{
    "id": 11727,
    "slug": "the-energy-conservation-building-code-rules-2018",
    "title": "The Energy Conservation Building Code Rules, 2018",
    "short_title": "The Energy Conservation Building Code Rules, 2018",
    "act_number": "Published vide Notification No. G.S.R.168(E), date",
    "act_year": 2018,
    "act_type": "CENTRAL",
    "location": "India (Central)",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "The Energy Conservation Building Code Rules, 2018",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(a) \"Act\" means the Energy Conservation Act, 2001 (52 of 2001);\n(b) \"best practices\" means those measures that-\nallow for optimisation of efficiencies in the identified components and systems to enhance the energy efficiency of the building; or\n(i) reduce the cost of construction having regard to the safety, stability of the building structure, health and environmental provisions of Central laws or State laws; and\n(ii) includes energy conservation measures approved by the State Energy Conservation Building Code Implementation Committee or Energy Conservation Building Code compliant Technical Grievances Redressal Committee or National Energy Conservation Building Code Implementation Committee;\n(c) \"building complex\" means a building or group of buildings constructed in a contiguous area for business, commercial, institutional purposes or assembly of buildings under the single ownership of individuals or group of individuals or under the name of a co-operative group society or on lease and sold as shops or office space or space for other commercial purposes;\n(d) \"built-up area\" means the total covered areas on all floors of a building from the basement to all storeys covered by walls and parapet measured at the floor levels excluding parking;\n(e) \"bye-laws\" means the building bye-laws framed by a State Government or any authority under its control to regulate the building activities in its areas falling in the jurisdiction of-\n(i) all Municipal authorities or Committees or Councils;\n(ii) all Metropolitan areas or Nagar Panchayats;\n(iii) all areas covered under the Development or Planning authorities;\nunder various development plans notified by a State Government and enforced by such authority in its jurisdiction in which the Energy Conservation Building Code compliant building shall be located and includes any regulation or rule framed by the State Government or any other authority having jurisdiction established by the State Government;\n(f) \"Certified Energy Auditor (Building)\" means a person who fulfills the eligibility criteria specified in the Energy Conservation (Minimum qualification for Energy Auditors and Energy Managers) Rules, 2006 and has qualified National Examination for Energy Conservation Building Codes Compliance;\n(g) \"Code\" means the Energy Conservation Building Code framed by the Bureau under the Act;\n(h) \"compliance documents\" mean the forms specified in Appendix D of the Code and includes certificates from Empanelled Energy Auditors (Building) to conform compliance with these rules,\n(i) \"connected load\" means the total of the rated wattage of all equipment, appliances and devices to be installed or installed in the building or part of the building or building complexes in terms of kiloWatt (kW) that will be allocated to all applicants for electric power consumption in respect of the proposed building or building complex, as the case may be, on their completion;\n(j) \"construction documents\" mean drawings or documents containing information pertaining to building construction processes and approvals, building materials and equipment specification, architectural details required by the authority having jurisdiction;\n(k) \"contract demand\" means the maximum demand in kiloWatt (kW) or kilo-Volt Ampere (kVA) (within a consumer's sanctioned load) agreed to be supplied by the electricity provider or utility in the agreement executed between the user and the utility or electricity provider;\n(l) \"Empanelled Energy Auditors (Building)\" means a firm consisting of the Certified Energy Auditor certified under Bureau of Energy Efficiency (Certification Procedures for Energy Auditors and Energy Managers) Regulations, 2010 and Certified Energy Auditor (Building), and empanelled with the Bureau;\n(m) \"energy conservation measures\" mean the measures incorporated in the building design for saving energy, or enhancing comfort in peak electrical or thermal demand, or reducing cooling or heating load covering any element of a component with any other element of the same or other component of the Code and includes any such measure incorporated in the said building design of the proposed or existing building;\n(n) \"energy performance index\" means annual energy consumption of a building in kiloWatt-hours per square meter of the area of the building which shall be calculated as per the following formula:\nEnergy performance Index= annual energy consumption in kWh total built up area (excluding storage area and the parking in the basement) in m\n(o) \"energy performance index ratio\" means the ratio of the energy performance index of the proposed building to the energy performance index of the standard baseline building;\n(p) \"establishment\" means a business or other organization, or the place where an organization operates and includes a Government