    "act_title": "The Coal Mines Regulations, 2017",
    "act_slug": "the-coal-mines-regulations-2017",
    "section_label": "Section",
    "section": {
        "number": "105",
        "title": "105. Manual opencast working.",
        "chapter": null,
        "content": "(1) In alluvial soil, morum, gravel, clay, debris or other similar ground,-\n(a) the sides shall be sloped at an angle of safety not exceeding 45 degrees from the horizontal or such other angle as the Regional Inspector may permit by an order in writing and subject to such conditions as he may specify therein; or\n(b) the sides shall be kept benched and the height of any bench shall not exceed 1.5 meters and the breadth thereof shall not be less than the height:\n(2) Where any pillar is left 'in situ' for the purpose of measurement, its height shall not exceed 2.5 meters; and where the height of such pillar exceeds 1.25 meters, the base of the pillar shall not be less than 1.5 meters in diameter.\n(3) In coal, the sides shall either be kept sloped at an angle of safety not exceeding 45 degree from the horizontal, or the sides shall be kept benched and the height of any bench shall not exceed three meters and the breadth thereof shall not be less than the height:\n(4) In an excavation in any hard and compact ground or in prospecting trenches or pits, the sides shall be adequately benched, sloped or secured so as to prevent danger from fall of sides:\n(5) No tree, loose stone or debris shall be allowed to remain within a distance of three meters from the edge or side of the excavation.\n(6) No person shall undercut any face or side or cause or permit such undercutting as to cause any overhanging.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 104
    },
    "prev_section": "104",
    "next_section": "106"
}