    "act_title": "The M.P. Boilers Rules, 1969",
    "act_slug": "the-m-p-boilers-rules-1969",
    "section_label": "Section",
    "section": {
        "number": "49",
        "title": "49. Repeal and savings.",
        "chapter": null,
        "content": "Form 'A'\nForm 'A'\n[Rules 18, 24 and 26]\nRegistry No.\nType of Boiler\nBoiler Rating\nName of Manufacturer\nYear and place of construction\n(1)\n(2)\n(3)\n(4)\n(5)\nDate of registration\nName of Owner\nPlace where in use\nRemark\nTransfers etc.\n(6)\n(7)\n(8)\n(9)\n(10)\nForm B-1\nForm B-1\n[Rule 19 (5) (6)]\nApplication for the Inspection of Boilers and Steam Pipes under the Indian Boilers Act, 1923 (Act V of 1923)\nApplication for the Inspection of Boilers and Steam Pipes under the Indian Boilers Act, 1923 (Act V of 1923)\nDivision I\nDivision I\nRegistered Number of boilers\nNumber of owner or agent\nWhere situated\nDate of Inspection desirable\nDescription of boiler and age\n(1)\n(2)\n(3)\n(4)\n(5)\n................ Owner or Agent\nDivision II\nDivision II\nBoiler Number\nBoiler rating\nFees\nExtra fees for Sunday and holiday inspection and\n\t\t\t\tother expenses\nTotal\n(1)\n(2)\n(3)\n(4)\n(5)\nChief Inspector of Boiler\nDivision III\nDivision III\n...................... Office of the Chief Inspector of Boilers.\nForm C\nForm C\n[ Vide Rule 19 (5) (g)]\nDeclaration of Inspector\nDeclaration of Inspector\nRegistered number of boiler\nDescription and material, when and where made\nRepairs and alteration since last inspection\nPurpose for which used\nBoiler rating\n(1)\n(2)\n(3)\n(4)\n(5)\nDate of last hydraulic test and pressure applied\nDate of Inspection\nLimit of working pressure of boiler in pounds per\n\t\t\t\tsquare inch\nDate of last hydraulic test of steam pipe\nRemarks\n(6)\n(7)\n(8)\n(9)\n(10)\n(1) That the above named boiler was duly inspected by me on the.......20.......... and found to be in accordance with the rules and requirements of the Indian Boilers Act, 1923 (Act V of 1923).\n(2) That the boiler with attached steam pipes is in charge of and is not so exposed as to be dangerous.\n(3) That the said boiler will, in my judgement, be safe for period of.............. months, at a working pressure, which is on no account to exceed the pressure stated in column (8) of this Form.\nInspector\nForm D\nForm D\n( See Rule 29)\nReport into the investigation of the accident to boiler\nReport into the investigation of the accident to boiler\nThe Chief Inspector of Boilers,\nMadhya Pradesh..............\nIn accordance with the instructions, I have held a preliminary enquiry into the accident and the circumstances attending it, to Boiler No..............and now make the following report :",
        "footnote": "",
        "is_definition": false,
        "sort_order": 45
    },
    "prev_section": "48",
    "next_section": "1"
}