    "act_title": "The Bombay Lifts Rules, 1958",
    "act_slug": "the-bombay-lifts-rules-1958",
    "section_label": "Section",
    "section": {
        "number": "29",
        "title": "29. Tests.",
        "chapter": null,
        "content": "(b) The brakes, limit switches, buffers, safety gears or gears and speed governor if fitted, shall be made to function during the test, and the electrical wiring and connections shall be tested for earthing insulation resistance and general soundness.\n(c) In the case of traction drive lifts, it shall be ascertained by a trial descent with 1½ times the full load whether the friction between the ropes and the sheave is sufficient.\n(d) The runway test shall be made with all electrical apparatus operative, except for the overspeed contact or cut-out on the governor. For lifts operating directly from alternating current the governor shall be tripped by hand at the maximum speed obtainable.\n(e) At each subsequent inspection the safety gear shall be tested with the lift-car stationary and the lift-car shall be lowered to ensure that the safety gear functions correctly.\n(f) The insulation of the electrical parts of all operating and similar devices shall be tested to withstand an alternating test-voltage equal to 10 times the working voltage for one minute, with a maximum of 2,000 volts, applied between contacts or similar parts, in the open position and between such contracts and earthed parts.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 36
    },
    "prev_section": "28",
    "next_section": "30"
}