{
    "id": 12435,
    "slug": "the-mineral-conservation-and-development-rules-1988",
    "title": "The Mineral Conservation And Development Rules, 1988",
    "short_title": "The Mineral Conservation And Development Rules, 1988",
    "act_number": "Published vide Notification G.S.R. 1023(E), dated ",
    "act_year": 1988,
    "act_type": "CENTRAL",
    "location": "India (Central)",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "The Mineral Conservation And Development Rules, 1988",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Application.",
            "chapter": null,
            "content": "(i) petroleum and natural gas;\n[(ii) coal, lignite and sand for stowing;]\n(iii) any mineral declared as prescribed substances for the purpose of the Atomic Energy Act, 1962 (33 of 1962); and\n(iv) minor minerals.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Definitions.",
            "chapter": null,
            "content": "[(a) \"abandonment of mine\" means final closure of a mine either whole or part thereof when the mineral deposits within mine or part thereof, have been fully extracted or when the mining operations have become uneconomic;]\n[(aa)] \"Act\" means the [Mines and Minerals (Regulation and Development) Act, 1957 (67 of 1957)] ;\n(b) \"agent\", when used in relation to a mine, means any person whether appointed as such or not, who acts as the representative of the owner in respect of the management of the mine or any part thereof;\n[(c) \"authorised officer\" means any officer of the Indian Bureau of Mines duly authorised in writing by the Controller General, Indian Bureau of Mines or an officer authorised in this behalf by the State Government to perform the functions under these rules;]\n(d) \"beneficiation\" means processing of minerals or ores for the purpose of-\n(i) regulating the size of a desired produce;\n(ii) removing unwanted constituents; and\n(iii) improving quality, purity or assay grade of desired product;\n(e) \"boring\" or \"drilling\" means the penetration of alluvial material, rocks or formations by holes for obtaining geological information, and for drawing samples therefrom;\n(f) \"Chief Controller of Mines\" means the Chief Controller of Mines of the Indian Bureau of Mines;\n(g) \"Controller General\" means the Controller General of the Indian Bureau of Mines;\n(h) \"Controller of Mines\" means the Controller of Mines of the Indian Bureau of Mines;\n(i) \"development\" means the driving of an opening to, or in an ore-body or seam or removing overburden or unproductive or waste materials as preparatory to mining or stopping;\n(j) \"environment\" and \"environmental pollution\", shall have the same meanings, assigned respectively to these terms in Environment (Protection) Act, 1986 (29 of 1986);\n[(jj) final mine closure plan\" means a plan for the purpose of decommissioning, reclamation and rehabilitation in the mine or part thereof after cessation of mining and mineral processing operations that has been prepared in the manner specified in the standard format and guidelines issued by the Indian Bureau of Mines;\n(jjj) \"financial assurance\" means the sureties furnished by the leaseholder to the competent authority so as to indemnify the authorities against the reclamation and rehabilitation cost;]\n(k) \"Form\" means a Form set forth in Schedule to these rules;\n(l) \"geologist\" means a person appointed in writing by the owner or agent to perform the duties of a geologist under these rules;\n(m) \"manager\" when used in relation to a mine, means any person appointed by the owner or agent and includes the owner or the agent if he appoints himself to be such manager, under section 17 of the Mines Act, 1952 (35 of 1952);\n[(mm) \"mine closure\" means steps taken for reclamation, rehabilitation measures taken in respect of a mine or part thereof commencing from cessation of mining or processing operations in a mine or part thereof;]\n(n) \"mining engineer\" means a person appointed in writing by the owner or agent to perform the duties of a mining engineer under these rules;\n(o) \"mining plan\" means a mining plan prepared under section 5 of the Act and the rules made thereunder;\n[(oo) \"progressive mine closure plan\" means a progressive plan, for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in the manner specified in the standard format and guidelines issued by Indian Bureau of Mines;]\n(p) \"prospect\" means an area where prospecting operations for minerals are being carried out and includes any area held under prospecting license;\n(q) \"recognised person\" means a person granted recognition by the competent authority to prepare mining plan;\n(r) \"Regional Controller\" means the Regional Controller of Mines of the Indian Bureau of Mines;\n(s) \"shaft\" means a vertical or inclined way or opening leading from the surface to workings below ground or from one part of the workings below ground to another, and includes an incline;\n(t) \"stopping\" means making any underground excavation other than development working made for the purpose of winning ores or minerals and includes extraction or splitting or reduction of pillars or blocks of minerals;\n[(tt) \"temporary discontinuance\" means the planned or unplanned suspension of mining operations in a mine or part thereof and where the operations are likely to be resumed after certain time;]\n(u) \"year\" means the twelve months period beginning from the first day of April and ending on the thirty-first day of March of the following year;\n(v) all other words and expressions used in these rules but not defined shall have the meanings respectively assigned to them in the Act.\n[Chapter I-A]\nReconnaissance Operations\nReconnaissance Operations\n3-A. Scheme of reconnaissance.\n(a) particulars of the area such as aerial extent, boundaries;\n(b) the scale of the plan and the area of geological mapping; and\n(c) the particulars of the machines and instruments to be used.\n3-B. Modification of scheme of reconnaissance.\n3-C. Reconnaissance operations to be carried out in accordance with the scheme of reconnaissance.\n3-D. Intimation about reconnaissance operations.\n3-E. Submission of reports about reconnaissance operations.\nChapter II\nProspecting Operations\nProspecting Operations",
            "footnote": "",
            "is_definition": true,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Scheme of prospecting.",
            "chapter": null,
            "content": "(a) particulars of the area;\n(b) the scale of the plan and the area of geological mapping;\n(c) the number of pits, trenches, and bore holes which he proposes to put in the area;\n(d) the particulars of the machines to be used;\n(e) the details of exploratory mining [if any, proposed] to be undertaken;\n(f) the number of samples proposed to be drawn and analysed;\n(g) the beneficiation studies proposed to be undertaken; and\n(h) any other matter relevant for the preparation of a scheme of prospecting, as directed by the Controller General or the authorised officer from time to time by a general or specific order.\n(a) baseline information of prevailing environmental conditions before the beginning of the prospecting operations;\n(b) [steps proposed to be taken for protection of environment which will include] prevention and control of air and water pollution, progressive reclamation and rehabilitation of the land disturbed by the prospecting operations, a scheme for the plantation of trees, and such other measures, as may be directed from time to time by the Controller General or the authorised officer for minimising the adverse effect of prospecting operations on the environment.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Modification of scheme of prospecting.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Prospecting operation to be carried out in accordance with scheme of prospecting.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Intimation about prospecting operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Report of prospecting operations.",
            "chapter": null,
            "content": "[* * *]\n(b) an yearly report in [Form B] so as to reach them within thirty days after the expiry of [twelve months] from the date of execution of the prospecting license or the expiry of the prospecting license whichever is earlier:\nChapter III\nMining Operations\nMining Operations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Mining plan.",
            "chapter": null,
            "content": "(a) in the light of the experience of operation of mining plan;\n(b) in view of the change in the technological development.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Modification of mining plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Mining plan to be submitted by the existing lessee.",
            "chapter": null,
            "content": "(a) to the Regional Controller for extension of time up to six months;\n(b) to the Controller of Mines for extension of time exceeding six months but not exceeding one year;\n(c) to the Chief Controller of Mines for extension of time beyond one year;\n[(d) to the officer authorised in this behalf by the State Government in respect of mining plan approved by the State Government.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Review of mining plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Mining operations to be in accordance with mining plans.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Prospecting and mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. Open-cast working.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Separate stacking of non-saleable minerals.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Underground mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. Sub-grade minerals to be brought to surface.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "19",
            "title": "19. Prohibition of reduction of blocks.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "20",
            "title": "20. Beneficiation studies to be carried out.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "21",
            "title": "21. Machinery and plant.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "22",
            "title": "22. Notice for opening of a mine.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "23",
            "title": "23. Abandonment of mines.",
            "chapter": null,
            "content": "[23-A. Mine closure plan.\n(i) a progressive mine closure plan; and\n(ii) a final mine closure plan.\n23-B. Submission of progressive mine closure plan.\n23-C. Submission of final mine closure plan.\n23-D. The modification of mine closure plan.\n23-E. Responsibility of the holder of mining lease.\n23-F. Financial assurance.\n(a) Letter of Credit from any Scheduled Bank;\n(b) Performance or surety bond;\n(c) Trust fund build up through annual contributions from the revenue generated by mine and based on expected amount sum required for abandonment of mine; or\n(d) Any other form of security or any other guarantees acceptable to the authority.\n[24. Notice of temporary discontinuance of work in mines and obligations of the lease holders.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "25",
            "title": "25. Intimation of reopening of a mine.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "26",
            "title": "26. Stopping of vein, etc.",
            "chapter": null,
            "content": "Chapter IV\nPlans And Sections\nPlans And Sections",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "27",
            "title": "27. General requirements about plans and sections.",
            "chapter": null,
            "content": "(a) show the name of the mine and of the owner and the purpose for which the plan or section is prepared;\n(b) show the true north or the magnetic meridian and the date of the latter;\n(c) show a scale of the plan at least twenty-five centimetres long and suitably sub-divided;\n(d) unless otherwise provided, be on a scale having a representative factor of-\n(i) 200:1 in case of mica mines and other mines having small-scale workings below ground;\n(ii) 2000:1 in case of mines having large open cast working and also in case of surface plans of large leasehold areas; and\n(iii) 1000:1 in other cases:\n(e) be properly inked in on a durable paper or on tracing cloth or other suitable material and be kept in good condition.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "28",
            "title": "28. Types of plans and sections.",
            "chapter": null,
            "content": "(a) a surface plan showing every surface feature within the mining lease boundaries such as building, telephone, telegraph or power transmission line, water-main, tramline, railway, road, river, water-course, reservoir, tank, bore-hole, shaft and incline opening, open-cast working, dumps and dumping ground, the waste land, forest, sanctuaries, agricultural land and grazing land and subsidence on the surface;\n(b) a surface geological plan of the area of leasehold, on a scale specified or approved by the Controller General by a general or special order in writing showing-\n(i) all the lithological units exposed in the area, in the pits, trenches and in any other openings made for prospecting and mining operations showing contact between lithological units;\n(ii) structural details like strike, dip, fold, fault, plunge of ore body;\n(iii) location of prospecting pits, trenches, boreholes and any other openings made for prospecting and/or mining operations;\n(iv) existing mine workings dumps;\n(c) a transverse section or sections of the workings through the shaft or shafts and main adits indicating clearly the strike and dip of the vein, lode, reef, or mineral bed or deposit at different points, and such sections of the strata sunk or driven through in the mine or proved by boring, as may be available;\n(d) a longitudinal mine section or sections showing a vertical projection of the mine working including outlines of all stopped out areas, where a reef, vein, lode or mineral bed/deposit or part thereof has dip exceeding thirty degrees from the horizontal plane:\n(e) an underground plan showing-\n(i) the position of the workings of the mine below ground;\n(ii) every boreholes and shaft (with depth), drive, cross-cut, winze, raise, excavation (stopped ground) and every tunnel and air passage connected therewith;\n(iii) every pillar or block of mineral left for the support of any structure on the surface; and underground magazines, if any;\n(iv) the general strike of the veins, lodes, reefs and mineral beds or deposits;\n(v) the position of every dyke, fault and other geological disturbance with the amount and direction of throw.\n(a) A key plan on a scale of 1:63,000 or 1:50,000 incorporating the following:-\n[(i) an administrative surface map showing the boundary of the mining lease, and the adjoining area lying preferably within five kilometres thereof;]\n(ii) contours at not more than [twenty] metres intervals;\n(iii) natural drainage system such as rivers, streams, nalahs, water reservoirs, ponds, lakes, irrigation dams and canals;\n(iv) roadways and railways;\n(v) places of historical and archaeological importance, monuments, places of worship, pilgrimage and of tourist interest;\n(vi) forests with tree density, sanctuaries, wastelands, agricultural lands, grazing lands;\n(vii) boundaries of all villages and towns with their population;\n(viii) predominant wind direction;\n(ix) any other relevant features:\n(b) An environment plan of the area of mining lease inclusive of the adjoining area within five hundred metres of the boundary of a lease area on 1:5000 scale incorporating the following:-\n(i) [an administrative surface map showing the boundary of the mining lease] ;\n(ii) contour lines at five metres intervals;\n(iii) all features indicated in sub-clauses (iii) to (ix) of clause (a) above;\n(iv) area occupied by mine workings area deforested, area covered by dump with the height of the dump, processing plant, surface building, workshop, mining township;\n(v) area reclaimed and area afforested, location of protective barriers, check dams erected to contain solid and liquid effluents generated by prospecting, mining, beneficiation or metallurgical operations carried out in the mine;\n(vi) all pumping stations and the courses of discharge of mine water:\n(b) The Controller General or the authorised officer may, by an order in writing, require the owner, agent, mining engineer or manager of a mine to submit to him within such time, such plans and sections, or tracings thereof, as he may specify in the order.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "29",
            "title": "29. Copies of plans and sections to be submitted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "30",
            "title": "30. Preparation of plans.",
            "chapter": null,
            "content": "Chapter V\nEnvironment\nEnvironment",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "31",
            "title": "31. Protection of environment.",
            "chapter": null,
            "content": "[32. Removal and utilisation of top soil.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "33",
            "title": "33. Storage of overburden, waste rock, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "34",
            "title": "34. Reclamation and rehabilitation of lands.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "35",
            "title": "35. Precaution against ground vibrations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "36",
            "title": "36. Control of surface subsidence.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "37",
            "title": "37. Precaution against air pollution.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "38",
            "title": "38. Discharge of toxic liquid.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "39",
            "title": "39. Precaution against noise.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "40",
            "title": "40. Permissible limits and standards.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "41",
            "title": "41. Restoration of flora.",
            "chapter": null,
            "content": "(a) take immediate measures for planting in the same area or any other area selected by the Controller General or the authorised officer not less than twice the number of trees destroyed by reason of any prospecting or mining operations;\n(b) look after them during the subsistence of the license/lease after which these trees shall be handed over to the State Forest Department or any other authority as may be nominated by the Controller General or the authorised officer; and\n(c) restore, to the extent possible, other flora destroyed by prospecting or mining operations.\nChapter VI\nEmployment Of Qualified Persons\nEmployment Of Qualified Persons",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "42",
            "title": "42. Employment of geologists and mining engineer",
            "chapter": null,
            "content": "(a) every holder of reconnaissance permit shall employ a whole-time geologist;\n(b) every holder of prospecting License shall employ a whole-time geologist and mining engineer;\n(c) every holder of a mining lease shall employ, in case of :-\n(i) category 'A' mines, a whole-time mining engineer and geologist;\n(ii) category 'B' mines, a part-time mining engineer and a part-time geologist :\n(i) category 'A' mines means\n(a) such fully mechanized mines where the work is being carried out by deployment of heavy mining machinery for deep hole drilling, excavation, loading and transport, or\n(b) such mines where the number of average employment exceeds one hundred and fifty in all or seventy-five workings below ground, or mines where any of the mining operations like deep hole drilling, excavation, loading and transport is carried out with the help of heavy machinery.\n(ii) category '13' mines means mines other than category 'A' mines :\nTable\nTable\nQualifications\nExperience\nCategory of Mines\n(1)\n(2)\n(3)\n(i) Diploma in Mining or Postgraduate Degree in\n\t\t\t\t\tGeology with First Class Matelliferrous Mine Manager's\n\t\t\t\t\tCertificate\nNil\nCategory 'B' Mines\n(ii) Holder of First Class Metalliferrous Mine\n\t\t\t\t\tManager's Certificate\nTwo years experience Category after obtaining\n\t\t\t\t\tthe Certificate\nCategory 'B' Mines\n(iii) Diploma in Mining or Postgraduate Degree\n\t\t\t\t\tin Geology or equivalent\n3 years experience in supervisory Category\n\t\t\t\t\tcapacity in Mines\nCategory 'B' Mines\n(iv) Graduate in Geology or holder of Second\n\t\t\t\t\tClass Metalliferrous Mine Manager's Certificate\n5 years experience after graduation or one year\n\t\t\t\t\texperience after obtaining the Certificate\nCategory 'B' Mines\n(v) Secondary School Leaving Certificate with\n\t\t\t\t\tMines Foreman's Certificate\n5 years experience as a Mine Foreman/Mate\nAll open cast mines of Category 'B'\n(b) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer.\nSubstituted by Notification No. G.S.R. 216 (E) dated 29.3.2010 (w.e.f. 24.10.1988)\nSubstituted by Notification No. G.S.R. 216 (E) dated 29.3.2010 (w.e.f. 24.10.1988)\nOLD LAW  ▼",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "42",
            "title": "42. Employment of geologist and mining engineer.",
            "chapter": null,
