    "id": 22888,
    "slug": "rajasthan-transparency-in-public-procurement-rules-2013",
    "title": "Rajasthan Transparency in Public Procurement Rules, 2013",
    "short_title": "Rajasthan Transparency in Public Procurement Rules, 2013",
    "act_number": "Published vide Notification No. G.S.R. 96, dated 2",
    "act_year": 2013,
    "act_type": "STATE",
    "location": "Rajasthan",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Rajasthan Transparency in Public Procurement Rules, 2013",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(i) \"Act\" means the Rajasthan Transparency in Public Procurement Act, 2012 (Act No. 21 of 2012);\n(ii) \"competent authority\" means an authority or officer to whom the relevant administrative or financial powers have been delegated for taking decision in a matter relating to procurement;\n[(ii-a) \"Earnest Security\" means an amount of security provided by the Project Proponent to the Administrative Department concerned as a token of sincerity and good faith, as specified in sub-rule (6) of Rule 79-F;\n(ii-b) \"Eligible Sector\" means the Sector, as specified in Rule 79-B, in which the project proposals can be accepted under the Swiss Challenge method;]\n(iii) \"form\" means form appended to these rules;\n(iv) \"international competitive bidding\" means a bidding process in which qualified bidders from all over the world, except those having nationality of a country declared ineligible by the Central Government, are allowed to participate;\n(v) \"national competitive bidding\" means a bidding process in which qualified bidders only from within India are allowed to participate;\n[(v-a) \"Project Proponent\" means a Legal entity or a Person who submits a proposal under Swiss Challenge Method;]\n(vi) \"section\" means section of the Rajasthan Transparency in Public Procurement Act, 2012 [; and]\n[(vii) \"State Level Empowered Committee (SLEC)\" means the State Level Empowered Committee constituted by the State Government under the chairmanship of the Chief Secretary for consideration/ examination/ approval of the project, received under Swiss Challenge Method.]\nChapter- II\nOrganisational Structure for Procurement",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Procurement committees.",
            "chapter": null,
            "content": "(a) Preparation of bidding documents;\n(b) Opening of bids;\n(c) Evaluation bids;\n(d) Monitoring of contract;\n(e) Spot Purchase;\n(f) Competitive negotiation; and\n(g) Any other purpose relating to procurement, as may be decided by the procuring entity.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. State Public Procurement Portal.",
            "chapter": null,
            "content": "5. e-procurement.\nChapter- III\nGeneral principles of procurement",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "6",
            "title": "6. Determination of need.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "7",
            "title": "7. Procurement plan.",
            "chapter": null,
            "content": "(a) Nature of Procurement - Goods/Works/Services;\n(b) Major Specifications - Quantity/Type/Quality;\n(c) Estimated Value;\n[(d) Source of Funds-State Funds/Central Assistance/Externally Aided Project/Others;]\n(e) Budget Code;\n(f) Procurement Method likely to be followed;\n(g) Timeframe for Bid Process; and\n(h) Timeframe for Delivery of goods or services or Completion of work to identify the funds required in the next financial year or subsequent financial years.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "8",
            "title": "8. Numbering convention.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "9",
            "title": "9. Procurement Management Information System and tracking.",
            "chapter": null,
            "content": "(a) In order to track the performance of the procurement process, information shall be collated at the procuring entity level on quarterly basis and be available for reference at procuring entity level at all times and shall be sent for collation to the respective Administrative Department. The Administrative Department shall further send the aggregated Procurement Management Information to the State Procurement Facilitation Cell quarterly.\n(b) The Management Information System shall cover the entire procurement cycle and incorporate performance targets set for various processes.\n(c) The Procurement Management Information System shall be developed in a query based format to allow for in-depth analysis and ease of use, providing real time information about the status of the bid at any point of time. This shall be integrated with the State Public Procurement Portal in order to further track performance on various parameters, including performance of contracts, delays and penalties imposed.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "10",
            "title": "10. Procurement Register.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "11",
            "title": "11. Administrative, Financial and Technical sanctions and availability of budget provision.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "12",
            "title": "12. Obligations related to value of procurement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "13",
            "title": "13. Participation of bidders.",
            "chapter": null,
            "content": "Chapter-IV\nMethods of Procurement",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "14",
            "title": "14. Methods of Procurement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "15",
            "title": "15. Open competitive bidding.",
            "chapter": null,
            "content": "[15A. Swiss Challenge Method.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "16",
            "title": "16. Limited bidding.",
            "chapter": null,
            "content": "(a) The procuring entity shall issue an invitation to bid by exhibiting it on the State Public Procurement Portal and by writing directly, and on the same day, to -\n(i) all the bidders who can supply the subject matter of procurement in terms of clause (a) of sub-section (1) of section 30; or\n(ii) all the bidders who are registered for the subject matter of procurement with the procuring entity or where a procuring entity does not register the bidders in respect of a subject matter of procurement, to the registered bidders of any other procuring entity, if any; or\n(iii) at least three manufacturers, authorised dealers, authorised service centres, bona-fide dealers or service providers, in case registered bidders are not available.\n(b) The procuring entity may allow all prospective bidders who fulfill the qualification criteria laid down for the procurement in the bidding documents, whether an invitation to bid has been issued to such bidders or not, to participate in the bidding process.\n(c) A minimum period of seven days, in case of emergency after recording reasons three days, shall be given to the bidders to offer their bids.\n(d) If limited bidding is invited under clause (b) and (c) of sub-section (1) of section 30, bid security shall not be obtained.\n(e) For the remaining procedure of procurement by limited bidding, the provisions of Chapter-V shall apply mutatis mutandis except publication of Notice Inviting Bids in the news papers as per sub-rule (6) or (7) of rule 43.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "17",
            "title": "17. Single source procurement.",
            "chapter": null,
            "content": "[(a) Hiring of the services of consultant or professional is required for a period of twenty four months and up to financial limit of Rupees twelve lakh in each case, subject to delegation of financial powers; or]\n(b) Price of subject matter of procurement is administered by the State Government or the Central Government.\n(a) The procuring entity shall solicit a bid from the single prospective bidder and shall also exhibit the invitation to bid on the State Public Procurement Portal if the value of procurement is rupees one lakh or more. The procuring entity shall not exhibit the invitation to bid on the State Public Procurement Portal, if it is of the opinion that subject matter for procurement is of nature specified in clause (e) or (h) of sub-section (1) of section 31.\n(b) The procuring entity may engage in negotiations in good faith with the bidder.\n(c) The single source may be selected out of the list of empanelled/registered bidders for the subject matter of procurement with the procuring entity or with any other procuring entity, where procuring entity uses the list of registered bidders of other procuring entity in terms of sub-section (5) of section 19 or suitable bidder identified through other reliable sources.\n(d) Bid security shall not be obtained in case of single source procurement.\n(e) Except as otherwise provided in this rule and provisions of Chapter-V relating to pre-qualification proceedings, bid security, publication of Notice Inviting Bids in the news papers, price of bidding documents, sale of bidding documents, pre-bid clarifications, exclusion of bids, comparison of rates of firms outside and those in Rajasthan, price/purchase preference in evaluation and dividing quantities among more than one bidder at the time of award, all other provisions of Chapter-V shall mutatis mutandis apply, but in case of matters covered under sub-rule (1) performance security shall not be obtained.\n(a) District Collector - Chairman\n(b) District level officer of the concerned department Member\n(c) Treasury Officer - Member Secretary\n(d) Special invitee, if required- Member",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "18",
            "title": "18. Two stage bidding.",
            "chapter": null,
            "content": "(a) In the first stage of the bidding process, the procuring entity shall invite proposals containing the professional and technical competence, qualifications of bidders regarding the subject matter of procurement and contractual terms and conditions of the proposed procurement;\n(b) All first stage bids, which are otherwise eligible, shall be evaluated in accordance with the procedure laid down in these rules and the bidding documents by bids evaluation committee;\n(c) The committee may hold discussions with the bidders and if any such discussion is held, equal opportunity shall be given to all bidders to participate in the discussions;\n(d) In revising the technical design, stipulations, relevant terms and conditions of the procurement, the procuring entity shall not modify the fundamental nature of the procurement itself, but may add, amend or delete any specification of the subject matter of procurement or criterion for evaluation;\n(e) Notwithstanding anything contained in sections 29 and 30, in the second stage of the bidding process, the procuring entity shall invite bids from all those bidders whose bids at the first stage were not rejected, to present final bid with bid prices and detailed technical bid in response to a revised set of terms and conditions of the procurement;\n(f) Any bidder, invited to bid but not in a position to supply the subject matter of procurement due to changes in the specifications, may withdraw from the bidding proceedings without liability of forfeiting bid security.\n(g) Except as otherwise provided in this rule all other provisions of Chapter-V shall, mutatis mutandis, apply.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "19",
            "title": "19. Procedure of electronic reverse auction.",
            "chapter": null,
            "content": "(a) the name and address of the procuring entity including e-mail address if any;\n(b) a detailed description of the subject matter of the procurement and the required time and location for providing such subject matter;\n(c) the terms and conditions of the procurement contract, to the extent they are already known to the procuring entity, and the form of the contract, if any, to be signed by the parties;\n(d) the criteria and procedures to be used for ascertaining the qualifications of bidders and any documentary evidence or other information that must be presented by bidders to demonstrate their qualifications;\n(e) the criteria and procedure for examining bids against the description of the subject matter of the procurement;\n(f) the criteria and procedure for evaluating bids, including any mathematical formula that shall be used in the evaluation procedure during the auction;\n(g) the manner in which the bid price is to be formulated and expressed, including a statement as to whether the price is to cover elements other than the cost of the subject matter of the procurement, such as any applicable transportation, insurance charges, customs duties, taxes, etc.;\n(h) the minimum number of bidders required to register for the auction;\n(i) how the auction can be accessed;\n(j) the deadline by which the bidders must register for the auction and the requirements for registration;\n(k) the date and time of the opening of the auction and the requirements for identification of bidders at the opening of the auction;\n(l) the criteria governing the closing of the auction;\n(m) other rules for the conduct of the auction, including the information that will be made available to the bidders in the course of the auction, the language in which it will be made available and the conditions under which the bidders will be able to bid;\n(n) references to the Act and these rules, and other laws and regulations directly pertaining to the procurement proceedings, including those applicable to procurement involving classified information, and the place where those laws and regulations may be found;\n(o) the means by which the bidders may seek clarification of information relating to the procurement proceedings;\n(p) the name, designation and address of one or more officers or employees of the procuring entity including e-mail address, if any, who are authorised to communicate directly with and to receive communications directly from the bidders in connection with the procurement proceedings before and after the auction without the intervention of an intermediary;\n(q) verification of any formalities including, where applicable, ascertainment of qualifications or responsiveness before execution of a written procurement contract and only after the fulfillment of such formalities, the contract shall come into force; and\n(r) any other requirement, which is considered by the procuring entity essential for the purpose.\n(a) an invitation to present initial bids, together with instructions for preparing initial bids; and\n(b) the manner, place and deadline for presenting initial bids.\n(a) despatch the notice of rejection specifying the reasons for rejection to each bidder whose initial bid was rejected;\n(b) issue an invitation to the auction to each qualified bidder whose initial bid is responsive, providing all information required to participate in the auction; and\n(c) where an evaluation of initial bids has taken place, each invitation to the auction shall also be accompanied by the outcome of the evaluation, as relevant to the bidder to which the invitation is addressed.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "20",
