55:22"
}