{
    "id": 10871,
    "slug": "telecommunication-interconnection-regulations-2018",
    "title": "Telecommunication Interconnection Regulations, 2018",
    "short_title": "Telecommunication Interconnection Regulations, 2018",
    "act_number": "(Act No. 1 of 2018)",
    "act_year": 2018,
    "act_type": "CENTRAL",
    "location": "India (Central)",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Telecommunication Interconnection Regulations, 2018",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title, extent and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(1) \"Act\" means the Telecom Regulatory Authority of India Act, 1997 (24 of 1997);\n(2) \"Authority\" means the Telecom Regulatory Authority of India established under sub-section (1) of section 3 of the Act;\n(3) \"busy hour\" means the continuous one-hour period lying wholly in a given time interval for which the traffic is highest;\n(4) \"interconnection\" means the commercial and technical arrangements under which service providers connect their equipment, network and services to enable their customers to have access to the customers, services and networks of other service providers;\n(5) \"interconnection charge\" means the charges payable by one service provider to another service provider for interconnection;\n(6) \"interconnection usage charges\" or \"IUC\" means the charge payable by one service provider to one or more service providers for usage of the network elements for origination, transit or termination of the calls;\n(7) \"licence\" means a licence granted or having effect as if granted under Section 4 of the Indian Telegraph Act, 1885, (13 of 1885) and Indian Wireless Telegraphy Act, 1933 (17 of 1933);\n(8) \"point of interconnection\" or \"POI\" means a mutually agreed point of demarcation (based on TRAI determination/regulations/License Agreement) where the exchange of traffic between the two parties takes place;\n(9) \"port\" means a place of termination on a switch/distribution frame to provide ingress and egress of traffic between two interconnecting networks;\n(10) \"regulations\" means the Telecommunication Interconnection Regulations, 2018 (1 of 2018);\n(11) \"Schedule \" means the Schedule appended to these regulations;\n(12) all other words and expressions used in these regulations but not defined, and defined in the Act and the rules and other regulations made thereunder, shall have the meanings respectively assigned to them in the Act or the rules or other regulations, as the case may be.\nChapter II\nInterconnection Agreement",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Interconnection agreement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Procedure for entering into interconnection agreement.",
            "chapter": null,
            "content": "(a) a copy of its license agreement;\n(b) name of the services for which interconnection is sought;\n(c) proposed locations of its points of interconnection; and\n(d) name of technology to be used for interconnection at each POI.\nChapter III\nBank Guarantee",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Bank guarantees.",
            "chapter": null,
            "content": "(a) the interconnection usage charges payable by the two interconnecting service providers to each other for the two months prior to the end of six months from the date of establishment of initial interconnection or the 1st February, 2018, whichever is later, shall be calculated and the service provider who is liable to pay interconnection usage charges, after adjustment, to the other service provider, shall be liable to furnish bank guarantee for a period of six months, if demanded by the other service provider;\n(b) the bank guarantee shall be limited to the amount of interconnection usage charges payable by a service provider after adjustment under clause (a); and\n(c) this process to determine the liability of a service provider to furnish the bank guarantee shall be repeated at the end of every six month.\nChapter IV\nProvisioning and Augmentation of Ports at POIs",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Seeking ports at POIs.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Request for initial provisioning of ports.",
            "chapter": null,
            "content": "[8. Request for augmentation of POIs.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "9",
            "title": "9. Framework for provisioning of ports.",
            "chapter": null,
            "content": "(a) within [ten working days] from the date of issue of its letter of acceptance, in case no demand note was issued; and\n(b) within [ten working days] from the date of receipt of payment from the requesting service provider against the demand note, in case a demand note was issued.\nChapter V\nInterconnection Charges",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "10",
            "title": "10. Interconnection charges.",
            "chapter": null,
            "content": "Chapter VI\nDisconnection of POIs",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "11",
            "title": "11. Procedure for disconnection of POIs.",
            "chapter": null,
            "content": "(a) give a show-cause-notice of fifteen working days to the other service provider with reasons for the proposed disconnection;\n(b) if not satisfied with the reply of the show-cause-notice issued under clause (a) or no reply is received to the show-cause-notice, give a notice of fifteen working days to such service provider specifying the date of disconnection of POI; and\n(c) not disconnect POI before the expiry of the period of notice given under clause (b):\nChapter VII\nFinancial Disincentive on Interconnection Matters",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "12",
            "title": "12. Consequences for contravention of the provisions of these regulations.",
            "chapter": null,
            "content": "Chapter VIII\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "13",
            "title": "13. Power of the Authority to issue direction.",
            "chapter": null,
            "content": "Schedule-I\nBank guarantee per E1 link at a POI\n( See regulation 5.)\nS. No.\nS. No.\nItem\nItem\nValue (in Rs.)\nValue (in Rs.)\n1\nCeiling on bank guarantee per E1 link at POI\n\t\t\t\t(in Rs.)\n8,00,000 multiplied by the\n\t\t\t\tinterconnection usage charge per minute applicable for the\n\t\t\t\ttraffic carried on E1 link\nNote: The Explanatory Memorandum explains the objects and reasons of the Telecommunication Interconnection Regulations, 2018 (1 of 2018).\nExplanatory Memorandum to\nExplanatory Memorandum to\n\"The Telecommunication Interconnection Regulations, 2018 \"\n\"The Telecommunication Interconnection Regulations, 2018\nA. Introduction\n1 http://www.citi.columbia.edu/elinoam/articles/interconnection_pricing.htm\nB. The Need for Regulation of Interconnection\n\" 2.2 Interconnection to be ensured : Interconnection with a major supplier will be ensured at any technically feasible point in the network. Such interconnection is provided:\n2.2 Interconnection to be ensured\n(a) under non-discriminatory terms, conditions (including technical standards and specifications) and rates and of a quality no less favourable than that provided for its own like services or for like services of non-affiliated service suppliers or for its subsidiaries or other affiliates;\n(b) in a timely fashion, on terms, conditions (including technical standards and specifications) and cost oriented rates that are transparent, reasonable, having regard to economic feasibility, and sufficiently unbundled so that the supplier need not pay for network components or facilities that it does not require for the service to be provided; and\n(c) upon request, at points in addition to the network termination points offered to the majority of users, subject to charges that reflect the cost of construction of necessary additional facilities.\"\n\"...each incumbent local exchange carrier has the following duties:.............\n(2) INTERCONNECTION- The duty to provide, for the facilities and equipment of any requesting telecommunications carrier, interconnection with the local exchange carrier's network-\n(A) for the transmission and routing of telephone exchange service and exchange access;\n(B) at any technically feasible point within the carrier's network;\n(C) that is at least equal in quality to that provided by the local exchange carrier to itself or to any subsidiary, affiliate, or any other party to which the carrier provides interconnection; and\n(D) on rates, terms, and conditions that are just, reasonable, and nondiscriminatory, in accordance with the terms and conditions of the agreement and the requirements of this section and section 252.\"\nC. The Present Regulatory Framework for Interconnection in India\n\" In exercise of the power vested in it under Section 14(b) of the Act, TDSAT does not have the jurisdiction to entertain the challenge to the regulations framed by the Authority under Section 36 of the Act. \"\n\"27.3 Interconnection between the networks of different Licensees for carrying circuit switched traffic shall be as per national standards of CCS No.7 as amended from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations/directions/orders issued by the TRAI/Licensor from time to time. For internetworking between circuit switched and IP based network, the Licensee shall install Media Gateway Switch. Further, the Licensor may direct the LICENSEE to adopt any other technical standards issued by TEC on interconnection related issues.\n27.4 Licensee shall interconnect with other Telecom Service Providers at the points of Interconnection (POI) subject to compliance of prevailing regulations, directions or determinations issued by TRAI. The charges for accessing other networks for internetwork  calls shall conform to the Orders/Regulations/Guidelines issued by the TRAI/Licensor from time to time. The Interconnection Agreements will, inter-alia , provide the following: (a) To meet all reasonable demand for the transmission and reception of messages between the interconnected systems. (b) To establish and maintain such one or more points of Interconnect as are reasonably required and are of sufficient capacity and in sufficient number to enable transmission and reception of the messages by means of the Applicable Systems, (c) To connect, and keep connected, to their Applicable Systems.