{
    "act_title": "The Assam Factories Rules, 1950",
    "act_slug": "the-assam-factories-rules-1950-1950",
    "section_label": "Section",
    "section": {
        "number": "83",
        "title": "83. Exemption of certain adult male workers.",
        "chapter": null,
        "content": "Schedule\nSerial. No.\nSection of the Act empowering grant of exemption\nClass of factories\nNature of work exempted\nExtent of exemption\nConditions\n1\n2\n3\n4\n5\n6\n1\n64 (2)(a) and 64(3)\nAll factories\nUrgent repairs\nSecs. 51, 52, 53, 54, 55, 56 and 61\n(i) Total hours of work done by any\n\t\t\t\tworker including the hours of normal work, if any, shall not\n\t\t\t\texceed 15 on any one day, 39 during any three consecutive days or\n\t\t\t\t66 during each period of seven consecutive days commencing from\n\t\t\t\this first employment on such repairs.\n(ii) No worker shall be employed\n\t\t\t\tfor more than 14 consecutive days without a rest period of 24\n\t\t\t\tconsecutive hours, and as the work permits a rest period of one\n\t\t\t\thour shall be permitted to each worker during his daily working\n\t\t\t\thours.\n(iii) Within 24 hours of the commencement of the work, a\n\t\t\t\tnotice shall be sent to the Inspector describing the nature of\n\t\t\t\tthe urgent repairs, stating the names of the persons employed,\n\t\t\t\tthe exact time of commencement of work and the period probably\n\t\t\t\trequired for its completion. A copy of the above notice shall be\n\t\t\t\tdisplayed in accordance with Section 108 (2) of the Act before\n\t\t\t\tthe workers are engaged on urgent repairs.\n2\n64 (2)(b) and 64 (3)\nAll factories\n(1) Maintenance work in the\n\t\t\t\tmechanic shop, the smithy or the foundry or in connection with\n\t\t\t\tthe mill-gearing, the electric driving or lighting apparatus, the\n\t\t\t\tmechanical or electrical lifts or the steam or water pipe or\n\t\t\t\tpumps of a factory.\n(2) Work of examining or repairing\n\t\t\t\tany machinery or other part of the plan which is necessary to\n\t\t\t\tearn on the work in factory.\n(3) Work in boiler houses and engine rooms, such a lighting\n\t\t\t\tfires in order to raise steam or generate gas preparatory to the\n\t\t\t\tcommencement of regular work in the factory.\nSecs 51, 54 55, 56 and 61\n(i) These exemptions shall apply in\n\t\t\t\tcase of the limited number of maintenance staff approved in\n\t\t\t\twriting by the Chief inspector of Factories. The occupier or\n\t\t\t\tmanager of the factories before; availing of these exemptions\n\t\t\t\tshall apply to the Chief Inspector for necessary approval of\n\t\t\t\tstaff.\n(ii) No worker shall be employed\n\t\t\t\tfor more than 10 hours in any one day, and spread over hours\n\t\t\t\tshall be limited to 12 in any day.\n(iii) Total number of hours of overtime work done by any\n\t\t\t\tworker shall not exceed 50 in any one quarter.\n3\n64 (2)(c) and 64(3)\nAll factories\nWork performed by drivers on lighting, ventilating and\n\t\t\t\thumidifying apparatus, work performed by live pumpmen, work of\n\t\t\t\tloading, unloading or transporting raw materials in factories\n\t\t\t\twhere such work is intermittent and mainly outside the factory\n\t\t\t\tpremises\nSecs. 51, 54, 58, 61\n(i) The exemption shall apply to a\n\t\t\t\tlimited number of adult male workers to be approved by the Chief\n\t\t\t\tInspector of Factories. A list of such workers shall be submitted\n\t\t\t\tto the Chief Inspector of Factories for approval prior to the\n\t\t\t\texemptions being availed.\n(ii) No worker shall be employed\n\t\t\t\tfor more than 10 hours in any one day.\n(iii) Total number of hours of\n\t\t\t\tovertime work done by any worker shall not exceed 50 in any one\n\t\t\t\tquarter.\n(iv) Spread over hours shall not exceed 12.\n4\n64(2)(d) and 64(3)\nOil tank installations\nWork in connection with pumping operation\nSecs. 51, 52, 54, 55, 56 and 61\n(i) The worker shall ordinarily be\n\t\t\t\temployed on daily eight hours shifts.\n(ii) No such worker shall be employed for more than 14\n\t\t\t\tconsecutive days without a rest period of 24 consecutive hours.\nOil Refineries\nAll continuous process work in refining crude petroleum\nDo\n(iii) No worker shall be employed for more than 10 hours in\n\t\t\t\tany one day except to enable a shift worker to work a part or the\n\t\t\t\twhole of a subsequent shift in the absence of a worker who has\n\t\t\t\tfailed to report for duty in time for a part of the whole shift,\n\t\t\t\tin which case the daily maximum hours of work shall be limited to\n\t\t\t\t16.