{
    "act_title": "The Delhi Electricity Supply Code And Performance Standards Regulations, 2007",
    "act_slug": "the-delhi-electricity-supply-code-and-performance-standards-regulations-2007",
    "section_label": "Section",
    "section": {
        "number": "43",
        "title": "43. Billing during the period defective/stuck/stopped/burnt meter remained at site.",
        "chapter": null,
        "content": "(ii) In cases where the recorded consumption of past twelve months prior to the date meter became defective is either not available or partially available, the consumption pattern for the next twelve months after the installation of new meter would be used for billing purposes.\n(iii) In case, the Maximum Demand Indicator (MDI) of the meter at the consumers installation is found to be faulty or not recording at all (unless tampered), the demand charges shall be calculated based on maximum demand during corresponding months/billing cycle of previous year, when the meter was functional and recording correctly. In case, the recorded MDI of corresponding month/billing cycle of past year is also not available, the average maximum demand recorded for the next six billing cycles after changing the meter shall be considered.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 72
    },
    "prev_section": "30",
    "next_section": "44"
}