    "act_title": "The M.P. Factories Rules, 1962",
    "act_slug": "the-m-p-factories-rules-1962",
    "section_label": "Section",
    "section": {
        "number": "99",
        "title": "99. Exemption of certain adult workers.",
        "chapter": null,
        "content": "Conditions\nConditions\n(a) Except in respect of exemption under clause (a) of sub-section (2) the restrictions imposed under Section 64 (4) shall apply to all exemptions granted under this rule :-\n(i) the total number of hours of works in any day shall not exceed 10 (ten) inclusive of overtime;\n(ii) the spreadover, inclusive of intervals for the rest, shall not exceed twelve hours in any one day :\n(iii) the total number of hours of work in a week including overtime shall not exceed sixty;\n(iv) the total number of hours of overtime shall not exceed fifty for any one quarter.\n(b) Overtime wages shall be paid in accordance with the provisions of Section 59 and Rule. 94.\n(c) The exemption granted under Section 54 shall not apply in the case of female workers.\n(d) whenever workers are exempted by Section 52 they shall be granted compensatory holiday in accordance with the provisions of Section 53 and Rule 93.\nSchedule Prescribed Under Rule 99\nS. No.\nSection of the Act empowering the grant of\n\t\t\t\texemption\nThe class of factories\nNature of exempted work\nExtent of exemptions\nConditions subject to which the exemption is\n\t\t\t\tgranted. (These conditions are in addition to those specified\n\t\t\t\tunder Rule 99)\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n1.\n64 (2) (a) and 64 (3)\nAll Factories\nUrgent Repairs. The following shall be considered to be urgent\n\t\t\t\trepairs :-\n(a) Repairs to any Part of the machinery, plant or a structure\n\t\t\t\tof a Factory which are of such nature that delay in their\n\t\t\t\texecution would involve danger to human life or safety or\n\t\t\t\tstoppage of the manufacturing process.\n(a) Within 24 hours of commencement of work on urgent repairs\n\t\t\t\ta written notice shall be sent to the Inspector describing\n\t\t\t\tbriefly the nature of the urgent repairs and specifying the\n\t\t\t\testimated time required to execute them. Before any worker is\n\t\t\t\temployed on overtime work entry of the proposed overtime shall be\n\t\t\t\tmade in the overtime register.\n(b) Breakdown repairs to the motive power transmission or\n\t\t\t\tother essential parts of the factories, Collieries, railways,\n\t\t\t\tmotor transport, gas electrical generating and transmission\n\t\t\t\tpumping or similar essential or public utility services carried\n\t\t\t\tout in general engineering works and foundries and which are\n\t\t\t\tnecessary to enable such concerns to maintain their manufacturing\n\t\t\t\tprocess, production or service during normal working hours.\nSections 51, 52,54,56,61.\n(b) No worker shall be employed for more than 14 consecutive\n\t\t\t\tdays without a holiday for the whole day or in the alternative a\n\t\t\t\tnet period of atleast 36 consecutive hours.\n(c) Repairs to commercial air craft done in a factory which\n\t\t\t\tare essential to enable aircraft to leave port in their proper\n\t\t\t\ttime or continue their normal operations in air worthy conditions\n\t\t\t\tas the case may be.\n(c) The average weekly hours of work of any such worker in any\n\t\t\t\tmonth shall not exceed 60.\n(d) Repairs in connection with a change of motive power for\n\t\t\t\texample from a steam to electricity or vice versa.\n(d) No worker shall be employed for more than 15 hours on any\n\t\t\t\tone day.\nWhen such work cannot possibly be done without stoppage, of\n\t\t\t\tthe normal manufacturing process.\nNote. - Periodical cleaning and lubricating are not\n\t\t\t\tincluded in the term 'URGENT REPAIRS'.\nNote.\n2.\n64 (2) (b) (1)\nAll factories\n(a) work in connection with the mill gearing the electrical\n\t\t\t\tdriving or lighting apparatus the mechanical or electrical lifts\n\t\t\t\tor steam of water pipes or pumps of factory.\n(a) No worker shall be allowed to work for more than 54 hours\n\t\t\t\tin any week.\n(b) Work of examining or repairing any machinery or other\n\t\t\t\tparts of the plant which is necessary for carrying on work in the\n\t\t\t\tfactory.\n(b) No worker shall be employed for more than 10 hours in any\n\t\t\t\tone day.\n(c) Work in boiler houses and engine room such as lighting\n\t\t\t\tfire in order to raise steam or generating gas preparatory to the\n\t\t\t\tcommencement of regular work in the factory or of engine drivers\n\t\t\t\tand engine oilers.\nSections 51, 54, 5 and 56.\n(c) Interval of atleast half an hour for food and rest shall\n\t\t\t\tbe given on each working day to all the workers employed on such\n\t\t\t\twork.\n(d) Work of cleaning work places.\n(d) The spread-over shall not exceed 12 hours.\n(e) Work of Departmental oilers and beltmen.\n(f) work in connection with pumping operations.\n(g) Work in foundries on the cupola and casting on the day the\n\t\t\t\tcupola is worked.\n(2) Gur Factories\nThe work performed by workers in crushing sugarcane.\nSections 51, 55 and 56.\n(a) No workers shall be employed for more than 54 hrs. in any\n\t\t\t\tone week.\n(3) Dyeing and Bleaching Factories or Depth.\nWork performed by Kierman\n(b) The interval for food and rest totaling 1 hour if the\n\t\t\t\tworking hours exceed 8 ½ hours in a day or half an hour if\n\t\t\t\tworking hours, do not exceed 8 ½ hours shall be given to\n\t\t\t\teach worker every day.\n3.\n64 (2)(c) and 64 (3)\n(1) All Factories\n(a) Work performed by workers on lighting ventilation and\n\t\t\t\thumidifying apparatus.\nSections 51, 54,55 and 61.\nNo worker shall be employed for more than 54 hours in only one\n\t\t\t\tweek.\n(b) Work performed by fire pumpman.\n64 (2)(c)\n(2) Cotton Ginning and Pressing Factories.\nWork of Fitters Oilmen Belt and Ropemen, Turners and\n\t\t\t\tBlacksmiths.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 179
    },
    "prev_section": "98",
    "next_section": "51"
}