            "content": "(a) every holder of a prospecting license shall employ a part-time or whole-time geologist or mining engineer; and\n(b) every holder of a mining lease shall employ-\n[(i) in case of the following category \"A\" mines, a whole-time mining engineer, namely:-\n(a) fully mechanised category \"A\" mines which shall be such mines where the work is being carried out by deployment of heavy mining machinery for deep hole drilling, excavation, loading and transport, and\n(b) other than fully mechanised category \"A\" mines which shall be such mines where the number of average employment exceeds one hundred and fifty in all or seventy-five in workings below ground, or a mine where any of the mining operations like deep hole drilling, excavation, loading and transport is carried out with the help of heavy machinery] :\nProvided that if any doubt arises as to whether any mine is a category \"A\" mine, it shall be referred to the Controller General for decisions;\n(ii) in the case of any other mine, referred to as category \"B\" mine, either a part-time mining engineer or a full time person permitted to be employed in terms of the provisions of sub-rule (6).\nGeologist A post-graduate degree in Geology granted by a University established or incorporated by or under a Central Act, A Provincial Act or a State Ac, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification. Mining Engineer A degree in Mining Engineering granted by a University established or incorporated by or under a Central Act, a Provincial Act, or a State act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification.\nGeologist\nA post-graduate degree in Geology granted by a University established or incorporated by or under a Central Act, A Provincial Act or a State Ac, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification.\nMining Engineer\nA degree in Mining Engineering granted by a University established or incorporated by or under a Central Act, a Provincial Act, or a State act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification.\n[* * *]\n[(d) Persons possessing the qualifications and experience corresponding to the category of mines as laid down in the Table below shall be eligible to be employed in respect of the category of mines specified:\nTABLE\nQualifications Experience Category of mines (1) (2) (3) (i) Diploma in Mining or Post graduate degree in Geology with First Class Metalliferrous Mine Manager's Certificate Nil All Category \"B\" Mines (ii) Holder of First Class Metalliferrous Mine Manager's Certificate Two years experience after obtaining the certificate All Category \"B\" Mines (iii) Diploma in Mining or Post-graduate degree in Geology or equivalent 3 years experience in supervisory capacity in mine All Category \"B\" Mines (iv) Graduate in Geology or holder of Second Class Metalliferrous Mine Manager's Certificate 5 years experience after graduation or one year's experience after obtaining the certificate All category \"B\" Mines (v) Secondary School Leaving Certificate with Mines Foreman's Certificate 5 years experience as a Mines Foreman/Mate All open cast mines of Category \"B\"] ]\nQualifications\nExperience\nCategory of mines\n(1)\n(2)\n(3)\n(i) Diploma in Mining or Post graduate degree in Geology with First Class Metalliferrous Mine Manager's Certificate\nNil\nAll Category \"B\" Mines\n(ii) Holder of First Class Metalliferrous Mine Manager's Certificate\nTwo years experience after obtaining the certificate\nAll Category \"B\" Mines\n(iii) Diploma in Mining or Post-graduate degree in Geology or equivalent\n3 years experience in supervisory capacity in mine\nAll Category \"B\" Mines\n(iv) Graduate in Geology or holder of Second Class Metalliferrous Mine Manager's Certificate\n5 years experience after graduation or one year's experience after obtaining the certificate\nAll category \"B\" Mines\n(v) Secondary School Leaving Certificate with Mines Foreman's Certificate\n5 years experience as a Mines Foreman/Mate\nAll open cast mines of Category \"B\"]\n(e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer\"> (e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer\"> (e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer\"> (e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer. (7) Where, due to reduction in average employment in the mine, a category \"A\" mine qualifies to become a category \"B\" mine, the employment of a mining engineer as required for category \"B\" mine may be done only with previous permission in writing of the Controller General or the authorised officer and subject to such conditions as he may specify.\n(e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer\"> (e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer\"> (e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer. (7) Where, due to reduction in average employment in the mine, a category \"A\" mine qualifies to become a category \"B\" mine, the employment of a mining engineer as required for category \"B\" mine may be done only with previous permission in writing of the Controller General or the authorised officer and subject to such conditions as he may specify.\n(e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer\"> (e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer. (7) Where, due to reduction in average employment in the mine, a category \"A\" mine qualifies to become a category \"B\" mine, the employment of a mining engineer as required for category \"B\" mine may be done only with previous permission in writing of the Controller General or the authorised officer and subject to such conditions as he may specify.\n(e) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "43",
            "title": "43. Duties of geologist.",
            "chapter": null,
            "content": "(a) prepare the necessary geological plans and sections which are required to delineate the ore body;\n(b) calculate ore reserves and its grade;\n(c) be responsible for providing all the necessary information required for controlling the quality of the minerals produced;\n(d) maintain proper records of the prospecting operations and records of sinking of shafts and boreholes as provided under these rules;\n(e) work out the appropriate method of sampling and ensure preparation of samples accordingly;\n(f) maintain an assay plan in cases of underground workings;\n(g) maintain all technical data for determining the shape and size of each stope block;\n(h) update the reserve figures, grade-wise and category-wise at the end of every year in case of a working mine;\n(i) identify the associated rocks and minerals and maintain proper records of the stacks of non-salable/sub-grade ores and minerals produced;\n(j) carry out all such orders and directions as may be given in writing under these rules by the Controller General or the authorised officer [and shall forward a copy of all such orders or directions to the holder of the prospecting license or, as the case may be, the mining lease] .",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "44",
            "title": "44. Duties of mining engineer.",
            "chapter": null,
            "content": "(b) On receipt of a requisition under clause (a), the owner or agent shall provide as soon as possible the materials and facilities requisitioned by the mining engineer.\nChapter VII\nNotices And Returns\nNotices And Returns",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "45",
            "title": "45. Monthly and annual returns",
            "chapter": null,
            "content": "[(a) a daily return which shall be submitted through the Mobile application of the Indian Bureau of Mines, latest by 1800 hours of the following day;\n(aa) a monthly return which shall be submitted before the 10th day of every month in respect of the preceding month in electronic form, along with a print copy of the same if it is not digitally signed, in the respective Form as indicated below:-\n(i) for all minerals except copper, gold, lead, pyrite, tin, tungsten, zinc, precious and semi-precious stones, in Form F-1;\n(ii) for copper, gold, lead, pyrite, tin, tungsten, zinc, in Form F-2; and\n(iii) for precious and semi-precious stones, in Form F-3;\n(b) an annual return which shall be submitted before the 1st day of July each year for the preceding financial year in electronic form, along with a print copy of the same if it is not digitally signed, in the respective Form as indicated below:-\n(i) for all minerals except copper, gold, lead, pyrite, tin, tungsten, zinc precious and semi-precious stones, in Form H-1;\n(ii) for copper, gold, lead, pyrite, tin, tungsten, zinc, in Form H-2; and\n(iii) for precious and semi-precious stones, in Form H-3:\n(i) a monthly return which shall be submitted before the 10th of every month in respect of preceding month in Form N;\n(ii) an annual return which shall be submitted before the 1st July each year for the preceding financial year in the Form O.\n(i) in the case of mining of minerals by the owner, agent, mining engineer or manager of mine, then the Regional Controller of Mines may,-\n(a) order suspension of all mining operations in the mine and may revoke the order of suspension only after ensuring proper compliance;\n(b) take action to initiate prosecution under these rules;\n(c) recommend termination of the mining lease, in case such suppression or misrepresentation of information indicates abetment or connivance of illegal mining;\n(ii) in the case of trading or storage or end-use [* * *] of minerals, the State Government, where the person or company engaged in trading or storage or end-use [* * *] of minerals is sourcing the minerals, shall order suspension of, -\n(a) trading License (by whatever name it is called);\n(b) all transportation permits issued to such person or company for mineral transportation (by whatever name it is called); (c) storage License for stocking minerals (by whatever name it is called); (d) permits for end-use industry [* * *] of minerals (by whatever name it is called); as the case may be, of such person or company engaged in trading or storage or end-use or\nexport of minerals, and may revoke the order of suspension only after ensuring proper compliance. [(iii) in the case of export of minerals, the Directorate General of Foreign Trade shall order suspension of permits for carrying out such exports of minerals of such person or company engaged in export of minerals, and may revoke the order of suspension only after ensuring proper compliance.] [(8) In case of mining of minerals by the owner, agent, mining engineer or manager of mine the -\n(c) storage License for stocking minerals (by whatever name it is called);\n(d) permits for end-use industry [* * *] of minerals (by whatever name it is called);\nas the case may be, of such person or company engaged in trading or storage or end-use or\nexport of minerals, and may revoke the order of suspension only after ensuring proper compliance.\n[(iii) in the case of export of minerals, the Directorate General of Foreign Trade shall order suspension of permits for carrying out such exports of minerals of such person or company engaged in export of minerals, and may revoke the order of suspension only after ensuring proper compliance.]\n(a) sale value is the gross amount payable by the purchaser as indicated in the sale invoice, where the sale transaction is on an arms' length basis and the price is the sole consideration for the sale, excluding taxes, if any.\n(b) ex-Mine price of mineral grade or concentrate shall be,-\n(I) where export has occurred, the total of, sale value on free-on-board (F.O.B) basis, less the actual expenditure incurred beyond the mining lease area towards -\n(i) transportation charges by road;\n(ii) loading and unloading charges;\n(iii) railway freight (if applicable);\n(iv) port handling charges or export duty;\n(v) charges for sampling and analysis;\n(vi) rent for the plot at the stocking yard;\n(vi) handling charges in port;\n(vii) charges for stevedoring and trimming;\n(viii) any other incidental charges incurred outside the mining lease area as notified by the Indian Bureau of Mines from time-to-time,\ndivided by the total quantity exported.\n(II) where domestic sale has occurred, the total of sale value of the mineral less the actual expenditure incurred towards transportation, loading, unloading, rent for the plot at the stocking yard, charges for sampling and analysis and any other charges beyond mining lease area as notified by the Indian Bureau of Mines from time-to-time, divided by the total quantity sold;\n(III) where sale has occurred, between related parties and is not on arms' length basis, then such sale shall not be recognised as a sale for the purposes of this rule and in such case, sub-clause (IV) shall be applicable;\n(IV) where the sale has not occurred, the average sale price published monthly by the Indian Bureau of Mines for that mineral grade or concentrate for a particular State:\n(V) the cost of production in case of captive mines.\n(a) where the sale of the mineral grade or concentrate has occurred and the sale transaction is on an arms' length basis and the price is the sole consideration for the sale, the sale value of the mineral grade or concentrate recorded in the invoice;\n(b) where the sale has not occurred, the product of average sale price published monthly by the Indian Bureau of Mines for a particular mineral grade or concentrate for a particular State and the quantity dispatched or procured:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "46",
            "title": "46. Notice of certain appointments.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "47",
            "title": "47. Notice of shaft sinking and boreholes.",
            "chapter": null,
            "content": "(a) the sinking of trial shaft or borehole to a depth exceeding ten metres from the surface, or\n(b) the extension of an existing shaft or borehole to a depth exceeding ten metres, or\n(c) the sinking of a new shaft or boreholes commencing from underground workings:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "48",
            "title": "48. Records of shafts and boreholes.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "49",
            "title": "49. Change in the name of mine to be notified.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "50",
            "title": "50. Notice of transfer of prospecting license or mining lease.",
            "chapter": null,
            "content": "[50-A. Notice of amalgamation of mining lease.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "51",
            "title": "51. Transfer of records to transferees.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "52",
            "title": "52. Copies of notices/returns to be submitted to the State Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "53",
            "title": "53. Copies of notices and returns to be maintained.",
            "chapter": null,
            "content": "Chapter VIII\nExamination Of Minerals And Issue Of Directives\nExamination Of Minerals And Issue Of Directives",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "54",
            "title": "54. Power to issue directions.",
            "chapter": null,
            "content": "(a) in the case of an order of a general nature or affecting a class of persons, be notified in Official Gazette; and\n(b) in the case of an order directed to a specified individual, be served on such individual, (i) by delivering or tendering it to that individual, or if it cannot be so delivered or tendered, by affixing it on the outer door or some other conspicuous part of the premises in which that individual lives, and a written report thereof shall be prepared and witnessed by two persons living in the neighbourhood.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "55",
            "title": "55. Examination of mineral deposits and taking of samples.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "56",
            "title": "56. Prohibition of deployment in certain cases.",
            "chapter": null,
            "content": "Chapter IX\nRevision And Penalty\nRevision And Penalty",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "57",
            "title": "57. Revision.",
            "chapter": null,
            "content": "[58. Penalty.\nChapter X\nMiscellaneous\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "59",
            "title": "59. Preservation of cores, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "60",
            "title": "60. Facilities for undertaking research or training.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "61",
            "title": "61. Submission of records/reports regarding research in geology or mining.",
            "chapter": null,
            "content": "(b) The information so received will be kept confidential, if required. The Government will, however, be free to utilise the information for general studies, planning or policy making purpose.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "62",
            "title": "62. Territorial jurisdiction of Controller of Mines/Regional Controller.",
            "chapter": null,
            "content": "[63. Obligation to supply other information.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "64",
            "title": "64. Provisions of these rules to be applicable to Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "65",
            "title": "65. Chief Controller of Mines, etc., to exercise powers of the Regional Controller of Mines.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "66",
            "title": "66. Repeal and savings.",
            "chapter": null,
            "content": "Schedule\nForm A\nForm A\nNotice of Commencement of Prospecting Operations\n(See rule 7)\nImportant\n1. 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 *2. *2. The Controller of Mines, ............................................. Indian Bureau of Mines, PIN...................................... *3. The Regional Controller of Mines, ............................................. Indian Bureau of Mines, PIN...................................... 4. State Government concerned. ............................................. 1. Name of the mineral or minerals for which prospecting license has been granted. (a)______________(c)_____________ (b)______________(d)_____________ 2. Name and address of the licensee. ............................................. PIN...................................... 3. In case the licensee is a company or Partnership firm or co-operative, please indicate. (i) Name and address of the Director-in-charge ............................................. PIN...................................... (ii) Address of the Register Office ............................................. PIN...................................... 4. Particulars of prospecting license\n(PL) : (i)Date of execution ............................................. (ii) Period .............................................\nyears, From............................ To............................... (iii) Area under license .................................. Hectares. 5. Location of the prospecting licensed area: (i) Topo sheet Number ............................................. (ii) Cadastral Survey or Khasra Number ............................................. (iii) Village ............................................. (iv) (a) Post Office ............................................. (b) Police Station ............................................. (v)(a) Taluka ............................................. (b) District ............................................. (c) State ............................................. (vi)(a) Nearest Railway Station ............................................. (b) The distance there from (Kilometres) ............................................. (vii)(a) Nearest Rest House/Dak Bungalow ............................................. (b) Its distance from (1) The Railway Station (Kilometres) ............................................. (2) The prospecting area (Kilometres) ............................................. 6. Particulars of Geologist or Mining Engineer employed for the prospecting licensed area: (i) Name and address ............................................. PIN...................................... (ii) Qualifications ............................................. (iii) Date of appointment ............................................. (iv) Nature of appointment Whole-time □ Part-time □ (Please tick (√) mark one of the boxes whichever is applicable). 7. Date of commencement of prospecting operations : ............................................. Place............ Signature............................................... Date............. Name in full........................................... Designation: Owner/Agent/Mining Engineer/Manager\n1.\n*2.\n*3.\n4.\n1.\n2.\n3.\n4.\n5.\n6.\n7.\nSignature...............................................\nName in full...........................................\nDesignation: Owner/Agent/Mining Engineer/Manager\n[Form AA]\nNotice Of Commencement Of Reconnaissance Operations\n(See rule 3-D)\nImportant\n1. 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 *2. *2. The Controller of Mines, ............................................. Indian Bureau of Mines, PIN........................................ *3. The Regional Controller of Mines, ............................................. Indian Bureau of Mines, PIN........................................ 4. State Government concerned. ............................................. PIN........................................ 1. Name of the mineral or minerals for which reconnaissance permit has been granted. (a)______________(c)_____________ (b)______________(d)_____________ 2. Name and address of the permit holder ............................................. ............................................. 3. In case the permit holder is a company or Partnership firm or co-operative, please indicate- (i) Name and address of the Director-in-charge ............................................. (ii) Address of the Registered Office ............................................. 4. Particulars of reconnaissance permit (i)Date of execution ............................................. (ii) Period .............................................\nyears, From............................ To............................... (iii) Area under permit .................................. Hectares. 5. Location of the reconnaissance permit area (A map showing the location on scale 1250,000 should be enclosed) (i) Topo sheet Number(s) ............................................. (ii) Co-ordinates of corner points ............................................. (iii)(a) District(s) ............................................. (b) State ............................................. 6. Particulars of Geologist or Mining Engineer, if any, employed for the reconnaissance (i) Name and address ............................................. (ii) Qualifications ............................................. (iii) Date of appointment ............................................. (iv) Nature of appointment Whole-time □ Part-time □ (Please tick (√) mark one of the boxes, whichever is applicable). 7. Date of commencement of reconnaissance operations : .............................................\n1.\n*2.\n*3.\n4.\n1.\n2.\n3.\n4.\n5.\n6.\n7.\nForm B\nForm B\nYearly Report Of The Prospecting Operations Carried Out\n[See rule 8(1)(b) and 8(2)]\nImportant\n1. 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 *2. *2. The Controller of Mines, ............................................. Indian Bureau of Mines, PIN........................................ *3. The Regional Controller of Mines, ............................................. Indian Bureau of Mines, PIN........................................ 4. State Government concerned. ............................................. 1. Name of the mineral or minerals for which prospecting license has been granted. (a)______________(c)_____________ (b)______________(d)_____________ 2. Name and address of the licensee ............................................. ............................................. PIN........................................ 3. Particulars of prospecting license\n(PL) : (i) Date of execution ............................................. (ii) Period .............................................\nyears, From............... to ................ (iii) Area under license .................................. Hectares. (iv) Number and date assigned by State Government to prospecting license (a) Number ............................................. (b) Date ............................................. 4. Location of prospecting licensed area\n: (i) Topo sheet Number ............................................. (ii) Cadestral survey or khasra number ............................................. (iii) Village ............................................. (iv)(a) Taluka ............................................. (b) District ............................................. (c) State ............................................. 5. Particulars of Geologist/Mining Engineer-in-charge of prospecting operations : (i) Name and address ............................................. ............................................. PIN........................................ (ii) Qualifications ............................................. (iii) Date of appointment ............................................. (iv) Nature of appointment Whole-time □ Part-time □ (Please tick (√) mark one of the boxes, whichever is applicable). 6. (i) Status of prospecting operation : In progress (Please tick (√) mark one of the boxes, whichever is applicable). Completed □ Abandoned □ (ii) If prospecting operation is completed or abandoned date of such completion or abandonment ............................................. 7. Total surface area covered by prospecting work (hectares) as on date ............................................. 8. Completion of prospecting work during the year (a) Pitting (i) Number of pits ............................................. (ii) Depth (metres) Average ............................................. Maximum ............................................. Minimum ............................................. (b) Trenching (i) Number of trenches ............................................. (ii) Length (metres) Average Maximum ............................................. Minimum ............................................. (c) Drilling Surface Underground (i) Number of boreholes completed during the year ............ ................. (ii) Number of boreholes in progress, if any ............ ................. (iii) Total annual drilling (metres) ............ ................. (d) Particulars of drilling machines: Type Make Capacity Number of drills ........... ................ ............ .................... (e) Exploratory mining, if any: (1) Number of levels .......................................... (2) Total development (metres) .......................................... (3) Mode of entry .......................................... (4) Quantity of ore produced with grade .......................................... (f) Number of samples analysed : (1) Main constituent (please specify) .......................................... (2) Complete analysis ..........................................\n1.\n*2.\n*3.\n4.\n1.\n2.\n3.\n4.\n5.\n6.\n7.\n8.\nNote.\nSignature...................................................\nName in full................................................\nDesignation:Owner/Agent/Mining Engineer/Manager\n[ Form-BB ]\nForm-BB\n(See rule 3-E)\nImportant\n1. 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 *2. *2. The Controller of Mines, ............................................. Indian Bureau of Mines, PIN........................................ *3. The Regional Controller of Mines, ............................................. Indian Bureau of Mines, PIN........................................ 4. State Government concerned. ............................................. 1. Name of the permit holder ............................................. 2. Nature of the firm ............................................. 3. Address of the firm ............................................. 4. Area under permit .............................................\n(square kms.) 5. Location : (i) Topo sheet No. (s) (ii) Co-ordinates of corner point (iii) District(s) ............................................. (iv) State ............................................. 6. Date of grant of permit 7. Period of permit 8. Reconnaissance survey work done (A brief description of the work involved alongwith particulars of the machines and instruments used would be given against each of the following items) (i) Regional survey (ii) Aerial/photogeological work (iii) Geological mapping including area covered and scale (iv) Geophysical (v) Geochemical (vi) Test drilling : Number, area of influence meterage and sampling 9. Nature and structure of the ore body 10. Analysis of the ores or minerals 11. If abandoned (i) Date of abandonment (ii) Reasons for abandonment\n1.\n*2.\n*3.\n4.\n1.\n2.\n3.\n4.\n5.\n6.\n7.\n8.\n9.\n10.\n11.\nSignature................................................\n(Full name of the signatory)\nDesignation............................................\nand\nAddress..................................................\nDate of despacth....................................\nForm C\nForm C\nNotice Of Intimation Of Opening/Reopening Of Mine/Change In The Name Of Mine\n[See rules 22(1), 22(2), 25 and 49]\nImportant\n1. 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 2. Controller of Mines, ............................................. Indian Bureau of Mines, PIN...................................... 3. The Regional Controller of Mines, ............................................. Indian Bureau of Mines, PIN...................................... 4. State Government concerned 1.(i) Name of the mineral worked ............................................. (ii) Name(s) of other minerals, if any, for which lease has been granted : ............................................. 2.(i) Name of the mine ............................................. (ii) Change in the name of mines, if any: ............................................. (Indicate old name and reason of change) ............................................. 3. Name and address of the lessee/owner: ............................................. 4. Ownership of the mine (a) Public Sector (b) Joint Sector (c) Private Sector [4-A. Date of opening/reopening of mine:] ............................................. [4-B. In case of reopening, date of discontinuation] ............................................. 5. Particulars of the mining lease (ML)\n: (i)Date of execution ............................................. (ii) Period .............................................\nyears, from ................................... to ....................................... (iii) Area under lease .................................. Hectares. 6. Location of the mining lease : (i) Village.................................. Distt........................................ Taluka/Tehsil................................... (ii) Post Office.............................Police Station........................... Distt.............................................. (iii) Nearest Railway Station........................................................ Distance......................................... (iv) Nearest Rest House/Dak Bangalow......................................... 7. Name and address of previous owner, if any and the date of abandonment: ............................................. ............................................. PIN........................................ Date...................................... 8. Particular of agent: ............................................. Name and address: ............................................. 9. Particulars of Mining Engineer employed in the mines : (i) Name and address : (ii) Qualification: (iii) Date of appointment : (iv) Status of employment: Whole-time □ Part-time □ 10. Particulars of the manager of the mine: ............................................. Name and address ............................................. 11. Letter No. and date through which the mining plan was approved by the Indian Bureau of Mines Letter No.............................\n1.\n2.\n3.\n4.\n5.\n6.\n7.\n8.\n9.\n10.\n11.\nSignature...................................................\nName in full................................................\nDesignation:Owner/Agent/Mining Engineer/Manager\n[ Form D ]\nForm D\nNotice Of Intention Of Abandonment Of Mine Or Part Of The Mine\n[See rule 23(2)]\nImportant\nImportant\n(ii) Name of other minerals worked, if any:\n(i) Date of execution:\n(ii) Period............years, from...........to........\n(iii) Area under lease........hectares.\n(a) Village:\n(b) Post Office:\n(c) District:\n(d) State:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "9",
            "title": "9. Reasons for abandonment: [Please tick (√) whichever is applicable] (i) Lack of demand □ (ii) Exhaustion of ore/mineral □ (iii) Un-economic operations □",
            "chapter": null,
            "content": "[Please tick (√) whichever is applicable]\n□\n□\n□\n(i)  Proved\n(ii)  Probable\n(iii)  Possible\n(a) Company labour\n(b) Contract labour\nSignature...................................................\nName in full................................................\nDesignation:Owner/Agent/Mining Engineer/Manager\nForm D-1\nForm D-1\nNotice of Temporary Discontinuance of Mine\n(See rule 24)\nImportant\n(ii) Name of the other minerals worked, if any:\n(i) Date of execution:\n(ii) Period.........years, from..........to..........\n(iii) Area under lease..........hectares.\n(a) Village:\n(b) Post Office:\n(c) District:\n(d) State:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "9",
            "title": "9. Reasons for temporary discontinuance: [Please tick (√) whichever is applicable] (i)Lack of demand □ (ii)Non-availability of Labour □ (iii) Rains □ (iv) Transport bottleneck □ (v)Strike/Lockout □ ( vi) Operation becoming uneconomic □ (vii)Other reasons (specify) □",
            "chapter": null,
            "content": "[Please tick (√) whichever is applicable]\n□\n□\n□\n□\n□\n□\n□\nSignature...................................................\nName in full................................................\nDesignation:Owner/Agent/Mining Engineer/Manager\nForm E\nForm E\nNotice Of Commencement Of Stoping\n[See rule 26(2)]\nMine Code....................................\nImportant",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "1",
            "title": "1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440 001 2. The Controller of Mines, ........................................ Indian Bureau of Mines, PIN................................... 3. The Regional Controller of Mines, ........................................ Indian Bureau of Mines, PIN................................... 4. State-Government concerned ........................................ 1. (a) Name of mine ........................................ (b) Section/pit number** ",
            "chapter": null,
            "content": "Signature...................................................\nName in full................................................\nDesignation:Owner/Agent/Mining Engineer/Manager\nNote.\n[ Form F-1 ]\nForm F-1\nMonthly Return\n[See rule 45(5) (aa) (i)]\nFor the month of..............20.........\nMonthly Return\nMonthly Return\n[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]\n(i) The Regional Controller of Mines\nIndian Bureau of Mines\n___________ Region,\nPIN:\n(ii) The State Government\nPart I\nGeneral And Labour\nGeneral And Labour",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "1",
            "title": "1. Details of the Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "1",
            "title": "1. Details of the Mine:",
            "chapter": null,
            "content": "(a) Registration number allotted by Indian Bureau of Mines (to\n\t\t\t\tgive registration number of the Lessee/ Owner)\n(b) Mine Code (allotted by Indian Bureau of Mines )\nMine Code\n(c) Name of the Mineral\n(d) Name of Mine\n(e) Name(s) of other mineral(s), if any, produced from the\n\t\t\t\tsame mine\n(f) Location of the Mine :\nLocation of the Mine :\nVillage\nPost Office\nTahsil/Taluk\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone no:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "2",
            "title": "2. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "2",
            "title": "2. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "Name of Lessee/Owner\nAddress\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone No:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "3",
            "title": "3. Details of Rent/ Royalty/ Dead Rent/ DMF/ NMET amount\n\t\t\t\tpaid in the month",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        },
        {
            "number": "3",
            "title": "3. Details of Rent/ Royalty/ Dead Rent/ DMF/ NMET amount\n\t\t\t\tpaid in the month",
            "chapter": null,
            "content": "(i) Rent paid (Rs)\n(ii) Royalty paid (Rs)\n(iii) Dead Rent paid (Rs)\n(iv) Payment made to the DMF (Rs)\n(v) Payment made to the NMET (Rs)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 71
        },
        {
            "number": "4",
            "title": "4. Details on working of mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 72
        },
        {
            "number": "4",
            "title": "4. Details on working of mine:",
            "chapter": null,
            "content": "(i) Number of days the mine worked:\n(ii) Reasons for work stoppage in the mine during the month\n\t\t\t\t(due to strike, lockout, heavy rain, non-availability of labour,\n\t\t\t\ttransport bottleneck, lack of demand, uneconomic operations,\n\t\t\t\tetc.) and the number of days of work stoppage for each reason\n\t\t\t\tseparately\nReasons\nNo of days",
            "footnote": "",
            "is_definition": false,
            "sort_order": 73
        },
        {
            "number": "5",
            "title": "5. Average Daily Employment and Total Salary/Wages paid #:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 74
        },
        {
            "number": "5",
            "title": "5. Average Daily Employment and Total Salary/Wages paid #:",
            "chapter": null,
            "content": "Work place\nDirect\nContract\nTotal Salary/Wages (Rs)\nMale\nFemale\nMale\nFemale\nDirect\nContract\nBelow ground\nOpencast\nAbove ground\nTotal\n# To include all employees exclusive to the mine and attached factory, working or mineral dressing plant at the mine site.\nPart-II\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\n(Unit of Quantity in Tonnes)\n(a) Hematite\n(b) Magnetite\nCategory\nOpening stock\nProduction\nClosing stock\n(a) Open Cast workings\n(b) Underground Workings\n(c) Dump workings\nGrade of ROM@\nDespatches from mine-head\nEx-mine Price (Rs)\n($): Applicable for iron ore and chromite only. For other minerals data of dispatches to be reported in 3(ii)\nGrades**\nOpening stock at mine-head\nProduction\nDespatches from mine-head\nClosing stock at mine-head\nEx-mine price (♦/ Tonne)\nGrade**\nTotal quantity of mineral Pulverized (in tonnes)\nTotal quantity of pulverized mineral produced\n\t\t\t\t(for each mesh size)\nTotal Quantity of pulverized mineral sold during\n\t\t\t\tthe month\nMesh size\nQuantity (tonne)\nMesh size\nQuantity (tonne)\nEx-factory Sale value (♦ )\n(*): Not applicable for Iron ore, Manganese ore, Bauxite and Chromite\nDeduction\n\t\t\t\tclaimed\nAmount (in Rs/Tonne)\nRemarks\na) Cost of transportation (indicate loading station and\n\t\t\t\tdistance from mine in remarks)\nb) Loading and unloading charges\nc) Railway freight, if applicable (indicate destination and\n\t\t\t\tdistance)\nd) Port handling charges/ export duty (indicate name of port)\ne) Charges for sampling and analysis\nf) Rent for the plot at Stocking yard\ng) Other charges (specify clearly)\nTotal (a) to (g)\n# Not applicable for captive dispatches and ex-mine sales\nGrade (^)\nNature of Despatch (indicate whether Domestic\n\t\t\t\tSale or Domestic Transfer or Captive consumption or Export)\nFor Domestic Purposes\nFor export\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer ##\nConsignee name ##\nQuantity\nSale value (Rs)\nCountry\nQuantity\nF.O.B Value(Rs)\n(^): To indicate the grades of ores as mentioned below (see @ and **)\n## To indicate separately if more than one buyer.\nNote:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).\na)\nb)\nc)\na)\nb)\nc)\nPlace:\nSignature\nDate:\nName\n\t\t\t\tin full:\nDesignation: Owner/ Agent/ Mining Engineer/\n\t\t\t\tManager\nMineral\nMineral\nGrades\nGrades\nIron ore\na) Below 51%\n\t\t\t\tFe ROM\nb) 51% to\n\t\t\t\tbelow 55% Fe ROM\nc) 55% to\n\t\t\t\tbelow 58% Fe ROM\nd) 58% to\n\t\t\t\tbelow 60% Fe ROM\ne) 60% to\n\t\t\t\tbelow 62% Fe ROM\nf) 62% to\n\t\t\t\tbelow 65% Fe ROM\ng) 65% and\n\t\t\t\tabove Fe ROM\nChromite\na) Below 40%\n\t\t\t\tCr2O3 ROM\nb) 40% to\n\t\t\t\tbelow 52 % Cr2O3 ROM\nc) 52% and\n\t\t\t\tabove Cr2O3 ROM\nMineral\nMineral\nGrades\nGrades\nIron ore\nIron ore\n(i) Lumps:\n(i) Lumps:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(ii) Fines:\n(ii) Fines:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(iii) Concentrates\n(iii) Concentrates\n(iv) Calibrated Lump Ore (CLO)\n(iv) Calibrated Lump Ore (CLO)\n(Quantity already reported in Lumps should not be reported\n\t\t\t\tagainst CLO)\na) Below 62% Fe (CLO any size)\nb) 62% to below 65% Fe (5-18 mm\n\t\t\t\tsize CLO)\nc) 62% to below 65% Fe (10-40 mm\n\t\t\t\tsize CLO)\nd) 62% to below 65% Fe (CLO\n\t\t\t\tothers)\ne) 65% and above Fe (5-18 mm size\n\t\t\t\tCLO)\nf) 65% and above Fe (10-40 mm size\n\t\t\t\tCLO)\ng) 65% and above Fe (CLO others)\nManganese Ore\nManganese Ore\n(i) Ore\n(i) Ore\na) Below 25% Mn\nb) 25% to below 35% Mn\nc) 35% to below 46% Mn\nd) 46% and above Mn\ne) Dioxide ore\n(ii) Concentrates\n(ii) Concentrates\nBauxite\nBauxite\n(i) For use in alumina and\n\t\t\t\taluminium extraction:-\n(i) For use in alumina and\n\t\t\t\taluminium extraction:-\n(Please also furnish the actual averages of the ore falling\n\t\t\t\twithin the following ranges of grades):\na) Below 40% Al 2 O 3\nb) 40% to below 45% Al 2 O 3\nc) 45% to below 50% Al 2 O 3\nd) 50% to below 55% Al 2 O 3\ne) 55% to below 60% Al 2 O 3\nf) 60% and above Al 2 O 3\n(ii) For use other than alumina and aluminium metal\n\t\t\t\textraction\n(ii) For use other than alumina and aluminium metal\n\t\t\t\textraction\na) Cement\nb) Abrasive\nc) Refractory\nd) Chemical\nChromite\nChromite\n(i) Lumps\n(i) Lumps\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(ii) Fines\n(ii) Fines\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(iii) Concentrates\n(iii) Concentrates\nAsbestos\nAsbestos\na) Amphibole\nb) Chrysotile\nFluorite/Fluorspar\nFluorite/Fluorspar\na) 80% and above CaF 2\nb) 70% to below 80% CaF 2\nc) 30% to below 70% CaF 2\nd) Below 30% CaF 2\nGraphite\nGraphite\na) With 80% or more fixed carbon\nb) With 40 % or more fixed carbon but less than 80% fixed\n\t\t\t\tcarbon\nc) With 20% or more fixed carbon but less than 40% fixed\n\t\t\t\tcarbon\nd) With less than 20% fixed carbon\nKyanite\nKyanite\na) 40% and above Al 2 O 3\nb) Below 40% Al 2 O 3\nLimestone\nLimestone\na) LD Grade (less than 1.5% silica content)\nb) SMS\nc) BF\nd) Chemical\ne) Cement\nRock Phosphate/ Phosphorite\nRock Phosphate/ Phosphorite\na) Above 30% P 2 O 5\nb) Above 25% to 30% P 2 O 5\nc) Above 20% to 25% P 2 O 5\nd) Upto 20% P 2 O 5\n[ Form F-2 ]\nForm F-2\n[See rule 45(5) (aa) (ii)]\nFor the month of ________20\nMonthly Return\nMonthly Return\n[To be used for minerals Copper, Gold, Lead, Pyrites, Tin, Tungsten and Zinc]\n(i) The Regional Controller of Mines\nIndian Bureau of Mines\n_________Region,\nPIN:\n(ii) The State Government\nPart - I\n(General and Labour)\n(General and Labour)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 75
        },
        {
            "number": "1",
            "title": "1. Details of the Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 76
        },
        {
            "number": "1",
            "title": "1. Details of the Mine:",
            "chapter": null,
            "content": "(a) Registration number allotted by Indian Bureau of Mines (to\n\t\t\t\tgive registration number of the Lessee/ Owner)\n(b) Mine Code (allotted by Indian Bureau of Mines )\nMine Code\n(c) Name of the Mineral\n(d) Name of Mine\n(e) Name(s) of other mineral(s), if any, produced from the\n\t\t\t\tsame mine\n(f) Location of the Mine :\nLocation of the Mine :\nVillage\nPost Office\nTahsil/Taluk\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone no:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 77
        },
        {
            "number": "2",
            "title": "2. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 78
        },
        {
            "number": "2",
            "title": "2. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "Name of Lessee/Owner\nAddress\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone No:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 79
        },
        {
            "number": "3",
            "title": "3. Details of Rent/ Royalty/ Dead Rent/ DMF/ NMET amount\n\t\t\t\tpaid in the month",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 80
        },
        {
            "number": "3",
            "title": "3. Details of Rent/ Royalty/ Dead Rent/ DMF/ NMET amount\n\t\t\t\tpaid in the month",
            "chapter": null,
            "content": "(i) Rent paid (Rs)\n(ii) Royalty paid (Rs)\n(iii) Dead Rent paid (Rs)\n(iv) Payment made to the DMF (Rs)\n(v) Payment made to the NMET (Rs)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 81
        },
        {
            "number": "4",
            "title": "4. Details on working of mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 82
        },
        {
            "number": "4",
            "title": "4. Details on working of mine:",
            "chapter": null,
            "content": "(i) Number of days the mine worked:\n(ii) Reasons for work stoppage in the mine during the month\n\t\t\t\t(due to strike, lockout, heavy rain, non-availability of labour,\n\t\t\t\ttransport bottleneck, lack of demand, uneconomic operations,\n\t\t\t\tetc.) and the number of days of work stoppage for each reason\n\t\t\t\tseparately\nReasons\nNo of days",
            "footnote": "",
            "is_definition": false,
            "sort_order": 83
        },
        {
            "number": "5",
            "title": "5. Average Daily Employment and Total Salary/Wages paid #:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 84
        },
        {
            "number": "5",
            "title": "5. Average Daily Employment and Total Salary/Wages paid #:",
            "chapter": null,
            "content": "Work place\nDirect\nContract\nTotal Salary/Wages (Rs)\nMale\nFemale\nMale\nFemale\nDirect\nContract\nBelow ground\nOpencast\nAbove ground\nTotal\n# To include all employees exclusive to the mine and attached factory, working or mineral dressing plant at the mine site.\nPart-II\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\n(Unit of Quantity in Tonnes)\nOpening stocks\nProduction\nClosing stocks\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nA. From Underground workings\ni) From\n\t\t\t\tDevelopment\nii) From\n\t\t\t\tStoping\nB. From Opencast workings\nTotal\nOpening stocks of\n\t\t\t\tthe Ore at concentrator/plant\nOre received from the mine\nOre treated\nQuantity\nMetal content/grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nConcentrates * Obtained\nTailings\nClosing stocks of concentrates at the\n\t\t\t\tconcentrator/plant\nQuantity\nMetal content/grade\nValue (Rs)\nQuantity\nMetal content/grade\nQuantity\nMetal content/grade\n*In case of any leaching method adopted, give quantity recovered and grade contained separately.\nOpening Stocks of the concentrates at the\n\t\t\t\tsmelter/ plant\nConcentrates received from concentrator/ plant\nConcentrates received from other sources\n\t\t\t\t(specify)\nConcentrates sold (if any)\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nConcentrates treated\nClosing stocks of concentrate at the Smelter/\n\t\t\t\tPlant\nMetals(*) recovered (specify)\nOther by-products, if any, recovered\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nGrade\nValue (Rs)\nQuantity\nGrade\nValue (Rs)\n(*) Please give category-wise break-up viz. blister, fire refined copper, cathodes, electrolytic copper wire bars, lead ingots, zinc cathodes, zinc dross, gold, tungsten etc.\nMetal/  Product\nOpening stocks of Metals/ Products\nPlace of sale\nMetals/Products sold(@)\nClosing stocks of Metals/ Products\nQuantity\nGrade\nQuantity\nGrade\nValue(#) (Rs)\nQuantity\nGrade\nNote:\n(#) Please give ex-plant sale value.\n(@) Please give category-wise break-up of metals and other products sold.\nDeduction claimed #\nAmount (in Rs./ Unit)\nRemarks\na) Cost of transportation (indicate loading station and\n\t\t\t\tdistance from mine in remarks)\nb) Loading and unloading charges\nc) Railway freight, if applicable (indicate destination and\n\t\t\t\tdistance)\nd) Port Handling charges/export duty (indicate name of port)\ne) Charges for sampling and analysis\nf) Rent for the plot at Stocking yard\ng) Other charges (specify clearly)\nTotal (a) to (g)\n# Not applicable for captive dispatches and ex-mine sales\nGrade (ore/ Conc.)\nNature of Despatch (indicate whether Domestic\n\t\t\t\tSale or Domestic Transfer or Captive consumption or Export)\nFor Domestic Purposes\nFor export\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer ##\nConsignee name ##\nQuantity\nSale value (Rs)\nCountry\nQuantity\nF.O.B Value(Rs)\n## To indicate separately if more than one buyer.\nNote. - Mine owners are required to substantiate domestic sale value/ FOB value for each grade quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).\na)\nb)\nc)\na)\nb)\nc)\nPlace:\nSignature\nDate:\nName\n\t\t\t\tin full:\nDesignation: Owner/ Agent/ Mining Engineer/\n\t\t\t\tManager\n[ Form F-3 ]\nForm F-3\n[See rule 45(5) (aa) (iii)]\nFor the month of ________20\nMonthly Return\nMonthly Return\n[To be used for precious and semi-precious stones]\n(i) The Regional Controller of Mines\nIndian Bureau of Mines\n_________Region,\nPIN:\n(ii) The State Government\nPart - I\n(General and Labour)\n(General and Labour)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 85
