    "id": 24225,
    "slug": "tamil-nadu-lifts-rules-1997",
    "title": "Tamil Nadu Lifts Rules, 1997",
    "short_title": "Tamil Nadu Lifts Rules, 1997",
    "act_number": "Published vide Notification No. G. O. Ms. No. 173,",
    "act_year": 1997,
    "act_type": "STATE",
    "location": "Tamil Nadu",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Tamil Nadu Lifts Rules, 1997",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(a) \"Act\" means the Tamil Nadu Lifts Act, 1997 (Tamil Nadu Act 35 of 1997);\n(b) \"Form\" means a form appended to these rules;\n(c) \"section\" means a section of the Act;\n(d) \"licence\" means the owner of the Lift to whom the licence is granted;\n(e) \"Urban Local Body\" means the Corporation, Municipality or Town Pan-chayat;\n(f) \"Inspector\" means an Inspector appointed under section 3 of the Act;\n(g) \"Licensed electrical contractor\" means the contractor who is licensed by the Electrical Licensing Board, Government of Tamil Nadu for carrying out electrical works.",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Permission to erect a Lift or the making additions or alterations to existing lift.",
            "chapter": null,
            "content": "(a) to erect a Lift in such place; or\n(b) to make additions or alterations to existing Lift shall make an application in Form \"A\" to the Inspector. Every such application shall be accompanied by-\n(i) Triplicate copies of drawings duly signed by the applicant showing the following particulars, namely:-\n(a) Layout of the Lift erection;\n(b) Plan;\n(c) Sectional elevation;\n(d) Arrangement of doors;\n(e) Lift well enclosures;\n(f) Size and position of the machine relating to the Lift well;\n(g) Position of hoisting machine;\n(h) Number of floors to be served and total travel; and\n(i) Wiring diagram of the complete electrical installation with all wiring, light points, switch-fuses, control panel and other electrical apparatus, size of wires, earthing scheme with size of earth leads, method of construction of earth electrodes, laying of cables for Lift equipments duly signed by the manufacturer of Lift or company of Electrical and Mechanical Engineer to whom the lift erection work is entrusted and also signed by the licensed electrical contractor to whom the electrical erection work is entrusted:\n(ii) Copy of approval obtained from the Urban Local Body concerned for the building plan:\n(iii) A challan for a fee of Rs. 500 (rupees five hundred only) for a lift remitted into Government Treasury.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Licence for working a Lift.",
            "chapter": null,
            "content": "(a) a work completion report of the erection of Lift in Form \"D\" as obtained either from the manufacturer of Lifts or a Company of Electrical and Mechanical Engineers, as the case may be;\n(b) a completion report in Form \"E\" of the licensed electrical contractor;\n(c) a challan for a fee of Rs. 500 (rupees five hundred only) towards the licence remitted into a Government Treasury;\n(d) copy of insurance policy taken by the owner of the Lift, covering insurance for the persons using such Lift.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Renewal of licence.",
            "chapter": null,
            "content": "(b) If the application for renewal of licence along with fees and copy of renewed Insurance Policy taken by the owner of the Lift covering insurance for the persons using the Lift is not produced to the Inspector within the period referred to in clause (a), an additional fee of Rs. 50 (rupees fifty only) for each lift for a delay of each month or a fraction thereof shall also be remitted into the Government Treasury by the licensee and the challan shall accompany the application for renewal of licence.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Application for licence in case of existing Lifts.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Terms and conditions of licence for working of Lift.",
            "chapter": null,
            "content": "(1) The licensee shall forthwith report to the Inspector any defect in the operation of the Lift;\n(2) The licensee shall not carry out any additions or alterations to a Lift erected without obtaining permission in that behalf from the Inspector as required under these rules;\n(3) The licensee shall not use the Lift which is not in a safe condition and shall be solely responsible for the safe maintenance of Lift, so that these rules are always complied with;\n(4) The maintenance of the Lift shall be done by a manufacturer of Lifts or Company of Electrical and Mechanical Engineers approved by the Inspector;\n(5) No other person shall wilfully interfere with any mechanism of the Lift;\n(6) Every Lift Operator, if appointed in case of manually operated Lift, must have attained the age of eighteen years and shall be a person who has been trained in the correct operation \"of the Lift;\n(7) When a Lift erected at any place ceases to be used as such, the owner shall either remove it or maintain it in safe mechanical condition after disconnecting it entirely from the electric supply. All gates and doors shall be securely locked, so as to prevent the accidental entry to Lift well and to prevent inadvertent use;\n(8) All electrical works in connection with erection of Lift shall be carried out in accordance with the provisions of the Indian Electricity Act, 1910 [(Central Act IX of 1910)] and the Indian Electricity Rules, 1956;\n(9) All apparatus and components of Lifts shall be of sufficient ratings and of sufficient mechanical strength for the duty which they may be required to perform under the environmental conditions of installation and shall be constructed, installed, protected, worked and maintained to ensure safety of human beings and property;\n(10) The code of practices prescribed by the Bureau of Indian Standards including National Electrical Code shall be followed in respect of the Lift and its installation;\n(11) The material and apparatus used shall conform to the prescribed specifications of Bureau of Indian Standards; and\n(12) The Lift shall be tested in the manner specified in specifications and Codes of Bureau of Indian Standards.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Appeal.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Precautions to be adopted by the owner of the Lift.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Intimation of accidents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Qualifications for appointment of Inspector.",