\n27.5 The charges for accessing other networks for inter-network calls shall be based on mutual agreements between the service providers conforming to the Orders/IUC Regulations/Guidelines issued by the TRAI from time to time.\n27.6 The provision of any equipment and its installation for the purpose of Interconnection shall be subject to mutual agreement of the concerned parties and shall conform to TRAI's regulations and orders.\n27.7 The Interconnection Tests for each and every interface with any Telecom Service Provider shall be carried out by mutual arrangement between the Licensee and the other party involved. In case of disagreement for rectification of deficiencies/deviations in conducted interconnection tests, reference could be made to Licensor/TRAI.\"\nD. The Present Exercise to Review the Regulatory Framework for Interconnection in India\nQuestion (a): In view of regulatory, market and technological changes during the last few years in telecommunication sector, is any review of existing regulations on interconnection called for with a view to make interconnection agreements more effective, non-discriminatory, fair and transparent? If yes, which kind of changes are required in interconnection regulation framework?\nQuestion (b): Should TRAI notify/prescribe a standardized interconnection agreement (default option) in those situations, where the two service providers fail to negotiate mutually agreed terms and conditions of interconnection within a specified time frame?\nE. Analysis of the Key Issues Raised in the Consultation Paper\n(a) How to ensure fair, reasonable and non-discriminatory terms and conditions of interconnection agreement between TSP?\n(b) Should seeker/provider concept continue?\n(c) Whether it is appropriate to mandate only those TSPs who hold significant market power (SMP) to publish their Reference Interconnect Offers (RIOs)? If yes, what should be the criteria for reckoning a TSP as SMP?\n(d) What details should a new TSP furnish for entering into interconnection agreement?\n(e) What should be the time-frame for entering into an interconnection agreement? Should financial disincentive be imposed TSPs for not entering into interconnection agreement within stipulated time?\n(f) Is there a need for bank guarantee (BG) in the Interconnection Agreement? If yes, how to determine the amount of BG?\n(g) Should an interconnection agreement between TSPs continue to operate when one of them acquires a new license?\n(h) Whether existing interconnection agreements should also be allowed to be migrated to the new framework which will come out as a result of this consultation process?\n(i) Should Interconnection Agreements and POIs be service-specific or service-agnostic? If POIs are merged together (service-agnostic POIs), which methods of discovery, prevention and penalization of any traffic manipulation by TSPs should be put in place? (j) Under what circumstances, a TSP can disconnect POIs? What procedure should be followed before disconnection of POIs?\n(k) Is there a need to have a co-ordination committee to facilitate effective and expeditious interconnection between TSPs?\n(l) Whether there is any need to review the level of interconnection as mentioned in the Guidelines annexed to the RIO Regulations, 2002?\n(m) In case, interconnection for Inter-circle calls to fixed-line network continues to remain at SDCA, should alternate level of interconnection be specified in cases of technical non-feasibility (TNF) at SDCA level?\n(n) What should be the framework to ensure timely provisioning/augmentation of E1 ports?\n(o) Should separate time periods for provisioning of ports be prescribed for (a) fixed-line networks and (b) mobile/IP networks?\n(p) Should financial disincentive be imposed for (a) not providing initial POI and (b) not augmenting POI within stipulated time-frame?\n(q) Whether augmentation of ports be allowed at higher levels such as STM-1 in place of E1s?\n(r) How to ensure that inflated demand for ports is not made by a TSP?\n(s) In case interconnection seeker agrees to bear the total cost of equipment required for augmentation in advance, should a TSP give the requested ports irrespective for the traffic at POI?\n(t) What should be the method to settle IUC and how should the delayed payment between TSPs be handled?\n(u) Which policy and regulatory measures are required to be taken to encourage TSPs to migrate to interconnection at IP level?\n(v) Whether there is a need to establish a framework for Interconnect Exchange to eliminate bilateral interconnection issues?Is there any need for a separate framework for Interconnect Exchanges in view of the fact that the new NLDO authorization permits transit traffic to be carried over by NLDO?",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "1",
            "title": "1. How to ensure fair, reasonable and non-discriminatory terms and conditions of interconnection agreement between TSP?",
            "chapter": null,
            "content": "Question: Which amongst the following is the best option to ensure fair, reasonable and nondiscriminatory terms and conditions of interconnection agreement between telecom service providers (TSPs), in view of the technological, market, licensing, regulatory and legal developments in the telecommunication services sector in India since 2002?\n(i) To amend the Telecommunication Interconnection (Reference Interconnection Offer) Regulation, 2002 taking into consideration the technological, market, licensing, regulatory and legal changes since the year 2002;\n(ii) To prescribe a Standard Interconnection Agreement, which must be entered into between interconnecting TSPs, in case they are unable to mutually agree on terms and conditions of interconnection agreement between themselves in a specified time-frame;\n(iii) To prescribe only the broad guidelines based on fair, reasonable and nondiscriminatory principles and leave the details of the interconnection agreement to be mutually decided by the interconnecting TSPs in a time-bound manner; or\n(iv) Any other method .\ni. View - 1: The Authority should prescribe only the broad guidelines based on Fair, Reasonable and Non-discriminatory (FRAND) principles; the Authority should leave the commercial and technical details of the interconnection agreement for mutual negotiations between the interconnecting TSPs to allow flexibility and innovation.\nii. View - 2: The Authority should only amend the RIO Regulations of 2002 with a focus to ensure that the principle of reciprocity is followed by the interconnecting TSPs; and\niii. View - 3: Standard Interconnection Agreement (SIA) is the best option to ensure fair and reasonable terms and conditions of interconnection agreement between TSPs.\na. Which method is appropriate - ex-ante regulation or ex-post intervention on Interconnection matters?\nIn a multi-service provider (or competitive) environment, interconnection is regarded as a lifeline of a telecommunication services sector. Internationally, strategic anti-competitive behavior on interconnection matters has retarded onset of competition in many telecommunication markets around the world. According to ITU surveys4, interconnection   related issues are ranked by many countries as the single most important problem in the development of a competitive marketplace. It is widely believed that the incumbent TSPs have a tendency to delay interconnection by way of prescribing one sided terms and conditions in the interconnection agreement, charging a high price etc.; such behavior leads to protracted and costly negotiations between competing TSPs at the cost of efficient services to the consumers. Clearly, it is in the interest of consumers that effective and expeditious interconnections take place between TSPs. Most countries in the world have formulated exante regulatory guidelines for establishing proper environment to facilitate interconnection. The Authority observed that in recent past in the country, there have been several instances of - (a) refusal to enter into interconnection agreement; (b) refusal to make available adequate interconnection capacity; and (c) posturing for disconnection of interconnection facility on flimsy grounds, by some TSPs. Based on the foregoing facts and analysis, the Authority is of the opinion that the case for ex-post regulatory regime for interconnection in India remains weak. Accordingly, the Authority has decided to continue with the formal ex-ante regulatory regime for interconnection in India.\n4 Source: Telecommunication Regulation Handbook Module 3 Interconnection Infodev, accessible on https://www.itu.int/ITU-D/treg/Documentation/Infodev_handbook/3_Interconnection.pdf\nb. Whether the present regulatory framework for interconnection in India is suited for the present-day telecom market?\nThe present regulatory framework for interconnection hinges primarily on the three directives of the Authority viz. - (a) Determination dated 08.01.2001;(b) The Telecommunication Interconnection (Reference Interconnect Offer) Regulation, 2002 dated 12.07.2002; and(c) Authority's Direction dated 07.06.2005 to provide interconnection to the interconnection seeker within 90 days of the applicable payments made by the interconnection seeker.\nThe Telecommunication Interconnection (Reference Interconnect Offer) Regulation, 2002 mandates a TSP enjoying Significant Market Power (SMP) status to submit its proposed RIO (describing, inter-alia , the technical and commercial conditions for interconnection based on the model RIO as annexed to the Regulation) to the Authority for approval and then to publish the approved RIO on its web-site. Such RIO, thereafter, forms the basis of all interconnection agreements to be entered into by/and with the issuer of the RIO. The Authority took note of the fact that with the present level of fragmentation in the telecommunication services market, not many TSPs may be reckoned as SMPs and therefore, the matter of entering into interconnection agreement requires a review.