{
    "act_title": "Telecommunication Interconnection Regulations, 2018",
    "act_slug": "telecommunication-interconnection-regulations-2018",
    "section_label": "Section",
    "section": {
        "number": "13",
        "title": "13. Power of the Authority to issue direction.",
        "chapter": null,
        "content": "Schedule-I\nBank guarantee per E1 link at a POI\n( See regulation 5.)\nS. No.\nS. No.\nItem\nItem\nValue (in Rs.)\nValue (in Rs.)\n1\nCeiling on bank guarantee per E1 link at POI\n\t\t\t\t(in Rs.)\n8,00,000 multiplied by the\n\t\t\t\tinterconnection usage charge per minute applicable for the\n\t\t\t\ttraffic carried on E1 link\nNote: The Explanatory Memorandum explains the objects and reasons of the Telecommunication Interconnection Regulations, 2018 (1 of 2018).\nExplanatory Memorandum to\nExplanatory Memorandum to\n\"The Telecommunication Interconnection Regulations, 2018 \"\n\"The Telecommunication Interconnection Regulations, 2018\nA. Introduction\n1 http://www.citi.columbia.edu/elinoam/articles/interconnection_pricing.htm\nB. The Need for Regulation of Interconnection\n\" 2.2 Interconnection to be ensured : Interconnection with a major supplier will be ensured at any technically feasible point in the network. Such interconnection is provided:\n2.2 Interconnection to be ensured\n(a) under non-discriminatory terms, conditions (including technical standards and specifications) and rates and of a quality no less favourable than that provided for its own like services or for like services of non-affiliated service suppliers or for its subsidiaries or other affiliates;\n(b) in a timely fashion, on terms, conditions (including technical standards and specifications) and cost oriented rates that are transparent, reasonable, having regard to economic feasibility, and sufficiently unbundled so that the supplier need not pay for network components or facilities that it does not require for the service to be provided; and\n(c) upon request, at points in addition to the network termination points offered to the majority of users, subject to charges that reflect the cost of construction of necessary additional facilities.\"\n\"...each incumbent local exchange carrier has the following duties:.............\n(2) INTERCONNECTION- The duty to provide, for the facilities and equipment of any requesting telecommunications carrier, interconnection with the local exchange carrier's network-\n(A) for the transmission and routing of telephone exchange service and exchange access;\n(B) at any technically feasible point within the carrier's network;\n(C) that is at least equal in quality to that provided by the local exchange carrier to itself or to any subsidiary, affiliate, or any other party to which the carrier provides interconnection; and\n(D) on rates, terms, and conditions that are just, reasonable, and nondiscriminatory, in accordance with the terms and conditions of the agreement and the requirements of this section and section 252.\"\nC. The Present Regulatory Framework for Interconnection in India\n\" In exercise of the power vested in it under Section 14(b) of the Act, TDSAT does not have the jurisdiction to entertain the challenge to the regulations framed by the Authority under Section 36 of the Act. \"\n\"27.3 Interconnection between the networks of different Licensees for carrying circuit switched traffic shall be as per national standards of CCS No.7 as amended from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations/directions/orders issued by the TRAI/Licensor from time to time. For internetworking between circuit switched and IP based network, the Licensee shall install Media Gateway Switch. Further, the Licensor may direct the LICENSEE to adopt any other technical standards issued by TEC on interconnection related issues.\n27.4 Licensee shall interconnect with other Telecom Service Providers at the points of Interconnection (POI) subject to compliance of prevailing regulations, directions or determinations issued by TRAI. The charges for accessing other networks for internetwork  calls shall conform to the Orders/Regulations/Guidelines issued by the TRAI/Licensor from time to time. The Interconnection Agreements will, inter-alia , provide the following: (a) To meet all reasonable demand for the transmission and reception of messages between the interconnected systems. (b) To establish and maintain such one or more points of Interconnect as are reasonably required and are of sufficient capacity and in sufficient number to enable transmission and reception of the messages by means of the Applicable Systems, (c) To connect, and keep connected, to their Applicable Systems.