    "id": 22669,
    "slug": "rajasthan-minor-mineral-concession-rules-2017",
    "title": "Rajasthan Minor Mineral Concession Rules, 2017",
    "short_title": "Rajasthan Minor Mineral Concession Rules, 2017",
    "act_number": "Published vide Notification No. G.S.R. 118 dated 2",
    "act_year": 2017,
    "act_type": "STATE",
    "location": "Rajasthan",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Rajasthan Minor Mineral Concession Rules, 2017",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title extent and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(i) \"Act\" means the Mines and Minerals (Development and Regulation) Act, 1957 (Central Act No. 67 of 1957);\n(ii) \"Appellate Authority\" means the Government or any other authority vested with such powers under these rules or any other authority authorised by the Government to perform the functions of the appellate authority;\n(iii) \"Assessee\" means a person holding any mineral concession or a permit and includes any other person who is possessing, trading, processing or using minor mineral;\n(iv) \"Assessing Authority\" means Director, Additional Director Mines, Additional Director Mines (Vigilance), Superintending Mining Engineer, Superintending  Mining Engineer (Vigilance), Mining Engineer, Mining Engineer (Vigilance), Assistant Mining Engineer, Assistant Mining Engineer (Vigilance) or Revenue Intelligence Officer of the State Director of Revenue Intelligence (SDRI) or any other officer authorised by the State Government to make assessment;\n(v) \"Assessment Year\" means the period beginning from the first day of April and ending on the thirty first day of March of the following year or part thereof;\n(vi) \"Assistant Mining Engineer\" means Assistant Mining Engineer of the Department of Mines and Geology, Rajasthan having jurisdiction over the area, as may be fixed by the Government, from time to time;\n(vii) \"Assistant Mining Engineer (vigilance)\" means Assistant Mining Engineer (vigilance) of the Department of Mines and Geology, Rajasthan having jurisdiction over the area, as may be fixed by the Government, from time to time;\n(viii) \"Bajri\" means weathered detritus consisting of graded particles of varying sizes obtained from loose weathered rock material from the provenance, usually found in river beds or basins or paleo-channels also covers river sands;\n(ix) \"Bid Security\" means a security provided by a bidder for securing the fulfillment of any obligation in terms of provisions of the bidding document;\n(x) \"Boundary Pillar\" means reinforced cement concrete or cemented pillar of size having a base of 0.3m x 0.3m and height 1.30m of which 0.7m shall be above ground level and 0.6m below the ground, painted in yellow colour and top ten centimeters in red colour by enamel paint. Every pillar shall be marked with lease or licence number and pillar number in black paint;\n(xi) \"Brick earth\" means earth used for making bricks, kavelus, earthen pots or used for other identical purposes;\n(xii) \"Brick Earth Permit\" means a permit granted for specific area and period for excavation and removal of brick earth for making bricks for a particular brick kiln;\n(xiii) \"Building stone\" means any rock or mineral which is used as building or construction material;\n(xiv) \"Competent Authority\" means the Government or any other authority, authorized by the Government to exercise the powers delegated under these rules;\n(xv) \"Dead Rent\" means the minimum guaranteed amount payable for mining lease which is calculated as per the area of the lease and revisable as provided in these rules;\n(xvi) \"Dealer\" means any person who carries on the business of buying, selling, storing, distributing or processing of minerals, directly or otherwise for cash or for deferred payment or for commission, remuneration or other valuable consideration or uses minerals as a raw material;\n(xvii) \"Department\" means the Department of Mines and Geology, Government of Rajasthan;\n(xviii) \"Departmental web Portal\" means mines.rajasthan.gov.in or any website used for exchange of information electronically through information and communication technology by the Government;\n(xix) \"Director\" means the Director of Mines and Geology, Rajasthan and includes Additional Director also;\n(xx) \"District Mineral Foundation Trust (DMFT)\" means a trust, established by the Government under section 9B of the Act;\n(xxi) \"e-auction\" means auction for grant of mining lease, quarry licence, royalty collection contract, excess royalty collection contract or for disposal of any seized mineral, tool, equipment, vehicle or other machinery etc. through electronic platform;\n(xxii) \"Environment\" or \"Environmental Pollution\" shall have the same meanings, as assigned to them in the Environment (Protection) Act, 1986 (Central Act No. 29 of 1986);\n(xxiii) \"Excavation\" means digging and/or collecting of minor minerals from any land;\n(xxiv) \"Excess Royalty Collection Contract\" means a contract to collect royalty in excess of annual dead rent and any other charges as may be specified in the contract, on behalf of the Government for specified mineral dispatched by the mining lessee, from the area specified in the contract;\n(xxv) \"Family\" means husband, wife and their dependent children;\n(xxvi) \"Final mine closure plan\" means a plan for the purpose of decommissioning, reclamation and