            "title": "20. Registration for the electronic reverse auction and the timing of holding the auction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "21",
            "title": "21. Requirements during the electronic reverse auction.",
            "chapter": null,
            "content": "(a) price, where the procurement contract is to be awarded to the lowest-priced bid; or\n(b) price and other criteria specified to the bidders as applicable, where the procurement contract is to be awarded to the most advantageous bid.\n(a) all bidders shall have an equal and continuous opportunity to present their bids;\n(b) there shall be automatic evaluation of all bids in accordance with the criteria, procedure and formula provided to the bidders;\n(c) each bidder must receive, instantaneously and on a continuous basis during the auction, sufficient information allowing it to determine the standing of its bid vis-a-vis other bids; and\n(d) there shall be no communication between the procuring entity and the bidders or among the bidders, other than as provided for in clauses (a) and (c) above.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "22",
            "title": "22. Requirements after the electronic reverse auction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "23",
            "title": "23. Other provisions for electronic reverse auction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "24",
            "title": "24. Request for Quotations.",
            "chapter": null,
            "content": "(a) quotations shall be requested from as many potential bidders as practicable, subject to a minimum of three;\n(b) each bidder from whom a quotation is requested shall be informed whether any elements other than the charges for the subject matter of the procurement itself, such as any applicable transportation, insurance charges, customs duties, taxes, etc. are to be included in the price.\n(c) each bidder shall be permitted to give only one quotation.\n(d) the successful quotation shall be the lowest priced quotation meeting the needs of the procuring entity as set out in the request for quotations.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "25",
            "title": "25. Spot Purchase.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "26",
            "title": "26. Procurement without quotations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "27",
            "title": "27. Procurement of works by work order system and piece work system.",
            "chapter": null,
            "content": "(a) in work order the quantity, rate and time of completion are invariably mentioned. Penalty for failure to complete the work within the stipulated time is also specified. Maximum work that can be allotted on a work order shall be less than rupees one lakh;\n(b) work order shall be given to a registered bidder only;\n(c) work order can be given only on the approved Schedule of Rates applicable to the Division/Sub-Division concerned. The Superintending Engineer/Executive Engineer shall ensure that the rates being allowed on work order are not in excess of open bid rates prevalent in the area;\n(d) work order can be given by officers as per delegation of financial powers; and\n(e) work order agreement shall be executed, after obtaining performance security, in the form specified for the purpose. A Register of Work Orders shall be maintained in the form specified for the purpose.\n(a) Execution of work on Piece Work System should normally be avoided. Piece Work System may be resorted to only in a uniform type of work in large quantities, like earth work of canals, desilting, repair and maintenance of roads, etc.\n(b) For determination of rates, open bids shall be invited by Additional Chief Engineer concerned for each division under its control. The intention of the department in inviting such bids for determination of Annual Rate Contract for entering into Piece Work Agreement should be made clear at the time of invitation of bids. Registered bidders of all categories shall be entitled to participate in such bids. After observing all required formalities of bids, the Additional Chief Engineer shall sanction unit rates for the specified items of work, which shall remain in force normally for one year or until the rates are revised but shall in no case remain in force more than three months after completion of one year.\\\n(c) Once such unit rates have been sanctioned, Divisional Officers shall be competent to enter into Piece Work Agreement below rupees one lakh at a time with a single registered bidder of any category. Second Piece Work Agreement shall be entered into only after successful completion of the earlier work. Piece Work Agreement shall be entered into with the registered bidders allowed to operate in the said Division.\n(d) In the Piece Work System, the Department is free to ask the bidders to cease the work, and payments are made for the work actually executed as per designs, drawings, specifications, after due measurements and checking of measurement as specified. The maximum period of completion of each piece work is twenty one days which shall not be extended in any case.\n(e) In every Divisional office, a Register of Piece Work Agreements shall be maintained in the form specified for the purpose. In the first week of every month, the Divisional Officer shall submit copies of all Piece Work Agreements accepted by him during the previous month to the Superintending Engineer, giving justification for the award of work on Piece Work Agreement explaining the necessity/emergency instead of on regular contracts. The Superintending Engineer, during his inspection and otherwise, shall ensure that the Divisional Officers do not execute work on Piece Work Agreement in a routine manner and rates allowed are not in excess of the running rates approved by the Additional Chief Engineer for the relevant Division, and check with open bid rates of similar works on regular contract basis in the Sub-Division/Division/Circle and that the system of record measurements of work done and check measurements thereof is followed properly.\n(f) The contract awarded on Piece Work System is exempted from depositing performance security.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "28",
            "title": "28. Competitive negotiations.",
            "chapter": null,
            "content": "(a) procurement of the subject matter shall be made through the competitive negotiations committee. The committee shall give the following certificate -\n(b) to ensure effective competition, an adequate number, not being less than three, of potential bidders selected in a non-discriminatory manner shall be included in procurement process;\n(c) an equal opportunity shall be given to all bidders to participate in the negotiations. Any requirements, guidelines, documents, clarifications or other information related to the negotiations that is communicated by the procuring entity to a bidder before or during the negotiations shall be communicated, subject to section 49, at the same time and on an equal basis to all other bidders engaging in negotiations with the procuring entity related to the procurement, unless such information is specific or exclusive to that bidder;\n(d) after completion of negotiations, the procuring entity shall request all bidders remaining in the proceedings to present, by a specified time and date, a best and final offer with respect to all aspects of their proposals;\n(e) the committee shall keep the record of all the bids received;\n(f) no negotiations shall take place between the procuring entity and bidders with respect to their best and final offers;\n(g) the procuring entity shall ensure that the successful offer is the lowest or most advantageous offer; and\n(h) nothing contained in sections 5 to 10 (both inclusive), sections 12 to 27 (both inclusive) and Chapter III of the Act shall apply to purchases made by competitive negotiations.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "29",
            "title": "29. Rate contract.",
            "chapter": null,
            "content": "(a) A procuring entity may award a rate contract by the method of open competitive bidding. If it is not possible to adopt the method of open competitive bidding, the procuring entity after recording reasons may adopt another method of procurement. An approximate quantity of required goods, works or service during the period shall be indicated in the Notice Inviting Bids, but no minimum quantity is guaranteed.\n(b) The period of rate contract shall be generally one year, preferably a financial year to match with budget provisions and levy of taxes. It may be a shorter period, if variations in market prices are expected to be significant. It may also be a longer period up to maximum two years, if the variations in market prices are not expected to be significant. The reasons for selecting the period for rate contract shall be recorded.\n(c) In the first stage single part or two part bids shall be invited in accordance with the provisions of section 13.\n(d) A rate contract shall be entered, for price without a commitment for quantity, place and time of supply of subject matter of procurement, with the bidder of lowest priced bid or most advantageous bid.\n(e) In the second stage supply or work order shall be placed at the contracted price for supply or execution of the required quantity of the subject matter of procurement mentioning the place of supply or execution, delivery schedule, etc., as and when needed.\n(f) Rate contracts may be entered with more than one bidder as parallel rate contracts provided there is such provision in the bidding documents, in the order of their standing in final evaluation, by giving them counter offer of prices of the lowest or most advantageous bidder, in order to secure prompt delivery of goods or services or execution of works, if the quantity of the subject matter of procurement required is beyond the capacity of the lowest bidder or the subject matter of procurement is of critical or vital nature.\n(g) The terms and conditions of the rate contract including provision for liquidated damages shall be similar to those prescribed for procurement by open competitive bidding.\n(h) The prices under a rate contract shall be subject to price fall clause. A clause regarding price fall shall be incorporated in the terms and conditions of rate contract. Price fall clause is a price safety mechanism in rate contracts and it provides that if the rate contract holder quotes/reduces its price to render similar goods, works or services at a price lower than the rate contract price to anyone in the State at any time during the currency of the rate contract, the rate contract price shall be automatically reduced with effect from the date of reducing or quoting lower price, for all delivery of the subject matter of procurement under that rate contract and the rate contract shall be amended accordingly. The firms holding parallel rate contracts shall also be given opportunity to reduce their price by notifying them the reduced price giving them fifteen days time to intimate their acceptance to the revised price. Similarly, if a parallel rate contract holding firm reduces its price during currency of the rate contract, its reduced price shall be conveyed to other parallel rate contract holding firms and the original rate contract holding firm for corresponding reduction in their prices. If any rate contract holding firm does not agree to the reduced price, further transaction with it, shall not be conducted.\n(i) It should be ensured that new rate contracts become operative right after the expiry of the existing rate contracts without any gap. In case it is not possible to conclude the new rate contracts due to unavoidable reasons, the existing rate contracts may be extended on same price, terms and conditions for a period not exceeding 3 months. In such cases it shall be ensured that market prices have not fallen down during the period for the subject matter of procurement or its constituents, to be procured under the rate contract.\n(j) Except as otherwise provided in this rule all other provisions of Chapter-V shall, mutatis mutandis, apply.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "30",
