{
    "act_title": "The Calcutta Metro Railway General Rules, 2000",
    "act_slug": "the-calcutta-metro-railway-general-rules-2000",
    "section_label": "Section",
    "section": {
        "number": "8",
        "title": "8. Means of getting or obtaining permission to approach.",
        "chapter": null,
        "content": "(a) Track Circuits;\n(b) Speed Code Transmitters;\n(c) Axle Counters through Panel Operation;\n(d) Electrical Communication Instruments.\n8.02. Provision of instruments.\n8.03. Consent required before interfering with Block Working equipment.\n8.04. Certificate of Competency.\n8.05. Train signal register.\n8.06. Authority to proceed.\n(a) display of proceed code in the cab signal while in ATO or CMM mode;\n(b) permission from Traffic Controller for the train stalled in the mid section due to track circuit/ATP failure to come to next station in 'RMM' mode.\n(c) while in \"OFF\" mode under Absolute Block System;\n(i) taking 'off of the starter signal; or\n(ii) any document or procedure specified in this behalf in special instructions.\n8.07. Driving Motorman to examine authority to proceed.\n(a) he has obtained an 'authority to proceed';\n(b) the 'authority to proceed' given to him is proper;\n(c) that the authority refers to the ATP block/block section he is about to enter;\n(d) if the said authority is in writing, it is complete and duly signed in full and in ink or dot pen with station stamp.\n8.08. Conditions for closing the block section.\n8.09. Responsibility of Station Master as to authority to proceed when the section is worked in Absolute Block System or One Train Only System.\n8.10. Failure of track circuits, axle counters, panel boards.\n8.11. Form for written authority to proceed.\n8.12. Special responsibility as to operation of panel.\n(1) no one but himself operates the panel for purposes of granting or obtaining of permission to approach;\n(2) no one except the person authorised by special instructions, opens the panel.\nN.B.\n8.13. Preservation of messages and written authorities to proceed.\n8.14. Cancellation of permission to approach.\n8.15. Working of trains in case of failure of communication including total failure of communication.\n(1) When panel phone/magneto telephone provided for obtaining line clear fails, the line clear shall be asked through the traffic controller and line clear shall be obtained by the operation of line clear switch.\n(2) When line clear switch is defective, line clear shall be obtained through panel phone/magneto phone exchanging private number and the authority to proceed will be paper line clear ticket indicating private number thereon.\n(3) When both the line clear switch and panel/magneto telephone fail, the line clear shall be obtained through control phone exchanging private number and the authority to proceed will be paper line clear ticket. In such case, both the Station Masters shall indicate arrival and departure time of last preceeding train and the Traffic Controller shall keep a record of private number exchanged between stations.\n(4) When all the above communication systems fail, the trains shall be worked on \"Authority to proceed without line clear\" subject to -\n(i) The driving and the conducting motorman shall be advised about the circumstances.\n(ii) \"Authority to proceed without line clear\" on prescribed form (separate for UP & DN) shall be given to the driving motorman.\n(iii) A caution order restricting speed to 25 KMPH over the straight and 8 KMPH over a portion where view ahead is not clear shall be handed over to the driving motorman.\n(iv) Train shall run at an interval as specified in special instructions.\n(v) When approaching the station ahead the driving motorman must bring his train to a stand at the foot of the stop signal and shall move as guided by the signal or piloted post.\n(vi) Paper line clear ticket should be issued as per special instruction.\n(vii) The driving motorman shall hand over the authority to proceed to the Station Master at the end of the affected section who will preserve this for inspection.\n(5) When all communications including the communication between the Traffic Controller and the motorman through radio telephone/emergency telephone fail, the train service will be regulated as per special instructions.\n8.16. Failure of radio communication between train crew and traffic controller.\n8.17. Use and operation of block working equipment.\nChapter - IX\nPermanent Way and Works",
        "footnote": "",
        "is_definition": false,
        "sort_order": 7
    },
    "prev_section": "7",
    "next_section": "9"
}