            "chapter": null,
            "content": "[12. Qualifications for appointment of persons to assist Inspectors.\n(a) (i) he possesses a degree in electrical engineering from a University\n(ii) he possesses experience for a period of not less than three years in the practice of electrical engineering, of which not less than one year shall be in an electrical or mechanical engineering workshop or in works connected with generation of transmission or distribution of electricity\n(b) (i) he possesses a diploma in electrical engineering from a recognized institution or a qualification equivalent thereto; and\n(ii) he possesses experience for a period of not less than six years in the practice of electrical engineering, of which not less than two years shall be in an electrical or mechanical engineering workshop or in works connected with generation or transmission or distribution of electricity.\n(a) functions under sub-section (3) of section 4;\n(b) functions under sub-section (3) of section 5;\n(c) other incidental functions under the Act to be discharged in the process of enforcement of the provisions of the Act and these rules).\nForm \"A\"\nForm \"A\"\n( See rule 3 of the Tamil Nadu Lifts Rules, 1997)\nApplication For Permission\nApplication For Permission",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "1",
            "title": "1. Full Name and address of the applicant:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "2",
            "title": "2. Name and address of the agent, if any,:",
            "chapter": null,
            "content": "3. (a) Address of the premises where the Lift is to be:\n*installed.:\n*made additions or alterations:\n(b) Approval reference of Urban Local Body concerned for the building pan (Copy of approval letter and approved plan to be enclosed).:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "4",
            "title": "4. Whether a licence has been previously granted (details to be given).:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "3",
            "title": "5. Type and Make of Lift proposed to be erected (A sketch of the Lift and erection plans as per rule 3 shall be attached).:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "6",
            "title": "6. The rated maximum speed of the Lift, the Maker's or Designer's rated capacity in weight (Kgs.).:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "7",
            "title": "7. The maximum number of passengers in addition to the Lift Operator which the Lift can carry.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "8",
            "title": "8. The total weight of the Lift car carrying the maximum load (weight of car plus maximum allowable load).:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "9",
            "title": "9. The weight of the counter-weight (Kgs.).:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "10",
            "title": "10. The number, description, weights (Kgs.) and size (in sq.mm.) of the supporting cables.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "11",
            "title": "11. The depth of the pit for lowest part of the car when at the lowest floor (in mms.).:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "12",
            "title": "12. Details of the construction of the overhead arrangement with weight (Kgs.) and sizes (mms.) of beams.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "13",
            "title": "13. A fee of Rs. 500 (rupees five hundred only) for each Lift paid into Government Treasury is enclosed.:",
            "chapter": null,
            "content": "Date:\nSignature of the applicant.\n*Strike off whichever is inapplicable.\nForm B\nForm B\n[ See rule 3(2) of the Tamil Nadu Lifts Rules, 1997]\nGovernment of Tamil Nadu\nGovernment of Tamil Nadu\nLetter No..........\nDated:...............\nSignature.........\n(Inspector of Lifts, Government of Tamil Nadu)\n*Strike off whichever is inapplicable.\nForm C\nForm C\n[ See rule 4(a) of the Tamil Nadu Lifts Rules, 1997]\nNotice Intimating the Completion of the Work of Erection of A Lift and Application for A Licence to Work the Lift\nNotice Intimating the Completion of the Work of Erection of A Lift and Application for A Licence to Work the Lift\nYours faithfully,\n(2) Work completion report of the manufacturer of Lifts or Company of Electrical and Mechanical Engineers.\n(3) Work completion report of the Electrical Contractor.\n(4) Copy of Insurance Policy.\nForm \"D\"\nForm \"D\"\n[ See rule 4(1) of the Tamil Nadu Lifts Rules, 1997]\nYours faithfully,\nSignature of the manufacturer of lifts or\nthe company of the Electrical and\nMechanical Engineers.\nForm \"E\"\nForm \"E\"\n[ See rule 4(1) of the Tamil Nadu Lifts Rules, 1997]\nForm of Completion Report from Licensed Contractor for Electrical Works of Lift\nForm of Completion Report from Licensed Contractor for Electrical Works of Lift\n(1) Electrical Installation at:\n(2) Voltage and system of supply:\n(3) Particulars of works-\n(a) M.V Installation:\nSI. No.\nEquipment\nCapacity\nVoltage\nFed from Distribution board/ Switch Board\n(b) Lighting\n(c) Test results-\n(2) Between phases.\n(3) Between each phase and earth",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "2",
            "title": "2. Maximum earthing resistance of installation.",
            "chapter": null,