            "title": "30. Registration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "31",
            "title": "31. Empanelment by pre-qualification process.",
            "chapter": null,
            "content": "(a) the name and address of the procuring entity;\n(b) eligibility criteria required for empanelment;\n(c) the terms and conditions of the empanelment including the duration of the empanelment; and\n(d) the description of the subject matter of procurement, to the extent known.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "32",
            "title": "32. Direct procurement from notified agencies.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "33",
            "title": "33. Purchase or price preference in procurement.",
            "chapter": null,
            "content": "Chapter- V\nBid Process Management- Open Competitive Bidding",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "34",
            "title": "34. Description of subject matter of procurement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "35",
            "title": "35. Criteria for evaluation of bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "36",
            "title": "36. Preparation of bidding documents.",
            "chapter": null,
            "content": "(a) Notice Inviting Bids (NIB);\n(b) Instruction to Bidders (ITB);\n(c) Bid Data Sheet (BDS);\n(d) Qualification and Evaluation criteria;\n(e) Bidding Forms; and\n(f) Conditions of Contract and Contract Forms:\n(i) General Conditions of Contract;\n(ii) Special Conditions of Contract; and\n(iii) Contract Forms.\n(g) Any other documents, as may be necessary.\n(a) instructions for preparing bids;\n(b) the criteria and procedures that shall be applied in the ascertainment of the qualifications of bidders;\n(c) the requirements as to documentary evidence or other information that must be submitted by bidder in proof of its qualifications;\n(d) a detailed description of the subject matter of the procurement, including but not limited to, technical specifications, plans, drawings and designs if relevant, the quantity of the goods, any incidental services to be performed, the location where the goods are to be delivered, the work is to be executed or the services are to be provided and the required time, if any;\n(e) the detailed procedure for presentation, opening, examination and evaluation of bids, minimum requirement, if any, with respect to technical, quality and performance characteristics that bids must meet in order to be considered responsive, and the criteria to be used by the procuring entity in evaluation of bids and determining the successful bid, including any provision for preference and any criteria other than price to be used and the relative weight of such criteria;\n(f) the terms and conditions of the procurement contract or the rate contract, to the extent they are already known to the procuring entity, and the contract or agreement form, if any, to be signed by the parties;\n(g) if alternatives to the characteristics of the goods, works or services, contractual terms and conditions or other requirements set forth in the bidding documents are permitted, a statement to that effect, and a description of the manner in which alternative bids are to be evaluated and compared;\n(h) if bidders are permitted to submit bids for only a portion of the goods, works or services to be procured, a description of the portion or portions for which bids may be submitted;\n(i) the manner in which the bid price is to be formulated and expressed, including a statement as to whether the price is to cover elements other than the cost of the goods, works or services themselves, such as any applicable transportation and insurance charges, customs duties and taxes etc.;\n(j) any requirements of the procuring entity with respect to the issuer and the nature, form, amount and other terms and conditions of any bid security to be provided by bidder submitting bid, and any such requirements for any security for the performance of the procurement contract or the rate contract to be provided by the bidder that enters into the procurement contract, including securities such as labour and materials bonds;\n(k) the manner, place and deadline for the submission of bids;\n(l) the means by which, bidders may seek clarifications of the bidding documents and a statement as to whether the procuring entity intends to convene a meeting of bidders;\n(m) the period of time during which bids shall remain valid;\n(n) the place, time and date for the opening of bids;\n(o) references to the Act, these rules and other laws and regulations directly pertinent to the procurement proceedings, provided, however, that the omission of any such reference shall not constitute grounds for appeal or liability on the part of the procuring entity;\n(p) the name, designation, address and e-mail address, if any, of one or more officers or employees of the procuring entity, who are authorised to communicate directly with and to receive communications directly from bidders in connection with the procurement proceedings, without the intervention of an intermediary;\n(q) any commitments to be made by the bidder outside of the procurement contract, such as commitments relating to the transfer of technology;\n(r) reference to the right provided to seek appeal of an unlawful act or decision of, or procedure followed by the procuring entity in relation to the procurement proceedings;\n(s) if the procuring entity reserves the right to cancel bid proceedings and reject all bids, a statement to that effect;\n(t) any formalities that shall be required once a bid has been accepted for a procurement contract or rate contract to enter into force, including, where applicable, the execution of a written procurement contract and approval by a higher authority or the State Government; and\n(u) any other requirements laid down by the procuring entity like detail project report, concession agreement, design, plans, etc. in conformity with the Act and these rules relating to the preparation and submission of bids and to other aspects of the procurement proceedings.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "37",
            "title": "37. Single part and two part bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "38",
            "title": "38. Qualification of bidders.",
            "chapter": null,
            "content": "(a) the procuring entity shall disqualify a bidder if it finds at any time that, -\n(i) the information submitted, concerning the qualifications of the bidder, was false or constituted a misrepresentation; or\n(ii) the information submitted, concerning the qualifications of the bidder, was materially inaccurate or incomplete; and\n(b) the procuring entity may require a bidder, who was pre-qualified, to demonstrate its qualifications again in accordance with the same criteria used to prequalify such bidder. The procuring entity shall disqualify any bidder that fails to demonstrate its qualifications again, if requested to do so. The procuring entity shall promptly notify each bidder requested to demonstrate its qualifications again as to whether or not the bidder has done so to the satisfaction of the procuring entity.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "39",
            "title": "39. Eligibility of bidders.",
            "chapter": null,
            "content": "(a) all parties to the Joint Venture shall sign the bid and they shall be jointly and severally liable; and\n(b) a Joint Venture shall nominate a representative who shall have the authority to conduct all business for and on behalf of any or all the parties of the Joint Venture during the bidding process. In the event the bid of Joint Venture is accepted, either they shall form a registered Joint Venture company/firm or otherwise all the parties to Joint Venture shall sign the Agreement.\n(a) any procuring entity, if debarred by the State Government; and\n(b) a procuring entity if debarred by such procuring entity.\n[40. Time frame for procurement process.\nTable\nTable\nBid cycle of outer time frame for various procurement method by one stage bidding\nBid cycle of outer time frame for various procurement method by one stage bidding\nS. No.\nS. No.\nStages of\n\t\t\t\tProcurement\nStages of\n\t\t\t\tProcurement\nProcurement Method\nProcurement Method\nOpen Competitive Bidding\nOpen Competitive Bidding\nLimited Bidding and Single Source Procurement\nLimited Bidding and Single Source Procurement\n1\n1\n2\n2\n3\n3\n4\n4\n1.\nIssue of bidding documents\nOn the day of first publication of Notice\n\t\t\t\tInviting Bids.\n-\n2.\nSubmission of bids\n(i) Thirty Days, if estimated value of procurement is more than Rs. 50 crores and Twenty days, if the estimated value of procurement is upto Rs. 50 crores from the date of first publication of Notice Inviting Bids.\n(ii) Where clarifications/ addendum are issued, at least fifteen days, if estimated value of procurement is more than Rs. 50 crores and 10 days, if estimated value of procurement is upto Rs. 50 crores, from the date of issue of clarifications/ addendum:\n(iii) In case of International Competitive Bidding, the period of submission of bids shall be forty five days from the date of first publication of Notice Inviting Bids and at lest twenty days from the date of issue of clarifications/ addendum.\nSeven days from issue of Bidding documents/date\n\t\t\t\tof issue of clarifications/addendum.\n3.\nTechnical bid opening\nWithin one day of last day of submission of\n\t\t\t\tbids.\nWithin one day of last day of submission of\n\t\t\t\tbids.\n4.\nIssue of letter of award\nWithin three days of approval of award by the\n\t\t\t\tcompetent authority.\nWithin three days of approval of award by the\n\t\t\t\tcompetent authority.\n5.\nExecution of contract agreement\nWithin fifteen days of issue of letter of award\n\t\t\t\tor a period as specified in the bidding documents.\nWithin fifteen days of issue of letter of award\n\t\t\t\tor a period as specified in the bidding documents.\n6.\nDeclaration of the bid results on State Public\n\t\t\t\tProcurement Portal and Procuring entity's website, if any\nWithin three days of issue of letter of\n\t\t\t\tacceptance.\nWithin three days of issue of letter of\n\t\t\t\tacceptance.\nTable\nTable\nTime schedule for decision on the bids by the competent authority\nTime schedule for decision on the bids by the competent authority\nS. No.\nS. No.\nAuthority competent to take decision\nAuthority competent to take decision\nTime allowed for decision\nTime allowed for decision\n1\n1\n2\n2\n3\n3\n1.\nHead of Office or Executive Engineer\nTwenty days\n2.\nRegional Officer or Superintending Engineer\nThirty Days\n3.\nHead of the Department or Chief Engineer/Additional Chief Engineer\nForty days\n4.\nAdministrative Department concerned/Finance Committee/ Board/Empowered Committee/Empowered Board etc.\nFifty days\nNote. - (1) The period specified above shall be inclusive of time taken in communication of acceptance of bid.\nNote.\n(2) If procuring entity is other than the departments of the State Government or its attached or subordinate offices, the concerned administrative department shall specify the equivalent authority competent to take decision on the bid.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "41",
            "title": "41. Pre-qualification proceedings.",
            "chapter": null,
            "content": "(a) Registration or empanelment of prospective bidders may be done as per the procedure specified for pre-qualification proceedings.\n(b) The procuring entity shall take a decision to pre-qualify a bidder only in accordance with the criteria and procedures a s set out in the invitation to pre-qualify and in the pre-qualification documents.\n(c) The procuring entity shall promptly notify each bidder presenting an application to pre-qualify whether or not it has been pre-qualified and also publish the result of pre-qualification proceedings on the State Public Procurement Portal.\n(d) The procuring entity shall promptly communicate, with reasons, to each bidder that it has not been pre-qualified.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "42",
            "title": "42. Bid security.",
            "chapter": null,
            "content": "(i) Departments/Boards of the State Government or Central Government:\n(ii) Government Companies as defined in clause (45) of Sec. 2 of the Companies Act, 2013;\n(iii) company owned or controlled, directly or indirectly, by the Central Government, or by any State Government or Governments, or partly by the Central Government and partly by one or more State Governments which is subject to audit by the Auditor appointed by the Comptroller and Auditor-General of India under sub-section (5) or (7) of Section 139 of the Camp attics Act, 2013; or\n(iv) Autonomous bodies, Registered Societies, Cooperative Societies which are owned or controlled or managed by the State Government or Central Government.]\n(a) when the bidder withdraws or modifies its bid after opening of bids;\n(b) when the bidder does not execute the agreement, if any, after placement of supply/work order within the specified period;\n(c) when the bidder fails to commence the supply of the goods or service or execute work as per supply/work order within the time specified;\n(d) when the bidder does not deposit the performance security within specified period after the supply/work order is placed; and\n(e) if the bidder breaches any provision of code of integrity prescribed for bidders specified in the Act and Chapter VI of these rules.\n(a) the expiry of validity of bid security;\n(b) the execution of agreement for procurement and performance security is furnished by the successful bidder;\n(c) the cancellation of the procurement process; or\n(d) the withdrawal of bid prior to the deadline for presenting bids, unless the bidding documents stipulate that no such withdrawal is permitted.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "43",