rehabilitation in the mine, cluster or part thereof after cessation of mining and mineral processing operations that has been prepared in the manner specified and in the standard format as per the guidelines issued by the Indian Bureau of Mines or State Government;\n(xxvii) \"Financial Assurance\" means the surety furnished by the holder of mining lease or quarry licence, as the case may be, to the competent authority so as to indemnify the authorities against the reclamation and rehabilitation cost;\n(xxviii) \"Forms\" means forms appended to these rules;\n(xxix) \"Government\" means the Government of Rajasthan;\n(xxx) \"Illegal Mining\" means any prospecting or mining operations undertaken by any person in any area without holding any mineral concession, permit or any other permission granted or permitted under these rules or without any lawful authority, as the case may be.\n(a) violation of any rules, during prospecting or mining operations in any area under authority of valid mineral concession, permit or any other permission granted under these rules shall not be considered as illegal mining;\n(b) any area granted under a mineral concession, permit or any other permission granted under these rules, as the case may be, shall be considered as an area held with lawful authority by the holder of such lease, licence or permit while determining the extent of illegal mining; and\n(c) any research work or field studies carried out by teachers and students of college as a part of their field curriculum shall not be treated as illegal mining.\n(xxxi) \"Mine Closure\" means steps taken for reclamation, rehabilitation measures taken in respect of a mine or part thereof commencing from cessation of mining or processing operations in a mine or part thereof;\n(xxxii) \"Mineral Concession\" means a mining lease, quarry licence or any other permission granted by competent authority under these rules;\n(xxxiii) \"Mines Foreman Grade I or Mines Foreman Grade II\" means Mines Foreman of the Department of Mines and Geology, Rajasthan having jurisdiction over the area fixed by the Mining Engineer, Mining Engineer (Vigilance), Assistant Mining Engineer or Assistant Mining Engineer (Vigilance), as the case may be, from time to time;\n(xxxiv) \"Mining Approach Road\" means a stretch of road existing in the mining area constructed mainly for mineral development and declared as such by the Director, from time to time;\n(xxxv) \"Mining Engineer\" means Mining Engineer of the Department of Mines and Geology, Rajasthan having jurisdiction over the area, as may be fixed by the Government from time to time;\n(xxxvi) \"Mining Engineer (vigilance)\" means Mining Engineer (vigilance) of the Department of Mines and Geology, Rajasthan having jurisdiction over the area, as may be fixed by the Government, from time to time;\n(xxxvii) \"Mining Plan\" means a mining plan prepared under these rules and duly approved by the competent authority for the development of minor mineral deposits in the area concerned and includes simplified mining scheme required to be submitted as per the provisions of these rules;\n(xxxviii)\"Ordinary earth\" means ordinary earth used for filling or leveling purposes in construction of embankment of dams, canals, roads, buildings, railways etc;\n(xxxix) \"Performance Security\" means a security provided for due observance of the performance of the mineral concession or contract;\n(xl) \"Premium amount\" means the amount payable as premium under these rules by the applicant, bidder or concession holder, as the case may be;\n(xli) \"Progressive mine closure plan\" means a plan, for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in the manner specified and in the standard format as per the guidelines issued by the Indian Bureau of Mines or State Government;\n(xlii) \"Quarry Licence\" means a licence granted under these rules wherein a licensee is required to pay fixed annual licence fee exclusive of royalty;\n(xliii) \"Rawanna\" means the rawanna or e-rawanna duly issued by the department or electronically generated from the departmental web portal and includes any other system notified by the Government for dispatch, consumption or processing of mineral or overburden from a specified area granted under any mineral concession or permit;\n(xliv) \"Royalty\" means the charge payable to the Government in respect of the ore or mineral excavated, consumed or removed from any land granted under these rules as specified in Schedule II;\n(xlv) \"Royalty Receipt\" means the receipt issued for collection of royalty and/or permit fee or any other charges for mineral dispatch from area under Excess Royalty Collection Contract or Royalty Collection Contract on Check Post or Naka by the department personnel or contractor duly authenticated or e-authenticated by the department;\n(xlvi) \"Royalty collection contract\" means a contract to collect royalty with or without permit fees and any other charges, as the case may be, on behalf of the Government for specified mineral dispatched, by the quarry licencee or permit holder, from the area specified in the contract;\n(xlvii) \"Schedule\" means the Schedule appended to these rules;\n(xlviii) \"Scheduled Areas\" means Scheduled area of Rajasthan as referred to in clause (1) of Article 244 of the Constitution of India;\n(xlix) \"Scheduled Bank\" means a Bank as defined in clause (e) of section 2 of the Reserve