\nIron and Steel factory\nAll work on steel furnace\nDo\n(iv) Total number of hours of over time work done by any\n\t\t\t\tworker shall not exceed 50 in any one quarter.\nCalcining work\nContinuous process of Calcination of Coke\nDo.\n(v) The system of shift used in the\n\t\t\t\tfactory shall have the approval of the Chief Inspector.\n(vi) Spread over hours shall not exceed 12 except to enable a\n\t\t\t\tshift worker to work a part or the whole of a. subsequent shift\n\t\t\t\tin the absence of a worker who has failed to report for duty inn\n\t\t\t\ttime or for the whole shift.\nHydroelectric Public supply factory\nOperation and maintenance of prime movers and auxiliaries,\n\t\t\t\ttransformers and switches\nSections 51, 52, 54, and 61\n(i) No worker shall be employed for more than 14 consecutive\n\t\t\t\tdays without a rest period of 24 consecutive hours.\nPublic Electric Supply companies generating\n\t\t\t\telectricity with thermal power\nWorkers attending to boilers, turbine, engine, generators,\n\t\t\t\tmotors, switch boards, pumps, batteries and auxiliaries.\nDo.\n(ii) No worker shall be employed\n\t\t\t\tfor more than 10 hours in any one day except to facilitate a\n\t\t\t\tchange of shift.\n(iii) Total overtime hours of work shall not exceed 50 in any\n\t\t\t\tquarter.\nElectrical Transforming Factories\nOperation and maintenance of transforming plant, switches and\n\t\t\t\tsynchronous condensers\nDo.\nDo.\nWater works and water pumping station\nThe work of attending to boilers, prime movers, pumps and\n\t\t\t\tauxiliaries.\nDo.\nDo.\nDistilleries\nAttendance of boilers, Prime movers and pumps, extraication of\n\t\t\t\tsugar from various bases, fermentation of sugar juice and wash\n\t\t\t\tdistillation processes.\nDo.\nDo.\nChemical factories.\nWork on sulphur burners, chambers, concentrators and pumps,\n\t\t\t\troasting furnace, manufacture of hydrochloric acid, nitric acid,\n\t\t\t\tsulphuric acid, sulphates, sulphides, nitrates, chlorides,\n\t\t\t\tsuperphosphates work on steam service.\nDo.\n(i) No worker shall be employed for\n\t\t\t\tmore than 14 consecutive days without a rest period of 24\n\t\t\t\tconsecutive hours.\n(ii) No worker shall be employed\n\t\t\t\tfor more than 10 hours in any one day except enable a shift\n\t\t\t\tworker to a part of the whole of a subsequent shift in the\n\t\t\t\tabsence of worker who has failed to report for duty in time or\n\t\t\t\tfor the whole shift.\n(iii) Total overtime hours of work shall not exceed 50 in any\n\t\t\t\tquarter.\nVegetable oil Hydrogeneration factories\nWork of refining, bleaching, filtering, generation of\n\t\t\t\thydrogen. Hydrogeneration and deodorising processes, compressing\n\t\t\t\tof oxygen,charging of cylinders, work on power equipment.\nDo.\n(i) No worker shall be employed;\n\t\t\t\tfor more than 14 consecutive days without a rest period of 24\n\t\t\t\tconsecutive hours.\n(ii) No worker shall be employed\n\t\t\t\tfor more than 10 hours in any one day except to enable a shift\n\t\t\t\tworker to work a part or the whole of subsequent shift in the\n\t\t\t\tabsence of a worker who has failed to report for duty in time or\n\t\t\t\tfor the whole shift.\n(iii) Total overtime hours of work shall not exceed 50 in any\n\t\t\t\tone quarter.\nIce factories\nWork of engine and compressor drivers, assistants and oilers,\n\t\t\t\twork on ice making machinery.\nDo.\nDo.\nGlass factories\nWork in attending to furnace. All process work from mixing of\n\t\t\t\tbatch to removal of manufactured glass ware from the lears.\nSections 52 and 55. Section 52\nNo worker shall be employed for more than 14 consecutive days\n\t\t\t\twithout a rest period of 24 consecutive hours.\nPaper factories\nAll work on paper making machinery and on the generation and\n\t\t\t\tsupply of power connected therewith.\nSections 54 and 55\nNo worker shall be employed for more the 10 hours in any one\n\t\t\t\tday, and for more than 14 consecutive days without a rest period\n\t\t\t\tof 24 consecutive hours.\nPaper factories\nWork on choppers, digesters, kneaders, strainers and washers,\n\t\t\t\tbeaters, paper making machines, pumping plant, reelers, cutters\n\t\t\t\tand power plant.\nSections 52, 54 and 55\nDo.\nPlywood factories\nThe continuous process work of cutting, gumming, pressing and\n\t\t\t\tdrying of plywood.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 86
    },
    "prev_section": "82",
    "next_section": "55"
}