{
    "act_title": "The Coal Mines Regulations, 2011",
    "act_slug": "the-coal-mines-regulations-2011",
    "section_label": "Section",
    "section": {
        "number": "88",
        "title": "88. Winding ropes, etc.",
        "chapter": null,
        "content": "(i) its melting point shall not exceed 300 degrees centigrade, and its temperature When poured into the socket shall not exceed 363 degree centigrade;\n(ii) in the length of rope which is to lie within the tapered part of the socket, the fibre core, if any, shall be cut and the wires shall be untwisted and thoroughly cleaned; and\n(iii) the socket shall be heated to a temperature of about 100 degrees centigrade before the white metal is poured into it.\n(i) every rope shall be recapped once at least in every six months, or if necessary, at shorter intervals and also after every overwind; and\n(ii) before every recapping, a length, including the capping, of at least two metres shall be cut off the rope and every piece of rope so cut-off shall be opened and its internal condition examined.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 87
    },
    "prev_section": "87",
    "next_section": "89"
}