Bank of India Act, 1934 (Central Act No. 2 of 1934);\n(l) \"Security Deposit\" means a deposit provided for due observance of the terms and conditions of the mineral concession or contract;\n(li) \"Short Term Permit\" means a permit granted under these rules for excavation and removal of a specified quantity of mineral from a specified area within a specified period;\n(lii) \"State\" means the State of Rajasthan;\n(liii) \"Superintending Mining Engineer\" means Superintending Mining Engineer of the Department of Mines and Geology, Rajasthan having jurisdiction over the area concerned, as may be fixed by the Government, from time to time;\n(liv) \"Superintending Mining Engineer (vigilance)\" means Superintending Mining Engineer (vigilance) of the Department of Mines and Geology, Rajasthan having jurisdiction over the area concerned as may be fixed by the Government, from time to time;\n(lv) \"Surveyor or Senior Surveyor\" means Surveyor of the Department of Mines and Geology, Rajasthan having jurisdiction over the area as may be fixed by the Mining Engineer, Mining Engineer (Vigilance), Assistant Mining Engineer or Assistant Mining Engineer (Vigilance), as the case may be, from time to time;\n(lvi) \"Tenant\" means the tenant as defined in the Rajasthan Tenancy Act, 1955 and includes agricultural worker and village artisan; and\n(lvii) \"Transit Pass\" means a pass including e-transit pass duly issued by the Department or generated online, to the lessee, stockist, trader, dealer etc. for lawful transportation of royalty paid mineral.",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Repeal and savings.",
            "chapter": null,
            "content": "Chapter II\nRights of Existing Mineral Concession Holders and Applicants",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Rights of a holder of a prospecting licence to obtain a mining lease.",
            "chapter": null,
            "content": "(i) has undertaken prospecting operations to establish mineral resources in such land;\n(ii) has not committed any breach of the terms and conditions of the prospecting licence;\n(iii) is otherwise a fit person for being granted the mining lease; and\n(iv) undertakes to pay premium amount equal to two and half times of the dead rent or as may be determined by the Government from time to time, which shall be payable every year in advance and shall not be adjusted against dead rent or royalty:\n(i) a copy of PAN card, if the applicant is individual and copies of PAN card of all the partners, members or directors in case the applicant is a firm or association of person or company, as the case may be. Applicant shall also submit copy of TIN number in case of a partnership firm or association of persons or a company;\n(ii) a copy of driving licence or passport or voter identification card or aadhar card for photo identity and address proof;\n(iii) a copy of partnership deed and firm registration certificate in case of partnership firm issued under the Indian Partnership Act, 1932 or Limited Liability Partnership Act, 2008 or a copy of memorandum of association, articles of association and certificate of incorporation in case of company registered under the Companies Act, 2013;\n(iv) a copy of resolution passed by the board of directors in favour of a person who is authorized to sign the application on behalf of the company;\n(v) a copy of registered power of attorney in favour of a person who is authorized to sign the application, on behalf of the firm or association of persons where application is not signed by all the partners or persons as the case may be;\n(vi) a copy of no dues certificate from the Mining Engineer or Assistant Mining Engineer, concerned, if the applicant or his/her family member holds or has held any mineral concession or royalty or excess royalty collection contract in the State:\n(vii) a copy of an affidavit giving particulars of areas already held by the applicant under mineral concession including the area held jointly with other persons, area applied but not granted and granted but not executed or registered;\n(viii) e-mail address and mobile number of an individual or all members of association of persons or firm or all partners of the partnership firm or company or all the directors of the company or Government undertakings, as the case may be;\n(ix) a recent passport size color photo of applicant and all the partners, members or directors in case the applicant is a firm or association of person or company, as the case may be;\n(x) a copy of plan and description report of the applied area with latitude and longitude in WGS 84 Datum of all the corner pillars of the applied area; and\n(xi) a copy of revenue details of the applied area with khasra naksha trace, khansra or araji number, jamabandi and extent of the area of the khasra or aaraji falling in the applied area along with superimposed map.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Rights of a holder of letter of intent to obtain a [mining lease or quarry licence.]",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Rights of grantee of mining lease sanctioned before commencement of these rules.",
            "chapter": null,
            "content": "Chapter III\nGrant of Mineral Concession",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Area of mining lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Area of quarry licence.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Period of mining lease.",