\nThe Authority's Direction dated 07.06.2005 mandates interconnection provider to provide interconnection within 90 days of the applicable payments made by the interconnection seeker. Though the afore-mentioned Direction enabled provisioning of POIs to interconnection seekers to a certain extent, the followings facts indicate that the time-frame for provisioning of POIs requires a review:\n(i) The provisions of Direction dated 07.06.2005 come into effect only after the interconnection seeker has made the applicable payments to the interconnection provider, which is possible only after the interconnection provider issues demand note to the interconnection seeker; in absence of a specific time-frame mandated to the interconnection provider to issue demand note after receiving demand for provision of initial interconnection and augmentation of points of interconnection (POIs), it is possible to obey the `letter' of the Direction even without obeying its `spirit'.\n(ii) The 90 days' time period provided for fulfilling the demand of interconnection seeker has proved to be rather long keeping in view the fact that many new entrants have acquired a large number of subscribers in rather short periods of time, in turn, requiring a ramp-up of POI capacities at much shorter notice.\nClearly, the present day regulatory framework for interconnection in the country requires an overhaul to cater to the needs of the present-day telecom market. Accordingly, the Authority has decided to prescribe a broad regulatory framework to address the contentious issues between interconnecting service providers through these regulations.\nc. What should be the broad regulatory framework for interconnection?\nThe Authority examined the options available to it for devising a regulatory framework for interconnection with a view to ensure effective and expeditious interconnection amongst TSPs and has decided that henceforth `The Telecommunication Interconnection Regulations, 2018' (hereinafter referred to as the TIR,2018) comprising of regulations on important aspects of interconnection (e.g. interconnection agreement, bank guarantees, provisioning of initial interconnection and augmentation of POIs, disconnection of POIs, financial disincentive on interconnection matters etc.) shall apply over all the service providers offering telecommunication services in India. The provisions of the TIR, 2018 shall prevail over the existing interconnection arrangements between the TSPs in India. Through these regulations, the Authority has decided to, inter-alia , mandate the following with respect to interconnection agreement between service providers:\n(i) A service provider who intends to enter into an interconnection agreement with another service provider shall place request to such service provider.\n(ii) The service provider, to whom request has been made for entering into interconnection agreement, shall, within five working days of receipt of the request, send draft interconnection agreement to the service provider from whom the request was received.\n(iii) On receipt of the draft interconnection agreement, the service provider who made the request for entering into interconnection agreement shall, within five working days, submit its suggestions and objections, if any, on such draft to the other service provider.\n(iv) The service provider to whom request has been made for entering into interconnection agreement shall, within thirty days of receipt of request, enter into interconnection agreement, on non-discriminatory basis, with the requesting service provider.\nWith regard to the interconnection charges such as set-up charges and infrastructure charges, the Authority has decided that the interconnection charges may be mutually negotiated between service providers subject to the regulations or directions issued by the Authority from time to time, provided that such charges are reasonable, transparent and non-discriminatory.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "2",
            "title": "2. Should the concept of interconnection seeker/interconnection provider continue?",
            "chapter": null,
            "content": "\"Interconnection Provider\" means the service provider to whose network an interconnection is sought for providing telecommunication services.\n\"Interconnection Seeker\" means the service provider who seeks interconnection to the network of the interconnection provider.\n(a) Set-up Charges (Payable towards configuration, testing and commissioning of new POI);\n(b) Port Charges (In accordance with the Telecommunication Interconnection (Port Charges) Regulation, 2001 as amended from time to time); and\n(c) Infrastructure Charges(Charges for infrastructure provided by the interconnection provider i.e. collocation charges etc.)\n\"12.3.1 The cost of up-gradation/modifying interconnecting networks to meet the service requirements of the service shall be met by the Party seeking interconnection. However, mutually negotiated sharing arrangements for cost of upgrading/modifying interconnecting networks between the service providers shall be permitted .\n12.3.2 Two years after the initial interconnection is established, the issue as to who bears the cost of additional resources required shall be negotiated between the service providers. The general principle followed in these negotiations is that each party should bear the incremental costs incurred for the additional ports required for meeting the QoS standards relating to its outgoing traffic to the other Party. \"\nClause 17.11 of Basic Services, Clause 17.9 of NLD license and Clause 17.10 of ILD license: \"The network resources including the cost of upgrading/modifying interconnecting networks to meet the service requirements of service will be provided by service provider seeking interconnection. However mutually negotiated sharing arrangements for cost of upgrading/modifying interconnecting networks between the service providers shall be permitted\" .\nClause 28.4 of CMTS license, Clause 27.3 of UASL and Clause 28.2 of UL: \"The network resources including the cost of upgrading/modifying interconnecting networks to meet the service requirements of the licensee will be mutually negotiated keeping in view of the orders and regulations issued by the TRAI from time to time.\"\nQuestion: Whether there is a need to continue with the present concept of interconnection seeker/interconnection provider? If yes, what should be the criteria?\n(a) The interconnection provider has to create capacities in its own network for the interconnection seeker in the initial phase of interconnection. The creation of these capacities has cost implications for the interconnection provider. Therefore, it should be borne by the seeker for a (mutually agreed) pre-defined period.\n(b) The interconnection seeker may use a different technology from that used by the provider. Hence, the provider may have to modify its network to facilitate interconnection to the seeker. The concept of interconnection seeker/provider helps in shifting the responsibility to the interconnection seeker for bearing the cost of such technology changes.\n(c) The Interconnection seeker/provider concept is prevalent worldwide.\n(a) View-1: Concept to apply forever: A few stakeholders including public sector service providers have argued that there can be only one criterion for defining interconnection seeker/ provider viz.- the existing TSP is interconnection provider and a new TSP is interconnection seeker and shall remain seeker for ever irrespective of the market share; all other definitions are prejudiced and mischievous and chaotic. A public sector service provider has contended that the status of PSUs as `interconnection provider' should be perpetual as they are incumbent service providers.\n(b) View-2: Concept to apply for initial two years in case of new entrants: Many stakeholders have opined that the status of interconnection seeker/provider should be applied only when a new entrant launches the service for the first time in a particular licensed service area (LSA), for the initial period of two years from the date of launch of commercial services. After two years, each party should bear the cost of its outgoing traffic including the capacity built in first two years; this includes the cost of interlinking media.\n(c) View-3 : Concept to apply differently for difference service segments: A few stakeholders have suggested the following method to implement seeker/provider concept:\n(i) For interconnection between two access service providers, the late entrant should be considered as the interconnection seeker for the initial period of two years after which the cost should be borne by both parties based on their respective outgoing traffic.\n(ii) For interconnection between access service provider and NLDO/ILDO, the NLDO/ILDO should be considered as interconnection seeker in perpetuity.\n(iii) In case the license of an access service provider is renewed upon expiry of 20 years, it should no longer be regarded as interconnection seeker in the fresh interconnection agreement.\n(a) For a period of two years from the date of establishment of initial interconnection, the service provider, who made the request for entering into interconnection agreement, shall seek ports at POIs from the other service provider to meet the demand of incoming and outgoing traffic at the POIs.\n(b) At the end of two years from the date of establishment of initial interconnection or on the 1st February, 2018, whichever is later, the total ports existing at a POI shall be converted for carrying one way traffic in such a manner that the number of ports for sending the outgoing traffic of each service provider to the other service provider are in proportion to their outgoing traffics averaged over a period of preceding three months; and after the conversion of ports, each service provider shall seek ports to meet the requirement of its outgoing traffic.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "3",
            "title": "3. Which details should a new TSP furnish for entering into interconnection agreement?",
            "chapter": null,