        },
        {
            "number": "1",
            "title": "1. Details of the Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 86
        },
        {
            "number": "1",
            "title": "1. Details of the Mine:",
            "chapter": null,
            "content": "(a) Registration number allotted by Indian Bureau of Mines (to\n\t\t\t\tgive registration number of the Lessee/ Owner)\n(b) Mine Code (allotted by Indian Bureau of Mines )\nMine Code\n(c) Name of the Mineral\n(d) Name of Mine\n(e) Name(s) of other mineral(s), if any, produced from the\n\t\t\t\tsame mine\n(f) Location of the Mine :\nLocation of the Mine :\nVillage\nPost Office\nTahsil/Taluk\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone no:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 87
        },
        {
            "number": "2",
            "title": "2. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 88
        },
        {
            "number": "2",
            "title": "2. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "Name of Lessee/Owner\nAddress\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone No:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 89
        },
        {
            "number": "3",
            "title": "3. Details of Rent/ Royalty/ Dead Rent/ DMF/ NMET amount\n\t\t\t\tpaid in the month",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 90
        },
        {
            "number": "3",
            "title": "3. Details of Rent/ Royalty/ Dead Rent/ DMF/ NMET amount\n\t\t\t\tpaid in the month",
            "chapter": null,
            "content": "(i) Rent paid (Rs)\n(ii) Royalty paid (Rs)\n(iii) Dead Rent paid (Rs)\n(iv) Payment made to the DMF (Rs)\n(v) Payment made to the NMET (Rs)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 91
        },
        {
            "number": "4",
            "title": "4. Details on working of mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 92
        },
        {
            "number": "4",
            "title": "4. Details on working of mine:",
            "chapter": null,
            "content": "(i) Number of days the mine worked:\n(ii) Reasons for work stoppage in the mine during the month\n\t\t\t\t(due to strike, lockout, heavy rain, non-availability of labour,\n\t\t\t\ttransport bottleneck, lack of demand, uneconomic operations,\n\t\t\t\tetc.) and the number of days of work stoppage for each reason\n\t\t\t\tseparately\nReasons\nNo of days",
            "footnote": "",
            "is_definition": false,
            "sort_order": 93
        },
        {
            "number": "5",
            "title": "5. Average Daily Employment and Total Salary/Wages paid #:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 94
        },
        {
            "number": "5",
            "title": "5. Average Daily Employment and Total Salary/Wages paid #:",
            "chapter": null,
            "content": "Work place\nDirect\nContract\nTotal Salary/Wages (Rs)\nMale\nFemale\nMale\nFemale\nDirect\nContract\nBelow ground\nOpencast\nAbove ground\nTotal\n# To include all employees exclusive to the mine and attached factory, working or mineral dressing plant at the mine site.\nPart-II\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\nCategory\nUnit of quantity\nQuantity\n(a) Opencast workings\n(b) Underground workings\nGem Variety\nIndustrial\nOthers\nRough and uncut stones\nCut and Polished Stones\nNo. of stones\nQty @\nNo. of stones\nQty @\nNo. of stones\nQty @\nNo. of stones\nQty @\nA .Opening stocks\nB. Production\n(i) From\n\t\t\t\tOpencast Working\n(ii) From\n\t\t\t\tunderground working\nTotal (Production)\nC. Despatches\nD. Closing Stocks\nE. Ex-mine Price (Rs)\n@:The Unit of quantity viz. Carats/Grams/Kilogram etc., as the case may be, should be indicated under quantity.\nDeduction claimed #\nAmount (in Rs/ Unit)\nRemarks\na) Cost of transportation (indicate loading station and\n\t\t\t\tdistance from mine in remarks)\nb) Loading and unloading charges\nc) Railway freight, if applicable (indicate destination and\n\t\t\t\tdistance)\nd) Port handling charges/export duty (indicate name of port)\ne) Charges for sampling and analysis\nf) Rent for the plot at stocking yard\ng) Other charges (specify clearly)\nTotal (a) to (g)\n# Not applicable for captive dispatches and ex-mine sales\nGrade (*)\nNature of Despatch (indicate whether Domestic\n\t\t\t\tSale or Domestic Transfer or Captive consumption or Export)\nFor Domestic Purposes\nFor export\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer ##\nConsignee name ##\nQuantity\nSale value (Rs)\nCountry\nQuantity\nF.O.B Value(Rs)\n*: To indicate rough and uncut stones, cut and polished stones, industrial, others\n## To indicate separately if more than one buyer.\nNote. - Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).\na)\nb)\nc)\na)\nb)\nc)\nPlace:\nSignature\nDate:\nName\n\t\t\t\tin full:\nDesignation: Owner/ Agent/ Mining Engineer/\n\t\t\t\tManager\nOmitted by Notification No. G.S.R. 75 (E) dated 9.2.2011 (w.e.f 24.10.1988)\nOmitted by Notification No. G.S.R. 75 (E) dated 9.2.2011 (w.e.f 24.10.1988)\nOLD LAW  ▼\nForm F-9\nForm F-9\nMonthly Return\n[See rule 45(1)(a)(ix)]\nFor the month of.............20......\nMine Code...............................\nMINE CODE............................ (i) Name of the Mineral ............................................. (ii) Name of mine........................ ............................................. (iii) Name(s) of other mineral(s), if any, produced from the same mine ................................................ To 1. Controller General, Nagpur Indian Bureau of Mines, PIN 440001 2. The Controller of Mines, ................................................ Indian Bureau of Mines, PIN........................................... 3. Regional Controller of Mines, ................................................ Indian Bureau of Mines, PIN........................................... 4. State Government concerned ................................................\nPart I\nGeneral And Labour\nWork Place Direct labour Contract labour Wages\n(Rs.) Male Female Male Female Male Female Below ground Open-cast Above ground Total\nWork Place\nDirect labour\nContract labour\nWages\n(Rs.)\nMale\nFemale\nMale\nFemale\nMale\nFemale\n(ii) Total salaries paid to technical and supervisory staff.\nPart II\nProduction, Despatches And Stocks\n(Unit of Quantity in Tonnes)\nItems R.O.M. Ore Processed/Sorted (Grades) Others Total A. Opening Stock at mine-head B. Production C. Pit Mouth Value D. Despatches from mine (i) For Domestic Consumption Quantity (Tonne) Sale Value (Rs.) (ii) For Exports Quantity (Tonne) Sale Value (Rs.) E. Closing Stock at mine-head\nR.O.M. Ore Processed/Sorted (Grades)\nOthers\nTotal\nA.\nB.\nC.\nD.\nE.\nNote.\n(b) Give reasons for increase/decrease in production, if any, during the month compared to the previous month.\n[(c)  The data in Part-II above shall be furnished grade-wise. The grades for iron ore shall be as per Form F-1, those for manganese ore as per Form F-2, for bauxite and laterite as per Form F-3, for chromite as per Form F-4 , for copper, lead, zinc, pyrites, gold, tungsten as per Form F-5, for mica, as per Form F-6, for precious and semi-precious stones as per Form F-7, and for other minerals as mentioned in Form F-8, respectively.]\nSignature...................................................\nName in full................................................\nDesignation:Owner/Agent/Mining Engineer/Manager\nForm G\nForm G\n[See Rule 45(1)(b)]\nMINE CODE………………………. Annual Return indicating (a) Consumption of explosives for the year 20……..20……. (b) Estimated requirement of explosives for the next year 20……..20……. To 1. Controller General, Nagpur Indian Bureau of Mines, PIN 440001 2. The Controller of Mines, ................................................ Indian Bureau of Mines, PIN........................................... 3. Regional Controller of Mines, ................................................ Indian Bureau of Mines, PIN........................................... 4. State Government concerned ................................................\nClassification of explosives Unit Quantity consumed during the year Estimated requirement during the next year Small dia. (upto 32 mm) Large dia. (above 32 mm) Small dia. (upto 32 mm) Large dia. s(above 32 mm) (1) (2) (3) (4) (5) (6) 1. Gun Powder kg . 2. Nitrate kg . Mixture a. Loose ammonium nitrate b. Ammonium nitrate in cartridged form 3. Nitro compound kg . 4. Liquid Oxygen Soaked cartridges kg . 5. Slurry explosives kg . (Mention different trade names) 6. Detonators Nos. 1. Ordinary 2. Electrical (a) Ordinary (b) Delay 7. Fuse Mts. (a) Safety Fuse (b) Detonating Fuse 8. Plastic ignition cord Mts. 9. Others (Sepecify) Mention Mention the unit\nUnit\nQuantity consumed during the year\nEstimated requirement during the next year\nSmall dia.\n(upto 32 mm)\nLarge dia.\n(above 32 mm)\nSmall dia.\n(upto 32 mm)\nLarge dia.\ns(above 32 mm)\n(2)\n(3)\n(4)\n(5)\n(6)\nkg .\nkg .\nkg .\nkg .\nkg .\nNos.\nMts.\nMts.\nMention\nSignature...................................................\nName in full................................................\nDesignation:Owner/Agent/Mining Engineer/Manager\n[Form H-1]\n[Form H-1]\n[See rule 45(5)(b)(i)]\nFor the financial year 1 st April, 20__ to 31 st March, 20__\nAnnual Return\nAnnual Return\n[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]\n(i) The Regional Controller of Mines\nIndian Bureau of Mines\n___________ Region,\nPIN\n(ii) The State Government\nPart I\n(General)\n(General)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 95
        },
        {
            "number": "1",
            "title": "1. Details of Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 96
        },
        {
            "number": "1",
            "title": "1. Details of Mine:",
            "chapter": null,
            "content": "(a)\n\t\t\t\tRegistration number allotted by Indian Bureau of Mines (to give\n\t\t\t\tregistration number of the Lessee/Owner)\n(b) Mine Code\n\t\t\t\t(allotted by Indian Bureau of Mines )\n(c) Name of\n\t\t\t\tthe Mineral\n(d) Name of\n\t\t\t\tMine\n(e) Name(s)\n\t\t\t\tof other mineral(s), if any, produced from the same mine",
            "footnote": "",
            "is_definition": false,
            "sort_order": 97
        },
        {
            "number": "2",
            "title": "2. Location of the Mine :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 98
        },
        {
            "number": "2",
            "title": "2. Location of the Mine :",
            "chapter": null,
            "content": "Village\nPost Office\nTahsil/Taluk\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone no:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 99
        },
        {
            "number": "3",
            "title": "3. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 100
        },
        {
            "number": "3",
            "title": "3. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "Name of\n\t\t\t\tLessee/Owner\nAddress\nDistrict\nState\nPIN Code3\nFax no:\nE-mail:\nPhone No:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 101
        },
        {
            "number": "4",
            "title": "4. Registered Office of the Lessee:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 102
        },
        {
            "number": "5",
            "title": "5. Director in charge :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 103
        },
        {
            "number": "6",
            "title": "6. Agent :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 104
        },
        {
            "number": "7",
            "title": "7. Manager :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 105
        },
        {
            "number": "8",
            "title": "8. Mining Engineer in charge:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 106
        },
        {
            "number": "9",
            "title": "9. Geologist in charge :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 107
        },
        {
            "number": "10",
            "title": "10. Transferor (previous owner), if any, and date of transfer:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 108
        },
        {
            "number": "11",
            "title": "11. Particulars of area operated/ Lease (Furnish\n\t\t\t\tinformation on items (i) to (vi) lease-wise in case mine workings\n\t\t\t\tcover more than one lease)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 109
        },
        {
            "number": "11",
            "title": "11. Particulars of area operated/ Lease",
            "chapter": null,
            "content": "(i) Lease\n\t\t\t\tnumber allotted by the State Government……………………………………………………\n(ii) Area\n\t\t\t\tunder lease (hectares):\nUnder Forest\nOutside\n\t\t\t\tForest\nTotal\n(iii) Date of\n\t\t\t\texecution of mining lease deed\n(iv) Period\n\t\t\t\tof lease\n(v) Area for\n\t\t\t\twhich surface rights are held (hectares)\nUnder Forest\nOutside\n\t\t\t\tForest\nTotal\n(vi) Date and\n\t\t\t\tperiod of renewal (if applicable)\n(vii) In case\n\t\t\t\tthere is more than one mine in the same lease area, indicate name\n\t\t\t\tof mine and mineral produced",
            "footnote": "",
            "is_definition": false,
            "sort_order": 110
        },
        {
            "number": "12",
            "title": "12. Lease area (surface area) utilisation as at the end of\n\t\t\t\tyear (hectares):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 111
        },
        {
            "number": "12",
            "title": "12. Lease area (surface area) utilisation as at the end of\n\t\t\t\tyear (hectares):",
            "chapter": null,
            "content": "Under forest\nOutside forest\nTotal\n(i) Already\n\t\t\t\texploited & abandoned by opencast (O/C) mining\n(ii) Covered\n\t\t\t\tunder current (O/C) Workings\n(iii)\n\t\t\t\tReclaimed/rehabilitated\n(iv) Used for\n\t\t\t\twaste disposal\n(v) Occupied\n\t\t\t\tby plant, buildings, residential, welfare buildings & roads\n(vi) Used for\n\t\t\t\tany other purpose (specify)\n(vii) Work\n\t\t\t\tdone under progressive mine closure plan during the year",
            "footnote": "",
            "is_definition": false,
            "sort_order": 112
        },
        {
            "number": "13",
            "title": "13. Ownership/exploiting Agency of the mine: (Public\n\t\t\t\tSector/Private Sector/Joint Sector)",
            "chapter": null,
            "content": "Part - II\n(Employment and Wages)\n(Employment and Wages)\n1.Number of supervisory staff\n\t\t\t\temployed at the mine\nDescription\nWholly employed\nPartly employed\n(i) Graduate\n\t\t\t\tMining Engineer\n(ii) Diploma\n\t\t\t\tMining Engineer\n(iii)\n\t\t\t\tGeologist\n(iv)\n\t\t\t\tSurveyor\n(v) Other\n\t\t\t\tadministrative and technical supervisory staff\nTotal :\n2.(i) Number of days the mine worked:\n(ii) No. of\n\t\t\t\tshifts per day:\n(iii)\n\t\t\t\tIndicate reasons for work stoppage in the mine during the year\n\t\t\t\t(due to strike, lockout, heavy rain, non-availability of labour,\n\t\t\t\ttransport bottleneck, lack of demand, uneconomic operations,\n\t\t\t\tetc.) and the number of days of work stoppage for each of the\n\t\t\t\tfactors separately.\nReasons\nNo. of days",
            "footnote": "",
            "is_definition": false,
            "sort_order": 113
        },
        {
            "number": "3",
            "title": "3. Employment and salary/\n\t\t\t\twages paid :",
            "chapter": null,
            "content": "Maximum number of persons employed\n\t\t\t\ton any one day during the year:\n(i) In workings below ground on (date) ..........................\n\t\t\t\t(a) (number) ..................\n(ii) In all\n\t\t\t\tin the mine on ............. (date) ..........................\n\t\t\t\t(a) (number)..................\nClassification\nTotal number of man days worked during the year\nNo. of days worked during the year\nAverage daily number of persons employed\nTotal Wages/ Salary for the year (Rs)\nDirect\nContract\nTotal\nMale\nFemale\nTotal\n(1)\n2(A)\n2(B)\n2(C)\n(3)\n4(A)\n4(B)\n4(C)\n(5)\nBelow Ground\nOpencast\nAbove Ground\nTotal:\n# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site\nPart-II A\n(Capital Structure)\n(Capital Structure)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 114
        },
        {
            "number": "1",
            "title": "1. Value\n\t\t\t\tof Fixed Assets* (Rs…………………………………)",
            "chapter": null,
            "content": "(in respect of the mine,\n\t\t\t\tbeneficiation plant, mine work-shop, power and water\n\t\t\t\tinstallation)\nIn case this information is\n\t\t\t\tfurnished as combined information in another mine's return please\n\t\t\t\tspecify Mine Code/Mine\nName:\nDescription\nAt the beginning of the year (Rs)\nAdditions during the Year (Rs)\nSold or discarded during the year (Rs)\nDepreciation during the year (Rs)\nNet closing Balance (Rs) (2+3)- (4+5)\nEstimated market value** (Rs)\n1\n2\n3\n4\n5\n6\n7\n(i) Land***\n(ii) Building:\nIndustrial\nResidential\n(iii) Plant and Machinery including transport equipment\niv) Capitalised Expenditure such as pre-production\n\t\t\t\texploration, development, major overhaul and repair to machinery\n\t\t\t\tetc. (As prescribed under Income Tax Act)\nTotal:\n* In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mine's return. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.\n** Optional and may be furnished in respect of items (i), (ii) and (iii) if the mine owner desires.\n*** Including any non-recurring expenditure incurred on the acquisition of land.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 115
        },
        {
            "number": "2",
            "title": "2. Source of Finance ( at\n\t\t\t\tthe end of the year) :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 116
        },
        {
            "number": "2",
            "title": "2. Source of Finance ( at\n\t\t\t\tthe end of the year) :",
            "chapter": null,
            "content": "(i) Paid up Share Capital (Rs)\n(ii) Own Capital (Rs)\n(iii) Reserve & Surplus (All Types)(Rs)\n(iv) Long Term loans outstanding (#)(Rs)\nName of the\n\t\t\t\tInstitution/ Source\nAmount of Loan (Rs)\nRate of Interest\n(#) Indicate the names of the lending institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 117
        },
        {
            "number": "3",
            "title": "3. Interest and Rent (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 118
        },
        {
            "number": "3",
            "title": "3. Interest and Rent (Rs)",
            "chapter": null,
            "content": "(i) Interest paid during the year\n(ii) Rents (excluding surface rent) paid during the year\nPart - III\n(Consumption of Materials)\n(Consumption of Materials)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 119
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed during the year",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 120
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed during the year",
            "chapter": null,
            "content": "Description\nUnit\nQuantity\nValue (Rs)\n(i) Fuel\n(i) Fuel\n(a) Coal\nTonnes\n(b) Diesel\n\t\t\t\tOil\nLtrs.\n(c) Petrol\nLtrs.\n(d) Kerosene\nLtrs.\n(e) Gas\nCu.M.\n(ii) Lubricant\n(ii) Lubricant\n(a) Lubricant\n\t\t\t\toil\nLtrs.\n(b) Grease\nKgs.\n(iii) Electricity\n(iii) Electricity\n(a) Consumed\nKwh\n(b) Generated\nKwh\n(c) Sold\nKwh\n(iv) Explosives (furnish full details in Part IV)\n(iv) Explosives (furnish full details in Part IV)\n(v) Tyres\n(v) Tyres\nNos.\n(vi) Timber & Supports\n(vi) Timber & Supports\n(vii) Drill rods & kits\n(vii) Drill rods & kits\nNos.\n(viii) Other spares & stores\n(viii) Other spares & stores",
            "footnote": "",
            "is_definition": false,
            "sort_order": 121
        },
        {
            "number": "2",
            "title": "2. Royalty, Rents and Payments made to DMF & NMET (Rs):",
            "chapter": null,
            "content": "X\nPaid for current year\nPaid towards past arrears\n(a) Royalty\n(b) Dead rent\n(c) Surface rent\n(d) Payment made to DMF\n(e) Payment made to NMET",
            "footnote": "",
            "is_definition": false,
            "sort_order": 122
        },
        {
            "number": "3",
            "title": "3. Compensation paid for felling trees during the year (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 123
        },
        {
            "number": "4",
            "title": "4. Depreciation on fixed assets (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 124
        },
        {
            "number": "5",
            "title": "5. Taxes and cesses",
            "chapter": null,
            "content": "X\nX\nAmount in Rupees paid during the year to:\nX\nX\nCentral Govt.\nState Govt.\n(i) Sales Tax\n(ii) Welfare cess\n(iii) Other taxes & cesses:-\n(a) Mineral\n\t\t\t\tcess\n(b) Cess on\n\t\t\t\tdead rent\n(c) Others\n\t\t\t\t(please specify)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 125
        },
        {
            "number": "6",
            "title": "6. Other expenses (Rs) :",
            "chapter": null,
            "content": "(i) Overheads\n(ii) Maintenance\n(iii) Money value of other benefits paid to workmen\n(iv) Payment made to professional agencies\nPart -IV\n(Consumption of Explosives)\n(Consumption of Explosives)\nLicensed capacity of magazine:\n\t\t\t\t(specify unit separately in kg/tonne, numbers, metres )\nItem\nItem\nUnit\nUnit\nCapacity\nCapacity\nClassification of Explosives\nUnit\nQuantity consumed during the year\nEstimated requirement during the next year\nSmall dia. (upto 32 mm)\nLarge dia. (above 32 mm)\nSmall dia. (upto 32 mm)\nLarge dia. (above 32 mm)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 126
        },
        {
            "number": "1",
            "title": "1. Gun Powder",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 127
        },
        {
            "number": "2",
            "title": "2. Nitrate Mixture",
            "chapter": null,
            "content": "Kg.\nX\nX\nX\nX\nX\nX\nX\nX\na. Loose\n\t\t\t\tammonium nitrate\nb. Ammonium\n\t\t\t\tnitrate in cartridged form",
            "footnote": "",
            "is_definition": false,
            "sort_order": 128
        },
        {
            "number": "3",
            "title": "3. Nitro compound Kg.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 129
        },
        {
            "number": "4",
            "title": "4. Liquid Oxygen soaked cartridges",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 130
        },
        {
            "number": "5",
            "title": "5. Slurry explosives (Mention different trade names)",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 131
        },
        {
            "number": "6",
            "title": "6. Detonators",
            "chapter": null,
            "content": "No.s\nX\nX\nX\nX\nX\nX\nX\nX\ni) Ordinary\nii)\n\t\t\t\tElectrical\nX\nX\nX\nX\nX\nX\nX\nX\n(a) Ordinary\n(b) Delay",
            "footnote": "",
            "is_definition": false,
            "sort_order": 132
        },
        {
            "number": "7",
            "title": "7. Fuse",
            "chapter": null,