            "chapter": null,
            "content": "(i) to be eligible to exercise the right of first refusal, the lessee shall comply with the conditions of the mining lease, the Act and the Rules made thereunder till its expiry;\n(ii) prior to publication of the notice inviting bid, the Mining Engineer or Assistant Mining Engineer concerned shall give a notice to the lessee requiring the lessee to specify his willingness or non-willingness to exercise the right of first refusal in writing, within a period of thirty days of receipt of such notice;\n(iii) the notice inviting bid shall specify that the lessee holding the lease prior to expiry of the mining lease has the right of first refusal and shall also specify his willingness or non-willingness specified pursuant to clause (ii), if any;\n(iv) upon conclusion of the second round of e-auction as per rule 14, the Mining Engineer or Assistant Mining Engineer concerned shall issue a notice to the lessee seeking written confirmation of his willingness to exercise the right of first refusal within a period of seven days of the conclusion of the second round of e-auction;\n(v) the notice given under clause (iv) shall be acknowledged by the lessee and who shall, within a period of fifteen days of receipt of notice, exercise the right of first refusal in writing to the Mining Engineer or Assistant Mining Engineer concerned, failing which it shall be construed that the lessee is not desirous of exercising the right of first refusal and the successful bidder shall be entitled to a mining lease in the manner provided in these rules; and\n(vi) if the lessee exercise the right of first refusal and matches the highest final offer price, the lessee shall be deemed to be the successful bidder in place of the earlier successful bidder declared after the second round of e-auction and shall be entitled to a mining lease in the manner provided in these rules.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Period of quarry licence.",
            "chapter": null,
            "content": "(i) to be eligible to exercise the right of first refusal, the licencee shall comply with the conditions of the quarry licence, the Act and the Rules made thereunder till its expiry;\n(ii) prior to publication of the notice inviting bid, the Mining Engineer or Assistant Mining Engineer concerned shall give a notice to the licencee requiring the licencee to specify his willingness or non-willingness to exercise the right of first refusal in writing, within a period of thirty days of receipt of such notice;\n(iii) the notice inviting bid shall specify that the licencee holding the licence prior to expiry of the quarry licence has the right of first refusal and shall also specify his willingness or non-willingness specified pursuant to clause (ii) to this sub-rule, if any;\n(iv) upon conclusion of the second round of e-auction as per rule 14, the Mining Engineer or Assistant Mining Engineer concerned shall issue a notice to the licencee seeking written confirmation of his willingness to exercise the right of first refusal within a period of seven days of the conclusion of the second round of e-auction;\n(v) the notice given under clause (iv) to this sub-rule shall be acknowledged by the licencee and who shall, within a period of fifteen days of receipt of notice, exercise the right of first refusal in writing to the Mining Engineer or Assistant Mining Engineer concerned, failing which it shall be construed that the licencee is not desirous of exercising the right of first refusal and the successful bidder shall be entitled to a quarry licence in the manner provided in these rules; and\n(vi) if the licencee exercise the right of first refusal and matches the highest final offer price, the licencee shall be deemed to be the successful bidder in place of the earlier successful bidder declared after the second round of e-auction and shall be entitled to a quarry licence in the manner provided in these rules.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Restriction on grant of mining lease or quarry licence.",
            "chapter": null,
            "content": "(i) except in accordance with the provisions of these rules;\n(ii) to any person unless such a person is an Indian national, or a company as defined in clause (20) of section 2 of the Companies Act, 2013;\n(a) in case of a firm registered under Indian Partnership Act, 1932 or Limited Liability Partnership Act, 2008 or other association of individuals, only if all the members of the firm or members of the associations are citizens of India; and\n(b) in case of an individual, only if he/she is a citizen of India.\n(iii) in the Schedule Area without obtaining prior recommendation of the Panchayati Raj Institutions at appropriate level as prescribed under the Rajasthan Panchayati Raj (Modification of Provisions in Their Application to the Schedule Areas) Act, 1999 (Act No. 16 of 1999);\n(iv) in respect of lands notified by the Government as reserved for use for the Government or local authorities for any public or special purposes without obtaining prior permission from the concerned competent authority:\n(v) to a person against whom or any member of his/her family or to a partnership firm or a private limited company against whom or any partner of the firm or any director of the private limited company or limited liability company as the case may be, or any member of his/her family or against a firm of which he/she or any member of his/her family is or was a partner, the dues of the department are outstanding:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Prerequisites for e-auction of mineral concession.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Bidding parameters for e-auction.",