            "content": "(a) letter issued by DoT intimating MSC SPC for every LSA;\n(b) letter issued by DoT intimating MSISDNs/TFN Levels/Fixed Number Series level allocation for provisioning subscribers;\n(c) company profile and market share;\n(d) TEC Interface approvals for all equipment to be connected for interconnection;\n(e) network architecture with low level and high level POP details;\n(f) projection of likely reasonable demand for Interconnect Location wise E1 capacity for six months post-commercial launch (locations should be given with detailed Address and latitude-longitude);\n(g) likely date of start of commercial operations;\n(h) services proposed to be offered and proposed connectivity (with justifications);\n(i) Interconnecting technology, for example, TDM/IP, SMPP, ISUP, SCCP, etc.;\n(j) details of transport media such as satellite, Microwave, PDH, SDH, DWDM, ATM, etc.;\n(k) KYC documents of the requesting service provider viz. Service Tax Certificate/PAN Card/GST Registration Certificate etc.\n(l) a copy of Memorandum of Association of the Company;\n(m) a copy of Article of Association,\n(n) the latest Annual report of the Company,\n(o) a list of Directors with DIN,\n(p) a certified true copy of Board resolution,\n(q) original Power of Attorney,\n(r) specimen signature,\n(s) copy of Incorporation Certificate with CIN\n(a) To ascertain as to whether the requesting service provider is licensed for the service for which it is seeking interconnection;\n(b) To know the location of POI and interconnection technology of the requesting service provider.\n(a) a copy of its license agreement;\n(b) name of the services for which interconnection is sought;\n(c) proposed locations of its POIs; and\n(d) name of technology to be used for interconnection at each POI.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "4",
            "title": "4. What should be the time-frame for entering into an interconnection agreement?",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "4",
            "title": "4. What should be the time-frame for entering into an interconnection agreement?",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "5",
            "title": "5. Is there a need for bank guarantee (BG) in Interconnection Agreement? If yes, how to determine the amount of BG?",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "5",
            "title": "5. Is there a need for bank guarantee (BG) in Interconnection Agreement? If yes, how to determine the amount of BG?",
            "chapter": null,
            "content": "(a) An interconnecting TSP is using the POIs for terminating traffic only and is in net payable position at all times (for example in case of interconnection with standalone NLDO/ILDOs), and,\n(b) An interconnecting TSP defaults in payment by more than 10 days for three consecutive months in the year.\n(a) Bank guarantees are required to securitize the net receivable from the interconnecting TSP. Even the licensor follows this practice to securitize its net receivable on account of License Fees and Spectrum Usage Charges.\n(b) Certain TSPs, while exiting their businesses, did not pay their dues of interconnection charges to the interconnecting TSPs. The provision of bank guarantees is required to guard against such eventualities.\nA bank guarantee is a guarantee from a lending institution ensuring the liabilities of a debtor will be met. In other words, if the debtor fails to settle a debt, the bank covers it.\nSource: http://www.investopedia.com/terms/b/bankguarantee.asp\na. The service provider, who made request for entering into interconnection agreement, shall be liable to furnish bank guarantee, for a period of six months from the date of establishment of initial interconnection for the total number of ports sought during such period, if demanded by the service provider to whom request for entering into interconnection agreement was made: Provided that the amount of such bank guarantee shall be determined in the manner specified in the Schedule-I to these regulations.\nb. At the end of six months from the date of establishment of initial interconnection or on the 1st February, 2018, whichever is later, liability to furnish bank guarantee shall be determined in the following manner:\n(i) the interconnection usage charges payable by the two interconnecting service providers to each other for the two months prior to the end of six months from the date of establishment of initial interconnection or the 1st February, 2018, whichever is later, shall be calculated and the service provider who is liable to pay interconnection usage charges, after adjustment, to the other service provider, shall be liable to furnish bank guarantee for a period of six months, if demanded by the other service provider;\n(ii) the bank guarantee shall be limited to the amount of interconnection usage charges payable by a service provider after adjustment as discussed in the above clause; and\n(iii) this process to determine the liability of a service provider to furnish the bank guarantee shall be repeated at the end of every six month.\nS. No.\nS. No.\nItem\nItem\nLegend\nLegend\nValue\nValue\n1\nNo. of channels in an E1 circuit\na\n30\n2\nAverage utilization of a channel for carrying\n\t\t\t\tpayload\nb\n70%\n3\nMaximum no. of equivalent channels utilized per\n\t\t\t\tE1 circuit\nc=a*b\n21\n4\nMaximum minutes of usage (MOU) in busy hour per\n\t\t\t\tE1 circuit\nd=c*60\n1,260\n5\nMaximum MOU in a day per E1 circuit (assuming\n\t\t\t\tbusy hour traffic as 9% of the daily traffic)\ne=d/(9%)\n14,000\n6\nMaximum MOU in one month per E1\nf=e*30\n4,20,000\n7\nMaximum MOU in two months per E1\nG=f*2\n8,40,000\nCeiling on bank guarantee per E1 link at a\n\t\t\t\tPOI (in Rs.) = 8,00,000 multiplied by interconnection\n\t\t\t\tusage charge per minute applicable for the traffic carried on the\n\t\t\t\tE1 link\nCeiling on bank guarantee per E1 link at a\n\t\t\t\tPOI (in Rs.) = 8,00,000 multiplied by interconnection\n\t\t\t\tusage charge per minute applicable for the traffic carried on the\n\t\t\t\tE1 link\nCeiling on bank guarantee per E1 link at a\n\t\t\t\tPOI (in Rs.) = 8,00,000 * Rs. 0.06 = Rs. 48,000\n(a) If IUC payable by the service provider-1 to the service provider-2 for the period of the preceding two months is Rs. 50 Lakh and IUC payable by the service provider-2 to the service provider-1 for the period of the preceding two months is Rs. 35 Lakh;\n(b) then the service provider-1 is liable to pay a maximum of bank guarantee of Rs. 15 lakh for a period of six months if the service provider-2 demands for it.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "6",
            "title": "6. Should an interconnection agreement between TSPs continue to operate when one of them acquires a new license?",
            "chapter": null,
            "content": "Question: Should an interconnection agreement between TSPs continue to operate if an interconnecting TSP acquires a new license upon expiry of an old license? Alternatively, should fresh agreements be entered into upon specific request of either party to the interconnection?\n(a) As long as there is continuity in the inter-connectivity, terms and conditions of the existing interconnection agreement between TSPs should continue to operate.\n(b) The expiry of existing license and issuance of new license is a commercial aspect as no disconnection in the interconnection is ever effectuated and no fresh demands for  interconnection are made. Also equipment are normally not replaced or for that matter even the existing system are not altered in any manner whatsoever. So, merely some technical alterations in the license/change of license cannot be a sustainable ground in defying the existing agreement between the parties since it was signed on mutually agreed terms.\n(c) The existing interconnection agreements do not contain a clause regarding termination/renewal of the agreement as a consequence of renewal of license.\n(a) 20 years is a long period of time and many changes relating to technological, market, licensing, regulatory and legal developments may have happened which require changes in the agreement. Hence, fresh agreements should be entered into as and when the existing agreements expire on the expiry of license. However, status of interconnection seeker/ provider should not apply to such fresh interconnection agreements.\n(b) Interconnection agreement between TSPs is legally based on the valid licenses held by the interconnecting TSPs. In case of expiry of the license of either of the interconnecting TSPs, the existing interconnection agreement would not remain legally valid unless both the interconnecting TSPs agree for the same and record the same in form of addenda to the existing interconnection agreement. Else a fresh interconnection agreement needs to be entered into by the interconnecting TSPs.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "7",
            "title": "7. Should existing interconnection agreements be allowed to be migrated to the new framework which will come out as a result of this consultation process?",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "8",
            "title": "8. Should Interconnection Agreements and POIs be service-specific or service-agnostic? In case, POIs are merged together, what methods of discovery, prevention and penalization of any traffic manipulation by TSPs should be put in place?",
            "chapter": null,