establishment and private establishment;\n(q) \"form\" means the forms appended to these rules;\n(r) \"owner\" means a person, group of persons, a company, a trust, an institute, registered body, State Government or Central Government and its attached or sub-ordinate departments, undertakings and such other agencies or organizations in whose name the property stands registered in the revenue records for the construction of a building or building complex;\n(s) \"proposed design\" means the computerised design of a building consistent with the actual design of a building which complies with all the requirements of the Code either through prescriptive or whole building performance method;\n(t) \"standard baseline design\" means the standard design that complies with all the mandatory and prescriptive requirements of the Code and has the same built-up area of the proposed building;",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Application.",
            "chapter": null,
            "content": "(a) building envelope;\n(b) comfort systems and controls (heating, ventilation and air conditioning service hot water system);\n(c) lighting and controls;\n(d) electrical and renewable energy systems;\n(e) any other system, as may be specified from time to time by the Bureau:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Compliance mechanism.",
            "chapter": null,
            "content": "(a) Prescriptive Method. - The building shall comply with the mandatory requirements and prescriptive requirements as specified in the Code for envelope components, comfort systems and controls, lighting and controls, electrical and renewable energy systems;\n(b) Whole Building Performance Method. - The building shall comply with all mandatory measures and the requirements specified in the whole building performance method of the Code and the energy performance index of the proposed design under this method shall be the same or less than the energy performance index of the standard baseline design of building as follows:\nenergy performance Index ratio= energy performance index of proposed design energy performance index of standard baseline design ≤1",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Procedure for erection of Code compliant building.",
            "chapter": null,
            "content": "(a) construction documents duly signed by the owner together with an undertaking in Form II;\n(b) construction documents shall ensure -\n(i) compliance with the applicable building bye-laws in force;\n(ii) building design incorporates energy conservation measures and best national and international practices having regard to the climatic conditions of the site and specific needs of the building so as to optimise the energy performance index ratio of the building;\n(iii) that all the data, building features, identified energy conservation measures under various building components and systems are shown in detail and in the manner specified in the applicable bye-laws;\n(iv) the drawing of plan, colour of plan, dimensions of plan, scale of plan as per requirements of the applicable bye-laws in force;\n(c) compliance documents covering the construction of components and systems of the Code, duly certified by Empanelled Energy Auditors (Building) including the following, namely:-\n(i) energy performance index ratio report in respect of the proposed building at the design stage;\n(ii) certificate in Form III by Empanelled Energy Auditors (Building) certifying the compliance documents as specified in Appendix D of the Code;\n(iii) have been scrutinized or verified in respect of the identified energy conservation measures; and\n(iv) an application with heading super scribed \"Application for permission to erect/re-erect an Energy Conservation Building Code Compliant Building\", duly signed by the owner seeking building permit from the concerned authority having jurisdiction before starting construction work in respect of the proposed building.\n(a) scrutinize the construction documents with respect to-\n(i) floor area;\n(ii) window area;\n(iii) wall area;\n(iv) roof area of the building;\n(v) built-up area of the proposed design of the building;\n(b) scrutinize the Code compliance documents and the check list as specified in the Appendix D of the Code and identify -\n(i) the energy conservation measures that are applicable to the proposed design of building;\n(ii) insulation quantities in walls and roof, and the construction assemblies, solar heat gain coefficient, visible light transmittance and thermal transmittance (U-factor) for window assemblies;\n(iii) heating, ventilation and air-conditioning component tables for air-handling equipment, refrigeration equipment, condensing equipment and air-flow summaries;\n(iv) heating, ventilation and air-conditioning equipment efficiencies and control equipment;\n(v) tables showing lighting equipment schedules;\n(vi) lighting power density calculations in the design documents;\n(vii) lighting controls;\n(viii) motor efficiencies and controls;\n(ix) findings of the document review to match with the energy model inputs for the proposed building by using the simulation tool approved by the Bureau;\n(c) scrutinize energy performance index ratio projected at the design stage;\n(d) verify and certify the items from (i) to (ix) of (b) and (c);\n(e) fill the check list as specified in the Appendix D of the Code and issue correction list in case the design documents of the proposed design of building provide inadequate information or do not meet the requirements of these rules and shall-\n(i) communicate his findings in Form IV to the owner of the building under intimation to the concerned authority having jurisdiction;\n(ii) give specified time to the owner to implement its findings;\n(iii) satisfy himself that the communication received from the owner within the specified time, meet the findings and fulfill the shortcomings;\n(f) record his approval and complete the checklist conforming compliance with the Code and these rules, and issue the certificate of approval in Form V to the owner under intimation to the concerned authority having jurisdiction and State designated agency.