{
    "act_title": "The Oil Mines Regulations, 2017",
    "act_slug": "the-oil-mines-regulations-2017",
    "section_label": "Section",
    "section": {
        "number": "102",
        "title": "102. Emergency plan.",
        "chapter": null,
        "content": "(a) fire;\n(b) blowout, explosion, ignition, influx of inflammable or noxious gas;\n(c) bursting of equipment, pipeline or uncontrolled escape of petroleum;\n(d) failure of structures;\n(e) chemical spillage;\n(f) natural calamities;\n(g) medical evacuation; and\n(h) any other emergencies.\n(a) the action to be taken in the event of any major accident including when and how the said action is to be taken;\n(b) organisation plan clearly stating the line of command and the responsibilities of each person involved in case of emergency situation;\n(c) equipment plan such as the make, type, capacity, location, field of operation, and operating procedure in respect of every equipment; and\n(d) strategy plan specifying the number of steps to be taken in any particular case of emergency.\n(a) alarm and communication system;\n(b) system of notifying the authorities;\n(c) the duties and responsibilities of each key personnel including measures to be adopted to avert or minimise the consequences of the emergency;\n(d) when and how the equipment shall be used and when and how the action shall be carried out;\n(e) help or information that would be available from associated and external agencies including Government agencies;\n(f) guidelines for terminating the action; and\n(g) plan for training of personnel and for mock-drills.\n(a) all equipment on the installation provided for compliance with the emergency plan is maintained in a reliable state under efficient working order and in good condition without repair; and\n(b) there is a written scheme prepared for the systematic examination of all emergency equipment by an independent competent person.\n(a) specify the nature and frequency of examination that may be carried out, before first use of the equipment on the installation and also after any modification or repair; and\n(b) review and modify the emergency plan periodically and in particular before any alteration is carried out and submit a copy thereof to the Regional Inspector.\nChapter- IX\nMachinery, Plant and Equipment",
        "footnote": "",
        "is_definition": false,
        "sort_order": 101
    },
    "prev_section": "101",
    "next_section": "103"
}