            "content": "Question: Whether interconnection and interconnection agreement should be service-specific or service-agnostic (i.e. a TSP can send any type of traffic on a point of interconnection which is allowed under the terms and conditions of the license given to it)? What are the advantages/disadvantages of having service specific POIs when the TSPs are equipped with call data record (CDR) based billing systems?\nQuestion: If POIs are merged together, what methods of discovery, prevention and penalization of any traffic manipulation by TSPs (whereby higher IUC traffic is recorded as lower IUC traffic in the CDR of the originating TSP) should be put in place?\n(a) With respect to service-specific interconnection agreement: While the License may permit offering a wide range of services, interconnection agreement should be service-specific because interconnection for different services involves different technical and commercial aspects. The interconnection agreement includes the charges incurred on the set-up of an interconnecting network such as port charges, set-up charges etc. These charges vary as per the applicable set-up/interconnection scenario and, hence, there can be no standard interconnection agreement that covers all scenarios. The charges are required to be agreed upon, on a case-by-case basis.\n(b) With respect to the service-specific interconnection (points of interconnection/trunk groups): The type of traffic, an interconnecting TSP hands over to the other interconnecting TSP at the POI, depends upon the terms of the interconnection agreement. ATSP may have a POI at a designated location for various services with other TSP; however, the Trunk Groups (TGs) are to be kept separate for different services to ensure that only the traffic from services meant for a particular TG is handed over. While TSPs are equipped with a CDR-based billing system, a unified POI with no demarcation would induce the TSPs to tamper with the CLIs, leading to a loss to the terminating TSP. In such a situation, the TSP will have no means to check and block such traffic. The routing, numbering, IUC charges etc. are also all service specific and any attempt to have service agnostic interconnection would result in misuse and arbitrage. The CDR at terminating exchange/network does not have the provision to identify the location of calling subscriber, leading to billing disputes between TSPs.\n(a) With respect to service-agnostic interconnection agreement: At present the prevailing regime for licensing is Unified Licensing and, therefore, multiple interconnection agreements should not be insisted upon. There should be only one interconnection agreement for all the services allowed under the terms and conditions of the License signed by the TSP with specific provision for each type of License authorizations, such as NLD, ILD etc.\n(b) With respect to service-agnostic interconnection: Service-specific POIs lead to inefficient utilisation of resources as there will be a level of unused capacity in multiple POIs.The requirement for service-specific POIs originates from the requirement to distinguish between the type of calls terminating on a TSPs network as different type of calls have different IUC charges. However, with enhanced CDRs the same objective can be achieved without the requirement of having service-specific POIs. Each TSP must maintain CDRs which record the originating and terminating numbers, the originating and terminating type of call i.e. wireline, wireless, Fixed Wireless Access (FWA), internet telephony. Once these CDRs are exchanged at the end of the month, the IUC payable would be easily determined and there would be no requirement to resort to service specific POIs and the POIs can be made service agnostic. This would increase the efficiency of the network and also achieve the purpose of being able to determine the correct type of call for the purpose of determining the final IUC bill.\n(a) Interconnection agreements are entered into by the TSPs who have been granted any of the following licenses in the country:\n(i) License for access service (viz. BSO/CMTS/UASL);\n(ii) License for NLD services;\n(iii) License for ILD services;\n(iv) Unified License having authorization for at least one of the access/NLD/ILD services.\n(b) At present, termination charges for - domestic calls from wireline networks; domestic calls from wireless networks; and international calls; - are different.\n(c) In the past, there have been allegations on some TSPs of passing off higher-IUC calls as lower-IUC calls by way of tampering CLI of calling party.\n(d) CDR based billing systems cannot detect as to whether CLI of calling party has been tampered with.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "9",
            "title": "9. Is there a need to have a coordination committee to facilitate effective and expeditious interconnection between TSPs?",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "10",
            "title": "10. Under what circumstances, can a TSP disconnect POIs?",
            "chapter": null,
            "content": "(a) When a TSP bypasses traffic i.e. the TSP hands over traffic, which is meant to be handed over at a designated POI, at other POIs meant for other services, primarily to pay lower termination/carriage charges;\n(b) When a TSP transits traffic through a third party i.e. the TSP hands over its traffic to the interconnecting TSP via some other TSP without its consent;\n(c) When a TSP hands over calls without CLI/Incorrect CLI/tampered CLI in order to pass off higher-IUC calls as lower-IUC calls;\n(d) When a TSP provides a service not defined in its license;\n(e) When a TSP does not make payment of IUC as per the agreed terms of interconnection;\n(f) When a TSP uses services against national security or in contravention of laws, terms of License or regulations;\n(g) When a TSP's network adversely affects the normal operation of the interconnecting TSP's network;\n(h) When a TSP commits a breach of confidentiality provisions of interconnection agreement;\n(i) When a TSP has been adjudged bankrupt or insolvent;\n(j) The defaulting party has ceased to hold license under Sec-4 of the Indian Telegraph Act, 1885.\n1 The Licenses issued by the Government require inter-alia that interconnected networks will connect, and keep connected, to their Applicable Systems.\n2 The Authority, vide its Direction dated 31.12.2003, inter-alia , directed that a TSP who wish to disconnect the POIs should give a notice for disconnection of POI with a suitable time period (not less than 10 days). M/s BSNL appealed in TDSAT against the afore-mentioned Direction (Appeal No. 2 of 2004). TDSAT, vide its order dated 21.04.2004, set aside the TRAI's Direction except the period of notice (not less than 10 days) for disconnection of POI.\ninter-alia\n3 The Authority has received numerous representations from several TSPs in the past, contending that some TSPs, unilaterally, disconnect POIs in certain circumstances based on their own interpretation of terms and conditions for non-payment of dues etc. Such disconnection of POIs results in blocking of services to consumers.\n(i) give a show-cause-notice of fifteen working days to the other service provider with reasons for the proposed disconnection;\n(ii) if not satisfied with the reply of the show-cause-notice issued under above clause or no reply is received to the show-cause-notice, give a notice of fifteen working days to such service provide specifying the date of disconnection of POI; and\n(iii) not disconnect POI before the expiry of the period of notice given under the above clause (ii):",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "11",
            "title": "11. Whether there is any need to review the level of interconnection as mentioned in the Guidelines annexed to the RIO Regulations, 2002?",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "12",
            "title": "12. What should be the framework to ensure timely provisioning/augmentation of E1 ports?",
            "chapter": null,
            "content": "Question: What should be the framework to ensure timely provisioning/augmentation of E1 ports? Please provide full framework with timelines including the following aspects:\n(a) Minimum number of E1 ports for start of service;\n(b) Maximum time period for issuance of demand note by the interconnection provider;\n(c) Maximum time period for payment for demanded E1 ports by the interconnection seeker;\n(d) Intimation of provisioning of requested E1 ports by interconnection provider;\n(e) Space allocation for collocation of transmission equipment;\n(f) Maximum time period for establishment of transmission links by the interconnection seeker;\n(g) Maximum time period for acceptance testing;\n(h) Maximum time period for issuance of final commissioning letter by the interconnection provider; and\n(i) Maximum time period for start of traffic in the POI after provisioning/augmentation of E1 ports for which payment has already been made.\n(a) Demand should be reasonable: Demand for interconnection ports should be placed by the interconnection seeker along with justification of traffic because the provisioning of interconnection ports does not require augmentation of capacity at POIs only but also in the access network. As the interconnection seeker compensates the interconnection provider only for the cost of interconnection capacity accruing to its traffic, a substantial amount of investment made in the access network for handling the additional traffic will go waste if the actual requirement of the service provider turns out to be much lower than the demand projected by it.\n(b) The Interconnection provider requires to perform `due diligence' prior to agreeing for demand: Considering the fact that the interconnection provider has an existing network, which may require expansion and other changes to accommodate the demand of interconnection seeker, the interconnection provider needs to perform due diligence of the demand with the help of historical trends of traffic on POIs. This is important to ensure that an interconnection provider do not have to invest in creating needless capacities in its network.\n(c) Initial E1s for the pre-launch phase should be limited to 1-2 E1s for testing the inter connectivity between the networks.\n(d) The interconnection provider should intimate the location for POIs so that the interconnection seeker can make timely planning and arrangement.\n(e) Provision for space, power, and infrastructure: If the agreement provides for space, power and infrastructure to be provided to the interconnection seeker, the feasibility for space allocation, power, etc., needs to be checked by the interconnection provider within a specified time frame. In case it is found to be unfeasible, the interconnection seeker should be required to make alternate arrangements within a defined time frame.\n(a) A service provider, upon receipt of request of ports, and collocation space, if required, shall issue letter of acceptance and demand note, if any, within five working days of the receipt of the request.\n(b) A service provider, upon receipt of the demand note, shall pay the amount within three working days from the date of receipt of the demand note.