\n(i) approve the design and sanction building plan only after it has received a certificate in Form II or Form IV from the Empanelled Energy Auditors (Building);\n(ii) grant permit to erect or re-erect the building or add to or make alterations in the building to carry out the construction works subject to the following conditions in its sanction letter, namely: -\n(A) the construction work shall be in accordance with the sanctioned plan and requirement under the Code and these rules;\n(B) the compliance with these rules shall be achieved during construction-in-progress;\n(C) the building shall not be occupied before issuance of occupancy certificate to the owner;\n(D) the authority having jurisdiction may, at any stage, revoke the permit on receipt of noncompliance report from the Empanelled Energy Auditors (Building) or on the notice of any misrepresentation of material facts in the application in respect of the provisions of these rules or the Code after giving a reasonable opportunity of being heard to the owner.\n(a) give notice of his intention to start the construction work of the building in Form VI;\n(b) undertake construction of energy conservation measures incorporated in the construction documents in terms of sub-clause (ii) of clause (b) of sub-rule (1);\n(c) have flexibility in constructing the building components and systems covered in the construction documents referred to in clause (a) of sub-rule (1) to most effective use of energy by deploying best practices in such components and systems to optimize the energy performance index ratio;\n(d) take the approval of the Empanelled Energy Auditors (Building) before undertaking such construction referred to in clause (c) if the components and systems proposed to be constructed are other than those incorporated in the construction and compliance document.\n(a) fill out the checklist specified in the Appendix D of the Code, provide comments if the proposed design of building does not meet the construction requirements and specify the shortcomings in compliance to the Code, these rules and sanctioned plan, and shall-\n(i) communicate its shortcomings and finding to the owner;\n(ii) give specified time to the owner to implement its findings;\n(iii) satisfy himself that the communication received thereafter from the owner meets the specified findings and fulfill shortcomings;\n(b) record his approval and complete the checklist indicating compliance with the Code and these rules, and issue a certificate of compliance in Form VII to the owner under intimation to the authority having jurisdiction;\n(c) where it is determined at any stage that construction is not proceeding in accordance with the sanctioned plan or is in violation of any of the provisions of the Code and these rules, Empanelled Energy Auditors (Building) shall notify the owner, and request for additional information with respect to his findings or on the short comings identified by him as per Form VIII;\n(d) in case the Empanelled Energy Auditors (Building) is satisfied with the additional information provided by the owner, he shall record the same in the certificate of compliance in Form VII and communicate the same to the owner under intimation to the authority having jurisdiction;\n(e) in case the Empanelled Energy Auditors (Building)is not satisfied with the additional information submitted by the owner he shall report the same to the authority having jurisdiction to ensure that all further construction is stayed until correction has been effectuated and a certificate of compliance has been issued by Empanelled Energy Auditors (Building).\n(a) the duly completed compliance forms together with check list of various components covered under rule (3) at the completion stage which shall include the followings-\n(i) review of heating, ventilation and air-conditioning component tables for air-handling equipment, refrigeration equipment, condensing equipment, air-flow summaries, tables showing lighting equipment specifications, and tables showing motor specifications;\n(ii) inspection of lighting equipment like lamps, ballasts, to confirm fixture wattage and inspection shall include at least random check across according to the type of usage in the building to determine lighting power density;\n(iii) review the required lighting controls such as manual switching off perimeter, day lighting circuits, automated occupancy based control, photo sensor controls, and automated timer based controls;\n(iv) review of coefficient of performance values of installed heating, ventilation and air conditioning equipment and control equipment;\n(v) review of efficiencies of installed motor and controls;\n(vi) review of power factor and power distribution losses;\n(vii) review the required check metering and monitoring system.