            "chapter": null,
            "content": "(i) in case of mining lease, twenty percent of royalty payable additionally for every dispatch over and above the rates specified in Schedule II or as may be determined by the Government, from time to time; and\n(ii) in case of quarry licence, an amount equal to the annual licence fee of the area under auction payable every year or as may be determined by the Government, from time to time.\n(i) in case of mining lease, percentage so quoted for every dispatch and which shall not be adjusted against dead rent:\n(ii) in case of quarry licence, an amount so quoted every year in advance and shall not be adjusted against annual licence fee.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Electronic auction and bidding process of mineral concession.",
            "chapter": null,
            "content": "(i) particulars of area classified into forests land, land owned by the Government and private persons; and\n(ii) if area under auction contains land owned by the private persons, specifying the condition of right of first refusal to such [khatedars] .\n(i) First round of auction shall be held in following manner, namely: -\n(a) A technical bid shall be submitted by the bidder along with: -\n(I) A scanned copy of bid letter in Form -3;\n(II) Bid security as specified in rule 18;\n(III) An initial price offer which shall be equal to or above the reserve price;\n(IV) A scanned copy of affidavit regarding no-dues of the department;\n(V) A scanned copy of no-dues certificate from the Mining Engineer or Assistant Mining Engineer concerned where the bidder holds or had held mineral concession or royalty collection contract or excess royalty collection contract;\n(VI) A scanned copy of Memorandum of Association and Articles of Association, certificate of incorporation in case bidder is a company or partnership deed and firm registration certificate in case bidder is a firm, as the case may be;\n(VII) A scanned copy of power of attorney in format as specified in Form -4 or resolution of board of directors in favour of person submitting bid in case of a firm or company, as the case may be;\n(VIII) A scanned copy of PAN card or TIN;\n(IX) A scanned copy of address proof;\n(X) A scanned copy of balance sheet certified by the chartered accountant or income tax returns of preceding financial year; and\n(XI) E-mail address and mobile number;\n(b) Failure to comply with the provisions of clause (a) for whatsoever reason, shall lead to non-admission of technical bid;\n(c) The bids shall be opened by the following committee: -\n(I) Additional Director Mines (HQ);\n(II) Financial Adviser; and\n(III) Superintending Mining Engineer (HQ-II or III) concerned;\n(d) Evaluation report of technical bids shall be prepared and shall be informed to all the bidders individually through e-mail or SMS. Initial price offer of all technically qualified bidders shall be opened by the committee mentioned in clause (c) on the schedule date of e-auction;\n(e) The technically qualified bidders shall be ranked on the basis of the descending initial price offer submitted by them and the technically qualified bidder holding the first fifty percent of the ranks (with any fraction rounded off to higher integer) or the top five technically qualified bidder, whichever is higher, shall qualify as qualified bidder for participating in the second round of electronic auction:\n(f) Qualified bidders shall be intimated about their qualification for electronic auction against specific items in accordance with the terms and conditions of the bid, through notice on the web site of agency appointed for auction through their secured login as well a system generated e-mail; and\n(g) The highest initial price offer amongst the qualified bidders shall be the floor price for the second round of online electronic auction and all the qualified bidders shall participate in the second round of electronic auction:\n(ii) Second round of e-auction shall be held in following manner, namely: -\n(a) The qualified bidders may submit their final price offer exclusive all taxes and duties which shall not be less than the floor price. The bidder will have the sole responsibility to make payment of all applicable taxes and duties to the authorities concern directly and produce the proof of the same to the department:\n(b) The date, time and period of e-auction shall be as per the schedule mentioned in notice inviting bid. However the closing time of e-auction shall be automatically extended in the event a bid is received during the last eight minutes before the scheduled closing time of electronic auction. The closing time of electronic auction will be automatically extended by eight minutes from the last received bid time to give equal opportunity to all other qualified bidders.