\n(c) The service provider, who issued the letter of acceptance, shall intimate the requesting service provider about provisioning of the ports and allocation of the collocation space, if applicable,-\n(i) within five working days from the date of issue of its letter of acceptance, in case no demand note was issued; and\n(ii) within five working days from the date of receipt of payment from the requesting service provider against the demand note, in case a demand note was issued.\n(d) A service provider, upon receipt of the intimation about provisioning of the ports and allocation of the collocation space, if applicable, shall, within three working days of the receipt of the intimation, intimate the other service provider about establishment of the transmission link between the POIs of the two service providers.\n(e) A service provider, upon receipt of the intimation about establishment of the transmission link between the POIs, shall, within five working days of the receipt of the intimation, carry out acceptance testing and issue final letter of commissioning of the ports to the other service provider.\nMaximum period (in working days) for service\n\t\t\t\tprovider-2 to issue letter of acceptance and demand note, if any,\n\t\t\t\tupon receipt of request of ports and collocation space from\n\t\t\t\tservice provider-1\n5\nMaximum period (in working days) for service\n\t\t\t\tprovider-1 to pay the amount from the date of receipt of the\n\t\t\t\tdemand note\n3\nMaximum period (in working days) for service\n\t\t\t\tprovider-2 to intimate service provider-1 about the provisioning\n\t\t\t\tof the requested ports at the POI and allocation of collocation\n\t\t\t\tspace\n5\nMaximum period (in working days) for service\n\t\t\t\tprovider-1 to intimate service provider-2 about establishment of\n\t\t\t\ttransmission link between the POIs\n3\nMaximum period (in working days) for service\n\t\t\t\tprovider-2 to carry out acceptance testing and issue final letter\n\t\t\t\tof commissioning of the ports\n5",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "13",
            "title": "13. Should separate time periods for provisioning of ports be prescribed for (a) fixed-line networks and (b) mobile/IP networks?",
            "chapter": null,
            "content": "(a) Interconnection happens on the core network, whether it is fixed-line network or mobile/IP network and hence, there is no justification for separate time periods for the provision of ports based on technology.\n(b) The regulations should be technology agnostic.\n(c) Interconnection for fixed-line and mobile networks is no different. Especially now with the provision of being able to interconnect over IP networks, the cost and complexity involved in interconnections has substantially reduced.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "14",
            "title": "14. Whether augmentation of ports be allowed at higher levels such as STM-1 in place of E1s?",
            "chapter": null,
            "content": "(a) The augmentation of ports is already permitted at STM-1 level and therefore requires no regulatory prescription.\n(b) The augmentation at STM-1 or other levels should be mutually agreed upon by the Parties instead of being mandated.\n(c) Depending upon traffic requirement, augmentation may be allowed at STM-1 level also.\n(d) When the existing POI exceeds 63 E1s, further augmentation may be done on STM-1 Level subject to technical feasibility in both the TSPs' nodes.\n(e) The Telecommunication Interconnection (Port Charges) Regulation, 2001 prescribes port charges on the basis of E1 ports.\n(f) Augmentation of ports must be entirely based on capacity required on both sides.\n(g) The augmentation of ports may be allowed at higher levels such as STM-1 in place of E1. It leads to lower hardware costs and much better bit rates and capable of carrying both circuit switched and packet switched calls. For smaller requirements, the existing practice of E1 level ports should be allowed to be continued.\n(a) Most of the interconnect equipment (viz. Media Gateways, MSCs etc.) of the TSPs is equipped with STM-1 ports. The proportion of STM-1 ports vis-à-vis E1 ports on such equipment is growing in favour of STM-1 ports.\n(b) The STM-1 ports are not only economical but also require much less rack space. As a result, the same rack/shelf of equipment can accommodate much higher interconnection capacity if it contains STM-1 ports as against the scenario when it contains only E1-ports. Thus interconnection at STM-1 level may be a win-win proposition for both the interconnecting TSPs.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "15",
            "title": "15. How to ensure that inflated demand for ports is not made by a TSP?",
            "chapter": null,
            "content": "(a) View-1: Augmentation should be based on current capacity utilization of more than 70% during network busy hour (NBH) consistently for last one week. The quantum of augmentation should be reasonable increase which should bring utilization in between the range of 50 to 70%.\n(b) View-2: Some interconnection seekers tend to project inflated demands due to their ambitious traffic projections. Catering to such inflated demands would be a costly affair, and might also lead to the creation of superfluous capacities at the port, radio and switch level as well as other wasteful investments. Therefore, it should be the responsibility of the interconnection seeker to justify the demand from a technical and commercial standpoint for the ports and it should be up to the provider to agree to the calculations given by the interconnection seeker.\n(c) View-3: To ensure that inflated demand for ports is not made by the requesting TSP, the Port Charges should be abolished. In case even after three months, average busy hour utilization of initial POI is below 10% continuously for a month, the Port Charges, as prescribed by TRAI, should be applicable on the interconnection seeker for a period of six months. In case, even after expiry of six months' period from the last POI augmentation, the average busy hour utilisation of POI remains below 30% for a month, then the TSP may withdraw such augmented port capacity.\na. Request for initial provisioning of ports: After entering into an interconnection agreement, the service provider, who made request for entering into interconnection agreement, may request the other service provider to provide such number of ports at POIs which shall meet the requirement of its outgoing and incoming traffic at the POIs for a period of three months from the date of initial interconnection.\nb. Request for augmentation of POIs: A service provider may request the other service provider for additional ports at a POI, if the projected capacity utilization of the ports at such POI, at the end of thirty days from the date of placing the request, is likely to be more than 70% of the ports at the POI and such projected capacity utilization of the ports at the POI shall be determined on the basis of the daily traffic for the preceding thirty days at the POI during busy hour: Provided that the service provider shall request for such number of additional ports which is likely to bring the capacity utilization of the ports at the POI at the end of thirty days from the date of making request, to less than 60%.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "16",
            "title": "16. In case interconnection seeker agrees to bear the total cost of equipment required for augmentation in advance, should a TSP give the requested ports irrespective of the traffic at POI?",
            "chapter": null,
            "content": "(a) Interconnection has to be optimal and efficient and cannot be given carte blanche at the behest of one of the parties. It may be noted that the License states that \"...The Interconnection Agreements will, inter-alia , provide the following: (a) To meet all reasonable demand for the transmission and reception of messages between the interconnected systems.\" Hence reasonableness of the demand for interconnection is sine-qua-non of the license and the interconnection agreements. Interconnection agreements provide for measuring traffic on  agreed routes busy hours to assess future capacity requirements. Hence, there can be no case for the interconnecting TSP augmenting ports irrespective of volume of traffic at POI.\ninter-alia\n(b) The total cost of equipment includes both the capital expenditure and operating expenditure on network elements such as BTS, BSC, MSC, transmission links, interconnection ports, passive infrastructure such as tower, etc. The Interconnection seeker pays only the port charge, and that too, for a period of two years. If the traffic is less than the demanded capacity, the provider's cost of deploying the additional network will go to waste. Therefore, the provision of ports has to be justifiable and on the basis of reasonable traffic projections corroborated with actual traffic.\n(a) In case a new entrant or requesting TSP is providing projections in advance and agrees to bear the total cost of equipment required for augmentation in advance, the other TSP must provide the requested ports irrespective of the volume of traffic at POI. The potential under-utilisation of capacity, and therefore, the stuck capital could be the only apprehension for an interconnection provider to delay in providing ports (as otherwise in the case of appropriate utilisation, it is in the interest of the provider also to create this capacity). By paying for this capacity, the seeker is addressing this concern and, therefore, the provider must give the requested ports irrespective of the volume of traffic at POIs.\n(b) With sufficient time required for upgradation of equipment, there should be no constraint in provisioning (capacity wise) as interconnection provider is getting the cost from interconnection seeker in advance.\n(c) Depending upon the technical feasibility at the interconnection provider, if the interconnection seeker agrees to bear the total cost of equipment required for augmentation in advance, the interconnection provider should be able to give the requested ports irrespective of volume of traffic at POI. However, this has to be time staggered based on the backend capabilities of the provider and related operational matters. The demand from the seeker should be validated by the Traffic Engineering on the assumptions made for forecasting traffic and number of subscribers.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "17",