\n(b) a list of the energy related building features in the proposed design, if any, which are different from the sanctioned or standard baseline design;\n(c) all documents and invoices in support of the construction undertaken with respect to all energy conservation measures including insulation, fenestration, heating, ventilation and air-conditioning, lighting and electrical systems, water heating systems of the building.\n(i) that the energy performance of the building shall be monitored and verified by the State Energy Conservation Building Code Implementation Committee of the concerned State;\n(ii) that the owner through the Empanelled Energy Auditors (Building) shall submit to the State designated agency, an energy performance index report as per Form XIII under intimation to Bureau for two consecutive years after the building has been fully operational;\n(iii) in case the energy performance index ratio of the building is more than one, the authority having jurisdiction may issue a provisional occupancy certificate subject to the condition that the owner shall undertake energy audit of the building to identify additional energy conservation measures to achieve the energy performance index ratio of the building approved in the sanctioned plan or permit within a period of three years;\n(iv) if the owner fails to achieve the energy performance index ratio as specified in clause (iii) within a period of three years from the date of occupancy of the building the authority having jurisdiction shall place the matter before the State Energy Conservation Building Code Technical Grievances Redressal Committee, which shall hear the owner and the Empanelled Energy Auditors (Building) and make recommendations in the matter accordingly and the authority having jurisdiction shall comply with such recommendations.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Committees.",
            "chapter": null,
            "content": "(a) State Energy Conservation Building Code Implementation Committee headed by Chief Secretary of the State or, his nominee and comprising of all stakeholders including a nominee from Bureau, to-\n(i) promote energy efficiency standards through optimization of parameters in the various components and systems of the building in line with the provisions of these rules to enhance the building performance and provide every support to it to make it an effective instrument of promoting energy conservation and energy efficiency in the commercial buildings or establishment;\n(ii) forward its recommendations to the Bureau to assist the National Energy Conservation Building Code Implementation Committee to develop and revise energy consumption standards for buildings, in terms of energy performance index, zone-wise - hot and dry, warm and humid, composite, temperate and cold climate zones, classification-wise;\n(iii) create awareness about Energy Conservation Building Code and procedure for erection of Code compliant building;\n(iv) promote construction of energy efficient buildings ensuring quality and consistency in their constructions having regard to the climatic conditions and needs of the building projects;\n(v) promote capacity building of building professionals, developers and contractors to promote energy efficient designs of buildings in close co-ordination with authorities having jurisdiction;\n(vi) undertake performance review of annual work of all Empanelled Energy Auditors (Building) to check their credentials;\n(b) prepare a summary of violations which shall be provided by State designated agency to the Bureau and review such violations for the purpose of evaluating his professional skills;\n(c) prepare a yearly report and furnish the same to the Bureau indicating inter alia the progress made in compliance of these rules in the State and the steps taken by the State designated agency to improve the rate of compliance of Code in the State;\n(d) create data base through compilation of data of energy performance index and its ratio achieved by each building constructed after coming into force of these rules;\n(e) Energy Conservation Building Code Compliant Technical Grievances Redressal Committee headed by an officer of the Urban Development Department of the State, with other members, not exceeding four, nominated by the State Energy Conservation Building Code Implementation Committee who are qualified by experience and training to pass judgement upon matters pertaining to construction of Code compliant building in the State, to-\n(i) hear grievance filed by the owner of a Code complaint building within the specified time period given by the authority having jurisdiction relating to the building permit, completion certificate, occupancy certificate of building including determination of the energy performance index ratio at the completion stage and interpretation of these rules or any other grievance arising out of the implementation of the Code and these rules;\n(ii) make recommendations to the authority having jurisdiction to reconsider such issue, or for implementation by the authority having jurisdiction, as the case may be.\n(a) one representative each nominated by all State designated agencies preferably Empanelled Energy Auditors (Building) dealing with the Code compliant buildings in each State;\n(b) a representative of Bureau of Indian Standards;\n(c) a representative of Ministry of Housing and Urban Affairs;\n(d) a representative of Central Public Works Department;\n(e) a representative of Construction Industry;\n(f) a representative of Council of Architecture;\n(g) any other member, who may be nominated by the Chairperson.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Responsibilities and duties of the owner.",
