{
    "act_title": "The Marble Development And Conservation Rules, 2002",
    "act_slug": "the-marble-development-and-conservation-rules-2002",
    "section_label": "Section",
    "section": {
        "number": "21",
        "title": "21. System of working.",
        "chapter": null,
        "content": "(a)\nFor small quarry or mine (having area upto one hectare):\n(i)\nCompressor\n...\none\n(ii)\nJackhammer or any other pneumatic or hydraulic drill\n...\none\n(iii)\nChain pulley block\n...\none\n(iv)\nWinch or 8 to 10 tonnes capacity crane\n...\none\n(v)\nWedges, chisels and hammers as needed\n...\n(vi)\nWater pump\n...\none\n(b)\nFor medium size quarry or mine (having area above one hectare\n\t\t\t\tand upto three hectares):\n(i)\nCompressors\n...\ntwo\n(ii)\nJackhammer or any other pneumatic or hydraulic drill\n...\nas needed\n(iii)\nMobile cranes (15 to 20 tonnes)\n...\none to two\n(iv)\nDerrick crane or Loader\n...\none\n(v)\nExcavator (0.3 cu.m. to 0.9 cu.m.)\n...\none\n(vi)\nTippers or Loaders\n...\ntwo\n(vii)\nWire saws or chain saws\n...\nas needed\n(viii)\nHydraulic jacks\n...\nas needed\n(c)\nFor large quarry or mine (having area more than three\n\t\t\t\thectares):\n(i)\nCompressors\n...\nthree to four\n(ii)\nMobile cranes (15 to 20 tonnes)\n...\nas needed\n(iii)\nDerrick crane (20 to 40 tonnes) or Loader\n...\nas needed\n(iv)\nExcavator (0.9 cu.m. to 1.1 cu.m.)\n...\nas needed\n(v)\nTippers or Loaders excavator\n...\ntwo for each\n(vi)\nWagon drills\n(vii)\nSlot liners\n...\nas needed\n(viii)\nLine drilling machines\n(ix)\nDiamond wire saws\n(x)\nChain saws or diamond belt saws\n(xi)\nHydraulic jacks",
        "footnote": "",
        "is_definition": false,
        "sort_order": 20
    },
    "prev_section": "20",
    "next_section": "22"
}