            "title": "43. Notice Inviting Bids.",
            "chapter": null,
            "content": "(a) the name and address of the procuring entity including email address, if any;\n(b) a summary of the principal required terms and conditions of the procurement contract or rate contract to be entered into as a result of the procurement proceedings, including the nature, quantity, time and place of delivery of the goods to be supplied, the works to be executed, or the services to be provided;\n(c) whether the bid procedure shall be conducted in a single stage or two stages and whether it is to be presented simultaneously in two envelopes (one envelope containing the technical, quality and performance characteristics of the bid and the other envelope containing the financial aspects of the bid);\n(d) the criteria and procedures to be used for evaluating the qualifications of bidders;\n(e) the procedure of obtaining the solicitation documents and the place from which they may be obtained;\n(f) the price, if any, charged by the procuring entity and the mode of payment for the solicitation documents and the amount of bid security and its form;\n(g) the manner, place and deadline for the submission of bids;\n(h) right of the procuring entity to cancel the bid process and reject any or all of the bids;\n(i) the time, date and place of opening of bids;\n(j) whether any of the items of procurement are reserved for a specific category of bidders; and\n(k) any other important information.\n(a) the name and address of the procuring entity including email address, if any;\n(b) a summary of the required principal terms and conditions, to the extent known at the time of invitation to pre-qualify, of the procurement contract or rate contract to be entered into as a result of the procurement proceedings, including the nature, quantity and place of delivery of the goods to be supplied, the nature and location of the works to be effected, or the nature of the services and the location where they are to be provided, as well as, the required time for the supply of the goods or for the completion of the works, or the timetable for the provision of the services, if already known;\n(c) the criteria and procedures to be followed for evaluating the qualifications of bidders;\n(d) the procedure of obtaining the pre-qualification documents and the place from which they may be obtained;\n(e) the price, if any, charged by the procuring entity and the mode of payment for the pre-qualification documents and subsequent to pre-qualification, for the bidding documents;\n(f) the manner, place and deadline for presenting applications to pre-qualify; and\n(g) the time, date and place of opening of proposals for prequalification.\nTable\nTable\nTime for submission of bids and modes of publicity for procurement of works\nTime for submission of bids and modes of publicity for procurement of works\nS. No.\nS. No.\nEstimated value of procurement\nEstimated value of procurement\nPeriod for submission of bid from the date of\n\t\t\t\tfirst publication of Notice Inviting Bid\nPeriod for submission of bid from the date of\n\t\t\t\tfirst publication of Notice Inviting Bid\nMode of publication\nMode of publication\n1\n1\n2\n2\n3\n3\n4\n4\n1.\nUp to rupees ten lakh\nSeven days\n(i)\n(ii)\nNotice Board of the procuring \n\t\t\t\tentity and all subordinate Regional and Divisional Head Quarters, as the \n\t\t\t\tcase may be.\nOne Regional daily newspaper.\n2.\nAbove rupees ten lakh and upto Rupees one Crore\nTen days\n(i)\n(ii)\n(iii)\nNotice Board of the\n\t\t\t\tprocuring entity and all subordinate Regional and Divisional Head\n\t\t\t\tQuarters, as the case may be.\nOne Regional daily\n\t\t\t\tnewspaper.\nOne leading daily State Level newspaper having\n\t\t\t\tcirculation of fifty thousand copies and above.\n3.\nAbove rupees one crore\nTwenty days\n(i)\n(ii)\n(iii)\nNotice Board of the\n\t\t\t\tprocuring entity and of all subordinate Regional and Divisional\n\t\t\t\tHead Quarters, as the case may be.\nOne State level\n\t\t\t\tleading daily newspaper having circulation of fifty thousand\n\t\t\t\tcopies and above\nOne all India level English daily newspaper with wide\n\t\t\t\tcirculation.\nTable\nTable\nTime for submission of bids and modes of publicity for procurement of works\nTime for submission of bids and modes of publicity for procurement of works\nS. No.\nS. No.\nEstimated Value of procurement\nEstimated Value of procurement\nPeriod for submission of bid from the date of\n\t\t\t\tfirst publication of Notice Inviting Bid\nPeriod for submission of bid from the date of\n\t\t\t\tfirst publication of Notice Inviting Bid\nMode of publication\nMode of publication\n1\n1\n2\n2\n3\n3\n4\n4\n1.\nUp to rupees ten lakh\nSeven days\n(i)\n(ii)\nNotice Board of the procuring entity and its\n\t\t\t\tsubordinate offices; and\nOne leading Regional daily newspaper.\n2.\nAbove rupees ten lakh and upto Rupees two crore\nTen days\n(i)\n(ii)\nNotice Board of the\n\t\t\t\tprocuring entity and its subordinate offices, and\nOne leading Regional daily newspaper and one State \n\t\t\t\tlevel leading daily newspaper having circulation of 50,000 copies or more.\n3.\nAbove rupees two crore and upto 50 crore\nTwenty days\n(i)\n(ii)\n(iii)\nNotice Board of the\n\t\t\t\tprocuring entity and its subordinate offices.\nOne leading Regional daily newspaper and one State level leading daily newspaper having circulation of 50,000 copies or more, and\nOne all India level daily English newspaper with wide circulation.\n4.\nAbove rupees 50 crore\nThirty days\n(i)\n(ii)\n(iii)\nNotice Board of the\n\t\t\t\tprocuring entity and its subordinate offices.\nOne leading Regional\n\t\t\t\tdaily newspaper, one State level leading daily newspapers having\n\t\t\t\tcirculation of 50,000 copies or more.\nOne all India level daily newspaper with wide\n\t\t\t\tcirculation.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "44",
            "title": "44. Price for bidding documents, pre-qualification documents or bidder registration documents and processing fee or user charges.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "45",
            "title": "45. Sale of bidding documents",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "46",
            "title": "46. Pre-bid clarifications.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "47",
            "title": "47. Changes in the bidding documents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "48",
            "title": "48. Period of validity of bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "49",
            "title": "49. Format and signing of bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "50",
            "title": "50. Sealing and marking of bids.",
            "chapter": null,
            "content": "(a) bear the name and complete address along with telephone/mobile number of bidder;\n(b) bear complete address of the procuring entity with telephone number, if any;\n(c) bear the specific identification of the bidding process pursuant to Notice Inviting Bids and any additional identification marks as specified in the bidding documents; and\n(d) bear a warning not to be opened before the time and date for bid opening, in accordance with the Notice Inviting Bids.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "51",
            "title": "51. Deadline for the submission of bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "52",
            "title": "52. Late bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "53",
            "title": "53. Receipt and Custody of Bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "54",
            "title": "54. Withdrawal, substitution and modification of bids.",
            "chapter": null,
            "content": "(a) submitted in accordance with the bidding documents, and in addition, the envelope shall be clearly marked as \"Withdrawal,\" \"Substitution,\" or \"Modification\"; and\n(b) received by the person authorised to receive the bids or directly dropped in the bid box prior to the last time and date fixed for receiving of bids.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "55",
            "title": "55. Opening of bids.",
            "chapter": null,
            "content": "(a) the name of the bidder and whether there is a substitution or modification;\n(b) the bid prices (per lot if applicable);\n(c) the bid security, if required; and\n(d) any other details as the committee may consider appropriate.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "56",
            "title": "56. Preliminary examination of bids.",
            "chapter": null,
            "content": "(a) bid is signed, as per the requirements listed in the bidding documents;\n(b) bid has been sealed as per instructions provided in the bidding documents;\n(c) bid is valid for the period, specified in the bidding documents;\n(d) bid is accompanied by bid security or bid securing declaration;\n(e) bid is unconditional and the bidder has agreed to give the required performance security; and\n(f) other conditions, as specified in the bidding documents are fulfilled. 32",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "57",
            "title": "57. Tabulation of Technical bids.",
            "chapter": null,
            "content": "(a) Name and address of the bidder including e-mail address, if any;\n(b) Reference of registration/empanelment, if any, with the procuring entity or other procuring entity;\n(c) Is there any substitution or modification of the original bid;\n(d) Weather the bidder fulfills the eligibility criteria given in the bidding documents;\n(e) Whether the bid has been signed by the bidder or an authorised person (whether valid document of authority is enclosed);\n(f) Whether proof of payment of price of bid documents given;\n(g) Whether proof of payment of processing fee or user charges, if any, bid security or the instrument of bid security or bid securing declaration given;\n(h) Response to the required qualification criteria and allotment of marks for them, or whether meets the minimum standards fixed for each criterion in the bidding documents for, -\n(i) availability of financial resources;\n(ii) past performance and experience;\n(iii) technical and professional competence including requirement of technical/professional/specialist personnel and availability of required machinery and equipment;\n(iv) managerial resources and competence;\n(v) whether proof/declaration has been given as required under clauses (b) to (e) of sub-section (2)of section 7;\n(vi) any other qualification criteria fixed in accordance with the provisions of section 7.\n(i) Result of evaluation of Technical bids, whether qualified or not, if not, reasons thereof.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "58",
            "title": "58. Tabulation of Financial bids.",
            "chapter": null,
            "content": "(a) Name and address of the bidders including e-mail address, if any;\n(b) If evaluation of Technical bids has taken place, whether the bidder has qualified in evaluation of Technical bids;\n(c) Specifications of the subject matter of procurement offered;\n(d) Rates quoted per unit, per item and total price of each item quoted or percentage above, below on the rates given in the bidding documents, as the case may be;\n(e) Excise duty, Rajasthan VAT, Central sales tax, Entry tax and any other taxes as applicable, to be shown separately;\n(f) Packing and forwarding charges, freight, insurance etc.;\n(g) Total cost per unit, per item and all items including all cost and taxes;\n(h) Discount, rebate if any (if permitted);\n(i) Alternative offers (if permitted);\n(j) Delivery/completion period quoted;\n(k) Validity period of bids quoted;\n(l) Mode of payment quoted;\n(m) Samples, trials offered (if asked for) and results of sample testing and trials conducted;\n(n) Guarantee/warrantee/defect liability period quoted, if asked for;\n(o) Contract maintenance period quoted, if asked for;\n(p) Response to any other information asked for in the bidding documents;\n(q) Any conditions quoted different from those included in the bidding documents;\n(r) Is there any material deviation, reservation or omission from the required specifications and terms and conditions set out in the bidding documents;\n(s) Result of evaluation of financial bids- standing of the bidder in financial evaluation;\n(t) Combined evaluation of Technical and Financial bids, if stipulated in the bidding documents- standing of the bidder in combined evaluation of Technical and Financial bids;",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "59",
            "title": "59. Determination of responsiveness.",
            "chapter": null,