            "chapter": null,
            "content": "(a) engage Empanelled Energy Auditors (Building) in development of building design, installation of energy conservation measures and equipment to meet with the requirements of these rules and ensure following, namely:-\n(i) finalize the compliance approach relevant for his building project based on the complexity of the building, budget and time constraints;\n(ii) finalize the energy conservation measures as per the Code as amended from time to time having regard to the location of the proposed building;\n(iii) to integrate the energy conservation measures in the building design in accordance with the provisions of these rules;\n(iv) that drawings, specifications and compliance forms are prepared and energy conservation measures are reflected in the building design documents and submitted to the authority having jurisdiction in compliance with the requirements of the rules accompanied by a certificate specifying the energy performance index ratio of the building by the Empanelled Energy Auditors (Building) that the documents are as per the requirement of these rules;\n(v) notice is given within the validity of sanction to the authority having jurisdiction of his intention to start the construction work at the building site;\n(vi) commence the work within the period specified by the authority having jurisdiction from the date of such notice or seek extension of time for starting the construction work, wherever necessary;\n(vii) ensure that the designed energy conservation measures are deployed in the construction of the building and installation of its components and systems.\n(b) permit the Empanelled Energy Auditors (Building) to enter the building or premises at any reasonable time for the purpose of inspection to ensure compliance of building works with rules and regulations under the Act;\n(c) give written notice to the authority having jurisdiction intimating the completion of the construction work along with a certificate from the Empanelled Energy Auditors (Building) to the effect that-\n(i) the construction of the building has been done in accordance with the sanction of the building permit;\n(ii) all the energy conservation measures have been installed and inspected, and they meet the requirements of the Code and these rules;\n(iii) the building design meet with the provisions of the Code and these rules;\n(d) give written notice to the authority having jurisdiction as well as to the State designated agency in case of termination of the services of Empanelled Energy Auditors (Building) and appointment of other Empanelled Energy Auditors (Building) in its place;\n(e) obtain an occupancy permit from the authority having jurisdiction prior to any occupancy of the building or part thereof after completion of the building;\n(f) report the practical difficulties to the Empanelled Energy Auditors (Building), if any, in carrying out the provisions of these rules, who shall take necessary action in consultation with State designated agency and State Energy Conservation Building Code Implementation Committee;\n(g) on the receipt of the notice, if any, from the authority having jurisdiction, he shall discontinue such usage within reasonable time as specified in such notice and in no case he shall disregard the provisions of these rules;\n(h) where he proposes to alter the installation of any system or material or equipment on account of improving the energy efficiency of the building contrary to the system, material or equipment as indicated in the sanction plan he shall use or install such system or material or equipment after obtaining the necessary approval of the Empanelled Energy Auditors (Building):",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Role, responsibilities and duties of the Empanelled Energy Auditors (Building).",
            "chapter": null,
            "content": "(a) verify and certify -\n(i) the design of the building keeping in view the design criteria, energy goals of the project, energy systems performance verification plan, and the modeling approach;\n(ii) the energy conservation measures based on the design approach for the project under consideration;\n(iii) construction documents and compliance documents, compliance forms and checklists specified to ensure that the building complies with the Code and these rules;\n(iv) energy performance index ratio of the proposed building;\n(b) furnish a certificate under its seal and authorized signature to the effect that drawings, specifications, construction documents, compliance documents and forms prepared covering building envelope, comfort system and controls, lighting and electrical power systems, wherever applicable, and all other Code related documentation prepared for submission to the authority having jurisdiction ensuring compliance with these rules;\n(c) inspect