{
    "act_title": "The Orissa Factories Rules, 1950",
    "act_slug": "the-orissa-factories-rules-1950",
    "section_label": "Section",
    "section": {
        "number": "31",
        "title": "Section 31 - 'Pressure Plant'",
        "chapter": null,
        "content": "Degree in Chemical or Electrical or Metallurgical or\n\t\t\t\t\tMechanical Engineering or its equivalent.\n(1) A minimum experience of 10 years in design or erection or\n\t\t\t\t\tmaintenance or Testing, examination and inspection of pressure\n\t\t\t\t\tplants.\nFacilities for carrying out hydraulic test, non-destructive\n\t\t\t\t\ttest, gauges equipment/gadgets for measurement and any other\n\t\t\t\t\tequipment or gauges to determine the safety in the use of\n\t\t\t\t\tpressure vessels.\n(ii) He shall be-\n(a) conversant with the relevant codes of practices and test\n\t\t\t\t\tprocedures relating to pressure vessels;\n(b) conversant with other statutory requirements concerning\n\t\t\t\t\tthe safety of unfired pressure vessels and equipment operating\n\t\t\t\t\tunder pressure;\n(c) conversant with the destructive testing techniques as are\n\t\t\t\t\tapplicable to pressure vessels;\n(d) able to identify the defects and arrive at a reliable\n\t\t\t\t\tconclusion with regard to the safety of the pressure plant.\n5\n(i) Section 36 precautions against dangerous fumes.\nMaster's degree in Chemical Engineering.\nA minimum of 7 years in collection, analysis of environmental\n\t\t\t\t\tsamples and calibration of monitoring equipment.\nMeters, instruments and devices duly calibrated certified for\n\t\t\t\t\tcarrying out the tests and certification of safety in working In\n\t\t\t\t\tconfined spaces.\n6\nVentilation systems as required\n\t\t\t\t\tunder various schedules framed under Section 87, such as\n\t\t\t\t\tschedules on-\nDegree in Mechanical or Electrical Engineering or equivalent.\n(i) A minimum of 7 years in the design fabrication,\n\t\t\t\t\tinstallation, testing of ventilation system and systems used for\n\t\t\t\t\textraction and collection of dusts fumes and vapours and other\n\t\t\t\t\tancillary equipment.\n(i) Grinding or glazing of metals and process\n\t\t\t\t\tincidental thereto;\n(ii) He shall be conversant with relevant codes of practice\n\t\t\t\t\tand tests procedures that are current in respect of ventilation\n\t\t\t\t\tand a traction system for furnaces and shall be able to arrive\n\t\t\t\t\tat a reliable conclusion with regard to effectiveness of the\n\t\t\t\t\tsystem.\n(ii) Cleaning or smoothing,\n\t\t\t\t\troughening, etc. of articles, by a jet of sand, metal shot, or\n\t\t\t\t\tgrit, or other abrasive propelled by a blast of compressed air\n\t\t\t\t\tor steam.\n(iii) Handling and processing of\n\t\t\t\t\tAsbestos.\n(iv) Manufacturing of Rayon by viscost process.\nNote-I - The Chief Inspector may relax the requirements of qualification in respect of a \"Competent Person\" If such person is exceptionally experienced and knowledgeable.\nNote-I\nNote-II - The \"Competent Person\" recognised under this provision shall not be above the age of 62 and shall be physically fit for the purpose of carrying out the tests, examination and inspections.\nNote-II\n(i) has violated any condition stipulated in the certificates of competency; or\n(ii) has carried out a test examination and inspection or has acted in a manner inconsistent with the intent or the purpose of the Act or these rules.\nRules prescribed under Sub-section (1) of Section 6\nRules prescribed under Sub-section (1) of Section 6\n3. [Approval of plans.\n(a) the site of the factory and immediate surroundings including adjacent buildings and other structures, roads, drains, etc.;\n(b) the plan, elevation and necessary cross sections of the factory buildings indicating all relevant details relating to natural lighting ventilation and means of escape in case of fire and the position of the plants and machinery, aisles and passage ways ; and\n(c) such other particulars, as the State Government or the Chief Inspector of Factories, as the case may be, may require.\n(a) a flow chart or the manufacturing process supplemented by a brief description of the process in its various stages;\n(b) plans in duplicate drawn to scale showing-\n(i) the site of the factory and immediate surroundings including adjacent buildings and other structures, roads, drains, etc.;\n(ii) the plan elevation and necessary cross sections of the various buildings indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fires. The plans shall also clearly indicate the position of the plant and machinery, aisles and passage ways ; and\n(c) such other particulars if the Chief Inspector may require.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 4
    },
    "prev_section": "29-Lifting",
    "next_section": "3A"
}