{
    "act_title": "The Coal Mines Regulations, 2011",
    "act_slug": "the-coal-mines-regulations-2011",
    "section_label": "Section",
    "section": {
        "number": "56",
        "title": "56. Duties and responsibilities of surveyor.",
        "chapter": null,
        "content": "(a) make such accurate surveys and leveling, and prepare such plans and sections and tracings thereof, as the manager may direct or as may be required by the Act or by the regulations or orders made thereunder, and shall sign the plans, sections and tracings and date his signature; and\n(b) be responsible for the accuracy of any plan and section, or tracings thereof that has been prepared and signed by him.\n(a) the full facts when working of the mine have approached to about 120 metres from the mine boundary, or from disused or waterlogged working;\n(b) any doubts which may arise or exist concerning the accuracy of the plans and sections prepared under these regulations; and\n(c) any other matter relating to the preparation of the plans and sections that he may like to bring to the notice of the manager.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 55
    },
    "prev_section": "55",
    "next_section": "57"
}