{
    "act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
    "act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
    "section_label": "Section",
    "section": {
        "number": "72",
        "title": "72. Conditions for taking 'OFF' last Stop signal or Intermediate block Stop signal at stations worked on absolute block system and equipped with manually operated Multiple Aspect Colour Light signalling.",
        "chapter": null,
        "content": "",
        "footnote": "",
        "is_definition": false,
        "sort_order": 75
    },
    "prev_section": "71",
    "next_section": "73"
}