            "title": "17. Should financial disincentive be imposed for not providing initial POI and not augmenting POI within stipulated timeframe etc.?",
            "chapter": null,
            "content": "Question: Whether financial disincentive should be imposed on TSPs for-\n(a) not entering into interconnection agreement within a stipulated timeframe ;\n(b) not providing initial POI;\n(c) not augmenting POI within stipulated timeframe;\n(d) for violation of any clause prescribed in the regulations.\n(a) Entering into an agreement, the provision of the initial POI, the augmentation of POIs and adherence to the clauses prescribed in the regulations involves continuous efforts at the ground level by both the interconnecting TSPs, which makes it very difficult to ascertain the cause of delay in the actual agreement/augmentation scenario. It would, therefore, be frivolous, unfair and unjust to impose a penalty on the interconnection provider, in light of their provision of quality services to customers. The provider cannot be unilaterally held responsible as interconnection involves two networks. Any action for non-compliance should only be on the defaulting party, after proper investigation.\n(b) No financial disincentive should be imposed on TSPs as provision of interconnection depends on various parameters including technical feasibility/network up-gradation etc.\n(c) There is no need for prescribing any financial disincentive as the existing practice of TRAI resolving any inter-operator issue is working fine and hence should be continued. In case any party is not satisfied with the resolution provided by the TRAI, the parties also have the right to approach TDSAT or any other Higher Court for adjudicating such dispute. Further, TRAI can recommend to DoT for suitable action in line with the license conditions.\ninter-alia\n(a) Currently, the incumbent TSPs can block interconnection, provision of POIs and augmentation of POIs with impunity without a financial burden being placed on them. Therefore, there is an urgent need for TRAI to levy punitive financial disincentives of Rs. 5 lakh per day of violation on incumbent TSPs in the event they fail to (a) provide interconnection agreements in a time bound manner; (b) provide initial POIs to interconnection seekers within a prescribed time period; (c) augment POIs within the stipulated time frame; and (d) for violation of other terms of the regulations and their licenses. Only upon the inclusion of such punitive financial disincentives, incumbent TSPs will begin complying with the terms of their License and the Interconnect Regulations.\n(b) Delay and denial of interconnection by existing TSPs to the new entrant violates licence conditions, disturbs level playing field tenets, stifles competition and hurts innovation and the interest of consumers. Therefore, there is a need to prescribe heavy penalty as a deterrent, for not providing initial interconnection or for not timely augmenting the interconnection capacities.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "18",
            "title": "18. What should be the method to settle Interconnection Usage Charges and how should the delayed payment between TSPs be handled?",
            "chapter": null,
            "content": "(a) View - 1: Mutual interconnection agreements should govern the matter of IUC settlement.\n(b) View - 2: IUC settlement should be done on net basis.\n(c) View - 3: The current settlement method on gross basis should be continued. This is advisable not only for ease of documentation for claiming deductions of pass through charges but also considering the upcoming GST regulation, which requires CENVAT availability only after TSP issuing the invoice makes payment of GST to the Government and uploads required details of the same on the web-site of Government.\n(a) View - 1: Issue of delayed payments between TSPs should also be allowed to be handled on bilateral basis.\n(b) View - 2: Any undisputed amount not paid by the TSP within the stipulated time period, should be chargeable with penal interest.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "19",
            "title": "19. Which policy and regulatory measures are required to be taken to encourage TSPs to migrate to interconnection at IP level?",
            "chapter": null,
            "content": "(a) The Authority should prescribe guidelines for gradual and phase-wise migration to IP-to-IP interconnection.\n(b) At present, the cost of media gateway required for interconnection between IP based network and TDM network is borne by the TSP having new technology IP based network. To stifle competition, the mobile service providers, even after having IP based networks are not providing IP based interconnection. The actual purpose will be served only if the IP based interconnection is mandated and appropriate regulatory framework of IP based interconnection is in place.\n(a) It is premature to take up this issue because interconnection at IP level can effectively take place only when the networks of all TSPs have migrated from Circuit Switching to Packet Switching. A separate Consultation needs to be initiated on the issue of IP-interconnection.\n(b) The regulators, around the world, have moved towards technology neutrality. In India, technology neutrality is enshrined in the NTP-2012/NTP-99 and the existing UAS/CMTS/UL  Licenses. The mandatory deployment of a particular technology would be contrary to the principles enshrined in the NTP and license agreements.\n(c) The TSPs in India have committed huge investments in the existing TDM-based networks, based on the initial license mandate and these investments have been made for larger time horizons. A mandate for migration to IP interconnection would lead to the redundancy of the presently deployed networks, which have a residual life of 5 to 10 years. Hence, any regulation towards compulsory IP interconnection will result in the unnecessary writing off of the existing assets without any corresponding techno-economic benefit to the existing TSPs. A migration to IP interconnection will also result in a very huge cost burden for the TSPs as it will involve deployment of network elements such as media gateways, signaling gateways, soft switches, session border controllers and the supporting transport network, etc.\n(d) The prevailing technology ecosystem is changing very dynamically, making it difficult to predict the emergence of new advanced technologies. The investments made for building of IP networks may become redundant in the future in case of the emergence of new network technologies. Therefore, a preference for any technology will place restrictions on the flexibility of the TSPs to choose the most suitable technology and may result in sub-optimal usage of the infrastructure.\n\"27.3 Interconnection between the networks of different Licensees for carrying circuit switched traffic shall be as per national standards of CCS No. 7 and for carrying IP based traffic as per Telecom Engineering Center (TEC) standards as amended from time to time by Telecom Engineering Center (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations/directions/orders issued by the TRAI/Licensor from time to time. For internet working between circuit switched and IP based network, the Licensee shall install Media Gateway Switch. Further, the Licensor may direct the LICENSEE to adopt any other technical standards issued by TEC on interconnection related matters.\"\n(a) Most TSPs have IP-based core networks. However, the network elements at the POI continue to remain predominantly circuit switched, largely owing to legacy reasons. Even though the licenses now allow IP-based interconnection, not much progress has happened in this direction.\n(b) At present, both circuit switched as well as IP-based access networks are being put to use for providing voice telephony. In the recent past, many TSPs have made announcements for introduction of IP-based access networks in the near future.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "20",
            "title": "20. Whether there is a need to establish a framework for Interconnect Exchange to eliminate bilateral interconnection issues?",
            "chapter": null,
            "content": "(a) Since the interconnection regime in India has evolved on a bilateral basis, there is no immediate need to establish a framework of Interconnect Exchange at this late stage, as it would not serve any useful purpose.\n(b) Interconnect exchange will be additional cost burden on industry without any additional benefit. This is because majority of the TSPs have established bilateral POIs after making large investments and, hence, interconnect exchange will be an additional/unproductive cost burden. Direct peering, both for TDM as well as for IP technology, is the only economical option at the high volume presently being handled by the POIs. This is evident from the fact that TSPs have established peer-to-peer connectivity, instead of using any kind of transit/interconnecting points, not only for TDM connectivity but also for IP connectivity. Therefore, the option of exchanging traffic only through interconnection exchange should be ruled out at the very outset.\n(c) Presently, TSPs are connected via POIs in several cities and towns. POI locations are presently based on low-cost routing. Interconnect Exchange will prevent the use of shortest path leading to the increase in latency and congestion in the network. Introduction of the interconnect exchange will also entail redesigning the transmission network for the POI traffic, which involves additional costs and huge write-offs.\n(d) TRAI in its Direction on \"Direct connectivity between networks of Service Providers\" vide File No. 101-13/2003-MN dated 22.07.2003 has acknowledged that transiting the traffic entails avoidable costs and accordingly justified the need for direct connectivity.