            "content": "(a) \"deviation\" is a departure from the requirements specified in the bidding documents;\n(b) \"reservation\" is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the bidding documents; and\n(c) \"Omission\" is the failure to submit part or all of the information or documentation required in the bidding documents.\n(a) if accepted, shall :-\n(i) affect in any substantial way the scope, quality, or performance of the subject matter of procurement specified in the bidding documents; or\n(ii) limits in any substantial way, inconsistent with the bidding documents, the procuring entity's rights or the bidders obligations under the proposed contract; or\n(b) if rectified, shall unfairly affect the competitive position of other bidders presenting responsive bids.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "60",
            "title": "60. Clarification of bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "61",
            "title": "61. Non-material Non-conformities in bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "62",
            "title": "62. Exclusion of bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "63",
            "title": "63. Evaluation of Technical bids in case of two part bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "64",
            "title": "64. Correction of arithmetic errors in financial bids.",
            "chapter": null,
            "content": "(a) if there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected, unless in the opinion of the bid evaluation committee there is an obvious misplacement of the decimal point in the unit price, in which case the total price as quoted shall govern and the unit price shall be corrected;\n(b) if there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall prevail and the total shall be corrected; and\n(c) if there is a discrepancy between words and figures, the amount in words shall prevail, unless the amount expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail subject to clause (a) and (b) above.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "65",
            "title": "65. Evaluation of financial bids.",
            "chapter": null,
            "content": "(a) in case of single part bid system where bid is received in single cover along with requisite bid security, processing fee or user charges and price of bidding documents within specified time, it shall be considered for financial evaluation by the bids evaluation committee;\n(b) in case of two part bid system the financial bids of the bidders who qualified in technical evaluation shall be opened at the notified time, date and place by the bid evaluation committee in the presence of the bidders or their representatives who choose to be present;\n(c) the process of opening, marking and signing on the financial bids shall be as prescribed in rule 55;\n(d) the names of the bidders, the rates given by them and conditions put, if any, shall be read out and recorded;\n(e) conditional bids are liable to be rejected;\n(f) the evaluation shall include all costs and all taxes and duties applicable to the bidder as per law of the Central/State Government/Local Authorities, and the evaluation criteria specified in the bidding documents shall only be applied;\n(g) the offers shall be evaluated and marked L1, L2, L3 etc. L1 being the lowest offer and then others in ascending order in case price is the only criteria, or evaluated and marked H1, H2, H3 etc. in descending order in case quality is also a criteria and the combined score of technical and financial evaluation is considered;\n(h) the bid evaluation committee shall prepare a comparative statement in tabular form in accordance with rule 58 with its report on evaluation of financial bids and recommend the lowest offer for acceptance to the procuring entity, if price is the only criterion, or most advantageous bid in other case;\n(i) it shall be ensured that the offer recommended for sanction is justifiable looking to the prevailing market rates of the goods, works or service required to be procured; and\n(j) in case a rate contract is being entered, more than one firm at the same lowest rate may be considered to ensure uninterrupted delivery but for this purpose, counter offer of lowest rate will be given for acceptance to the bidders quoting higher rates in the order of ascending value.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "66",
            "title": "66. Comparison of rates of firms outside and those in Rajasthan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "67",
            "title": "67. Price/purchase preference in evaluation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "68",
            "title": "68. Lack of competition.",
            "chapter": null,
            "content": "(a) the bid is technically qualified;\n(b) the price quoted by the bidder is assessed to be reasonable;\n(c) the bid is unconditional and complete in all respects;\n(d) there are no obvious indicators of cartelisation amongst bidders; and\n(e) the bidder is qualified as per the provisions of section 7",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "69",
            "title": "69. Negotiations.",
            "chapter": null,
            "content": "(a) when ring prices have been quoted by the bidders for the subject matter of procurement; or\n(b) when the rates quoted vary considerably and considered much higher than the prevailing market rates.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "70",
            "title": "70. Acceptance of the successful bid and award of contract.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "71",
            "title": "71. Information and publication of award.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "72",
            "title": "72. Procuring entity's right to accept or reject any or all bids.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "73",
            "title": "73. Right to vary quantity.",
            "chapter": null,
            "content": "(a) 50% of the quantity of the individual items and 50% of the value of original contract in case of works; and\n(b) 50% of the value of goods or services of the original contract.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        },
        {
            "number": "74",
            "title": "74. Dividing quantities among more than one bidder at the time of award.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 71
        },
        {
            "number": "75",
            "title": "75. Performance security.",
            "chapter": null,
            "content": "(i) Departments/Boards of the State Government or Central Government;\n(ii) Government Companies as defined in clause (45) of Sec. 2 of the Companies Act, 2013;\n(iii) company owned or controlled, directly or indirectly, by the Central Government, or by any State Government or Governments, or partly by the Central Government and partly by one or more State Governments which is subject to audit by the Auditor appointed by the Comptroller and Auditor-General of India under sub-section (5) or (7) of Sec. 139 of the Companies Act, 2013; or\n(iv) Autonomous bodies, Registered Societies, Cooperative Societies which are owned or controlled- or managed by the State Government or Central Government.\n(a) deposit though eGRAS;\n(b) Bank Draft or Banker's Cheque of a scheduled bank;\n(c) National Savings Certificates and any other script/instrument under National Savings Schemes for promotion of small savings issued by a Post Office in Rajasthan, if the same can be pledged under the relevant rules. They shall be accepted at their surrender value at the time of bid and formally transferred in the name of procuring entity with the approval of Head Post Master;\n(d) Bank guarantee/s of a scheduled bank. It shall be got verified from the issuing bank. Other conditions regarding bank guarantee shall be same as mentioned in the rule 42 for bid security;\n(e) Fixed Deposit Receipt (FDR) of a scheduled bank. It shall be in the name of procuring entity on account of bidder and discharged by the bidder in advance. The procuring entity shall ensure before accepting the Fixed Deposit Receipt that the bidder furnishes an undertaking from the bank to make payment/premature payment of the Fixed Deposit Receipt on demand to the procuring entity without requirement of consent of the bidder concerned. In the event of forfeiture of the performance security, the Fixed Deposit shall be forfeited along with interest earned on such Fixed Deposit.\n[(f) In case of procurement of works, the successful bidder at the time of signing of the contract agreement, may submit option for deduction of performance security from his each running and final bill @ 10% of the amount of the bill.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 72
        },
        {
            "number": "76",
            "title": "76. Execution of agreement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 73
        },
        {
            "number": "77",
            "title": "77. Confidentiality.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 74
        },
        {
            "number": "78",
            "title": "78. Cancellation of procurement process.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 75
        },
        {
            "number": "79",
            "title": "79. Documentary record of procurement proceedings.",
            "chapter": null,
            "content": "(a) the names and addresses of all bidders with bid prices and conditions of bid if bid is conditional;\n(b) the name and address of the successful bidder with price on which procurement is made;\n(c) in case of rate contract method, the names and addresses of the bidders with whom the rate contract is concluded;\n(d) a summary of modification, if any, made in the bidding documents;\n(e) details of qualification required, bidders having qualifications and details of qualified or disqualified bidders with reasons;\n(f) where a written procurement contract has been executed, including rate contract, copy of contract;\n(g) in the case of empanelment, the terms and conditions of the empanelment and a copy of the agreement, if any;\n(h) a summary of the evaluation and comparison of bids, including the application of any margin of preference and reasons for rejection or non-consideration of a bid, if any; and\n(i) if the procurement process is cancelled, reasons of cancellation.\n[Chapter- VA]\nBid Process Management - Swiss Challenge Method",
            "footnote": "",
            "is_definition": false,
            "sort_order": 76
        },
        {
            "number": "79A",
            "title": "79A. Swiss Challenge Method of Procurement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 77
        },
        {
            "number": "79B",
            "title": "79B. Eligible sectors under Swiss Challenge Method.",
            "chapter": null,
            "content": "(i) Agriculture, Horticulture, allied sector & post-harvest management Agri-infrastructure Agriculture and horticulture Markets; Floriculture parks and markets; Agro-food processing and allied infrastructure (including common-user cold storage facilities);\n(ii) Transportation & Logistics Roads (including bridges, highways, interchanges, and flyovers), Public Transport, Railway systems, Urban transport systems: MRTS, LRTS, Monorail, High-capacity bus systems, Airstrips, Inland water transport, Bus/Truck/Urban Transport Terminals and associated public facilities such as Public Amenities Centers;\n(iii) Warehousing infrastructure (including container freight stations, container depots, cold storage facilities and tank farms);\n(iv) Mechanized and Multistory Parking facilities;\n(v) Urban and Municipal Infrastructure (Sanitation, Water Supply and Sewerage; Desalination; Underground drainage; Solid waste/ Biomedical waste/Hazardous waste: Collection, transportation, treatment and disposal facilities);\n(vi) Education including Technical Education (Skill development etc.);\n(vii) Gas distribution network;\n(viii) Medical and Health Sector;\n(ix) Housing Sector & Environment;\n(x) Information Technology;\n(xi) Water Body Eco-system Management;\n(xii) Industrial infrastructure;\n(xiii) Irrigation Sector;\n(xiv) Land Reclamation;\n(xv) New & Renewable Energy (solar, wind, hydel etc.);\n(xvi) Power sector;\n(xvii) Public Buildings, Markets, gardens, parks;\n(xviii) Sports and Recreation infrastructure;\n(xix) Trade Fair, Convention, Exhibition and Cultural Centers;\n(xx) Tourism Sector;\n(xxi) Water Supply Project;\n(xxii) Up-gradation and restructuring of any of the projects in above sectors;\n(xxiii) Any project in public-private partnership that the State Government may find beneficial;\n(xxiv) Any proposal for the partial or complete disinvestment of a state public sector undertaking;\n(xxv) Any other project, which is a combination of above mentioned sectors; and\n(xxvi) On recommendations, with appropriate justifications, of the Administrative Department for inclusion of any new sector, SLEC may recommend for inclusion of the same to the State Government. Any new sector can be added to the list of \"eligible sectors\" of these rules, only after the consent of the Finance Department of State Government on the recommendations of the SLEC.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 78
        },
        {
            "number": "79C",
            "title": "79C. Projects, which shall not be acceptable under Swiss Challenge Method.",
            "chapter": null,
            "content": "(i) Proposals which contravene the provisions of any law that is in force;\n(ii) Proposals/ projects which would result in monopolistic situation;\n(iii) Projects which are less than Rs. 50.00 crores (Rs. Fifty Crores) in value.\n(iv) Proposals / projects that fall outside the sectors and below the financial limits as prescribed in these rules.\n(v) Proposals of PPP Projects involving financial assistance from State Government by way of viability gap funding (VGF) more than 20% of the total project cost, excluding the cost of land.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 79