the building works from the design stage to its commissioning stage of buildings including their uses under these rules and based on his certification, the authority having jurisdiction shall issue building permit, approve construction of building, issue completion and occupancy certificates;\n(d) the Empanelled Energy Auditors (Building) shall ensure that none of the professionals or employees working under him/her is engaged in any work in connection with the construction or alteration of the concerned building covered under these rules to ensure that there is no conflict of interest with his/her official duties with the interests of the authority having jurisdiction;\n(e) report to State designated agencies on such unusual technical issues that may arise due to issue of building permit or construction of building or during occupancy stage;\n(f) provide inputs to the National and State Energy Conservation Building Code Implementation Committees to facilitate for better implementation of the Code and these rules;\n(g) promote norms and standards specified in the Code.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Responsibilities and duties of State designated agency.",
            "chapter": null,
            "content": "(a) coordinate, regulate and enforce provisions of the Code and these rules for efficient use of energy and its conservation under the Act in the State;\n(b) ensure every commercial building or establishment having a connected load of 100 kW or above, or contract demand of 120 kVA or above, be constructed in compliance with these rules;\n(c) monitor the performance of the Empanelled Energy Auditors (Building) to improve the quality, consistency and rate of compliance of these rules with a view to make the cadre of Empanelled Energy Auditors (Building) as effective instruments for promotion of energy efficiency in the building sector in the State;\n(d) create a data bank in the State to measure the compliance rates of the Code compliant buildings and accurately account for the energy savings resulting from the compliance of these rules;\n(e) also create a data bank on energy use per square meter of area of the building under different zones namely, hot and dry, warm and humid, temperate, composite and cold, separately for each category in the State;\n(f) take necessary steps to make energy performance index as a measure to comply with these rules in the various categories of buildings and send its recommendations to the Bureau for the formulation of energy consumption norms and standards in respect of various categories of buildings constructed zone-wise in its State;\n(g) arrange conduct site visits, if considered necessary, to determine the accuracy of reporting by Empanelled Energy Auditors (Building) in the State;\n(h) prepare a report on performance of Empanelled Energy Auditors (Building) listing out the projects complying with these rules, projects in violation of compliance with these rules and the level of violation, and provide summary of such violations for each year to the Bureau of Energy Efficiency;\n(i) coordinate with the authority having jurisdiction to amend their building bye-laws incorporating the provisions of these rules for the purpose of construction of buildings in compliance with the Code and these rules;\n(j) provide necessary support to the authority having jurisdiction to conform to the provisions of these rules with regard to matters concerning design construction including energy conservation measures and occupancy for improving the energy performance of Code compliant buildings and effectiveness in compliance of these rules.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Miscellaneous.",
            "chapter": null,
            "content": "Form I\nForm I\n[ See rule 5(1)]\n[ See rule 5(1)]\nApplication for seeking building permit in respect of erection/ re-erection/making alteration in the Energy Conservation Building Code compliant Building\nApplication for seeking building permit in respect of erection/ re-erection/making alteration in the Energy Conservation Building Code compliant Building\nDate: __/__/____\n(i) Construction Documents and Compliance Forms together with check-lists incorporating the installation of Energy Conservations Measures specified in the aforesaid rules.\n(ii) The Construction Documents and Compliance Forms together with check-lists have been verified by Shri-------------- Regd. number __________ Empanelled Energy Auditors (Building). A certificate in Form II duly signed and sealed in this regard is enclosed.\nYours faithfully,\n(Name of the owner)\nAddress_______\nTel. No./Mobile No.