            "content": "Mts\nX\nX\nX\nX\nX\nX\nX\nX\n(a) Safety\n\t\t\t\tFuse\n(b)\n\t\t\t\tDetonating Fuse",
            "footnote": "",
            "is_definition": false,
            "sort_order": 133
        },
        {
            "number": "8",
            "title": "8. Plastic ignition cord",
            "chapter": null,
            "content": "Mts",
            "footnote": "",
            "is_definition": false,
            "sort_order": 134
        },
        {
            "number": "9",
            "title": "9. Others (specify)",
            "chapter": null,
            "content": "(Mention the unit)\nPart-V\n(General Geology and Mining)\n(General Geology and Mining)\n(Items 2 and 3 to be submitted separately for each mineral)\n(i) Exploration activities during the year:\nAt the beginning of the year\nDuring the year\nCumulative\nGrid spacing/ Dimension\nDrilling\nNo of holes\nMetrage\nPitting\nNo of pits\nExcavation (in m 3 )\nTrenching\nNo of trenches\nExcavation (in m 3 )\nLength covered (in metre)\nExpenditure on exploration (Rs)\nX\nX\n(ii). Any other exploration activity during the year:\nClassification\nCode\nAt the beginning of the year 1.4.20___\nAssessed during the year\nDepletion of reserves during the year\nBalance resources as on 31.3.20____\n(1)\n(2)\n(3)\n(4)\n(5)\n(6) = (3+4-5)\nA. Mineral Reserve\nA. Mineral Reserve",
            "footnote": "",
            "is_definition": false,
            "sort_order": 135
        },
        {
            "number": "1",
            "title": "1. Proved Mineral Reserve",
            "chapter": null,
            "content": "111",
            "footnote": "",
            "is_definition": false,
            "sort_order": 136
        },
        {
            "number": "2",
            "title": "2. Probable mineral Reserve",
            "chapter": null,
            "content": "121\n122",
            "footnote": "",
            "is_definition": false,
            "sort_order": 137
        },
        {
            "number": "3",
            "title": "3. Total Reserves",
            "chapter": null,
            "content": "B. Remaining Resources\nB. Remaining Resources",
            "footnote": "",
            "is_definition": false,
            "sort_order": 138
        },
        {
            "number": "1",
            "title": "1. Feasibility mineral Resource",
            "chapter": null,
            "content": "211",
            "footnote": "",
            "is_definition": false,
            "sort_order": 139
        },
        {
            "number": "2",
            "title": "2. Prefeasibility mineral resource",
            "chapter": null,
            "content": "221\n222",
            "footnote": "",
            "is_definition": false,
            "sort_order": 140
        },
        {
            "number": "3",
            "title": "3. Measured mineral resource",
            "chapter": null,
            "content": "331",
            "footnote": "",
            "is_definition": false,
            "sort_order": 141
        },
        {
            "number": "4",
            "title": "4. Indicated mineral resource",
            "chapter": null,
            "content": "332",
            "footnote": "",
            "is_definition": false,
            "sort_order": 142
        },
        {
            "number": "5",
            "title": "5. Inferred mineral resource",
            "chapter": null,
            "content": "333",
            "footnote": "",
            "is_definition": false,
            "sort_order": 143
        },
        {
            "number": "6",
            "title": "6. Reconnaissance mineral resource",
            "chapter": null,
            "content": "334",
            "footnote": "",
            "is_definition": false,
            "sort_order": 144
        },
        {
            "number": "7",
            "title": "7. Total remaining Resources",
            "chapter": null,
            "content": "Total (A+B)\nTotal (A+B)\nAt the beginning of the year\nGenerated during the year\nDisposed during the year\nTotal stacked at the end of the year\nAverage grade of the mineral reject generated\nAt the beginning of the year\nGenerated during the year\nDisposed in dumps during the year\nBack filled during the year\nTotal at the end of the year\nDescription\nWithin lease area\nOutside lease area\ni) Number of trees planted during the year\nii) Survival rate in percentage\niii) Total no. of trees at the end of the year\nType of machinery\nCapacity of each type of machinery\nUnit (in which capacity is reported)\nNo. of machinery\nElectrical/ Non-electrical (specify)\nUsed in opencast/ underground (specify)\n(ii) Furnish following information:\nItem\nTonnage\nAverage Grade\nFeed:\nConcentrates/processed products :\n(mention name)\nBy-products/Co-products:\n(mention name)\nTailings:\nPart-VI\n(Production, Despatches and Stocks)\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\n(Unit of Quantity in Tonnes)\n(a) Hematite\n(b) Magnetite\nCategory\nOpening stock\nProduction\nClosing stock\n(a) Open Cast workings\n(b) Underground Workings\n(c) Dump workings\nGrade of ROM@\nDespatches from mine-head\nEx-mine Price (Rs)\n($): Applicable for iron ore and chromite only. For other minerals data of dispatches to be reported in 3(ii)\n(ii) Grade-wise Production, Despatches, Stocks and Ex-mine prices:\nGrades**\nOpening stock at mine-head\nProduction\nDespatches from mine-head\nClosing stock at mine-head\nEx-mine price (Rs /Tonne)\n(iii) In case the mineral is being pulverized in own factory, please give the following particulars (*):\nGrade**\nTotal quantity of mineral Pulverized (in tonnes)\nTotal quantity of pulverized mineral produced\n\t\t\t\t(for each mesh size)\nTotal Quantity of pulverized mineral sold during\n\t\t\t\tthe year\nMesh size\nQuantity (tonne)\nMesh size\nQuantity (tonne)\nEx-factory Sale value (Rs)\n(iv) Average cost of pulverization (*) : Rs _______ per tonne.\n(*): Not applicable for Iron ore, Manganese ore, Bauxite and Chromite\nDeduction\n\t\t\t\tclaimed #\nAmount (in Rs/ Tonne)\nRemarks\na) Cost of transportation (indicate loading station and\n\t\t\t\tdistance from mine in remarks)\nb) Loading and unloading charges\nc) Railway freight, if applicable (indicate destination and\n\t\t\t\tdistance)\nd) Port handling charges/export duty (indicate name of port)\ne) Charges for sampling and analysis\nf) Rent for the plot at Stocking yard\ng) Other charges (specify clearly)\nTotal (a) to (g)\n# Not applicable for captive dispatches and ex-mine sales\nGrade (^)\nNature of Despatch (indicate whether Domestic\n\t\t\t\tSale or Domestic Transfer or Captive consumption or Export)\nFor Domestic Purposes\nFor export\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer ##\nConsignee name ##\nQuantity\nSale value (Rs)\nCountry\nQuantity\nF.O.B Value(Rs)\n(^): To indicate the grades of ores as mentioned below (see @ and **)\n## To indicate separately if more than one buyer.\nNote. - Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).\na)\nb)\na)\nb)\nPart-VII\nCost of Production\nCost of Production\nCost of production per tonne of ore/mineral produced\nSl.No.\nItem\nCost per tonne (Rs)\n(i)\nDirect Cost\n(a) Exploration\n(b) Mining\n(c) Beneficiation(Mechanical Only)\n(ii)\nOver-head\n\t\t\t\tcost\n(iii)\nDepreciation\n(iv)\nInterest\n(v)\nRoyalty\n(vi)\nPayments made\n\t\t\t\tto DMF\n(vii)\nPayments made\n\t\t\t\tto NMET\n(viii)\nTaxes\n(ix)\nDead Rent\n(x)\nOthers\n\t\t\t\t(specify)\nTotal\nNote. - Information given under Part VII will be kept confidential. The Government, however, will be free to utilize the information for general studies without revealing the identity of the firm.\nVerification\nVerification\nPlace:\nSignature\nDate:\nName\n\t\t\t\tin full:\nDesignation: Owner/ Agent/ Mining Engineer/\n\t\t\t\tManager\nMineral\nMineral\nGrades\nGrades\nIron ore\na) Below 51% Fe ROM\nb) 51% to below 55% Fe ROM\nc) 55% to below 58% Fe ROM\nd) 58% to below 60% Fe ROM\ne) 60% to below 62% Fe ROM\nf) 62% to below 65% Fe ROM\ng) 65% and above Fe ROM\nChromite\na) Below 40% Cr2O3 ROM\nb) 40% to below 52 % Cr2O3 ROM\nc) 52% and above Cr2O3 ROM\nMineral\nMineral\nGrades\nGrades\nIron ore\nIron ore\n(i) Lumps:\n(i) Lumps:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(ii) Fines:\n(ii) Fines:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(iii) Concentrates\n(iii) Concentrates\n(iv) Calibrated Lump Ore (CLO) (Quantity already\n\t\t\t\treported in Lumps should not be reported against CLO)\n(iv) Calibrated Lump Ore (CLO)\na) Below 62% Fe (any size)\nb) 62% to below 65% Fe (5-18 mm\n\t\t\t\tsize CLO)\nc) 62% to below 65% Fe (10-40 mm\n\t\t\t\tsize CLO)\nd) 62% to below 65% Fe (CLO\n\t\t\t\tothers)\ne) 65% and above Fe (5-18 mm size\n\t\t\t\tCLO)\nf) 65% and above Fe (10-40 mm size\n\t\t\t\tCLO)\ng) 65% and above Fe (CLO others)\nManganese Ore\nManganese Ore\n(i) Ore\n(i) Ore\na) Below 25% Mn\nb) 25% to below 35% Mn\nc) 35% to below 46% Mn\nd) 46% and above Mn\ne) Dioxide ore\n(ii) Concentrates\n(ii) Concentrates\nBauxite\nBauxite\n(i) For use in alumina and aluminium extraction:- (Please\n\t\t\t\talso furnish the actual averages of the ore falling within the\n\t\t\t\tfollowing ranges of grades):\n(i) For use in alumina and aluminium extraction:-\na) Below 40% Al 2 O 3\nb) 40% to below 45% Al 2 O 3\nc) 45% to below 50% Al 2 O 3\nd) 50% to below 55% Al 2 O 3\ne) 55% to below 60% Al 2 O 3\nf) 60% and above Al 2 O 3\n(ii) For use other than alumina and aluminium metal\n\t\t\t\textraction\n(ii) For use other than alumina and aluminium metal\n\t\t\t\textraction\na) Cement\nb) Abrasive\nc) Refractory\nd) Chemical\nChromite\nChromite\n(i) Lumps\n(i) Lumps\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(ii) Fines\n(ii) Fines\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(iii) Concentrates\n(iii) Concentrates\nAsbestos\nAsbestos\na) Amphibole\nb) Chrysotile\nFluorite/ Fluorspar\nFluorite/ Fluorspar\na) 80% and above CaF 2\nb) 70% to below 80% CaF 2\nc) 30% to below 70% CaF 2\nd) Below 30% CaF 2\nGraphite\nGraphite\na) With 80% or more fixed carbon\nb) With 40 % or more fixed carbon but less than 80% fixed\n\t\t\t\tcarbon\nc) With 20% or more fixed carbon but less than 40% fixed\n\t\t\t\tcarbon\nd) With less than 20% fixed carbon\nKyanite\nKyanite\na) 40% and above Al 2 O 3\nb) Below 40% Al 2 O 3\nLimestone\nLimestone\na) LD Grade (less than 1.5% silica content)\nb) SMS\nc) BF\nd) Chemical\ne) Cement\nRock Phosphate/ Phosphorite\nRock Phosphate/ Phosphorite\na) Above 30% P 2 O 5\nb) Above 25% to 30% P 2 O 5\nc) Above 20% to 25% P 2 O 5\nd) Upto 20% P 2 O 5\n[Form H-2]\n[Form H-2]\n[See rule 45(5)(b)(ii)]\nFor the financial year 1 st April, 20__ to 31 st March, 20__\nAnnual Return\nAnnual Return\n[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]\n(i) The Regional Controller of Mines\nIndian Bureau of Mines\n___________ Region,\nPIN\n(ii) The State Government\nPart I\n(General)\n(General)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 145
        },
        {
            "number": "1",
            "title": "1. Details of Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 146
        },
        {
            "number": "1",
            "title": "1. Details of Mine:",
            "chapter": null,
            "content": "(a)\n\t\t\t\tRegistration number allotted by Indian Bureau of Mines (to give\n\t\t\t\tregistration number of the Lessee/Owner)\n(b) Mine Code\n\t\t\t\t(allotted by Indian Bureau of Mines )\n(c) Name of\n\t\t\t\tthe Mineral\n(d) Name of\n\t\t\t\tMine\n(e) Name(s)\n\t\t\t\tof other mineral(s), if any, produced from the same mine",
            "footnote": "",
            "is_definition": false,
            "sort_order": 147
        },
        {
            "number": "2",
            "title": "2. Location of the Mine :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 148
        },
        {
            "number": "2",
            "title": "2. Location of the Mine :",
            "chapter": null,
            "content": "Village\nPost Office\nTahsil/Taluk\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone no:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 149
        },
        {
            "number": "3",
            "title": "3. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 150
        },
        {
            "number": "3",
            "title": "3. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "Name of\n\t\t\t\tLessee/Owner\nAddress\nDistrict\nState\nPIN Code3\nFax no:\nE-mail:\nPhone No:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 151
        },
        {
            "number": "4",
            "title": "4. Registered Office of the Lessee:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 152
        },
        {
            "number": "5",
            "title": "5. Director in charge :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 153
        },
        {
            "number": "6",
            "title": "6. Agent :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 154
        },
        {
            "number": "7",
            "title": "7. Manager :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 155
        },
        {
            "number": "8",
            "title": "8. Mining Engineer in charge:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 156
        },
        {
            "number": "9",
            "title": "9. Geologist in charge :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 157
        },
        {
            "number": "10",
            "title": "10. Transferor (previous owner), if any, and date of transfer:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 158
        },
        {
            "number": "11",
            "title": "11. Particulars of area operated/ Lease (Furnish\n\t\t\t\tinformation on items (i) to (vi) lease-wise in case mine workings\n\t\t\t\tcover more than one lease)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 159
        },
        {
            "number": "11",
            "title": "11. Particulars of area operated/ Lease",
            "chapter": null,
            "content": "(i) Lease\n\t\t\t\tnumber allotted by the State Government……………………………………………………\n(ii) Area\n\t\t\t\tunder lease (hectares):\nUnder Forest\nOutside\n\t\t\t\tForest\nTotal\n(iii) Date of\n\t\t\t\texecution of mining lease deed\n(iv) Period\n\t\t\t\tof lease\n(v) Area for\n\t\t\t\twhich surface rights are held (hectares)\nUnder Forest\nOutside\n\t\t\t\tForest\nTotal\n(vi) Date and\n\t\t\t\tperiod of renewal (if applicable)\n(vii) In case\n\t\t\t\tthere is more than one mine in the same lease area, indicate name\n\t\t\t\tof mine and mineral produced",
            "footnote": "",
            "is_definition": false,
            "sort_order": 160
        },
        {
            "number": "12",
            "title": "12. Lease area (surface area) utilisation as at the end of\n\t\t\t\tyear (hectares):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 161
        },
        {
            "number": "12",
            "title": "12. Lease area (surface area) utilisation as at the end of\n\t\t\t\tyear (hectares):",
            "chapter": null,
            "content": "Under forest\nOutside forest\nTotal\n(i) Already\n\t\t\t\texploited & abandoned by opencast (O/C) mining\n(ii) Covered\n\t\t\t\tunder current (O/C) Workings\n(iii)\n\t\t\t\tReclaimed/rehabilitated\n(iv) Used for\n\t\t\t\twaste disposal\n(v) Occupied\n\t\t\t\tby plant, buildings, residential, welfare buildings & roads\n(vi) Used for\n\t\t\t\tany other purpose (specify)\n(vii) Work\n\t\t\t\tdone under progressive mine closure plan during the year",
            "footnote": "",
            "is_definition": false,
            "sort_order": 162
        },
        {
            "number": "13",
            "title": "13. Ownership/exploiting Agency of the mine: (Public\n\t\t\t\tSector/Private Sector/Joint Sector)",
            "chapter": null,
            "content": "Part - II\n(Employment and Wages)\n(Employment and Wages)\n1.Number of supervisory staff\n\t\t\t\temployed at the mine\nDescription\nWholly employed\nPartly employed\n(i) Graduate\n\t\t\t\tMining Engineer\n(ii) Diploma\n\t\t\t\tMining Engineer\n(iii)\n\t\t\t\tGeologist\n(iv)\n\t\t\t\tSurveyor\n(v) Other\n\t\t\t\tadministrative and technical supervisory staff\nTotal :\n2.(i) Number of days the mine worked:\n(ii) No. of\n\t\t\t\tshifts per day:\n(iii)\n\t\t\t\tIndicate reasons for work stoppage in the mine during the year\n\t\t\t\t(due to strike, lockout, heavy rain, non-availability of labour,\n\t\t\t\ttransport bottleneck, lack of demand, uneconomic operations,\n\t\t\t\tetc.) and the number of days of work stoppage for each of the\n\t\t\t\tfactors separately.\nReasons\nNo. of days",
            "footnote": "",
            "is_definition": false,
            "sort_order": 163
        },
        {
            "number": "3",
            "title": "3. Employment and salary/\n\t\t\t\twages paid :",
            "chapter": null,
            "content": "Maximum number of persons employed\n\t\t\t\ton any one day during the year:\n(i) In workings below ground on (date) ..........................\n\t\t\t\t(a) (number) ..................\n(ii) In all\n\t\t\t\tin the mine on ............. (date) ..........................\n\t\t\t\t(a) (number)..................\nClassification\nTotal number of man days worked during the year\nNo. of days worked during the year\nAverage daily number of persons employed\nTotal Wages/ Salary for the year (Rs)\nDirect\nContract\nTotal\nMale\nFemale\nTotal\n(1)\n2(A)\n2(B)\n2(C)\n(3)\n4(A)\n4(B)\n4(C)\n(5)\nBelow Ground\nOpencast\nAbove Ground\nTotal:\n# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site\nPart-II A\n(Capital Structure)\n(Capital Structure)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 164
        },
        {
            "number": "1",
            "title": "1. Value\n\t\t\t\tof Fixed Assets* (Rs…………………………………)",
            "chapter": null,
            "content": "(in respect of the mine,\n\t\t\t\tbeneficiation plant, mine work-shop, power and water\n\t\t\t\tinstallation)\nIn case this information is\n\t\t\t\tfurnished as combined information in another mine's return please\n\t\t\t\tspecify Mine Code/Mine\nName:\nDescription\nAt the beginning of the year (Rs)\nAdditions during the Year (Rs)\nSold or discarded during the year (Rs)\nDepreciation during the year (Rs)\nNet closing Balance (Rs) (2+3)- (4+5)\nEstimated market value** (Rs)\n1\n2\n3\n4\n5\n6\n7\n(i) Land***\n(ii) Building:\nIndustrial\nResidential\n(iii) Plant and Machinery including transport equipment\niv) Capitalised Expenditure such as pre-production\n\t\t\t\texploration, development, major overhaul and repair to machinery\n\t\t\t\tetc. (As prescribed under Income Tax Act)\nTotal:\n* In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mine's return. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.\n** Optional and may be furnished in respect of items (i), (ii) and (iii) if the mine owner desires.\n*** Including any non-recurring expenditure incurred on the acquisition of land.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 165
        },
        {
            "number": "2",
            "title": "2. Source of Finance ( at\n\t\t\t\tthe end of the year) :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 166
        },
        {
            "number": "2",
            "title": "2. Source of Finance ( at\n\t\t\t\tthe end of the year) :",
            "chapter": null,
            "content": "(i) Paid up Share Capital (Rs)\n(ii) Own Capital (Rs)\n(iii) Reserve & Surplus (All Types)(Rs)\n(iv) Long Term loans outstanding (#)(Rs)\nName of the\n\t\t\t\tInstitution/ Source\nAmount of Loan (Rs)\nRate of Interest\n(#) Indicate the names of the lending institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 167
        },
        {
            "number": "3",
            "title": "3. Interest and Rent (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 168
        },
        {
            "number": "3",
            "title": "3. Interest and Rent (Rs)",
            "chapter": null,
            "content": "(i) Interest paid during the year\n(ii) Rents (excluding surface rent) paid during the year\nPart - III\n(Consumption of Materials)\n(Consumption of Materials)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 169
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed during the year",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 170
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed during the year",
            "chapter": null,
            "content": "Description\nUnit\nQuantity\nValue (Rs)\n(i) Fuel\n(i) Fuel\n(a) Coal\nTonnes\n(b) Diesel\n\t\t\t\tOil\nLtrs.\n(c) Petrol\nLtrs.\n(d) Kerosene\nLtrs.\n(e) Gas\nCu.M.\n(ii) Lubricant\n(ii) Lubricant\n(a) Lubricant\n\t\t\t\toil\nLtrs.\n(b) Grease\nKgs.\n(iii) Electricity\n(iii) Electricity\n(a) Consumed\nKwh\n(b) Generated\nKwh\n(c) Sold\nKwh\n(iv) Explosives (furnish full details in Part IV)\n(iv) Explosives (furnish full details in Part IV)\n(v) Tyres\n(v) Tyres\nNos.\n(vi) Timber & Supports\n(vi) Timber & Supports\n(vii) Drill rods & kits\n(vii) Drill rods & kits\nNos.\n(viii) Other spares & stores\n(viii) Other spares & stores",
            "footnote": "",
            "is_definition": false,
            "sort_order": 171
        },
        {
            "number": "2",
            "title": "2. Royalty, Rents and Payments made to DMF & NMET (Rs):",
            "chapter": null,
            "content": "X\nPaid for current year\nPaid towards past arrears\n(a) Royalty\n(b) Dead rent\n(c) Surface rent\n(d) Payment made to DMF\n(e) Payment made to NMET",
            "footnote": "",
            "is_definition": false,
            "sort_order": 172
        },
        {
            "number": "3",
            "title": "3. Compensation paid for felling trees during the year (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 173
        },
        {
            "number": "4",
            "title": "4. Depreciation on fixed assets (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 174
        },
        {
            "number": "5",
            "title": "5. Taxes and cesses",
            "chapter": null,
            "content": "X\nX\nAmount in Rupees paid during the year to:\nX\nX\nCentral Govt.\nState Govt.\n(i) Sales Tax\n(ii) Welfare cess\n(iii) Other taxes & cesses:-\n(a) Mineral\n\t\t\t\tcess\n(b) Cess on\n\t\t\t\tdead rent\n(c) Others\n\t\t\t\t(please specify)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 175
        },
        {
            "number": "6",
            "title": "6. Other expenses (Rs) :",
            "chapter": null,
            "content": "(i) Overheads\n(ii) Maintenance\n(iii) Money value of other benefits paid to workmen\n(iv) Payment made to professional agencies\nPart -IV\n(Consumption of Explosives)\n(Consumption of Explosives)\nLicensed capacity of magazine:\n\t\t\t\t(specify unit separately in kg/tonne, numbers, metres )\nItem\nItem\nUnit\nUnit\nCapacity\nCapacity\nClassification of Explosives\nUnit\nQuantity consumed during the year\nEstimated requirement during the next year\nSmall dia. (upto 32 mm)\nLarge dia. (above 32 mm)\nSmall dia. (upto 32 mm)\nLarge dia. (above 32 mm)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 176
        },
        {
            "number": "1",
            "title": "1. Gun Powder",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 177
        },
        {
            "number": "2",
            "title": "2. Nitrate Mixture",
            "chapter": null,
            "content": "Kg.\nX\nX\nX\nX\nX\nX\nX\nX\na. Loose\n\t\t\t\tammonium nitrate\nb. Ammonium\n\t\t\t\tnitrate in cartridged form",
            "footnote": "",
            "is_definition": false,
            "sort_order": 178
        },
        {
            "number": "3",
            "title": "3. Nitro compound Kg.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 179
        },
        {
            "number": "4",
