{
    "act_title": "The Orissa Factories (Exemption) Rules, 1996",
    "act_slug": "the-orissa-factories-exemption-rules-1996",
    "section_label": "Section",
    "section": {
        "number": "51",
        "title": "Section 51, 52, 54, 55, 56 and 61",
        "chapter": null,
        "content": "Ditto\n5.\n64(2)(b)\nDitto\nWork performed by furnacement and firemen\nSections 51, 54, 55 and 56\nDitto\n6.\n64 (2)(d)\nPublic electricity supply factories generating\n\t\t\t\t\telectricity in any manner and those engine rooms and boiler\n\t\t\t\t\tdepartments generating electricity in any manner for their own\n\t\t\t\t\tuse employing workers on shift\nOperation maintenance of (i) Prime movers\n\t\t\t\t\tand auxiliaries, generators, transformers and switch gears; (ii)\n\t\t\t\t\tBoilers and auxiliaries.\nSections 51, 52, 54, 55 and 56\n(a) The workers shall be allowed to work on\n\t\t\t\t\tshifts of not longer than eight hours durations\n(b) No such worker shall be employed more than\n\t\t\t\t\tfourteen consecutive days without a compensatory rest period of\n\t\t\t\t\tat least twenty hours at one time.\n(c) No such worker shall be employed so as to\n\t\t\t\t\twork in excess of any of the limits specified in Sub-section (4)\n\t\t\t\t\tof Section 61 :\nProvided that in the absence of a worker who\n\t\t\t\t\thas failed to report for duty, a shift worker may be allowed to\n\t\t\t\t\twork to whole or part of a subsequent shift on condition that -\n(i) the next shift of the shift worker shall\n\t\t\t\t\tnot commence before a period of 15 hours has elapsed after the\n\t\t\t\t\tspecified stopping time of the shift to which the worker\n\t\t\t\t\tbelongs;\n(ii) the circumstances under which the worker\n\t\t\t\t\tis required to work in the subsequent shift shall be noted\n\t\t\t\t\timmediately in the remarks column of the register of adult\n\t\t\t\t\tworkers.\n(d) No worker shall be allowed to work more\n\t\t\t\t\tthan 56 hours in any one week except when employed as in proviso\n\t\t\t\t\tto Clause (c) above, but he shall not be allowed to work for\n\t\t\t\t\tmore than 64 hours in any one week.\n7.\n64(2)(d)\nElectrical receiving stations and substations\n\t\t\t\t\tor in any factory the department of the factory receiving and\n\t\t\t\t\tdistributing electrical energy for the use of the factory\nOperation and maintenance of transformer and\n\t\t\t\t\ttheir auxiliaries including receiving and distribution,\n\t\t\t\t\tswitch-gear, lighting arresters, synchronous and other\n\t\t\t\t\tcondensers and rotary and static condensers.\nSections 51, 52, 55 and 56\nDitto\n8.\n64(2)(d)\nDistilleries\nWork on the extraction for sugar from various\n\t\t\t\t\tbases, fermentation of sugar juice and distillation of fermented\n\t\t\t\t\twash\nDitto\nDitto\n9.\n64(2)(d)\nSugar Factories\nOperation beginning with receiving and\n\t\t\t\t\tweighment of cane and ending with bagging of sugar where there\n\t\t\t\t\tis vaccum pan system\nDitto\nDitto\n10.\n64(2)(d)\nIron and Steel Factories\nOperation of blast furnaces, steel melting\n\t\t\t\t\tfurnaces Linz and Donawitz Converters, rolling mills and such\n\t\t\t\t\tother work which must proceed concurrently with such operations\n\t\t\t\t\tand must be for technical reason carried on continuously\n\t\t\t\t\tthroughout the day.\nDitto\nDitto\n11.\n64(2)(d)\nCoke-oven Plants\nOperation of cock-ovens\nDitto\nDitto\n12.\n64(2)(d)\nBy product Plants\nRecovery and treatment of by-products\nDitto\nDitto\n13.\n64 (2)(d)\nPaper Factories\nWork performed by male adult workers on bamboo\n\t\t\t\t\tpreparing plant, digester, strainers and washers, beaters, paper\n\t\t\t\t\tmaking machines, super calendar, acid plant, soda recovery\n\t\t\t\t\tplant, pumping plant, electrolysis plant and bleaching plant,\n\t\t\t\t\twork of lime reburning, gas producer plant, fibre recovery and\n\t\t\t\t\twater clarifier\nSections 51, 52, 55 and 56\nNo worker shall be allowed to work more than 56\n\t\t\t\t\thours in any one week except when employed as in proviso to\n\t\t\t\t\tClause (c) above, but he shall not be allowed to work for more\n\t\t\t\t\tthan 64 hours in any one week\n14.\n64 (2)(d)\nCement Factories\nAll works on continuous process units\nDitto\nDitto\n15.\n64(2)(d)\nAluminium Factories\nAll works on continuous process units\nDitto\nDitto\n16.\n64(2)(d)\nRefractories and Potteries\nWorkers or polishers in all potteries, mixing,\n\t\t\t\t\tmoulding, drying, setting and operations of kinds including gas\n\t\t\t\t\tproducer\nDitto\nDitto\n17.\n64(2)(d)\nChemical Factories\nAll works on continuous process\nDitto\nDitto\n18.\n64(2)(d)\nVegetable oil hydrogeneration factories\nThe work viz., refining, bleaching, filtering\n\t\t\t\t\tgeneration of hydrogen, hydrogenerating deodourising processes\n\t\t\t\t\talso compression of oxygen and the cylinder filling\nDitto\nDitto\n19.\n64(2)(d)\nIce Factories\nWork on the manufacturing/handling of ice\nDitto\nDitto\n20.\n64(2)(d)\nGlass Factories\nWork of charging and attending to the post or\n\t\t\t\t\ttanks, attending sheet glass, making machines and fully\n\t\t\t\t\tautomatic other glass making machines and firing the furnace\nDitto\nNo worker shall be allowed to work more than\n\t\t\t\t\tfifty-six hours in any one week except when employed as in\n\t\t\t\t\tproviso to Clause (c) above, but he shall not be allowed to work\n\t\t\t\t\tfor more than 64 hours in any one week.\n21.\n64(2)(d)\nOxygen Factories\nEngine and plant drivers, oilers and filling of\n\t\t\t\t\tcylinders\nSections 51, 52, 54, 55 and 56\nDitto\n22.\n64(2)(d)\nAcetyline Factories\nGeneration of gas filling of cylinders\nDitto\nDitto\n23.\n64(2)(d)\nWater works and pumping stations\nAll works\nSections 51, 52, 54, 55 and 56\nDitto\n24.\n64(2)(d)\nFerro-alloys Factories\nOperation on electric furnaces\nDitto\nDitto\n25.\n64(2)(d)\nOil Mills\nAll works on continuous process",
        "footnote": "",
        "is_definition": false,
        "sort_order": 3
    },
    "prev_section": "3",
    "next_section": "55"
}