__\nForm II\nForm II\n[ See rule 5(1)(a)]\n[ See rule 5(1)(a)]\n[Undertaking by owner for construction of the Energy Conservation Building Code compliant building]\n[Undertaking by owner for construction of the Energy Conservation Building Code compliant building]\nSignature\n(Name of the owner)\nAddress_______\nMobile No/ Tel. No-----\nForm III\nForm III\n[( See rule 5(1)(c)(ii) and 5(4)(a)(i)]\n[( See rule 5(1)(c)(ii) and 5(4)(a)(i)]\n[Certificate from Empanelled Energy Auditors (Building) to be enclosed with the application for Building Permit for Energy Conservation Building Code compliant building]\n[Certificate from Empanelled Energy Auditors (Building) to be enclosed with the application for Building Permit for Energy Conservation Building Code compliant building]\nCertificate\nCertificate\n(a) I/We have scrutinized the construction documents,undertaking given by the owner duly signed by the owner/design professional showing all the pertinent data and features of the building, equipment and systems in sufficient details covering building envelop, heating, ventilation and air-conditioning, service hot water, lighting and electrical power in accordance with municipal bye-laws and with the Energy Conservation Building Code rules,2018 in respect of building proposed to be constructed on plot on ----------------block no--------- scheme in the city of _________ in the State of __________ ;\n(b) I/We have scrutinized the compliance forms with the check- lists to ensure compliance with the bye-laws and the Energy Conservation Building Code Rules, 2018.\n(c) The compliance documents have been duly inspected by the undersigned.\n(d) The energy performance index ratio of the building design as per compliance documents, at the design stage is equal to or less than one and is therefore in compliance with the Energy Conservation Building Code Rules, 2018.\n(e) It is certified that all required scrutiny and verification of the documents submitted have been carried out diligently, truthfully and all reasonable professional skill, care and diligence have been taken in scrutinizing and verifying the drawings of the buildings and compliance forms together with check-lists covering the various components of the Energy Conservation Building Code rules, 2018.\n(f) The contents of all the documents submitted along with the application are a true representation of the facts and nothing has been concealed.\nSignature\nName of the Empanelled Energy Auditors (Building)\nRegistration No /SEAL.\nDate\nForm IV\nForm IV\n[ See rule 5(3)(e)(i) & 5(4)(a)(i)]\n[ See rule 5(3)(e)(i) & 5(4)(a)(i)]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of Building Permit Application in respect of the proposed building -Communication of omissions and non-compliance to owner]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of Building Permit Application in respect of the proposed building -Communication of omissions and non-compliance to owner]\nI/We,.........................(Name), being an authorised Empanelled Energy Auditors (Building)vide order No. ___________________ hereby state I/we have reviewed and verified the undertaking given by you and have inspected the construction documents, compliance forms, check-lists, submitted along with building permit application in respect of the various elements specified in sub-rule (3) of rule 5 of the various components of the proposed building in respect of the subject building and inform that the following omission/non-compliance have been discovered on inspection -\n(i)\n(ii)\n(iii)\n(iv)\nIt is requested that the necessary energy conservation measure in consultation with your design team be carried out in order to bring them in compliance with the Energy Conservation Building Code Rules, 2018. You are accordingly requested to take corrective action within a period of one month from the date of issue of this letter. Further action on your application for issue of building permit shall be taken after satisfactory compliance of the aforesaid omission/noncompliance.\nSignature\nEmpanelled Energy Auditors (Building)\nRegistration number/Mobile number\nSeal\nForm V\nForm V\n[ See rule 5(3)(f)]\n[ See rule 5(3)(f)]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of building permit application enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of building permit application enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building]\n(i) the omission/non-compliance pointed out by the undersigned in the certificate of Inspection dated .........have been complied with satisfactorily;\n(ii) the energy performance index ratio calculation match with the data given in the aforesaid documents and is in compliance with the Energy Conservation Building Code Rules, 2018.\n(a) all reasonable professional skill, care, and diligence have been taken in verifying the compliance forms in respect of the various elements of the components covered in Energy Conservation Building Code rules, 2018 and contents thereof are a true representation of the facts and meet the requirements of Energy Conservation Building Code Rules, 2018.\n(b) There is no objection for issue of building permit in respect of the aforesaid proposed building in so far as requirements of Energy Conservation Building Code Rules, 2018 are concerned.\nSignature\nAuthorized/Empanelled Energy Auditors (Building)\nRegistration number/ Mobile number\nSeal\nForm VI\nForm VI\n[ See rule 5(5)(a)]\n[ See rule 5(5)(a)]\nNotice for commencement of construction work of Energy Conservation Building Code compliant building\nNotice for commencement of construction work of Energy Conservation Building Code compliant building\nDate: __/__/____\nYours faithfully\nSignature of the owner\n(Name of the owner)\nAddress of the owner\nForm VII\nForm VII\n[ See rule 5(6)(b) and (d)]\n[ See rule 5(6)(b) and (d)]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of construction works enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building-- Issue of certificate of compliance]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of construction works enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building-- Issue of certificate of compliance]\nEmpanelled Energy Auditors (Building)\nenergy conservation measures installed during the construction works\nSignature\nName\nEmpanelled Energy Auditors (Building) /Registration No./Mobile number.