            "title": "4. Liquid Oxygen soaked cartridges",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 180
        },
        {
            "number": "5",
            "title": "5. Slurry explosives (Mention different trade names)",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 181
        },
        {
            "number": "6",
            "title": "6. Detonators",
            "chapter": null,
            "content": "No.s\nX\nX\nX\nX\nX\nX\nX\nX\ni) Ordinary\nii)\n\t\t\t\tElectrical\nX\nX\nX\nX\nX\nX\nX\nX\n(a) Ordinary\n(b) Delay",
            "footnote": "",
            "is_definition": false,
            "sort_order": 182
        },
        {
            "number": "7",
            "title": "7. Fuse",
            "chapter": null,
            "content": "Mts\nX\nX\nX\nX\nX\nX\nX\nX\n(a) Safety\n\t\t\t\tFuse\n(b)\n\t\t\t\tDetonating Fuse",
            "footnote": "",
            "is_definition": false,
            "sort_order": 183
        },
        {
            "number": "8",
            "title": "8. Plastic ignition cord",
            "chapter": null,
            "content": "Mts",
            "footnote": "",
            "is_definition": false,
            "sort_order": 184
        },
        {
            "number": "9",
            "title": "9. Others (specify)",
            "chapter": null,
            "content": "(Mention the unit)\nPart-V\n(General Geology and Mining)\n(General Geology and Mining)\n(Items 2 and 3 to be submitted separately for each mineral)\n(i) Exploration activities during the year:\nAt the beginning of the year\nDuring the year\nCumulative\nGrid spacing/ Dimension\nDrilling\nNo of holes\nMetrage\nPitting\nNo of pits\nExcavation (in m 3 )\nTrenching\nNo of trenches\nExcavation (in m 3 )\nLength covered (in metre)\nExpenditure on exploration (Rs)\nX\nX\n(ii). Any other exploration activity during the year:\nClassification\nCode\nAt the beginning of the year 1.4.20___\nAssessed during the year\nDepletion of reserves during the year\nBalance resources as on 31.3.20____\n(1)\n(2)\n(3)\n(4)\n(5)\n(6) = (3+4-5)\nA. Mineral Reserve\nA. Mineral Reserve",
            "footnote": "",
            "is_definition": false,
            "sort_order": 185
        },
        {
            "number": "1",
            "title": "1. Proved Mineral Reserve",
            "chapter": null,
            "content": "111",
            "footnote": "",
            "is_definition": false,
            "sort_order": 186
        },
        {
            "number": "2",
            "title": "2. Probable mineral Reserve",
            "chapter": null,
            "content": "121\n122",
            "footnote": "",
            "is_definition": false,
            "sort_order": 187
        },
        {
            "number": "3",
            "title": "3. Total Reserves",
            "chapter": null,
            "content": "B. Remaining Resources\nB. Remaining Resources",
            "footnote": "",
            "is_definition": false,
            "sort_order": 188
        },
        {
            "number": "1",
            "title": "1. Feasibility mineral Resource",
            "chapter": null,
            "content": "211",
            "footnote": "",
            "is_definition": false,
            "sort_order": 189
        },
        {
            "number": "2",
            "title": "2. Prefeasibility mineral resource",
            "chapter": null,
            "content": "221\n222",
            "footnote": "",
            "is_definition": false,
            "sort_order": 190
        },
        {
            "number": "3",
            "title": "3. Measured mineral resource",
            "chapter": null,
            "content": "331",
            "footnote": "",
            "is_definition": false,
            "sort_order": 191
        },
        {
            "number": "4",
            "title": "4. Indicated mineral resource",
            "chapter": null,
            "content": "332",
            "footnote": "",
            "is_definition": false,
            "sort_order": 192
        },
        {
            "number": "5",
            "title": "5. Inferred mineral resource",
            "chapter": null,
            "content": "333",
            "footnote": "",
            "is_definition": false,
            "sort_order": 193
        },
        {
            "number": "6",
            "title": "6. Reconnaissance mineral resource",
            "chapter": null,
            "content": "334",
            "footnote": "",
            "is_definition": false,
            "sort_order": 194
        },
        {
            "number": "7",
            "title": "7. Total remaining Resources",
            "chapter": null,
            "content": "Total (A+B)\nTotal (A+B)\nAt the beginning of the year\nGenerated during the year\nDisposed during the year\nTotal stacked at the end of the year\nAverage grade of the mineral reject generated\nAt the beginning of the year\nGenerated during the year\nDisposed in dumps during the year\nBack filled during the year\nTotal at the end of the year\nDescription\nWithin lease area\nOutside lease area\ni) Number of trees planted during the year\nii) Survival rate in percentage\niii) Total no. of trees at the end of the year\nType of machinery\nCapacity of each type of machinery\nUnit (in which capacity is reported)\nNo. of machinery\nElectrical/ Non-electrical (specify)\nUsed in opencast/ underground (specify)\n(ii) Furnish following information:\nItem\nTonnage\nAverage Grade\nFeed:\nConcentrates/processed products :\n(mention name)\nBy-products/Co-products:\n(mention name)\nTailings:\nPart-VI\n(Production, Despatches and Stocks)\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\n(Unit of Quantity in Tonnes; indicate unit of quantity if not in tonnes)\nOpening stocks\nProduction\nClosing stocks\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nA. From Underground workings\ni) From Development\nii) From Stoping\nB. From Opencast workings\nTotal\nOpening stocks\nProduction\nClosing stocks\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nA. From Underground workings\ni) From\n\t\t\t\tDevelopment\nii) From\n\t\t\t\tStoping\nB. From Opencast workings\nTotal\nOpening stocks of\n\t\t\t\tthe Ore at concentrator/plant\nOre received from the mine\nOre treated\nQuantity\nMetal content/grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nConcentrates * Obtained\nTailings\nClosing stocks of concentrates at the\n\t\t\t\tconcentrator/plant\nQuantity\nMetal content/grade\nValue (Rs)\nQuantity\nMetal content/grade\nQuantity\nMetal content/grade\n*In case of any leaching method adopted, give quantity recovered and grade contained separately.\nOpening Stocks of the concentrates at the\n\t\t\t\tsmelter/ plant\nConcentrates received from concentrator/ plant\nConcentrates received from other sources\n\t\t\t\t(specify)\nConcentrates sold (if any)\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nConcentrates treated\nClosing stocks of concentrate at the Smelter/\n\t\t\t\tPlant\nMetals(*) recovered (specify)\nOther by-products, if any, recovered\nQuantity\nMetal content/ grade\nQuantity\nMetal content/ grade\nQuantity\nGrade\nValue (Rs)\nQuantity\nGrade\nValue (Rs)\n(*) Please give category-wise break-up viz. blister, fire refined copper, cathodes, electrolytic copper wire bars, lead ingots, zinc cathodes, zinc dross, gold, tungsten etc.\nMetal/  Product\nOpening stocks of Metals/ Products\nPlace of sale\nMetals/Products sold(@)\nClosing stocks of Metals/ Products\nQuantity\nGrade\nQuantity\nGrade\nValue(#) (Rs)\nQuantity\nGrade\nNote:\n(#) Please give ex-plant sale value.\n(@) Please give category-wise break-up of metals and other products sold.\nDeduction claimed #\nAmount (in Rs./ Unit)\nRemarks\na) Cost of transportation (indicate loading station and\n\t\t\t\tdistance from mine in remarks)\nb) Loading and unloading charges\nc) Railway freight, if applicable (indicate destination and\n\t\t\t\tdistance)\nd) Port Handling charges/export duty (indicate name of port)\ne) Charges for sampling and analysis\nf) Rent for the plot at Stocking yard\ng) Other charges (specify clearly)\nTotal (a) to (g)\n# Not applicable for captive dispatches and ex-mine sales\nGrade (ore/ Conc.)\nNature of Despatch (indicate whether Domestic\n\t\t\t\tSale or Domestic Transfer or Captive consumption or Export)\nFor Domestic Purposes\nFor export\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer ##\nConsignee name ##\nQuantity\nSale value (Rs)\nCountry\nQuantity\nF.O.B Value(Rs)\n## To indicate separately if more than one buyer.\nNote. - Mine owners are required to substantiate domestic sale value/ FOB value for each grade quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).\na)\nb)\nc)\na)\nb)\nc)\nPart-VII\nCost of Production\nCost of Production\nCost of production per tonne of ore/mineral produced\nSl.No.\nItem\nCost per tonne (Rs)\n(i)\nDirect Cost\n(a) Exploration\n(b) Mining\n(c) Beneficiation(Mechanical Only)\n(ii)\nOver-head\n\t\t\t\tcost\n(iii)\nDepreciation\n(iv)\nInterest\n(v)\nRoyalty\n(vi)\nPayments made\n\t\t\t\tto DMF\n(vii)\nPayments made\n\t\t\t\tto NMET\n(viii)\nTaxes\n(ix)\nDead Rent\n(x)\nOthers\n\t\t\t\t(specify)\nTotal\nNote. - Information given under Part VII will be kept confidential. The Government, however, will be free to utilize the information for general studies without revealing the identity of the firm.\nVerification\nVerification\nPlace:\nSignature\nDate:\nName\n\t\t\t\tin full:\nDesignation: Owner/ Agent/ Mining Engineer/\n\t\t\t\tManager\n[Form H-3]\n[Form H-3]\n[See rule 45(5)(b)(iii)]\nFor the financial year 1 st April, 20__ to 31 st March, 20__\nAnnual Return\nAnnual Return\n[To be used for precious and semi-precious stones]\n(i) The Regional Controller of Mines\nIndian Bureau of Mines\n___________ Region,\nPIN\n(ii) The State Government\nPart I\n(General)\n(General)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 195
        },
        {
            "number": "1",
            "title": "1. Details of Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 196
        },
        {
            "number": "1",
            "title": "1. Details of Mine:",
            "chapter": null,
            "content": "(a)\n\t\t\t\tRegistration number allotted by Indian Bureau of Mines (to give\n\t\t\t\tregistration number of the Lessee/Owner)\n(b) Mine Code\n\t\t\t\t(allotted by Indian Bureau of Mines )\n(c) Name of\n\t\t\t\tthe Mineral\n(d) Name of\n\t\t\t\tMine\n(e) Name(s)\n\t\t\t\tof other mineral(s), if any, produced from the same mine",
            "footnote": "",
            "is_definition": false,
            "sort_order": 197
        },
        {
            "number": "2",
            "title": "2. Location of the Mine :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 198
        },
        {
            "number": "2",
            "title": "2. Location of the Mine :",
            "chapter": null,
            "content": "Village\nPost Office\nTahsil/Taluk\nDistrict\nState\nPIN Code\nFax no:\nE-mail:\nPhone no:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 199
        },
        {
            "number": "3",
            "title": "3. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 200
        },
        {
            "number": "3",
            "title": "3. Name and address of Lessee/Owner (along with fax no. and\n\t\t\t\te-mail):",
            "chapter": null,
            "content": "Name of\n\t\t\t\tLessee/Owner\nAddress\nDistrict\nState\nPIN Code3\nFax no:\nE-mail:\nPhone No:\nMobile:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 201
        },
        {
            "number": "4",
            "title": "4. Registered Office of the Lessee:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 202
        },
        {
            "number": "5",
            "title": "5. Director in charge :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 203
        },
        {
            "number": "6",
            "title": "6. Agent :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 204
        },
        {
            "number": "7",
            "title": "7. Manager :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 205
        },
        {
            "number": "8",
            "title": "8. Mining Engineer in charge:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 206
        },
        {
            "number": "9",
            "title": "9. Geologist in charge :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 207
        },
        {
            "number": "10",
            "title": "10. Transferor (previous owner), if any, and date of transfer:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 208
        },
        {
            "number": "11",
            "title": "11. Particulars of area operated/ Lease (Furnish\n\t\t\t\tinformation on items (i) to (vi) lease-wise in case mine workings\n\t\t\t\tcover more than one lease)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 209
        },
        {
            "number": "11",
            "title": "11. Particulars of area operated/ Lease",
            "chapter": null,
            "content": "(i) Lease\n\t\t\t\tnumber allotted by the State Government……………………………………………………\n(ii) Area\n\t\t\t\tunder lease (hectares):\nUnder Forest\nOutside\n\t\t\t\tForest\nTotal\n(iii) Date of\n\t\t\t\texecution of mining lease deed\n(iv) Period\n\t\t\t\tof lease\n(v) Area for\n\t\t\t\twhich surface rights are held (hectares)\nUnder Forest\nOutside\n\t\t\t\tForest\nTotal\n(vi) Date and\n\t\t\t\tperiod of renewal (if applicable)\n(vii) In case\n\t\t\t\tthere is more than one mine in the same lease area, indicate name\n\t\t\t\tof mine and mineral produced",
            "footnote": "",
            "is_definition": false,
            "sort_order": 210
        },
        {
            "number": "12",
            "title": "12. Lease area (surface area) utilisation as at the end of\n\t\t\t\tyear (hectares):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 211
        },
        {
            "number": "12",
            "title": "12. Lease area (surface area) utilisation as at the end of\n\t\t\t\tyear (hectares):",
            "chapter": null,
            "content": "Under forest\nOutside forest\nTotal\n(i) Already\n\t\t\t\texploited & abandoned by opencast (O/C) mining\n(ii) Covered\n\t\t\t\tunder current (O/C) Workings\n(iii)\n\t\t\t\tReclaimed/rehabilitated\n(iv) Used for\n\t\t\t\twaste disposal\n(v) Occupied\n\t\t\t\tby plant, buildings, residential, welfare buildings & roads\n(vi) Used for\n\t\t\t\tany other purpose (specify)\n(vii) Work\n\t\t\t\tdone under progressive mine closure plan during the year",
            "footnote": "",
            "is_definition": false,
            "sort_order": 212
        },
        {
            "number": "13",
            "title": "13. Ownership/exploiting Agency of the mine: (Public\n\t\t\t\tSector/Private Sector/Joint Sector)",
            "chapter": null,
            "content": "Part - II\n(Employment and Wages)\n(Employment and Wages)\n1.Number of supervisory staff\n\t\t\t\temployed at the mine\nDescription\nWholly employed\nPartly employed\n(i) Graduate\n\t\t\t\tMining Engineer\n(ii) Diploma\n\t\t\t\tMining Engineer\n(iii)\n\t\t\t\tGeologist\n(iv)\n\t\t\t\tSurveyor\n(v) Other\n\t\t\t\tadministrative and technical supervisory staff\nTotal :\n2.(i) Number of days the mine worked:\n(ii) No. of\n\t\t\t\tshifts per day:\n(iii)\n\t\t\t\tIndicate reasons for work stoppage in the mine during the year\n\t\t\t\t(due to strike, lockout, heavy rain, non-availability of labour,\n\t\t\t\ttransport bottleneck, lack of demand, uneconomic operations,\n\t\t\t\tetc.) and the number of days of work stoppage for each of the\n\t\t\t\tfactors separately.\nReasons\nNo. of days",
            "footnote": "",
            "is_definition": false,
            "sort_order": 213
        },
        {
            "number": "3",
            "title": "3. Employment and salary/\n\t\t\t\twages paid :",
            "chapter": null,
            "content": "Maximum number of persons employed\n\t\t\t\ton any one day during the year:\n(i) In workings below ground on (date) ..........................\n\t\t\t\t(a) (number) ..................\n(ii) In all\n\t\t\t\tin the mine on ............. (date) ..........................\n\t\t\t\t(a) (number)..................\nClassification\nTotal number of man days worked during the year\nNo. of days worked during the year\nAverage daily number of persons employed\nTotal Wages/ Salary for the year (Rs)\nDirect\nContract\nTotal\nMale\nFemale\nTotal\n(1)\n2(A)\n2(B)\n2(C)\n(3)\n4(A)\n4(B)\n4(C)\n(5)\nBelow Ground\nOpencast\nAbove Ground\nTotal:\n# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site\nPart-II A\n(Capital Structure)\n(Capital Structure)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 214
        },
        {
            "number": "1",
            "title": "1. Value\n\t\t\t\tof Fixed Assets* (Rs…………………………………)",
            "chapter": null,
            "content": "(in respect of the mine,\n\t\t\t\tbeneficiation plant, mine work-shop, power and water\n\t\t\t\tinstallation)\nIn case this information is\n\t\t\t\tfurnished as combined information in another mine's return please\n\t\t\t\tspecify Mine Code/Mine\nName:\nDescription\nAt the beginning of the year (Rs)\nAdditions during the Year (Rs)\nSold or discarded during the year (Rs)\nDepreciation during the year (Rs)\nNet closing Balance (Rs) (2+3)- (4+5)\nEstimated market value** (Rs)\n1\n2\n3\n4\n5\n6\n7\n(i) Land***\n(ii) Building:\nIndustrial\nResidential\n(iii) Plant and Machinery including transport equipment\niv) Capitalised Expenditure such as pre-production\n\t\t\t\texploration, development, major overhaul and repair to machinery\n\t\t\t\tetc. (As prescribed under Income Tax Act)\nTotal:\n* In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mine's return. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.\n** Optional and may be furnished in respect of items (i), (ii) and (iii) if the mine owner desires.\n*** Including any non-recurring expenditure incurred on the acquisition of land.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 215
        },
        {
            "number": "2",
            "title": "2. Source of Finance ( at\n\t\t\t\tthe end of the year) :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 216
        },
        {
            "number": "2",
            "title": "2. Source of Finance ( at\n\t\t\t\tthe end of the year) :",
            "chapter": null,
            "content": "(i) Paid up Share Capital (Rs)\n(ii) Own Capital (Rs)\n(iii) Reserve & Surplus (All Types)(Rs)\n(iv) Long Term loans outstanding (#)(Rs)\nName of the\n\t\t\t\tInstitution/ Source\nAmount of Loan (Rs)\nRate of Interest\n(#) Indicate the names of the lending institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 217
        },
        {
            "number": "3",
            "title": "3. Interest and Rent (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 218
        },
        {
            "number": "3",
            "title": "3. Interest and Rent (Rs)",
            "chapter": null,
            "content": "(i) Interest paid during the year\n(ii) Rents (excluding surface rent) paid during the year\nPart - III\n(Consumption of Materials)\n(Consumption of Materials)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 219
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed during the year",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 220
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed during the year",
            "chapter": null,
            "content": "Description\nUnit\nQuantity\nValue (Rs)\n(i) Fuel\n(i) Fuel\n(a) Coal\nTonnes\n(b) Diesel\n\t\t\t\tOil\nLtrs.\n(c) Petrol\nLtrs.\n(d) Kerosene\nLtrs.\n(e) Gas\nCu.M.\n(ii) Lubricant\n(ii) Lubricant\n(a) Lubricant\n\t\t\t\toil\nLtrs.\n(b) Grease\nKgs.\n(iii) Electricity\n(iii) Electricity\n(a) Consumed\nKwh\n(b) Generated\nKwh\n(c) Sold\nKwh\n(iv) Explosives (furnish full details in Part IV)\n(iv) Explosives (furnish full details in Part IV)\n(v) Tyres\n(v) Tyres\nNos.\n(vi) Timber & Supports\n(vi) Timber & Supports\n(vii) Drill rods & kits\n(vii) Drill rods & kits\nNos.\n(viii) Other spares & stores\n(viii) Other spares & stores",
            "footnote": "",
            "is_definition": false,
            "sort_order": 221
        },
        {
            "number": "2",
            "title": "2. Royalty, Rents and Payments made to DMF & NMET (Rs):",
            "chapter": null,
            "content": "X\nPaid for current year\nPaid towards past arrears\n(a) Royalty\n(b) Dead rent\n(c) Surface rent\n(d) Payment made to DMF\n(e) Payment made to NMET",
            "footnote": "",
            "is_definition": false,
            "sort_order": 222
        },
        {
            "number": "3",
            "title": "3. Compensation paid for felling trees during the year (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 223
        },
        {
            "number": "4",
            "title": "4. Depreciation on fixed assets (Rs)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 224
        },
        {
            "number": "5",
            "title": "5. Taxes and cesses",
            "chapter": null,
            "content": "X\nX\nAmount in Rupees paid during the year to:\nX\nX\nCentral Govt.\nState Govt.\n(i) Sales Tax\n(ii) Welfare cess\n(iii) Other taxes & cesses:-\n(a) Mineral\n\t\t\t\tcess\n(b) Cess on\n\t\t\t\tdead rent\n(c) Others\n\t\t\t\t(please specify)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 225
        },
        {
            "number": "6",
            "title": "6. Other expenses (Rs) :",
            "chapter": null,
            "content": "(i) Overheads\n(ii) Maintenance\n(iii) Money value of other benefits paid to workmen\n(iv) Payment made to professional agencies\nPart -IV\n(Consumption of Explosives)\n(Consumption of Explosives)\nLicensed capacity of magazine:\n\t\t\t\t(specify unit separately in kg/tonne, numbers, metres )\nItem\nItem\nUnit\nUnit\nCapacity\nCapacity\nClassification of Explosives\nUnit\nQuantity consumed during the year\nEstimated requirement during the next year\nSmall dia. (upto 32 mm)\nLarge dia. (above 32 mm)\nSmall dia. (upto 32 mm)\nLarge dia. (above 32 mm)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 226
        },
        {
            "number": "1",
            "title": "1. Gun Powder",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 227
        },
        {
            "number": "2",
            "title": "2. Nitrate Mixture",
            "chapter": null,
            "content": "Kg.\nX\nX\nX\nX\nX\nX\nX\nX\na. Loose\n\t\t\t\tammonium nitrate\nb. Ammonium\n\t\t\t\tnitrate in cartridged form",
            "footnote": "",
            "is_definition": false,
            "sort_order": 228
        },
        {
            "number": "3",
            "title": "3. Nitro compound Kg.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 229
        },
        {
            "number": "4",
            "title": "4. Liquid Oxygen soaked cartridges",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 230
        },
        {
            "number": "5",
            "title": "5. Slurry explosives (Mention different trade names)",
            "chapter": null,
            "content": "Kg.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 231
        },
        {
            "number": "6",
            "title": "6. Detonators",
            "chapter": null,
            "content": "No.s\nX\nX\nX\nX\nX\nX\nX\nX\ni) Ordinary\nii)\n\t\t\t\tElectrical\nX\nX\nX\nX\nX\nX\nX\nX\n(a) Ordinary\n(b) Delay",
            "footnote": "",
            "is_definition": false,
            "sort_order": 232
        },
        {
            "number": "7",
            "title": "7. Fuse",
            "chapter": null,
            "content": "Mts\nX\nX\nX\nX\nX\nX\nX\nX\n(a) Safety\n\t\t\t\tFuse\n(b)\n\t\t\t\tDetonating Fuse",
            "footnote": "",
            "is_definition": false,
            "sort_order": 233
        },
        {
            "number": "8",
