{
    "act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
    "act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
    "section_label": "Section",
    "section": {
        "number": "202",
        "title": "202. Working of multiple material or departmental trains and or other maintenance vehicles or machines.",
        "chapter": null,
        "content": "(a) such vehicle or train may be despatched into the blocked section either as one train to be separated at the site or singly one after another by issuing a shunting order 103 to the operators or loco pilot of first vehicle or train, and written authority to proceed without line clear 'authority to proceed without line clear' to the operators or loco pilots of subsequent vehicle or trains;\n(b) the 'authority to proceed without line clear' given to the operator or loco pilot shall be the authority, to proceed up to the assigned location. The kilometers up to which he must proceed into the obstructed block section, shall be recorded on this authority; and\n(c) the 'authority to proceed without line clear' may confirm whether the vehicle or train is to return after completion of the work or proceed ahead to the next block station or wait at the place of assigned location for clearance of line by the vehicle or train in the rear or front as may be applicable. The 'authority to proceed without line clear' shall also mention, if any, vehicle or train has gone ahead or shall be following it.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 203
    },
    "prev_section": "201",
    "next_section": "203"
}