{
    "act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
    "act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
    "section_label": "Section",
    "section": {
        "number": "239",
        "title": "239. Work involving danger to trains or traffic.",
        "chapter": null,
        "content": "(a) the inspector of works before giving permission to commence the work shall inform the traction power controller and who in turn will arrange to isolate and make dead the portions of electrical equipment concerned and issue a permit-to-work thereon under rule 264;\n(b) in case of an emergency the traction power controller shall switch `off' the power first and then advise the station master on duty and Controller of the power block imposed and reasons for doing so;\n(c) after completion of the work Inspector-incharge of work shall confirm to the Station Master on duty and traction power controller for the restoration of electrical tension in overhead equipment. After their mutual confirmation on the approved secured means of communication, if available otherwise by exchanging written messages in terms of rule 172 the overhead equipment shall be restored to work; and\n(d) The Station Master on duty when power block alone is given shall ensure that no electric rolling stock is permitted into or over sections of track for which work permit is issued and overhead lines are dead, and points and crossings are protected by means of stop callers in accordance with special instructions.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 240
    },
    "prev_section": "238",
    "next_section": "240"
}