        },
        {
            "number": "79D",
            "title": "79D. Procedure.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 80
        },
        {
            "number": "79E",
            "title": "79E. Preparation and submission of detailed and comprehensive proposal.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 81
        },
        {
            "number": "79F",
            "title": "79F. Earnest Security.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 82
        },
        {
            "number": "79G",
            "title": "79G. Detailed Project Report (DPR) preparation cost.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 83
        },
        {
            "number": "79H",
            "title": "79H. Clarifications regarding Detailed Project Report (DPR).",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 84
        },
        {
            "number": "79I",
            "title": "79I. Bid Parameters and Bid Value.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 85
        },
        {
            "number": "79J",
            "title": "79J. Competent Authority for approval of Projects under SCM and Procedure to be followed thereof.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 86
        },
        {
            "number": "79K",
            "title": "79K. Bidding Process.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 87
        },
        {
            "number": "79L",
            "title": "79L. Transaction Advisor.",
            "chapter": null,
            "content": "(i) he shall examine the DPR with respect to technology, technical specifications, cost estimates, drawings, Internal Rate of Return (IRR), Net Present Value (NPV), Equity debt ratio, Value for Money analysis, necessary approvals (statutory or otherwise) required for the implementation of the project etc.;\n(ii) he, if required by the Administrative Department, shall carry out additional studies for independently determining the project cost, project revenues, viability and risk analysis etc. including Value for Money analysis to ensure proper benchmarking;\n(iii) he shall be required to specify broad parameters regarding environment and social safeguards that need to be adhered by the concessionaire during implementation period in the bid document;\n(iv) he shall assist the Administrative Department to get necessary approvals from appropriate authorities for the implementation of the project;\n(v) he shall develop documents for Request for Qualification (RFQ)/Request for Proposals (RFP) and submit to the Administrative Department concerned for approval. The bidding criteria shall be designed in such a way that maximum competition is ensured;\n(vi) he shall develop and present the RFP and the concession agreement to the concerned authorities for approval and after competent approval, the same shall be launched into the market;\n(vii) he shall assist the Administrative Department concerned with the Bid process management, including Request for Proposal (RFP) launch, formulation of responses to bidder queries, bid evaluation and recommendations as per the criteria mentioned in the RFP document, recommending a bidder, contract negotiations and bid closure which are required to be undertaken, for bringing the Project to a Technical close;\n(viii) he shall submit all the documents for approval to the Administrative Department. He shall not provide any document to the bidder(s) or any other person(s) without explicit consent from the Administrative Department concerned; and\n(ix) he shall perform any other functions or responsibilities assigned by the Administrative Department.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 88
        },
        {
            "number": "79M",
            "title": "79M. Time frame for the total process.",
            "chapter": null,
            "content": "S. No.\nS. No.\nActivity\nActivity\nTime Required\nTime Required\n1.\nExamination of preliminary report and permission\n\t\t\t\tto the proponent to proceed for preparation of detailed proposal\n\t\t\t\tOR rejection of the proposal, as the case may be, by the\n\t\t\t\tAdministrative Department.\nOne Month from the date of receipt of the\n\t\t\t\tproposal.\n2.\nDetailed proposal submission by the proponent.\nWithin three Months or period extended under\n\t\t\t\tsub-rule (6) of Rule 79-D.\n3.\nExamination of detailed proposal, preparation of\n\t\t\t\tbid documents and approval from competent authority\nForty Five days\n4.\nBid invitation and submission of bids\n(i) Thirty days from the date of first\n\t\t\t\tpublication of Notice Inviting Bids;\n(ii) Where clarifications/addendum are issued,\n\t\t\t\tat least Fifteen days from date of issue of clarifications/\n\t\t\t\taddendum; or\n(iii) In case of International Competitive\n\t\t\t\tBidding, the period of submission of bids shall be forty five\n\t\t\t\tdays from the date of first publication of Notice Inviting Bids\n\t\t\t\tand at least twenty days from the date of issue of\n\t\t\t\tclarifications/ addendum.\n5.\nBids evaluation\nFifteen Days\n6.\nTime for project proponent to match the most\n\t\t\t\tadvantageous bid, if any.\nFifteen Days\n7.\nLetter of Award\nWithin 7 days of approval of award by the\n\t\t\t\tcompetent authority.\n8.\nExecution of Contract Agreement\nWithin fifteen days of issue of letter of award\n\t\t\t\tor a period as specified in the bidding documents.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 89
        },
        {
            "number": "79N",
            "title": "79N. Eligibility criteria for the Project Proponent.",
            "chapter": null,
            "content": "(i) the person or lead member shall have an average turnover of minimum of 100% project cost in the last three financial years and in case of Joint venture/consortium, an average turnover of minimum of 100% of project cost in last three financial years by lead member and the audited balance sheets of last three financial years shall be submitted;\n(ii) [the person or lead member, or any other member of the joint venture or consortium, shall have the experience] in handling at least one project in that Sector in which the proposal is being submitted, costing not less than 100% of total project cost over the last 10 years, in such project(s) where the contract has been awarded and work has been completed. (Work order and completion certificate from the client shall be provided);\n(iii) he shall not be blacklisted by Central Government, any State Government or any Government agency. He shall submit an undertaking to the effect that he has not been blacklisted by Central Government, any State Government or any Government agency; and\n(iv) he shall necessarily fulfill the prequalification / qualification criteria/ parameters for bidders, as per the bid document issued by the Administrative Department for open bidding process for the project.\n(i) company, certificate of incorporation;\n(ii) in case of firm, certificate of registration; and\n(iii) in case of partnership firm, partnership deed shall be submitted along with the proposal.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 90
        },
        {
            "number": "79O",
            "title": "79O. Power to call off the Project.",
            "chapter": null,
            "content": "Chapter VI\nCode of Integrity",
            "footnote": "",
            "is_definition": false,
            "sort_order": 91
        },
        {
            "number": "80",
            "title": "80. Code of integrity.",
            "chapter": null,
            "content": "(a) maintain an unimpeachable standard of integrity both inside and outside their office;\n(b) act in accordance with the provisions of the Act, these rules, guidelines issued under the Act and instructions;\n(c) not allow any bidders to have access to information on a particular procurement, before such information is available to the public at large;\n(d) not intentionally use unnecessarily restrictive or \"tailored\" specifications, terms of reference or statements of work that can discourage competition;\n(e) not solicit or accept any bribe, reward or gift or any material benefit of any directly or indirectly promise of future employment from anyone, who has sought or is seeking procurement from the procuring entity;\n(f) not have a financial interest in any bidder(s) responding to a procuring entity's bidding process and any person having financial interest in any bidder shall not participate in that procurement process;\n(g) not disclose proprietary and source selection information, directly or indirectly, to any person other than a person authorised to receive such information;\n(h) treat all bidders in a fair and equitable manner in line with the principle of fairness, integrity and transparency in the procurement process;\n(i) provide all bidders identical information at the same time, during the bidding process;\n(j) apply the same criteria of evaluation as specified in the bidding documents, bidder registration documents or pre-qualification documents and under no circumstances new evaluation criteria shall be introduced during the evaluation process;\n(k) not entertain any favour, recreation, presents, services, etc. from the bidders or prospective bidders;\n(l) protect the interests of the procuring entity under all circumstances while dealing with information and information sources;\n(m) maintain confidentially of all bids;\n(n) ensure that the selection of bidder is as per the bidding documents and is not influenced by personal reasons attributable to concerned officials in any manner; and\n(o) disclose conflict of interest, if any.\n(a) not offer any bribe, reward or gift or any material benefit either directly or indirectly in exchange for an unfair advantage in procurement process or to otherwise influence the procurement process;\n(b) not misrepresent or omit information that misleads or attempts to mislead so as to obtain a financial or other benefit or avoid an obligation;\n(c) not indulge in any collusion, bid rigging or anti-competitive behaviour to impair the transparency, fairness and progress of the procurement process;\n(d) not misuse any information shared between the procuring entity and the bidders with an intent to gain unfair advantage in the procurement process;\n(e) not indulge in any coercion including impairing or harming or threatening to do the same, directly or indirectly, to any party or to its property to influence the procurement process;\n(f) not obstruct any investigation or audit of a procurement process;\n(g) disclose conflict of interest, if any; and\n(h) disclose any previous transgressions with any entity in India or any other country during the last three years or any debarment by any other procuring entity.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 92
        },
        {
            "number": "81",
            "title": "81. Conflict of interest.",
            "chapter": null,
            "content": "(a) A conflict of interest occurs when procuring entity's personnel's private interests, such as outside professional or other relationships or personal financial assets, interfere or appear to interfere with the proper performance of its professional functions or obligations as a procurement official.\n(b) Within the procurement environment, a conflict of interest may arise in connection with such private interests as personal investments and assets, political or other outside activities and affiliations while in the service of the procuring entity, employment after retirement from the procuring entity's service or the receipt of a gift that may place the procuring entity's personnel in a position of obligation.\n(c) A conflict of interest also includes the use of procuring entity's assets, including human, financial and material assets, or the use of procuring entity's office or knowledge gained from official functions for private gain or to prejudice the position of someone procuring entity's personnel does not favour.\n(d) A conflict of interest may also arise in situations where procuring entity's personnel is seen to benefit, directly or indirectly, or allow a third party, including family, friends or someone they favour, to benefit from procuring entity's personnel's actions or decisions.\n(a) they have controlling partners in common;\n(b) they receive or have received any direct or indirect subsidy from any of them;\n(c) they have the same legal representative for purposes of the bid;\n(d) they have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another;\n(e) A bidder participates in more than one bid in the same bidding process. However, this does not limit the inclusion of the same sub-contractor, not otherwise participating as a bidder, in more than one bid; or\n(f) A bidder or any of its affiliates participated as a consultant in the preparation of the design or technical specifications of the subject matter of procurement of the bidding process. All bidders shall provide in Qualification Criteria and Biding Forms, a statement that the bidder is neither associated nor has been associated directly or indirectly, with the consultant or any other entity that has prepared the design, specifications and other documents for the subject matter of procurement or being proposed as Project Manager for the contract.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 93
        },
        {
            "number": "82",
            "title": "82. Breach of code of integrity by the bidder.",