            "title": "8. Plastic ignition cord",
            "chapter": null,
            "content": "Mts",
            "footnote": "",
            "is_definition": false,
            "sort_order": 234
        },
        {
            "number": "9",
            "title": "9. Others (specify)",
            "chapter": null,
            "content": "(Mention the unit)\nPart-V\n(General Geology and Mining)\n(General Geology and Mining)\n(Items 2 and 3 to be submitted separately for each mineral)\n(i) Exploration activities during the year:\nAt the beginning of the year\nDuring the year\nCumulative\nGrid spacing/ Dimension\nDrilling\nNo of holes\nMetrage\nPitting\nNo of pits\nExcavation (in m 3 )\nTrenching\nNo of trenches\nExcavation (in m 3 )\nLength covered (in metre)\nExpenditure on exploration (Rs)\nX\nX\n(ii). Any other exploration activity during the year:\nClassification\nCode\nAt the beginning of the year 1.4.20___\nAssessed during the year\nDepletion of reserves during the year\nBalance resources as on 31.3.20____\n(1)\n(2)\n(3)\n(4)\n(5)\n(6) = (3+4-5)\nA. Mineral Reserve\nA. Mineral Reserve",
            "footnote": "",
            "is_definition": false,
            "sort_order": 235
        },
        {
            "number": "1",
            "title": "1. Proved Mineral Reserve",
            "chapter": null,
            "content": "111",
            "footnote": "",
            "is_definition": false,
            "sort_order": 236
        },
        {
            "number": "2",
            "title": "2. Probable mineral Reserve",
            "chapter": null,
            "content": "121\n122",
            "footnote": "",
            "is_definition": false,
            "sort_order": 237
        },
        {
            "number": "3",
            "title": "3. Total Reserves",
            "chapter": null,
            "content": "B. Remaining Resources\nB. Remaining Resources",
            "footnote": "",
            "is_definition": false,
            "sort_order": 238
        },
        {
            "number": "1",
            "title": "1. Feasibility mineral Resource",
            "chapter": null,
            "content": "211",
            "footnote": "",
            "is_definition": false,
            "sort_order": 239
        },
        {
            "number": "2",
            "title": "2. Prefeasibility mineral resource",
            "chapter": null,
            "content": "221\n222",
            "footnote": "",
            "is_definition": false,
            "sort_order": 240
        },
        {
            "number": "3",
            "title": "3. Measured mineral resource",
            "chapter": null,
            "content": "331",
            "footnote": "",
            "is_definition": false,
            "sort_order": 241
        },
        {
            "number": "4",
            "title": "4. Indicated mineral resource",
            "chapter": null,
            "content": "332",
            "footnote": "",
            "is_definition": false,
            "sort_order": 242
        },
        {
            "number": "5",
            "title": "5. Inferred mineral resource",
            "chapter": null,
            "content": "333",
            "footnote": "",
            "is_definition": false,
            "sort_order": 243
        },
        {
            "number": "6",
            "title": "6. Reconnaissance mineral resource",
            "chapter": null,
            "content": "334",
            "footnote": "",
            "is_definition": false,
            "sort_order": 244
        },
        {
            "number": "7",
            "title": "7. Total remaining Resources",
            "chapter": null,
            "content": "Total (A+B)\nTotal (A+B)\nAt the beginning of the year\nGenerated during the year\nDisposed during the year\nTotal stacked at the end of the year\nAverage grade of the mineral reject generated\nAt the beginning of the year\nGenerated during the year\nDisposed in dumps during the year\nBack filled during the year\nTotal at the end of the year\nDescription\nWithin lease area\nOutside lease area\ni) Number of trees planted during the year\nii) Survival rate in percentage\niii) Total no. of trees at the end of the year\nType of machinery\nCapacity of each type of machinery\nUnit (in which capacity is reported)\nNo. of machinery\nElectrical/ Non-electrical (specify)\nUsed in opencast/ underground (specify)\n(ii) Furnish following information:\nItem\nTonnage\nAverage Grade\nFeed:\nConcentrates/processed products :\n(mention name)\nBy-products/Co-products:\n(mention name)\nTailings:\nPart-VI\n(Production, Despatches and Stocks)\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\nCategory\nUnit of quantity\nQuantity\n(a) Opencast workings\n(b) Underground workings\nGem Variety\nIndustrial\nOthers\nRough and uncut stones\nCut and Polished Stones\nNo. of stones\nQty @\nNo. of stones\nQty @\nNo. of stones\nQty @\nNo. of stones\nQty @\nA .Opening stocks\nB. Production\n(i) From\n\t\t\t\tOpencast Working\n(ii) From\n\t\t\t\tunderground working\nTotal (Production)\nC. Despatches\nD. Closing Stocks\nE. Ex-mine Price (Rs)\n@:The Unit of quantity viz. Carats/Grams/Kilogram etc., as the case may be, should be indicated under quantity.\nDeduction claimed #\nAmount (in Rs/ Unit)\nRemarks\na) Cost of transportation (indicate loading station and\n\t\t\t\tdistance from mine in remarks)\nb) Loading and unloading charges\nc) Railway freight, if applicable (indicate destination and\n\t\t\t\tdistance)\nd) Port handling charges/export duty (indicate name of port)\ne) Charges for sampling and analysis\nf) Rent for the plot at stocking yard\ng) Other charges (specify clearly)\nTotal (a) to (g)\n# Not applicable for captive dispatches and ex-mine sales\nGrade (*)\nNature of Despatch (indicate whether Domestic\n\t\t\t\tSale or Domestic Transfer or Captive consumption or Export)\nFor Domestic Purposes\nFor export\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer ##\nConsignee name ##\nQuantity\nSale value (Rs)\nCountry\nQuantity\nF.O.B Value(Rs)\n*: To indicate rough and uncut stones, cut and polished stones, industrial, others\n## To indicate separately if more than one buyer.\nNote. - Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required).\na)\nb)\nc)\na)\nb)\nc)\nPart-VII\nCost of Production\nCost of Production\nCost of production per unit of ore/mineral produced\nSl.No.\nItem\nCost per tonne (Rs)\n(i)\nDirect Cost\n(a) Exploration\n(b) Mining\n(c) Beneficiation(Mechanical Only)\n(ii)\nOver-head\n\t\t\t\tcost\n(iii)\nDepreciation\n(iv)\nInterest\n(v)\nRoyalty\n(vi)\nPayments made\n\t\t\t\tto DMF\n(vii)\nPayments made\n\t\t\t\tto NMET\n(viii)\nTaxes\n(ix)\nDead Rent\n(x)\nOthers\n\t\t\t\t(specify)\nTotal\nNote. - Information given under Part VII will be kept confidential. The Government, however, will be free to utilize the information for general studies without revealing the identity of the firm.\nVerification\nVerification\nPlace:\nSignature\nDate:\nName\n\t\t\t\tin full:\nDesignation: Owner/ Agent/ Mining Engineer/\n\t\t\t\tManager\nOmitted by Notification No. G.S.R. 75 (E) dated 9.2.2011 (w.e.f 24.10.1988)\nOmitted by Notification No. G.S.R. 75 (E) dated 9.2.2011 (w.e.f 24.10.1988)\nOLD LAW  ▼\nForm H-9\nForm H-9\nAnnual Return\n[See rule 45(1) (c) (ix)]\nFor the Financial Year 1st April, 20.......to 31st March, 20.......\nMINE CODE............................................... (i) Name of the mineral ................................................................ (ii) Name of mine ................................................................ (iii) Name(s) of other mineral(s), if any, produced from the same mine during the year 20........ ................................................................ ................................................................ To 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 2. The Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... 3. The Regional Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... 4. State Government concerned ................................................................\n(i)\n(ii)\n(iii)\nTo\nPart I\nGeneral\n(i) Lessee/Owner : .................................................. (ii) Registered Office of Lessee : .................................................. (iii) Agent : .................................................. (iv) Manager : .................................................. (v) Mining Engineer in Charge : .................................................. (vi) Geologist in Charge : .................................................. (vii) Transferor (previous lessee) if any, and date of transfer : ..................................................\n:\n:\n:\n:\n:\n:\n:\n(i) Area under lease (hectares): Under forest : .................................................. Outside forest : .................................................. Total : .................................................. (ii) Date of execution of mining lease deed : .................................................. (iii) Period of lease (iv) Area for which surface rights are held(hectares) : .................................................. (v) Date and period of renewal (if applicable) : .................................................. (vi) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced : ..................................................\n:\n:\n:\n:\n:\n:\n:\nUnder forest .................................................. Outside forest .................................................. Total .................................................. (i) Already exploited & abandoned by open- cast(O/C) mining .................................................. (ii) Covered under current (U/C) workings .................................................. (iii) Reclaimed/rehabilitated (iv) Used for waste disposal .................................................. (v) Occupied by plant, buildings, residential, welfare buildings and roads .................................................. (vi) Used for any other purpose(specify) ..................................................\n(i) PUBLIC SECTOR (ii) PRIVATE SECTOR (iii) JOINT SECTOR Part II Employment And Wages 1. Number of technical and supervisory staff employed at the mine Description\n(ii) PRIVATE SECTOR (iii) JOINT SECTOR Part II Employment And Wages 1. Number of technical and supervisory staff employed at the mine\n(iii) JOINT SECTOR Part II Employment And Wages 1. Number of technical and supervisory staff employed at the mine\nPart II\nEmployment And Wages\nDescription\nWholly employed\nPart employed\n.........................\n..............................\n.........................\n..............................\n.........................\n..............................\n.........................\n..............................\n.........................\n..............................\nReasons\nNumber of days\n(i) In workings below ground on...................................(a)........................................\n(ii) In all in the mine on...............................................(a)...........................................\nClassification Total No.of mandays worked durng the year No.of days worked during the year Average daily number of persons employed Totalwages /Salary bill for the year (1) Direct Contract Total (3) Male Female Total (5) (2-A) (2-B) (2-C) (4-A) (4-B) (4-C) Below Ground : (i) Foreman\n& Mining mates (ii) Face workers and loaders (iii) Others Open-cast workings : (i) Foreman\n& Mining mates (ii) Face workers and loaders (iii) Others Above ground : (i) Clerical & Supervisory Staff. (excluding the superior supervisory staff.) (ii)Workers in any Attached factory, Workshop or mineral dressing plant (iii)Others Total :\nTotal No.of mandays worked durng the year\nAverage daily number of persons employed\nTotalwages /Salary bill for the year\n(1)\nDirect\nContract\nTotal\n(3)\nMale\nFemale\nTotal\n(5)\n(2-A)\n(2-B)\n(2-C)\n(4-A)\n(4-B)\n(4-C)\nPart III\nConsumption Of Materials\nDescription Unit Quantity Value(Rs) [(i) Fuel] (a) Coal [tonnes] (b) Diesel Oil Ltrs . (c) Petrol Ltrs . (d) Kerosene Ltrs . (e) Gas Cu.m .] (ii) Lubricants Lubricant oil Ltrs . Grease Kgs . (iii) Electricity (a) Consumed Kwh . (b) Generated Kwh . (c) Sold Kwh . (iv) Explosives (of all types as per Form-G) [[(iv)(a)Tyres] (iv)(b) Timber and supports (iv)(c) drill rods and kits] (v) Other materials, spares and stores 2. Royalty, Dead Rent and Surface Rent (in `000 Rupees): Paid for current year Paid towards past arrears Royalty Dead Rent Surface Rent 3. Compensation paid for felling trees during the year(Rs.): ......................... 4. Depreciation on fixed assets (Rs.): ......................... 5. Taxes and cesses\n(Rs) Amount paid during the year To Central Government To State Government (i) Sale tax (ii) Welfare Cess (iii) Other taxes and cesses (a) Mineral cess (b) Cess on dead rent (c) Others (Please specify)\n(i) Overheads\n(ii) Maintenance\n(iii)Money value of other benefits paid to workmen\n(iv) Payment made to professional agencies.]\nPart IV\nGeneral Geology And Mining\n(a) Tick mark as applicable from each (i), (ii) and  (iii) below:\n(i) Reconnaissance/Prospecting/General Exploration/Detailed Exploration.\n(ii) Geological Study/Pre-feasibility Study Feasibility Study.\n(iii)Intrinsically Economic/Potentially Economic/Economic.\nb. Brief account of the studies indicated under 1(a) during the year.\nClassification Code Quantity Grade (1) (2) (3) (4) Total Mineral Resources (A + B) A. Mineral Reserve 111 1. Proved Mineral Reserve 121 and 122 2. Probable Mineral Reserve B. Remaining Resources 1. Feasibility Mineral Resource 211 2. Prefeasibility Mineral Resource 221 and 222 3. Measured Mineral Resource 331 4. Indicated Mineral Resource 332 5. Inferred Mineral Resource 333 S6.Reconnaissance Mineral Resource 334\nCode\nQuantity\nGrade\n(2)\n(3)\n(4)\n111\n121 and 122\n211\n221 and 222\n331\n332\n333\nNote.\nType of machinery No.\nof units Capacity H.P.\nType of machinery\nNo.\nof units\nCapacity\nH.P.\nPart V\nProduction, Despatches And Stocks\n(Unit of Quantity in Tonnes)\nFrom Open-cast workings From Underground workings Dump workings (a) Opening stock (b) Production (c) Closing Stock\nFrom Open-cast workings\nFrom Underground workings\nDump workings\n[Grades\n(As per royalty rates*)] Opening stock at mine-head Production Despatches from mine-head Closing stock at mine-head PMV (Rs./MT)\n[Grades\n(As per royalty rates*)]\nOpening stock at mine-head\nProduction\nDespatches from mine-head\nClosing stock at mine-head\nPMV\n(Rs./MT)\nNote.\n(a) Cost of Transportation ......................................................... (indicate loading stations and distance from mine) ......................................................... (b) Loading and unloading charges ......................................................... (c) Railway freight, if applicable ......................................................... (indicate destination and distance) (d) Port handling/export duty/and other charges, etc. ......................................................... (indicate name of port) ......................................................... Total (a) to (d)\nGrade of ore [Place of sale] For Domestic Consumption For export Consignee Quantity Sale Value (Rs.) Country Quantity F.O.B.\nValue (Rs.)\nFor Domestic Consumption\nFor export\nConsignee\nQuantity\nSale Value (Rs.)\nCountry\nQuantity\nF.O.B.\nValue (Rs.)\nPart VI\nCost Of Production\nCost of production per tonne of ore/mineral produced:\nItem Cost per metric tonne (Rs.) (i) Direct cost: (a) Exploration (b) Mining (c) Beneficiation (Mechanical only) (ii) Over head cost (iii) Depreciation (iv) Interest (v) Royalty (vi) Taxes (vii) Dead Rent (viii) Others (specify) Total:\nNote.\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager\nForm I\nForm I\nNotice Of Certain Appointment/resignation/termination/change Of Address\n(See rule 46)\nMine Code..........................................\nImportant\nTo 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 2. The Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... 3. The Regional Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... 4. State Government concerned ................................................................\nTo",
            "footnote": "",
            "is_definition": false,
            "sort_order": 245
        },
        {
            "number": "1",
            "title": "1. Name and address of the holder of Mining Lease or Prospecting License. 2. Name of mineral/minerals for which Mining Lease/Prospecting License is granted (a).....................(b)\n...................... (c) ....................(d)\n...................... 3. Name of mine/Prospecting Licensed area ................................................... 4. Location of mine/Prospecting Licensed area (i) Topo-sheet Number ................................................... (ii) Cadastral Survey or Kha",
            "chapter": null,
            "content": "Signature...................................\nName in full:...............................\nForm J\nForm J\nNotice Of Sinking Shafts And Boreholes\n(See rule 47)\nMine Code...........................................\nImportant\nTo 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 2. The Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... 3. The Regional Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... 4. State Government concerned ................................................................ 1. Name of prospect/mine and mineral worked/prospected ................................................................ 2. Name and address of Licensee/Lessee ................................................................ 3. Location ................................................................ (i)Topo-sheet Number ................................................................ (ii) Village ................................................................ (iii) Taluka ................................................................ (iv) District ................................................................ (v) State ................................................................\nTo\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager\nForm K\nForm K\nParticulars To Be Recorded In A Durable Bound Paged Book In Respect Of Each Borehole/pit/shaft\n(See rule 48)\nMINE CODE............................................... 1. Name of the mineral or Minerals for which the license or lease is granted: ................................................................ 2. Name and address of the Licensee or Lessee : ................................................................ 3. Name of prospect/mine: ................................................................ 4. Location: (i) Topo-sheet Number ................................................................ (ii) Cadastral Survey or Khasra number ................................................................ (iii) Village: ................................................................ (iv) Taluka: ................................................................ (v) District: ................................................................ (vi) State: ................................................................ 5. Type and make of the drill and size of core. ................................................................ 6. Bore hole/pit number its location: ................................................................ (a) Reduced levels at the collar of the borehole/pit. ................................................................ (b) Inclination and bearing of the hole ................................................................ (c) Altitude of the formation. ................................................................ 7. Duration of drilling/pitting: ................................................................ (a) Date of commencement ................................................................ (b) Date of completion ................................................................ 8. Total length of the hold/pit/shaft: ................................................................ 9. Purpose of drilling/pitting: ................................................................ 10. Total operating expenditure incurred: ................................................................ 11. Details of intersection (as given below)\n1.\n2.\n3.\n4.\n5.\n6.\n7.\n8.\n9.\n10.\n11.\nSr.No . RUN DETAILS Size of core/pit/shaft Percentage recovery of core Lithology Analysis details (Major Radicals a b c d) Remarks From in metre To in metres Width in metres True width in metres 1 2 3 4 5 6 7 8 9 10 1. 2. 3.\nSr.No .\nRUN DETAILS\nSize of core/pit/shaft\nPercentage recovery of core\nLithology\nAnalysis details (Major Radicals a b c d)\nRemarks\nFrom in metre\nTo in metres\nWidth in metres\nTrue width in metres\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager\nForm L\nForm L\nNotice Of Transfer Of Prospecting License Or Mining Lease\n(See Rule 50)\nMine Code.............................................\nImportant\nImportant\nTo 1. The Controller General, Nagpur Indian Bureau of Mines, PIN 440001 *2. The Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... *3. The Regional Controller of Mines, ................................................................ Indian Bureau of Mines, PIN........................................................... 4. State Government concerned ................................................................ 1. Name(s) of mineral(s) worked ................................................................ 2. Name and address of Licensee/Lessee ................................................................ 3. Particulars of the Prospecting License/Mining Lease ................................................................ (i) Date of execution ................................................................ (ii) Period ................years, from..............to........ (iii) Area under License/Lease ......................................... ..hectares. 4. Location of the prospecting area/mining lease area: ................................................................ (i) Topo-sheet number ................................................................ (ii) Cadastral map or khasra number ................................................................ (iii) Village ................................................................ (iv)(a) Taluka ................................................................ (b) District ................................................................ (c) State ................................................................ (v)(a) Nearest Railway Station ................................................................ (b) The distance there from ..................................................kilometres (vi)(a) Nearest Rest house/Dak bungalow ................................................................ (b) Its distance from (1) the Railway Station ..................................................kilometres (2) the prospecting license area/mine ................................................................ 5. Name and address of the Transferee or Assignee ................................................................ PIN........................................................... Place: ................. Signature:................................................... Date: ................. Name in full:............................................... Designation:  Lessee/Licensee........................\nTo\nPlace:\nSignature:...................................................\nDate:\nName in full:...............................................\nDesignation:  Lessee/Licensee........................