{
    "act_title": "The Customs and Central Excise Duties Drawback Rules, 2017",
    "act_slug": "the-customs-and-central-excise-duties-drawback-rules-2017",
    "section_label": "Section",
    "section": {
        "number": "14",
        "title": "14. Manner and time for claiming drawback on goods exported other than by post.",
        "chapter": null,
        "content": "(i) copy of export contract or letter of credit, as the case may be;\n(ii) copy of ARE-1, wherever applicable;\n(iii) insurance certificate, wherever necessary; and\n(iv) copy of communication regarding rate of drawback where the drawback claim is for a rate determined by the Principal Commissioner of Customs or Commissioner of Customs, as the case may be, under rule 6 or rule 7 of these rules.\n(b) where the exporter resubmits the claim for drawback after complying with the requirements specified in the deficiency memo, the same will be treated as a claim filed under sub-rule (1) for the purpose of section 75A.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 13
    },
    "prev_section": "13",
    "next_section": "15"
}