            "chapter": null,
            "content": "CHAPTER-VII\nAppeals",
            "footnote": "",
            "is_definition": false,
            "sort_order": 94
        },
        {
            "number": "83",
            "title": "83. Form of Appeal.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 95
        },
        {
            "number": "84",
            "title": "84. Fee for filing appeal.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 96
        },
        {
            "number": "85",
            "title": "85. Procedure for disposal of appeal.",
            "chapter": null,
            "content": "(a) hear all the parties to appeal present before him; and\n(b) peruse or inspect documents, relevant records or copies thereof relating to the matter.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 97
        },
        {
            "number": "86",
            "title": "86. Repeal and savings.",
            "chapter": null,
            "content": "Form No. 1\nForm No. 1\n[See rule 83]\n[See rule 83]\nMemorandum of Appeal under the Rajasthan Transparency in Public Procurement Act, 2012\nMemorandum of Appeal under the Rajasthan Transparency in Public Procurement Act, 2012",
            "footnote": "",
            "is_definition": false,
            "sort_order": 98
        },
        {
            "number": "1",
            "title": "1. Particulars of appellant:",
            "chapter": null,
            "content": "(i) Name of the appellant:\n(ii) Official address, if any:\n(iii)Residential address:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 99
        },
        {
            "number": "2",
            "title": "2. Name and address of the respondent(s):",
            "chapter": null,
            "content": "(i)\n(ii)\n(iii)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 100
        },
        {
            "number": "3",
            "title": "3. Number and date of the order appealed against and name and designation of the officer/authority who passed the order (enclose copy), or a statement of a decision, action or omission of the procuring entity in contravention to the provisions of the Act by which the appellant is aggrieved:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 101
        },
        {
            "number": "4",
            "title": "4. If the Appellant proposes to be represented by a representative, the name and postal address of the representative:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 102
        },
        {
            "number": "5",
            "title": "5. Number of affidavits and documents enclosed with the appeal:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 103
        },
        {
            "number": "6",
            "title": "6. Grounds of appeal: .................................................................................................................................................................. ............................................................................................................................................................................. .............................................................................................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 104
        },
        {
            "number": "7",
            "title": "7. Prayer: .................................................................................................................................................................. ............................................................................................................................................................................. ........................................................................................................................................................",
            "chapter": null,
            "content": "Appellant's Signature\n[Form No. 2]\n[Form No. 2]\n[ See Rule 79-D]\nCertificate to be furnished by Project Proponent\nCertificate to be furnished by Project Proponent",
            "footnote": "",
            "is_definition": false,
            "sort_order": 105
        },
        {
            "number": "1",
            "title": "1. The_____________________(Name of project) has been submitted by the undersigned as the duly authorised representative of_____________________(Name of Project Proponent) under the Swiss Challenge Method.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 106
        },
        {
            "number": "2",
            "title": "2. The Project Proponent will support fair competition through open bidding process to obtain the most advantageous bid.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 107
        },
        {
            "number": "3",
            "title": "3. The Project Proponent agrees to the standard project structure, bidding documents, concession agreement similar to other projects in the sector as decided by the Administrative Department / Government of Rajasthan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 108
        },
        {
            "number": "4",
            "title": "4. The Project Proponent agrees to abide by the Regulatory Authority, as and when formed by the Government of Rajasthan or through law.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 109
        },
        {
            "number": "5",
            "title": "5. The Project Proponent agrees that the cost of preparation of DPR, as decided by the Administrative Department, shall be reimbursable to the project proponent as provided in Rajasthan Transparency in Public Procurement Rules, 2013.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 110
        },
        {
            "number": "6",
            "title": "6. The Project Proponent agrees that the Administrative Department concerned has the right to call off the project anytime during the process without assigning any reason, but the Administrative Department may call off the project before entering into an agreement with the project proponent or the successful bidder, as the case may be.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 111
        },
        {
            "number": "7",
            "title": "7. The Project Proponent is technically and financially competent to handle the project implementation for which the proposal has been submitted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 112
        },
        {
            "number": "8",
            "title": "8. The Project Proponent understands and agrees that if the project proponent fails to submit the Detailed Proposal/DPR within the time given by the Administrative Department for the same, then, the Administrative Department may at its discretion exercise the option to develop the project on its own, through its agencies or through any third party, without the Project Proponent having any claims, whatsoever.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 113
        },
        {
            "number": "9",
            "title": "9. The Project Proponent agrees to abide by the Rajasthan Transparency in Public Procurement Act, 2012 and Rajasthan Transparency in Public Procurement Rules, 2013.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 114
        },
        {
            "number": "10",
            "title": "10. That the above statements are true to the best of my knowledge and belief.",
            "chapter": null,
            "content": "(Signature, Name and Designation of Authorised Representative of Project Proponent)\n[Form No. 3]\n[Form No. 3]\n[ See Rule 79-D]\nDetails of Proposal by Project Proponent\nDetails of Proposal by Project Proponent\nS. No.\nS. No.\nDescription\nDescription\nYes / No (wherever applicable)\nYes / No (wherever applicable)\nParticulars\nParticulars\nReference/Form\nReference/Form\n1.\n1.\nGeneral Information on the Project:\nGeneral Information on the Project:\n1.1\nDefine/Brief the Project Proposal\n1.2\nExplain the uniqueness of the project i.e. the\n\t\t\t\treasons for its being unique.\n1.3\nCharacteristics of the Project\n1.4\nCost of the Project and Other Details\n1.5\nState whether the letter has been submitted by\n\t\t\t\tthe project proponent adhering the conditions of the Swiss\n\t\t\t\tChallenge Method\n2.\n2.\nAssessment of Need of the project\nAssessment of Need of the project\n2.1\nNature of intended use\n2.2\nJustification of need\n3.\n3.\nDetails on technology (applicable in case of\n\t\t\t\tnew technology)\nDetails on technology (applicable in case of\n\t\t\t\tnew technology)\n3.1\nDetails of technology used for the project\n3.2\nIs the technology proprietary?\n3.3\n(a) Why should Government go for this technology\n\t\t\t\tonly?\n(b) What if sourcing of another technology has\n\t\t\t\tto be made in future during the life of the project for any\n\t\t\t\treason?\n4.\n4.\nNeed for Government Support\nNeed for Government Support\n4.1\nState the type of Government support required, if\n\t\t\t\tany, and why?\n4.2\nWill the proponent be able to raise necessary\n\t\t\t\tfunds & equity to undertake the project? (State how)\n5.\n5.\nEligibility of the proponent to undertake the\n\t\t\t\tproject\nEligibility of the proponent to undertake the\n\t\t\t\tproject\n5.1\nIs proponent planning to undertake the project\n\t\t\t\ton its own or through a consortium to meet the technical,\n\t\t\t\tfinancial and technological needs? Please Elaborate.\n-\n6.\n6.\nPrefeasibility report\nPrefeasibility report\n6.1\nHas the proponent conducted prefeasibility /\n\t\t\t\tfeasibility DPR (state the position/ information)?\n6.2\nState whether the preliminary financial\n\t\t\t\tviability of the project has been done.\n6.3\nState whether the proponent shall undertake all\n\t\t\t\tthe studies which are required for development of the project to\n\t\t\t\ttake it to the bidding phase within the timeframe specified in\n\t\t\t\tthese rules.\n7.\n7.\nProject Structure & Output\nProject Structure & Output\n7.1\nWhether the model (BOOT, BOT etc.), concession\n\t\t\t\tperiod, if any, been mentioned in the report?\n7.2\nService/ Output levels (Specify if applicable)\n8.\n8.\nProject Financials\nProject Financials\n8.1\nUser Fee, Tariff/fares(Specify) and their\n\t\t\t\tvariation with time\n8.2\nProvide all IRR details and provide NPV of the\n\t\t\t\tproject from income from operations and other forms.\n9.\n9.\nClearance / Approvals\nClearance / Approvals\n9.1\nState whether the environmental assessment is\n\t\t\t\trequired for the project\n9.2\nState whether the project proponent has\n\t\t\t\tmentioned all related approvals (Statutory or otherwise) required\n\t\t\t\tfor the project.\n10.\n10.\nQualifications of project proponent\nQualifications of project proponent\n10.1\nState whether the proponent has the technical\n\t\t\t\tcompetence for undertaking the Project? If yes, how?\n10.2\nState whether the proponent has the financial\n\t\t\t\tcompetence for undertaking the Project? If yes, how?\n10.3\nAny other, if any\n11.\n11.\nAny other\nAny other\n11.1\nAny other item/observation which the proponent\n\t\t\t\tfeels additionally relevant to mention.\n11.2\nWhether the project proponent agrees to come\n\t\t\t\tunder the regulatory authority as and when formed by the Govt, or\n\t\t\t\tthrough law?\n11.3\nIs this a conditional proposal? Please specify.\nNote. - 1. While preparing this Form, the placement of relevant references in the proposal have been indicated above.\nNote.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 115
        },
        {
            "number": "2",
            "title": "2. Appropriate response to queries in Yes/ No, where applicable, has been given and details, as required, have been elaborated under 'Particulars' column.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 116
        },
        {
            "number": "3",
            "title": "3. It is agreed that the above form could be modified or additional information sought by the Administrative' Department concerned at any time in future.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 117
        },
        {
            "number": "4",
            "title": "4. The above Form is provided in signed hard copy and also in soft copy.",
            "chapter": null,
            "content": "Signature of the Head of the Organization / Agency (Project Proponent) with Stamp and Date\n[Form No. 4]\n[Form No. 4]\n[ See Rule 79D]\nContent of pre-feasibility report\nContent of pre-feasibility report",
            "footnote": "",
            "is_definition": false,
            "sort_order": 118
        },
        {
            "number": "1",
            "title": "1. Introduction",
            "chapter": null,
            "content": "(i) Project formulation\n(ii) Aim, objective & methodology",
            "footnote": "",
            "is_definition": false,
            "sort_order": 119
        },
        {
            "number": "2",
            "title": "2. Sector Profile",
            "chapter": null,
            "content": "(i) Industry overview with regional specific profile\n(ii) Key Issues",
            "footnote": "",
            "is_definition": false,
            "sort_order": 120
        },
        {
            "number": "3",
            "title": "3. Market Assessment",
            "chapter": null,
            "content": "(i) Industry outlook\n(ii) Demand assessment\n(iii) SWOT analysis\n(iv) Case studies",
            "footnote": "",
            "is_definition": false,
            "sort_order": 121
        },
        {
            "number": "4",
            "title": "4. Project Concept",
            "chapter": null,
