        "content": "• Responsibilities and obligation with respect to the operation of the State Transmission System (STS).\n• Suitable measures for connectivity with the Grid for all generating plants.\n• The standards with reference to quality, continuity and reliability of service for compliance by the Licensees.\n• Planning of the State Electricity Grid and making arrangements for its operation, maintenance, development and expansion.\n• Operation of Grid under normal, abnormal and emergency conditions.\n• Procedures for black start, fast restart, restoration of supply after major disturbances.\n• Penalty for the non-compliance of this Grid Code, Grid Standards and the lawful directions of RLDC and SLDC.\n• Facilitation for beneficial trading of electricity by defining a common basis of operation of the Intra State Transmission System applicable to all the users of the system.\n• To ensure economy and efficiency in the operation of the power system in the State.\n• To achieve compliance with the Grid Standards and other relevant Standards, Codes, Regulations and direction of SLDC by every licensee and others involved in the operation of the power system.\n(a) Functional responsibilities of entities connected with the State Grid\n(b) System Planning\n(c) Grid Connectivity conditions\n(d) Requirement in Grid Operation\n(e) Scheduling and Despatch\n(f) Commercial issues and Implementation\n(g) Non Compliance\n(i) This code shall be read along with the, Tamil Nadu Electricity Supply Code, Tamil Nadu Electricity Distribution Code, and other relevant provisions of the Act, along with amendments thereon, rules and regulations made there under.\n(ii) Where any of the provisions of this Code is found to be inconsistent with those of the Act, rules or regulations made there under, not withstanding such inconsistency, the remaining provisions of this Code shall remain operative.\n(iii) Where any dispute arises as to the application or interpretation of any provisions of this Code, it shall be referred to the Commission whose decision shall be final and binding on the parties concerned.\n(iv) Wherever extracts of the Electricity Act, 2003, are reproduced, any changes / amendments to the original Act shall automatically be deemed to be effective under this Code also\nChapter 4",
        "footnote": "",
        "is_definition": false,
        "sort_order": 2
    },
    "prev_section": "2",
    "next_section": "4"
}