\n27.5 The charges for accessing other networks for inter-network calls shall be based on mutual agreements between the service providers conforming to the Orders/IUC Regulations/Guidelines issued by the TRAI from time to time.\n27.6 The provision of any equipment and its installation for the purpose of Interconnection shall be subject to mutual agreement of the concerned parties and shall conform to TRAI's regulations and orders.\n27.7 The Interconnection Tests for each and every interface with any Telecom Service Provider shall be carried out by mutual arrangement between the Licensee and the other party involved. In case of disagreement for rectification of deficiencies/deviations in conducted interconnection tests, reference could be made to Licensor/TRAI.\"\nD. The Present Exercise to Review the Regulatory Framework for Interconnection in India\nQuestion (a): In view of regulatory, market and technological changes during the last few years in telecommunication sector, is any review of existing regulations on interconnection called for with a view to make interconnection agreements more effective, non-discriminatory, fair and transparent? If yes, which kind of changes are required in interconnection regulation framework?\nQuestion (b): Should TRAI notify/prescribe a standardized interconnection agreement (default option) in those situations, where the two service providers fail to negotiate mutually agreed terms and conditions of interconnection within a specified time frame?\nE. Analysis of the Key Issues Raised in the Consultation Paper\n(a) How to ensure fair, reasonable and non-discriminatory terms and conditions of interconnection agreement between TSP?\n(b) Should seeker/provider concept continue?\n(c) Whether it is appropriate to mandate only those TSPs who hold significant market power (SMP) to publish their Reference Interconnect Offers (RIOs)? If yes, what should be the criteria for reckoning a TSP as SMP?\n(d) What details should a new TSP furnish for entering into interconnection agreement?\n(e) What should be the time-frame for entering into an interconnection agreement? Should financial disincentive be imposed TSPs for not entering into interconnection agreement within stipulated time?\n(f) Is there a need for bank guarantee (BG) in the Interconnection Agreement? If yes, how to determine the amount of BG?\n(g) Should an interconnection agreement between TSPs continue to operate when one of them acquires a new license?\n(h) Whether existing interconnection agreements should also be allowed to be migrated to the new framework which will come out as a result of this consultation process?\n(i) Should Interconnection Agreements and POIs be service-specific or service-agnostic? If POIs are merged together (service-agnostic POIs), which methods of discovery, prevention and penalization of any traffic manipulation by TSPs should be put in place? (j) Under what circumstances, a TSP can disconnect POIs? What procedure should be followed before disconnection of POIs?\n(k) Is there a need to have a co-ordination committee to facilitate effective and expeditious interconnection between TSPs?\n(l) Whether there is any need to review the level of interconnection as mentioned in the Guidelines annexed to the RIO Regulations, 2002?\n(m) In case, interconnection for Inter-circle calls to fixed-line network continues to remain at SDCA, should alternate level of interconnection be specified in cases of technical non-feasibility (TNF) at SDCA level?\n(n) What should be the framework to ensure timely provisioning/augmentation of E1 ports?\n(o) Should separate time periods for provisioning of ports be prescribed for (a) fixed-line networks and (b) mobile/IP networks?\n(p) Should financial disincentive be imposed for (a) not providing initial POI and (b) not augmenting POI within stipulated time-frame?\n(q) Whether augmentation of ports be allowed at higher levels such as STM-1 in place of E1s?\n(r) How to ensure that inflated demand for ports is not made by a TSP?\n(s) In case interconnection seeker agrees to bear the total cost of equipment required for augmentation in advance, should a TSP give the requested ports irrespective for the traffic at POI?\n(t) What should be the method to settle IUC and how should the delayed payment between TSPs be handled?\n(u) Which policy and regulatory measures are required to be taken to encourage TSPs to migrate to interconnection at IP level?\n(v) Whether there is a need to establish a framework for Interconnect Exchange to eliminate bilateral interconnection issues?Is there any need for a separate framework for Interconnect Exchanges in view of the fact that the new NLDO authorization permits transit traffic to be carried over by NLDO?",
        "footnote": "",
        "is_definition": false,
        "sort_order": 11
    },
    "prev_section": "12",
    "next_section": "1"
}