            "content": "(i) Project description\n(ii) Explanation of need and uniqueness of the project\n(iii) Project components\n(iv) Site location and analysis\n(v) Development Needs, Public needs & Planning considerations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 122
        },
        {
            "number": "5",
            "title": "5. Statutory & Legal Framework",
            "chapter": null,
            "content": "(i) Applicable laws\n(ii) Applicable policies",
            "footnote": "",
            "is_definition": false,
            "sort_order": 123
        },
        {
            "number": "6",
            "title": "6. Environmental & Social Impacts",
            "chapter": null,
            "content": "(i) Environmental Impacts\n(ii) Social Impacts\n(iii) Project related approvals/clearances",
            "footnote": "",
            "is_definition": false,
            "sort_order": 124
        },
        {
            "number": "7",
            "title": "7. Project Financials",
            "chapter": null,
            "content": "(i) Cost Estimation\n(ii) Revenue Stream, IRR etc.\n(iii) Viability Assessment",
            "footnote": "",
            "is_definition": false,
            "sort_order": 125
        },
        {
            "number": "8",
            "title": "8. Operation Framework",
            "chapter": null,
            "content": "(i) Risk identification and mitigation\n(ii) Indicative Project Structure\n(iii) Indicative Qualification & selection Criteria\n(iv) Option analysis to finalize the PPP model (if applicable)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 126
        },
        {
            "number": "9",
            "title": "9. Way Ahead",
            "chapter": null,
            "content": "(i) Any additional funding required from the government\n(ii) Govt, obligations for development\n(iii) Project Development Framework",
            "footnote": "",
            "is_definition": false,
            "sort_order": 127
        },
        {
            "number": "10",
            "title": "10. Any other approvals (statutory or otherwise) required from any authority",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 128
        },
        {
            "number": "11",
            "title": "11. Form:",
            "chapter": null,
            "content": "(i) Site map,\n(ii) Indicative Layout/Concept Plan\n[Form No. 5]\n[Form No. 5]\n[ See Rule 79-D]\nContents of Detailed Project Report\nContents of Detailed Project Report",
            "footnote": "",
            "is_definition": false,
            "sort_order": 129
        },
        {
            "number": "1",
            "title": "1. Executive Summary",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 130
        },
        {
            "number": "2",
            "title": "2. Project profile",
            "chapter": null,
            "content": "(i) Project objectives\n(ii) Project sponsors\n(iii) Project location",
            "footnote": "",
            "is_definition": false,
            "sort_order": 131
        },
        {
            "number": "3",
            "title": "3. Proposed business profile",
            "chapter": null,
            "content": "(i) Product mix\n(ii) Estimated production and investments",
            "footnote": "",
            "is_definition": false,
            "sort_order": 132
        },
        {
            "number": "4",
            "title": "4. Market analysis",
            "chapter": null,
            "content": "(i) Current scenario\n(ii) Demand assessment\n(iii) Strategies\n(iv) Growth drivers\n(v) SWOT analysis",
            "footnote": "",
            "is_definition": false,
            "sort_order": 133
        },
        {
            "number": "5",
            "title": "5. Establishing the need of the project",
            "chapter": null,
            "content": "(i) Detailed explanation of uniqueness of the project\n(ii) Demonstration of Public Need\n(iii) Demonstration of being in compliance with plans of department\n(iv) Demonstration of no conflict with any departmental scheme which provides same service",
            "footnote": "",
            "is_definition": false,
            "sort_order": 134
        },
        {
            "number": "6",
            "title": "6. Policy support and activities",
            "chapter": null,
            "content": "(i) Government initiatives\n(ii) Special government schemes\n(iii) Policy packages",
            "footnote": "",
            "is_definition": false,
            "sort_order": 135
        },
        {
            "number": "7",
            "title": "7. Land and site analysis",
            "chapter": null,
            "content": "(i) Site location\n(ii) Land ownership and land cost\n(iii) Geographical conditions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 136
        },
        {
            "number": "8",
            "title": "8. Proposed master plan, technical specifications & project cost estimates",
            "chapter": null,
            "content": "(i) Utility relocation plan\n(ii) Engineering surveys and investigations\n(iii) Layout plans and drawings\n(iv) Proposed common infrastructure, facilities etc.\n(v) Design criteria and spatial requirements\n(vi) Preparation of BOQ\n(vii) Technical parameters, specifications and drawings\n(viii) Cost estimates of the project",
            "footnote": "",
            "is_definition": false,
            "sort_order": 137
        },
        {
            "number": "9",
            "title": "9. Project means of finance & financial appraisal",
            "chapter": null,
            "content": "(i) Means of financing\n(ii) Appraisal framework and objectives\n(iii) Financial projections\n(iv) Value for Money analysis (if applicable)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 138
        },
        {
            "number": "10",
            "title": "10. Identification of risks",
            "chapter": null,
            "content": "(i) Risk identification\n(ii) Risk allocation and mitigation techniques",
            "footnote": "",
            "is_definition": false,
            "sort_order": 139
        },
        {
            "number": "11",
            "title": "11. Economic benefits of the project",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 140
        },
        {
            "number": "12",
            "title": "12. Environment assessment (if applicable)",
            "chapter": null,
            "content": "(i) Environmental impact assessment\n(ii) Social assessment\n(iii) Project related approvals",
            "footnote": "",
            "is_definition": false,
            "sort_order": 141
        },
        {
            "number": "13",
            "title": "13. Project structure and implementation schedule",
            "chapter": null,
            "content": "(i) Framework for project implementation\n(ii) Contractual framework\n(iii) Role of project consultant and project proponent\n(iv) Model concessionaire agreement",
            "footnote": "",
            "is_definition": false,
            "sort_order": 142
        },
        {
            "number": "14",
            "title": "14. Project operation and maintenance Operation and maintenance framework",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 143
        },
        {
            "number": "15",
            "title": "15. Any other approvals (statutory or otherwise) required to be taken from Government of Rajasthan / Government of India/any other authority.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 144
        },
        {
            "number": "16",
            "title": "16. List of Forms (To be submitted as applicable)",
            "chapter": null,
            "content": "(i) Memorandum and articles of association\n(ii) List of participating entrepreneurs\n(iii) Land documents (if any)\n(iv) Draft shareholders agreement\n(v) Draft leave and license agreement\n(vi) Draft procurement process\n(vii) Any other documents as required by the Administrative Department concerned.\n[Form No. 6]\n[Form No. 6]\n[ See Rule 79-E]\nSubmission of detailed and comprehensive proposal by Project Proponent\nSubmission of detailed and comprehensive proposal by Project Proponent\n(in Hard Copy and Soft Copy)\nS.No.\nS.No.\nItem\nItem\nResponse\nResponse\nRef. /Form\nRef. /Form\n1.\n1.\nGeneral\nGeneral\n1.1 Name of the Project\n1.2 Type of PPP (BOT, BOOT, BOLT, OMT etc.), if\n\t\t\t\tapplicable\n1.3 Location (State/District/Town)\n1.4 Administrative Department concerned\n1.5 Name of the Implementing Agency/Proponent\n1.6 Concession Period\n....\n2.\n2.\nProject Description\nProject Description\n2.1 Brief description of the project\n2.2 Justification for the project (Need)\n2.3 Possible alternatives, if any\n2.4 Estimated capital costs with break-up under\n\t\t\t\tmajor heads of expenditure. Also indicate the basis of cost\n\t\t\t\testimation.\n2.5 Investment phasing\n2.6 Project Implementation Schedule (PIS)\n3.\n3.\nFinancing Arrangements\nFinancing Arrangements\n3.1 Sources of financing (equity, debt etc.)\n3.2 Indicate the revenue streams of the Project\n\t\t\t\t(Annual flows over project life). Also indicate the underlying\n\t\t\t\tassumptions.\n3.3 Indicate the NPV of revenue streams\n3.4 Tariff/ user charges? Please specify in\n\t\t\t\tdetail.\n3.5 Have any FIs been approached? If yes, their\n\t\t\t\tresponse may be indicated\n3.6 Value for Money Analysis\n4.\n4.\nInternal Rate of return (IRR)\nInternal Rate of return (IRR)\n4.1 Economic IRR (if computed)\n4.2 Financial IRR, indicating various\n\t\t\t\tassumptions (attach separate sheet if necessary)\n5.\n5.\nClearances\nClearances\n5.1 Status of environmental clearances\n5.2 Clearances/approvals (statutory or\n\t\t\t\totherwise) required from Government of India, State Government\n\t\t\t\tand other authorities/local bodies\n5.3 Other support required from the State\n\t\t\t\tGovernment\n6.\n6.\nSupport from Government of Rajasthan\nSupport from Government of Rajasthan\n6.1 Viability Gap Funding, if required\n6.2 Government of Rajasthan guarantees being\n\t\t\t\tsought, if any\n7.\n7.\nConcession Agreement\nConcession Agreement\n7.1 Is the Concession Agreement based on MCA? If\n\t\t\t\tyes, indicate the variations, if any, in a detailed note (to be\n\t\t\t\tattached)\n7.2 Details of Concession Agreement (To be\n\t\t\t\tattached along with the submission)\n8.\n8.\nOthers\nOthers\n8.1 Remarks, if any",
            "footnote": "",
            "is_definition": false,
            "sort_order": 145
        },
        {
            "number": "1",
            "title": "1. While preparing this format, the placement of relevant references / Form in the detailed proposal has been mentioned as above.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 146
        },
        {
            "number": "2",
            "title": "2. It is agreed that the above format could be modified or additional information sought by the Administrative Department concerned at any time in future.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 147
        },
        {
            "number": "3",
            "title": "3. The above Form is provided in signed hard copy and separately in soft copy also.",
            "chapter": null,
            "content": "Signature of the Head of the Organization (Project Proponent) with date and stamp\n[Form No. 7]\n[Form No. 7]\n[ See Rule 79E]\nProject Financial Summary\nProject Financial Summary\nS.No.\nS.No.\nItem\nItem\nResponse\nResponse\n1\nGeneral\n1.1 Name of the Project\n1.2 Type of PPP (BOT, BOOT, BOLT, OMT etc.), if\n applicable\n1.3 Capacity of the Project\n1.4 Concession Period\n2.\nProject cost\n2.1 Land cost\n2.2 Building cost\n2.3 Plant & Machinery cost\n2.4 Operation & maintenance cost\n2.5 Other Costs if any\n3.\nFinancing Arrangements\n3.1 Financing Structure (% of equity and debt)\n3.2 Interest on debt (Assumed)\n3.3 Is any financial support from GoR required?\n4.\nRevenue streams for each Concession Year\n4.1 Revenue from Tariff.\n4.2 Revenue from Advertising\n4.3 Other Revenue Streams\n4.4Indicate the NPV of revenue streams with 12%\n discounting\n5.\nIRR\n5.1 Economic IRR (if computed)\n5.2 Equity IRR\n5.3 Project IRR\n6.\nOther remarks, if any\nSignature of the Head of the Organization (Project Proponent) with date and stamp\n[Form No. 8]\n[Form No. 8]\n[ See Rule 79E]\nCheck List for submission of documents\nCheck List for submission of documents\n(in Hard copy and Soft copy)\nS. No.\nS. No.\nDocuments to be Submitted\nDocuments to be Submitted\nApplicable (Y/N)\nApplicable (Y/N)\nSubmitted Hard Copy (Y/N)\nSubmitted Hard Copy (Y/N)\nSubmitted Soft Copy (Y/N)\nSubmitted Soft Copy (Y/N)\n1.\nCovering Letter from Head of the Organization\n2.\nDetailed Project Report\n3.\nProject Information Memorandum\n4.\nEarnest Deposit & Bid Value\n5.\nDraft Concession Agreement and if any changes\n have been undertaken with respect to the MCA\n6.\nDocuments relating to any issues on various\n clearances/ Land Acquisition\n7.\nDetails of any Policy Changes Required for\n implementation (if any)\n8.\nProject implementation schedule\n9.\nDetails for any other support required during\n implementation",
            "footnote": "",
            "is_definition": false,
            "sort_order": 148
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 26th September, 2019 [rj1028]",
        "Act Number": "Published vide Notification No. G.S.R. 96, dated 24.1.2013",
        "Enactment Date": "",
        "Act Year": "2013",
        "Short Title": "Rajasthan Transparency in Public Procurement Rules, 2013",
        "Type": "STATE",
        "Location": "Rajasthan"
    },
    "updated_at": "2026-09-29 21:55:21"
}