\n(e) The required Interconnect Exchange will be of very large capacity - equivalent to the combined size of the STP Networks deployed by all TSPs. By no means, Interconnect Exchange can be compared with MNP exchange as the size and scale of a MNP Exchange is merely 5 to 7% of subscribers opting of MNP every month.\n(f) The failure of the interconnect exchange would bring down the entire telecom network.\n(a) An interconnect exchange would help significantly in speeding up the process of Interconnection as a New TSP would not have to negotiate individual interconnection agreements with each TSP, who being their competitors, have no reason to cooperate.\n(b) Given the amount of delays experienced in obtaining interconnection agreements, the interconnect exchange will remove all bilateral interconnect issues and remove a significant entry barrier into the telecommunication industry and thereby opening up the telecommunication industry to newer players, which will enhance competition and benefit the end consumers. The Authority must provide a glide path to move towards an interconnect exchange over a period of time. A glide path is proposed since all TSPs have already established interconnection and borne the requisite costs and laid the infrastructure to establish interconnection. Therefore, mandating Interconnect Exchange would be an additional cost for the TSPs, which may be incurred with an appropriate glide path.\nF. Review\n[Schedule II]\nNote 1: The principal regulations were published vide F.No.10-10/2016-BB&PA dated 01.01.2018 (1 of 2018).\nNote 2: The Explanatory Memorandum explains the objects and reasons of the Telecommunication Interconnection (Amendment) Regulations, 2018 (4 of 2018).\nExplanatory Memorandum to \"The Telecommunication Interconnection (Amendment) Regulation, 2018 dated 05.07.2018\nExplanatory Memorandum to \"The Telecommunication Interconnection (Amendment) Regulation, 2018 dated 05.07.2018\n(a) After conversion of the ports from two way to one way as per the regulation, what will be the status of existing annual port charges being paid between the TSPs.\n(b) Since TRAI has already prescribed 0.5% POI congestion norm through QoS regulations, there may be no need to have an additional norm of bringing down the POIs capacity utilisation to less than 60%. According to them, currently the POIs are being utilized till as high as 85%-90% of their capacity while still complying with the QoS norm. However, the regulation has specified utilization of POIs to be as low as 60%-70% which is uncalled for as it will lead to inefficient use of network resources leading to unnecessary cost implications.\n(c) For provisioning of ports in time bound manner, they suggested that in line with the existing practice, the seeker should continue to make a forecast of required port capacity for the next 6 months to enable the other party to dimension its network accordingly.\n(d) According to service providers, the augmentation of POI capacity is a complex process requiring involvement of multiple domains such as core, transmission, and switching etc. and various technical, commercial, procurement and logistic issues pertaining to these domains and therefore, the time frame of 21 days specified in Regulation becomes a challenge.\nA. Analysis of the Key Issues raised in \"The draft Telecommunication Interconnection (Amendment) Regulations, 2018\" issued on 08.05.2018.\n(i) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-\n\"Provided that the port charges and infrastructure charges for all ports provided before the 1st February, 2018 shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018.\"\n(ii) For regulation 8 of the principal regulations, the following regulation shall be substituted:\nRequest for augmentation of POIs. - (1) Each service provider shall provide its forecast of busy hour outgoing traffic for each POI, at intervals of every six months, to the interconnecting service provider and the first such forecast shall be provided within sixty days of the commencement of \"The Telecom Interconnection (Amendment) Regulations, 2018\" and thereafter on the 1st April and 1st October every year.\nRequest for augmentation of POIs.\n(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:\nProvided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent.\"\n(iii) In regulation 9 of the principal regulations,\n(a) in sub-regulation (1), for the words \"five working days\", the words \"seven working days\" shall be substituted;\n(b) in sub-regulation (2), for the words \"three working days\", the words \"five working days\" shall be substituted;\n(c) in sub-regulation (3), for the words \"five working days\", wherever occurring, the words \"ten working days\" shall be substituted;\n(d) in sub-regulation (4), for the words \"three working days\", the words \"ten working days\" shall be substituted;\n(e) in sub-regulation (5), for the words \"five working days\", the words \"ten working days\" shall be substituted;\n(iv) After schedule I to the principal regulations, the following schedule shall be inserted, namely:-\n\"Schedule II\n(1) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-\n(1) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-\n\"Provided that the port charges and infrastructure charges for all ports provided before the 1st February, 2018 shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018.\"\n\"Provided that the port charges and infrastructure charges, for all ports provided before the 1st February, 2018, shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018.\"\n(1) For regulation 8 of the principal regulations, the following regulation shall be substituted:\n(1) For regulation 8 of the principal regulations, the following regulation shall be substituted:\nRequest for augmentation of POIs. - (1) Each service provider shall provide its forecast of busy hour outgoing traffic for each POI, at intervals of every six months, to the interconnecting service provider and the first such forecast shall be provided within sixty days of the commencement of \"The Telecom Interconnection (Amendment) Regulations, 2018\" and thereafter on the 1st April and 1st October every year.\nRequest for augmentation of POIs.\n(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:\nProvided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent.\"\nRequest for augmentation of POIs. - (1) Every service provider shall provide to the interconnecting service provider, at interval of every six months, its forecast of busy hour outgoing traffic, for the succeeding six months, at each POI and the first such forecast shall be provided within sixty days of the commencement of the Telecommunication Interconnection (Amendment) Regulations, 2018 and thereafter on the 1st April and 1st October every year.\nRequest for augmentation of POIs.\n(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing of the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:\nProvided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent.\"\n(3) In regulation 9 of the principal regulations,\n(a) in sub-regulation (1), for the words \"five working days\", the words \"seven working days\" shall be substituted;\n(b) in sub-regulation (2), for the words \"three working days\", the words \"five working days\" shall be substituted;\n(c) in sub-regulation (3), for the words \"five working days\", wherever occurring, the words \"ten working days\" shall be substituted;\n(d) in sub-regulation (4), for the words \"three working days\", the words \"ten working days\" shall be substituted;\n(e) in sub-regulation (5), for the words \"five working days\", the words \"ten working days\" shall be substituted;\n(a) A service provider, upon receipt of request of ports and collocation space, if required, shall issue letter of acceptance and demand note, if any, within seven working days of the receipt of request.\n(b) A service provider, upon receipt of the demand note, shall pay the amount, if any, within five working days from the date of receipt of demand note.\n(c) The service provider, who issued the letter of acceptance, shall intimate the requesting service provider about the provisioning of the requested ports at the POI and allocation of collocation space, if applicable,--\n(i) within ten working days from the date of issue of its letter of acceptance, in case no demand note was issued; and\n(ii) within ten working days from the date of receipt of payment from the requesting service provider against the demand note, in case a demand note was issued.\n(d) A service provider, upon receipt of the intimation about provisioning of the port and allocation of the collocation space, if applicable, shall, within ten working days of the receipt of the intimation, intimate the other service provider about establishment of transmission link between the POIs of the two service providers.\n(e) A service provider, upon receipt of the intimation about establishment of transmission link between the POIs, shall, within ten working days of the receipt of the intimation, carry out acceptance testing and issue final letter of commissioning of the ports to the other service provider.\nMaximum period (in working days) for service\n provider-2 to issue letter of acceptance and demand note, if any,\n upon receipt of request of ports and collocation space from\n service provider-1\n7\nMaximum period (in working days) for service\n provider-1 to pay the amount from the date of receipt of the\n demand note\n5\nMaximum period (in working days) for service\n provider-2 to intimate service provider-1 about the provisioning\n of the requested ports at the POI and allocation of collocation\n space\n10\nMaximum period (in working days) for service\n provider-1 to intimate service provider-2 about establishment of\n transmission link between the POIs\n10\nMaximum period (in working days) for service\n provider-2 to carry out acceptance testing and issue final letter\n of commissioning of the ports\n10",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 31st July, 2018 [act3102]",
        "Act Number": "(Act No. 1 of 2018)",
        "Enactment Date": "",
        "Act Year": "2018",
        "Short Title": "Telecommunication Interconnection Regulations, 2018",
        "Type": "CENTRAL",
        "Location": "India (Central)"
    },
    "updated_at": "2026-09-29 21:55:17"
}