            "content": "Signature of Supervisor\nSignature of Electrical Contractor\nName and Address\nName and Address\nCompetency Certificate\nElectrical Contractors Licence\nNo...............\nNo........................\nValid up to\nValid up to..........\nForm \"F\"\nForm \"F\"\n[ See rules 4(2), 5(2) and 6 of the Tamil Nadu Lifts Rules, 1997]\nLicence To Work A Lift\nLicence To Work A Lift\nParticulars\nParticulars\n(i) Make of Lift and Serial No........\n(ii) Type of Lift............\n(iii) Type of Control...........\n(iv) Capacity................\nDated.............\nInspector of Lits.\nDate of renewal\nDate of expiry\nSignature of the Officer renewing the Licence\n(1)\n(2)\n(3)\nConditions\nConditions\nForm \"G\"\nForm \"G\"\n[ See rule 5(1) of Tamil Nadu Lift Rules, 1997]\nApplication for Renewal of Licence for Working A Lift\nApplication for Renewal of Licence for Working A Lift",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "1",
            "title": "1. Full name and address of the applicant.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "2",
            "title": "2. Name and address of the local agent, if any.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "3",
            "title": "3. Address of the place where the Lift has been erected together with the name of the Owner thereof.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "4",
            "title": "4. Details of licence previously granted.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "5",
            "title": "5. Whether a challan for renewal fee of Rs. 500 (Rupees five hundred only) for each lift is enclosed.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "6",
            "title": "6. Whether a copy of valid Insurance Policy taken by the Owner of the Lift covering insurance for persons using the Lift is enclosed.:",
            "chapter": null,
            "content": "Yours faithfully,\nSignature of the\nowner of the Lift.\n(2) Copy of Insurance Policy\nForm \"H\"\nForm \"H\"\n( See rule 6 of Tamil Nadu Lift Rules, 1997)\nApplication for Licence for Working A Lift Erected Prior to the Commencement of the Tamil Nadu Lifts Act, 1997\nApplication for Licence for Working A Lift Erected Prior to the Commencement of the Tamil Nadu Lifts Act, 1997",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "1",
            "title": "1. Full name and address of the applicant.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "2",
            "title": "2. Name and address of the local agent, if any.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "3",
            "title": "3. Address of the place where the Lift has been erected together with the name of the owner thereof.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "4",
            "title": "4. Date of erection.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "5",
            "title": "5. Type of Lift erected.:",
            "chapter": null,
            "content": "6. (i) Maker's Name.:\n(ii) Maker's local agents, address.:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "7",
            "title": "7. The contract speed of the Lift.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "8",
            "title": "8. The contract load of the Lift (in Kilogram).:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "9",
            "title": "9. The maximum number of person including the Lift attendant which the Lift can carry.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "10",
            "title": "10. The total weight of the Lift car including the contract load.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "11",
            "title": "11. The weight of the counter weight.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "12",
            "title": "12. The number, description, weight and size of the suspension ropes.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "13",
            "title": "13. The pit depth.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "14",
            "title": "14. Travel and the number of floors served.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "15",
            "title": "15. The total head room.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "16",
            "title": "16. Details of construction of the overhead arrangement with the weight and size of the beams.:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "17",
            "title": "17. Whether a fee of Rs. 500 (Rupees five hundred only) for each Lift has been paid into the Government Treasury and challan enclosed:",
            "chapter": null,
            "content": "Date:\nSignature of the owner of the Light.\n(2) Challan of Government Treasury.\nForm \"I\"\nForm \"I\"\n( See rule 10 of the Tamil Nadu Lift Rules, 1997)\nNotice Of Accidents In Lifts\nNotice Of Accidents In Lifts\nNotifications\nNotifications\nDate of Coming Into Force of the Tamil Nadu Lifts Act, 1997\nDate of Coming Into Force of the Tamil Nadu Lifts Act, 1997\n[G. O. Ms. No. 172, Energy (B1), dated the 3rd November 1997]\nNo. II(2)/EGY/ 2244 (d-1)/97.\nAppointment of Electrical Inspector as Lift Inspectors for the District\nAppointment of Electrical Inspector as Lift Inspectors for the District\n[G. O. Ms. No. 174, Energy (B1), dated the 3rd November 1997]\nNo.-11(2)7 EGY/2244 (d-2)/97.\nAppointment of Chief Electrical Inspector to Government as Inspector of Lift for Approving the Manufacturers of Lifts and Companies of Electrical and Mechanical Engineers\nAppointment of Chief Electrical Inspector to Government as Inspector of Lift for Approving the Manufacturers of Lifts and Companies of Electrical and Mechanical Engineers\n[G. O. Ms. No. 174, Energy (B1), dated the 3rd November 1997]\nNo. H(2)/EGY/2244 (d-3)/97.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        }
    ],
    "metadata": {
        "Act ID": "tn698",
        "Act Number": "Published vide Notification No. G. O. Ms. No. 173, Energy (B1), dated 3rd November 1997-No. SRO A-117(c)/97",
        "Enactment Date": "",
        "Act Year": "1997",
        "Short Title": "Tamil Nadu Lifts Rules, 1997",
        "Type": "STATE",
        "Location": "Tamil Nadu"
    },
    "updated_at": "2026-09-29 21:55:21"
}