    "act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
    "act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
    "section_label": "Section",
    "section": {
        "number": "201",
        "title": "201. Working of Tower Wagon or Cars.",
        "chapter": null,
        "content": "(b) in case of working of tower wagon in station section the lines for which block is taken, shall be treated as deemed `obstructions' for the purpose of taking 'off' signals or train working or shunting. The affected line shall be protected by setting the points against such line and Stop plugs placed over the relevant point switches or buttons. Buzzer where provided shall also be switched;\n(c) in case of working of tower wagon in block section,-\n(i) The tower wagon shall be despatched from the station in rear only after blocking back or blocking forward the block section along with necessary authority for shunting or obstruction as in rule 103 and the requisite caution order is given;\n(ii) if the work necessitates stopping of trains on any of the adjacent line, block for the same shall be asked for by the supervisor and the affected section shall also be blocked back or blocked forward by the station master despatching the train; and\n(iii) if the nature of work is such that train movement need not be stopped on the adjoining line but infringement is apprehended during operation of the machine, the supervisor shall arrange to show signals in accordance with the rule 242 and loco pilot of trains proceeding into the section shall be issued caution order by station master at either end of the section.\n(d) when neither the block has been taken nor signal to warn the loco pilots as in sub-clause (iii) of clause (c ) of the sub-rule (5) of the rule 201 have been ensured on the adjoining line, the supervisor in charge shall see that during working adjacent lines are kept clear.\n(e) after the work is completed, the supervisor in charge shall issue a memo to the station master on duty to the effect that the work is over and other lines blocked or fouled are clear of obstructions and are safe for the passage of trains. Provided further that written memo may follow the advice given on secured voice communication where provided for early commencement of train operation on line under the system of working.\n(a) the supervisor-in-charge before leaving the site shall take permission of the station master of station in advance or in rear where the tower wagon is to arrive as per authority through the approved means of communication;\n(b) on getting the information from the supervisor in-charge of the tower wagon, the station master on duty shall arrange for reception of the tower wagon;\n(c) the supervisor on arrival of the tower wagon at the station shall confirm to the station master in writing against the relevant entries in train signal register that the section has been cleared of the obstruction after completion of work and the tower wagon or wagons have arrived; and\n(d) normal working of trains on the line for which block was taken, shall commence only after obtaining assurance from the supervisor as in clause (c) of the sub-rule (7) of the rule 201.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 202
    },
    "prev_section": "200",
    "next_section": "202"
}