\nGuidelines For Submission Of Returns\nA. Authority to who to be sent:\n(a) Monthly return in Form F\n(b) Annual Return in Form G, and\n(c) Annual Return in Form H.\nB. Time Schedule :\nC. General Instructions :\nD. Lease Details:\nE. Employment of Labour and Wages Paid: Part-II (Annual Return)\nF. Pit's Mouth Value:\nG. Production:\nH. Abbreviations used in the above Form:\nGovt. Government Ltd. Co. Limited Company & and No. Number Rs . Rupees Col. Column Ltrs . Litres Cu.Mtrs . Cubic Metres Kgs . Kilograms Kwh . Kilo Watt Hour R.O.M. Run-of-Mine F.O.R. Free on Rail Km. Kilometre % Percentage F.O.B. Free on Board MCM Million Cubic Metre mm Millimetre\nRs .\nCol.\nLtrs .\nLitres\nCu.Mtrs .\nKgs .\nKwh .\nKilometre\nMillimetre\n[ Form-M ]\nForm-M\n[See rule 45(1)]\n(Application for registration under Rule 45 of MCDR for undertaking mining or trading or storage or end use or export of minerals)\nNote. - If there is any change after registration in any of the fields, the form may be updated accordingly and informed to the Controller General, Indian Bureau of Mines\nTo. The Controller General Indian Bureau of Mines Nagpur-440001\nThe Controller General Indian Bureau of Mines Nagpur-440001\n*Category of applicant:\nο Individual\nο Association of individuals\nο Firm\nο Company registered under Companies Act\n*Type of business/activity:\nο Mining\nο Trading of minerals\nο Storage of minerals\nο End-user of minerals (including consumption from captive mines)\nο Export of minerals\nDetails of the applicant:\n(a) In case of individual applicant (includes owner, agent, mining engineer or manager of every mine):\n(i)\nName\nName\nShri/ Smt.\n\t\t\t\t(First name)/ (Middle name)/ (Last name)\nFather\n\t\t\t\tname\nFather\n\t\t\t\tname\nShri (First\n\t\t\t\tname)/ (Middle name)/ (Last name)\nDate of\n\t\t\t\tBirth\nDate of\n\t\t\t\tBirth\n(DD/MM/YYYY)\n(ii)\nPosition\n\t\t\t\tin mine (please tick mark the option)\nPosition\n\t\t\t\tin mine\nο       Owner\nο       Agent\nο       Mining\n\t\t\t\tengineer\nο       Manager\n(iii)\nAddress\nAddress\n(Door number/\n\t\t\t\tbuilding number/ plot number)\nBlock\nBlock\n(street\n\t\t\t\tnumber/ block number)\nTaluka\nTaluka\nDistrict\nDistrict\nState/ U.T\nState/ U.T\nPin code\nPin code\nE-mail\nE-mail\n(iv)\nTelephone\nTelephone\nOffice         \n\t\t\t\t:\nFax             \n\t\t\t\t:\nResidence\n\t\t\t\t:\nMobile        :\n(v)\nPAN number\nPAN number\n(vi)\nVoter ID\n\t\t\t\tnumber\nVoter ID\n\t\t\t\tnumber\n(vii)\nPassport\n\t\t\t\tnumber/ Driving License number\nPassport\n\t\t\t\tnumber/ Driving License number\n(b) In case of association of individuals:\n(i)\nName of\n\t\t\t\tAssociation, or name of the Signing authority of association\nName of\n\t\t\t\tAssociation, or name of the Signing authority of association\nFather\n\t\t\t\tname (of signing authority)\nFather\n\t\t\t\tname (of signing authority)\nDate of\n\t\t\t\tBirth\nDate of\n\t\t\t\tBirth\n(ii)\nAddress\nAddress\n(Door number/\n\t\t\t\tbuilding number/ plot number)\nBlock\nBlock\n(street\n\t\t\t\tnumber/ block number)\nTaluka\nTaluka\nDistrict\nDistrict\nState/ U.T\nState/ U.T\nPin code\nPin code\nE-mail\nE-mail\n(iii)\nTelephone\nTelephone\nOffice        \n\t\t\t\t:\nFax            \n\t\t\t\t:\nResidence\n\t\t\t\t:\nMobile        :\n(iv)\nDetails of\n\t\t\t\tAssociates\nDetails of\n\t\t\t\tAssociates\nName\nPAN\n\t\t\t\tnumber\nVoter\n\t\t\t\tID number\nCitizenship\nPassport\n\t\t\t\tnumber/ Driving License number (if available)\n(c) In case of a Firm:\n(i)\nName of\n\t\t\t\tFirm\nName of\n\t\t\t\tFirm\n(ii)\nAddress\nAddress\n(Door number/\n\t\t\t\tbuilding number/ plot number)\nBlock\nBlock\n(street\n\t\t\t\tnumber/ block number)\nTaluka\nTaluka\nDistrict\nDistrict\nState/ U.T\nState/ U.T\nPin Code\nPin Code\nE-mail\nE-mail\n(iii)\nTelephone\nTelephone\nOffice\n\t\t\t\t:\nFax\n\t\t\t\t:\nResidence\n\t\t\t\t:\nMobile :\n(iv)\nDetails of\n\t\t\t\tpartners in the Firm\nDetails of\n\t\t\t\tpartners in the Firm\nName\n\t\t\t\tof partner\nPAN\n\t\t\t\tnumber\nVoter\n\t\t\t\tID number\nCitizenship\nPassport\n\t\t\t\tnumber/ Driving License number (if available)\nFirm Type\n\t\t\t\t(Tick)\nFirm Type\n\t\t\t\t(Tick)\nRegistered/\n\t\t\t\tUnregistered\n(v)\nRegistration\n\t\t\t\tnumber of Firm\nRegistration\n\t\t\t\tnumber of Firm\n(as\n\t\t\t\tregistered under Indian Partnership Act, 1932)\nPAN\n\t\t\t\tNo.\nPAN\n\t\t\t\tNo.\nTIN\n\t\t\t\tNo.\nTIN\n\t\t\t\tNo.\nTAN\n\t\t\t\tNo.\nTAN\n\t\t\t\tNo.\n(vi)\nName of\n\t\t\t\tthe State where registered\nName of\n\t\t\t\tthe State where registered\n(vii)\nDate of\n\t\t\t\tregistration\nDate of\n\t\t\t\tregistration\n(dd/mm/yyyy)\n(d) In case of a company:\n(i)\nName of\n\t\t\t\tCompany\nName of\n\t\t\t\tCompany\n(ii)\nRegistered\n\t\t\t\tAddress\nRegistered\n\t\t\t\tAddress\nState/ U.T\nState/ U.T\nPin code\nPin code\nE-mail\nE-mail\n(iii)\nTelephone\nTelephone\nOffice\n\t\t\t\t:\nFax    :\n(iv)\nDetails of\n\t\t\t\tDirectors in the Company\nDetails of\n\t\t\t\tDirectors in the Company\nName\nPAN\n\t\t\t\tnumber\nVoter\n\t\t\t\tID number\nCitizenship\nPassport\n\t\t\t\tnumber/ driving License number (if available)\n(v)\nRegistration\n\t\t\t\tnumber of Company (as registered under Indian Companies Act,\n\t\t\t\t1956)\nRegistration\n\t\t\t\tnumber of Company\nTAN\n\t\t\t\tNo.\nTAN\n\t\t\t\tNo.\nTIN\n\t\t\t\tNo.\nTIN\n\t\t\t\tNo.\n(vi)\nName of\n\t\t\t\tthe State where registered\nName of\n\t\t\t\tthe State where registered\n(vii)\nDate of\n\t\t\t\tregistration\nDate of\n\t\t\t\tregistration\n(dd/mm/yyyy)\n(viii)\nDetails of\n\t\t\t\tOfficer responsible for conduct of business of the Company\nDetails of\n\t\t\t\tOfficer responsible for conduct of business of the Company\nName\nDesignation\nAddress\nPhone No.\nOffice         :\nResidence :\nMobile        :\nPAN No.\nVoter ID No.\nPassport No./\n\t\t\t\tDriving License No.\n(e) State License details (only for State License holder under section 23 C of MMDR Act) :\nState License No.\nState License No.\nState\nState\nArea of Business (District)\nArea of Business (District)\nDate of issue\nDate of issue\nValid upto (dd/mm/yyyy)\nValid upto (dd/mm/yyyy)\nIssuing Authority\nIssuing Authority\nName of Minerals\nName of Minerals\nSl. No.\nName of the mine\nMine code assigned by IBM\nSr. No.\nLocation of PL area\nArea held under PL (in ha.)\nName of Minerals\nDate of grant\nPeriod\nDate of execution of License\nVillage\nTaluka\nDistrict\nState\nLatitude (ddmmss)\nLongitude (ddmmss)\nSr. No.\nLocation of RP\nArea held under RP (in ha.)\nName of Minerals\nDate of grant\nPeriod\nDate of execution of License\nVillages\nTalukas\nDistricts\nState\nLatitude (ddmmss)\nLongitude (ddmmss)\nSr. No.\nLocation(s) of area used for storage\nArea Owned/held under rent (In hectres)\nName of Minerals\nRemarks\nVillage\nTaluka\nDistrict\nState\nLatitude (ddmmss)\nLongitude (ddmmss)\nSr. No.\nLocation(s) of plant where mineral is used\nName of the plant\nMineral consumed\nAverage consumption per year\nRemarks\nVillage\nTaluka\nDistrict\nState\nLatitude (ddmmss)\nLongitude (ddmmss)\nVerification\nVerification\nPlace:\nSignature:\nDate:\nName in full:\nNot to be filled by the applicant\nNot to be filled by the applicant\n(For internal use of the Indian Bureau of Mines)\n(For internal use of the Indian Bureau of Mines)\nRegistration No. assigns by\n\t\t\tIBM :\n[ Form-N ]\nForm-N\n[See rule 45(6)(i)]\nFor the month of ________20\nMonthly Return\nMonthly Return\n(i) The State Government\n(ii) The Regional Controller of Mines\nIndian Bureau of Mines\n_________Region,\nPIN:\nInstructions for Filling the Form",
            "footnote": "",
            "is_definition": false,
            "sort_order": 246
        },
        {
            "number": "1",
            "title": "1. General Particulars",
            "chapter": null,
            "content": "Registration No. (allotted by IBM)\nRegistration No. (allotted by IBM)\nName and Address\nName and Address\nPlant Name/ Storage location, if available\nPlant Name/ Storage location, if available\nLatitude and Longitude\nLatitude and Longitude\nName of activity(s) reported\nName of activity(s) reported\n(Tick whichever is/ are applicable)\n(a)\nTrading\n(b)\nExport\n(c)\nEnd-use\n(d)\nStorage",
            "footnote": "",
            "is_definition": false,
            "sort_order": 247
        },
        {
            "number": "2",
            "title": "2. Details Of The Activity.",
            "chapter": null,
            "content": "(a) Trading Activity\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre purchased during the month (within the\n\t\t\t\tcountry)\nOre imported during the month\nOre dispatched during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the supplier (to indicate separately if more\n\t\t\t\tthan one supplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer (to indicate separately if more than\n\t\t\t\tone buyer)\nQuantity\nValue (in Rs)\nQuantity\n(b) Export of ore\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre procured during the month for export (from\n\t\t\t\twithin the country)\nOre imported during the month\nOre exported during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the supplier (to indicate separately if more\n\t\t\t\tthan one supplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nQuantity\n(c) End-use mineral based activity\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre procured during the month (within the\n\t\t\t\tcountry)\nOre imported during the month\nOre consumed during the month\nOre dispatched during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian Bureau of Mines\n\t\t\t\tto the supplier (to indicate separately if more than one\n\t\t\t\tsupplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nQuantity\nValue (in Rs)\nRegistration number as allotted by the Indian Bureau of Mines\n\t\t\t\tto the buyer (to indicate separately if more than one buyer)\nQuantity\nValue (in Rs)\nQuantity\n(d) Storage Activity\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre received during the month (within the\n\t\t\t\tcountry)\nOre imported during the month\nOre dispatched during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the supplier (to indicate separately if more\n\t\t\t\tthan one supplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the person/ company to whom ore dispatched (to\n\t\t\t\tindicate separately if more than one person/ company)\nQuantity\nValue (in Rs)\nQuantity\nVerification\nVerification\nPlace:\nSignature:\nDate:\nName in full:\n# Grades of minerals to be reported in the above tables are as given below. (If separate grades are not mentioned below, report the mineral name against grade):\nMineral\nMineral\nGrades\nGrades\nIron ore\nIron ore\n(i) Lumps:\n(i) Lumps:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(ii) Fines:\n(ii) Fines:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(iii) Concentrates\n(iii) Concentrates\n(iv) Calibrated Lump Ore (CLO)\n(iv) Calibrated Lump Ore (CLO)\n(Quantity already reported in Lumps should not be reported\n\t\t\t\tagainst CLO)\na) Below 62% Fe (CLO any size)\nb) 62% to below 65% Fe (5-18 mm\n\t\t\t\tsize CLO)\nc) 62% to below 65% Fe (10-40 mm\n\t\t\t\tsize CLO)\nd) 62% to below 65% Fe (CLO\n\t\t\t\tothers)\ne) 65% and above Fe (5-18 mm size\n\t\t\t\tCLO)\nf) 65% and above Fe (10-40 mm size\n\t\t\t\tCLO)\ng) 65% and above Fe (CLO others)\n(v) ROM ore\n(v) ROM ore\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\nManganese Ore\nManganese Ore\n(i) Ore\n(i) Ore\na) Below 25% Mn\nb) 25% to below 35% Mn\nc) 35% to below 46% Mn\nd) 46% and above Mn\ne) Dioxide ore\n(ii) Concentrates\n(ii) Concentrates\nBauxite\nBauxite\n(i) For use in alumina and aluminium extraction:-\n(i) For use in alumina and aluminium extraction:-\na) Below 40% Al 2 O 3\nb) 40% to below 45% Al 2 O 3\nc) 45% to below 50% Al 2 O 3\nd) 50% to below 55% Al 2 O 3\ne) 55% to below 60% Al 2 O 3\nf) 60% and above Al 2 O 3\n(ii) For use other than alumina and aluminium metal\n\t\t\t\textraction\n(ii) For use other than alumina and aluminium metal\n\t\t\t\textraction\na) Cement\nb) Abrasive\nc) Refractory\nd) Chemical\nChromite\nChromite\n(i) Lumps\n(i) Lumps\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(ii) Fines\n(ii) Fines\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(iii) Concentrates\n(iii) Concentrates\n(iv) ROM ore\n(iv) ROM ore\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\nAsbestos\nAsbestos\na) Amphibole\nb) Chrysotile\nFluorite/ Fluorspar\nFluorite/ Fluorspar\na) 80% and above CaF 2\nb) 70% to below 80% CaF 2\nc) 30% to below 70% CaF 2\nd) Below 30% CaF 2\nGraphite\nGraphite\na) With 80% or more fixed carbon\nb) With 40 % or more fixed carbon but less than 80% fixed\n\t\t\t\tcarbon\nc) With 20% or more fixed carbon but less than 40% fixed\n\t\t\t\tcarbon\nd) With less than 20% fixed carbon\nKyanite\nKyanite\na) 40% and above Al 2 O 3\nb) Below 40% Al 2 O 3\nLimestone\nLimestone\na) LD Grade (less than 1.5% silica content)\nb) SMS\nc) BF\nd) Chemical\ne) Cement\nRock Phosphate/ Phosphorite\nRock Phosphate/ Phosphorite\na) Above 30% P 2 O 5\nAbove 25% to 30% P 2 O 5\nAbove 20% to 25% P 2 O 5\nUpto 20% P 2 O 5\nPrecious and semiprecious stones\nPrecious and semiprecious stones\na) Rough and uncut stones\nb) Cut and polished stones\nc) Industrial\nd) Others\n[Form-O]\n[Form-O]\n[See rule 45(6)(ii)]\nFor the financial year 1 st April, 20 ________ to 31 st March, 20 ________\nMonthly Return\nMonthly Return\n(i) The State Government\n(ii) The Regional Controller of Mines\nIndian Bureau of Mines\n_________Region,\nPIN:\n(iii) The Chief Mineral Economist,\nIndian Bureau of Mines\nInstructions for Filling the Form\na) Quantity to be reported in tonnes. If not please specify the unit.\nb) Value to be reported in rupees only.\nc) Registration number means the registration number allotted by Indian Bureau of Mines to the lessee/owner or to a trader/ stockist/ end-use mineral based industry/ exporter.\nd) Ore grade for various minerals, as given in the form, to be strictly used while reporting.\ne) Item 5 related to raw materials consumed may be filled up by all end use industry and iron & steel industry also.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 248
        },
        {
            "number": "1",
            "title": "1. General Particulars",
            "chapter": null,
            "content": "Registration No. (allotted by IBM)\nRegistration No. (allotted by IBM)\nName and Address\nName and Address\nPlant Name/ Storage location, if available\nPlant Name/ Storage location, if available\nLatitude and Longitude\nLatitude and Longitude\nName of activity(s) reported\nName of activity(s) reported\n(Tick whichever is/ are applicable)\n(a)\nTrading\n(b)\nExport\n(c)\nEnd-use\n(d)\nStorage",
            "footnote": "",
            "is_definition": false,
            "sort_order": 249
        },
        {
            "number": "2",
            "title": "2. Details Of The Activity.",
            "chapter": null,
            "content": "(a) Trading Activity\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre purchased during the month (within the\n\t\t\t\tcountry)\nOre imported during the month\nOre dispatched during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the supplier (to indicate separately if more\n\t\t\t\tthan one supplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the buyer (to indicate separately if more than\n\t\t\t\tone buyer)\nQuantity\nValue (in Rs)\nQuantity\n(b) Export of ore\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre procured during the month for export (from\n\t\t\t\twithin the country)\nOre imported during the month\nOre exported during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the supplier (to indicate separately if more\n\t\t\t\tthan one supplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nQuantity\n(c) End-use mineral based activity\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre procured during the month (within the\n\t\t\t\tcountry)\nOre imported during the month\nOre consumed during the month\nOre dispatched during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian Bureau of Mines\n\t\t\t\tto the supplier (to indicate separately if more than one\n\t\t\t\tsupplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nQuantity\nValue (in Rs)\nRegistration number as allotted by the Indian Bureau of Mines\n\t\t\t\tto the buyer (to indicate separately if more than one buyer)\nQuantity\nValue (in Rs)\nQuantity\n(d) Storage Activity\nMineral/ Ore\nGrade of mineral/ ore #\nOpening stock\nOre received during the month (within the\n\t\t\t\tcountry)\nOre imported during the month\nOre dispatched during the month\nClosing stock\nQuantity\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the supplier (to indicate separately if more\n\t\t\t\tthan one supplier)\nQuantity\nValue (in Rs)\nCountry\nQuantity\nValue (in Rs)\nRegistration number as allotted by the Indian\n\t\t\t\tBureau of Mines to the person/ company to whom ore dispatched (to\n\t\t\t\tindicate separately if more than one person/ company)\nQuantity\nValue (in Rs)\nQuantity\nNote:\n(a) Only end-use mineral based industry to respond to section 3 to 6\n(b) Information to be given separately for each industry and each unit",
            "footnote": "",
            "is_definition": false,
            "sort_order": 250
        },
        {
            "number": "3",
            "title": "3. Information Regarding end-use Mineral based Industries (other than Iron and Steel Industry)",
            "chapter": null,
            "content": "(i)\nName of Industry :\nName of Plant:\n(ii)\n(a)   State :\n(b)   District :\n(c)   Location :\n(iii)\nDetails on products manufactured with their capacities and\n\t\t\tproduction :\nProducts\nAnnual installed capacity during the year (in\n\t\t\t\ttonnes)\nProduction (in tonnes)\nPrevious financial year\nPresent financial year\n(1)\n(2)\n(3)\n(4)\nFinished Products\ni)\nii)\nIntermediate Products\ni)\nii)\nBy-Products\ni)\nii)\n(iv) Expansion programme/ Plan envisaged for future :\n(v) Research & Development programme carried out during the year (give details) :",
            "footnote": "",
            "is_definition": false,
            "sort_order": 251
        },
        {
            "number": "4",
            "title": "4. Information Regarding Iron and Steel Industry",
            "chapter": null,
            "content": "(i)\nName of Industry :\n(ii)\n(a)   State :\n(b)   District :\n(c)   Location :\n(iii)\nProducts manufactured with their capacity and\n\t\t\tproduction :\nProducts\nInstalled capacity (in tonnes)\nProduction ( in tonnes)\nRemarks\nPrevious financial year\nPresent financial year\n(a) Sinter\ni) Self fluxing\nii) Ordinary\n(b) Pellets\n(c) Coal\ni) Clean coal\nii) Coke (own production)\n(d) Pig iron\ni) Hot metal (total)\nii) Hot metal for own consumption.\niii) Pig iron for sale\n(e) Sponge Iron\n(f) Hot Briquetted Iron\n(g) Steel\ni) Liquid Steel/ Crude Steel\nii) Total Saleable Steel\na) Semi-finished Steel\nb) Finished Steel\n(h) Tin plates\n(i) Sulphuric acid\n(j) Refractories/bricks\n(k) Fertilizers\n(l) Any other product/by-product\nCoke purchased (in tonnes)\nprevious year\npresent year\n(iv) Expansion programme undertaken and progress made during the year :\n(v) Expansion programme /Plan envisaged for future :\n(vi) Research & Development programme carried out during the year (give details) :",
            "footnote": "",
            "is_definition": false,
            "sort_order": 252
        },
        {
            "number": "5",
            "title": "5. Details of Raw Materials Consumed in Production {including Electricity (in KWh), Coal and Petroleum products}",
            "chapter": null,
            "content": "Raw Material\nActual Consumption*\nEstimated Requirement*\nMineral/ Ore/ Metal/ Ferroalloy\nPhysical Specification\nChemical Specification\nPrevious financial year\nPresent financial year\nIndigenous\nImported\nIndigenous\nImported\nNext financial year\nNext to Next financial year\n(1)\n(2)\n(3)\n(4)\n(5)\n* Quantity to be reported in tonnes. If not please specify the unit.\nType@\nMineral/ Ore/ Metal/ Ferroalloy\nIndigenous\nImported\nName & address of supplier\nSource of supply (mine or area)\nIndicate the distance of mine/ rail to plant (in\n km)\nTransportation cost per unit by Rail/ Road\nQuantity*\nPrice per unit at factory site (in Rs)\nName & complete address of supplier (country\n wise)\nQuantity purchased*\nCost per unit at factory site (in Rs)\nMine Code\nDistrict\nMode\nCost per unit (in Rs)\nAddress\nCountry\n@ Indigenous/ Imported; * Quantity to be reported in tonnes. If not please specify the unit.\nVerification\nVerification\n# Grades of minerals to be reported in the above tables are as given below. (If separate grades are not mentioned below, report the mineral name against grade):\nMineral\nMineral\nGrades\nGrades\nIron ore\nIron ore\n(i) Lumps:\n(i) Lumps:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(ii) Fines:\n(ii) Fines:\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\n(iii) Concentrates\n(iii) Concentrates\n(iv) Calibrated Lump Ore (CLO)\n(iv) Calibrated Lump Ore (CLO)\n(Quantity already reported in Lumps should not be reported\n against CLO)\na) Below 62% Fe (CLO any size)\nb) 62% to below 65% Fe (5-18 mm\n size CLO)\nc) 62% to below 65% Fe (10-40 mm\n size CLO)\nd) 62% to below 65% Fe (CLO\n others)\ne) 65% and above Fe (5-18 mm size\n CLO)\nf) 65% and above Fe (10-40 mm size\n CLO)\ng) 65% and above Fe (CLO others)\n(v) ROM ore\n(v) ROM ore\na) Below 51% Fe\nb) 51% to below 55% Fe\nc) 55% to below 58% Fe\nd) 58% to below 60% Fe\ne) 60% to below 62% Fe\nf) 62% to below 65% Fe\ng) 65% and above Fe\nManganese Ore\nManganese Ore\n(i) Ore\n(i) Ore\na) Below 25% Mn\nb) 25% to below 35% Mn\nc) 35% to below 46% Mn\nd) 46% and above Mn\ne) Dioxide ore\n(ii) Concentrates\n(ii) Concentrates\nBauxite\nBauxite\n(i) For use in alumina and aluminium extraction:-\n(i) For use in alumina and aluminium extraction:-\na) Below 40% Al 2 O 3\nb) 40% to below 45% Al 2 O 3\nc) 45% to below 50% Al 2 O 3\nd) 50% to below 55% Al 2 O 3\ne) 55% to below 60% Al 2 O 3\nf) 60% and above Al 2 O 3\n(ii) For use other than alumina and aluminium metal\n extraction\n(ii) For use other than alumina and aluminium metal\n extraction\na) Cement\nb) Abrasive\nc) Refractory\nd) Chemical\nChromite\nChromite\n(i) Lumps\n(i) Lumps\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(ii) Fines\n(ii) Fines\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\n(iii) Concentrates\n(iii) Concentrates\n(iv) ROM ore\n(iv) ROM ore\na) Below 40% Cr 2 O 3\nb) 40% to below 52 % Cr 2 O 3\nc) 52% and above Cr 2 O 3\nAsbestos\nAsbestos\na) Amphibole\nb) Chrysotile\nFluorite/ Fluorspar\nFluorite/ Fluorspar\na) 80% and above CaF 2\nb) 70% to below 80% CaF 2\nc) 30% to below 70% CaF 2\nd) Below 30% CaF 2\nGraphite\nGraphite\na) With 80% or more fixed carbon\nb) With 40 % or more fixed carbon but less than 80% fixed\n carbon\nc) With 20% or more fixed carbon but less than 40% fixed\n carbon\nd) With less than 20% fixed carbon\nKyanite\nKyanite\na) 40% and above Al 2 O 3\nb) Below 40% Al 2 O 3\nLimestone\nLimestone\na) LD Grade (less than 1.5% silica content)\nb) SMS\nc) BF\nd) Chemical\ne) Cement\nRock Phosphate/ Phosphorite\nRock Phosphate/ Phosphorite\na) Above 30% P 2 O 5\nb) Above 25% to 30% P 2 O 5\nc) Above 20% to 25% P 2 O 5\nd) Upto 20% P 2 O 5\nPrecious and semiprecious stones\nPrecious and semiprecious stones\na) Rough and uncut stones\nb) Cut and polished stones\nc) Industrial\nd) Others",
            "footnote": "",
            "is_definition": false,
            "sort_order": 253
        }
    ],
    "metadata": {
        "Act ID": "16/749",
        "Act Number": "Published vide Notification G.S.R. 1023(E), dated 24.10.1988.",
        "Enactment Date": "",
        "Act Year": "1988",
        "Short Title": "The Mineral Conservation And Development Rules, 1988",
        "Type": "CENTRAL",
        "Location": "India (Central)"
    },
    "updated_at": "2026-09-29 21:55:18"
}