\nEmpanelled Energy Auditors (Building)\nSeal\nForm VIII\nForm VIII\n[ See rule 5(6)(c)]\n[ See rule 5(6)(c)]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of construction works enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building- Issue of certificate of non-compliance]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of construction works enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building- Issue of certificate of non-compliance]\nDate: __/__/____\n(i)\n(ii)\n(iii)\nor\nYours faithfully\nSignature\nName of\nAuthorized/\nEmpanelled Energy Auditors (Building)\nnumber/Mobile number.\nSeal\nForm IX\nForm IX\n[ See rule 5(7)]\n[ See rule 5(7)]\nNotice of completion\nNotice of completion\nYours faithfully,\nSignature ...............\nName of the owner Plot No. block No. Address\nForm X\nForm X\n[ See rule 5(7)]\n[ See rule 5(7)]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of completion of construction works enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building -Issue of certificate of compliance]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of completion of construction works enclosing construction documents and compliance forms in respect of Energy Conservation Building Code compliant building -Issue of certificate of compliance]\nCertificate\nCertificate\n(i) The works covered under the Energy Conservation Building Code Rules, 2018 have been completed to the best of my satisfaction. The details of the various components/system completed as per Energy Conservation Building Code rules, 2018 are given below:\nName of the component\ndated\n1.\n2.\n3.\n4.\n5.\n(ii) The energy performance index ratio of the said building match/with the data given in the aforesaid compliance documents specified in para 1 above.\n(iii) A list of the energy conservation measures deployed in the construction of aforesaid building enclosed. Necessary approvals required have been taken by the owner.\n(iv) The building in my/our view meets the requirements of Energy Conservation Building Code Rules compliant building and is fit for occupancy for which it has been erected, Refer Rule 2(i).\n(v) I further certify that all reasonable professional skill, care, and diligence have been taken in verifying the construction document and compliance forms in respect of the various elements of the components covered in the Energy Conservation Building Code rules, 2018 and contents thereof are a true representation of the facts and meet the requirements of the Energy Conservation Building Code rules, 2018.\n(vi) The check-list duly completed, signed sealed by the undersigned is enclosed.\nEmpanelled Energy Auditors (Building)\nSeal/Name/Regd. Number/\nCertification number\nA copy of the certificate is sent herewith to:\n(i) Commissioner, authority having jurisdiction, Town /city/ State\n(ii) Chief Executive, (By Name), State designated agency/Address/State of\nForm XI\nForm XI\n[ See rule 5(9)]\n[ See rule 5(9)]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of completion of construction works in respect of Energy Conservation Building Code compliant building-Communication of omissions and non-compliance to owner]\n[Certificate of Inspection by Empanelled Energy Auditors (Building) on review of completion of construction works in respect of Energy Conservation Building Code compliant building-Communication of omissions and non-compliance to owner]\nSignature\nEmpanelled Energy Auditors (Building)\nRegistration number/Mobile number.\nForm XII\nForm XII\n[ See rule 5(12)]\n[ See rule 5(12)]\nOccupancy Certificate\nOccupancy Certificate\n(to be issued by Authority having jurisdiction in their occupancy certificate)\n(to be issued by Authority having jurisdiction in their occupancy certificate)\nClimate Zone\n24 Hour use Building/ Regular Building\nHospitals/ Hostels/ Cell Centre/ Other Building Types\nDescription of the building\nGround Floor\nUsage\nconnected load\n1. 1st floor\n…………\n…………\n2. 2nd floor\n…………\n…………\n3. 3r floor\n…………\n…………\n4. 4th Floor\n…………\n…………\n5. etc.\nYours faithfully,\n(Signature of building official)\nAuthority having jurisdiction\nCopy to\nThe Chief Executive, State designated agency............\nForm XIII\nForm XIII\n[ See rule 5(12)(ii)]\n[ See rule 5(12)(ii)]\n[Energy performance index Report Submission by Empanelled Energy Auditors (Building) to State designated agency after the building has become fully operational]\n[Energy performance index Report Submission by Empanelled Energy Auditors (Building) to State designated agency after the building has become fully operational]\nYours faithfully\nSignature\nName of\nAuthorized/\nEmpanelled Energy Auditors (Building)\nNumber /Mobile number\nSeal",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        }
    ],
    "metadata": {
        "Act ID": "act3129",
        "Act Number": "Published vide Notification No. G.S.R.168(E), dated 13.2.2018",
        "Enactment Date": "",
        "Act Year": "2018",
        "Short Title": "The Energy Conservation Building Code Rules, 2018",
        "Type": "CENTRAL",
        "Location": "India (Central)"
    },
    "updated_at": "2026-09-29 21:55:17"
}