{
    "act_title": "The Oil Mines Regulations, 2017",
    "act_slug": "the-oil-mines-regulations-2017",
    "section_label": "Section",
    "section": {
        "number": "73",
        "title": "73. Precautions during acidising operations.",
        "chapter": null,
        "content": "(a) acidising operations at a well is carried out under the direct personal supervision of an official authorised for the purpose;\n(b) prior to the acidising operation, all pressure lines and associated equipment are tested to a pressure ten per cent higher than the expected working pressure; and\n(c) a non-return valve in the treating line as close to the wellhead as practicable is installed.\n(a) no person other than those required for acidising operation remains in the vicinity of the well; and\n(b) material safety datasheet is displayed at the site of operation and the requirements of material safety data sheet and personal protective equipment and other protective facilities are provided.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 72
    },
    "prev_section": "72",
    "next_section": "74"
}