\n(c) The successful bidder shall be decided by the system solely on the basis of highest financial bid submitted by the qualified bidders. No negotiation shall be conducted with any bidder;\n(d) The auction process shall be annulled if none of qualified bidders submit a final price offer on online electronic auction platform. In case the e-auction process is annulled due to non submission of at least one final price offer on the electronic auction platform, the bid security of the qualified bidder who has submitted the highest initial price offer i.e. the applicable floor price for the second round of e-auction, shall be forfeited;\n(e) On close of e-auction, the highest bidder shall be declared as successful bidder and thereafter bid sheet indicating the name of the successful bidder and bid price etc. shall be made available by the agency through e-mail within twenty four hours. The bid sheet may be downloaded through Management Information System (MIS) reports:\n(f) If area auctioned contains private land, upon conclusion of the second round of e-auction, the Mining Engineer or Assistant Mining Engineer concerned shall issue a notice to the landowner seeking written confirmation of their willingness to exercise the right of first refusal within a period of seven days of the conclusion of the second round of e-auction;\n(g) The notice given under clause (f) to this sub-rule shall be acknowledged by the landowner and who shall, within a period of sixty days of receipt of notice, exercise the right of first refusal in writing to the Mining Engineer or Assistant Mining Engineer concerned, failing which it shall be construed that the landowner is not desirous of exercising the right of first refusal;\n(h) If the landowner exercises the right of first refusal, matches the highest final offer price and deposits all other applicable payments, the landowner shall be deemed to be the successful bidder and shall be entitled to a mining lease in the manner provided in these rules. In such case, bid security paid by the erstwhile highest bidder shall be refunded:\n(i) On deposition of performance security by the successful bidder, bid security of the successful bidder shall be refunded by the agency appointed for auction within seventy two hours.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. Guidelines for submitting any bid on e-auction platform.",
            "chapter": null,
            "content": "(i) made a complete and careful examination of rules or guidelines for e-auction and unconditionally and irrevocably accepted the terms thereof;\n(ii) reviewed all relevant information provided by the Government, as may be relevant to the bid;\n(iii) accepted the risk of inadequacy, error or mistake in the information provided by or on behalf of the Government relating to any of the matters related to the e-auction process;\n(iv) satisfied itself about all matters regarding the e-auction process for submitting an informed bid, in accordance with the rules; and\n(v) acknowledged and agreed that inadequacy, lack of completeness or incorrectness of information or ignorance of any of the matters related to the e-auction process hereinabove shall not be a basis for any claim for compensation, damages, extension of time for performance of its obligations, loss of profits etc. from the Government.\n(i) bids have not been submitted with all the information;\n(ii) bids have been submitted without bid security; or\n(iii) bids have otherwise not been submitted in accordance with the rules and guidelines.\n(i) suspend and/or cancel the tender process and/or amend and/or supplement the tender process or modify the dates or other terms and conditions relating thereto;\n(ii) consult with any bidder in order to receive clarification or further information;\n(iii) retain any information and/or evidence submitted to the Government by, on behalf of, and/or in relation to any bidder; and/or\n(iv) independently verify, disqualify, reject and/or accept any and all submissions or other information and/or evidence submitted by or on behalf of any bidder;\n(a) the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence the actions of any person connected with the tender process (for avoidance of doubt, offering of employment to or employing or engaging in any manner whatsoever, directly or indirectly, any official of the Government who is or has been associated in any manner, directly or indirectly, with the tender process or arising therefrom, before or after the execution thereof, shall be deemed to constitute influencing the actions of a person connected with the tender process); or\n(b) save and except as permitted under these rules, engaging in any manner whatsoever, whether during the tender process or after the grant of the mining lease, quarry licence, royalty collection contract, excess royalty collection contract or the execution of the same, as the case may be;\n(ii) \"Fraudulent Practice\" means a misrepresentation or omission of facts or suppression of facts or disclosure of incomplete facts, in order to influence the tender process;\n(iii) \"Coercive Practice\" means impairing or harming, or threatening to impair or harm, directly or indirectly, any person or property to influence any person's participation or action in the tender process;\n(iv) \"Undesirable Practice\" means, -\n(a) establishing contact with any person connected with or employed or engaged by the Government with the objective of canvassing, lobbying or in any manner influencing or attempting to influence the tender process;\n(b) having a conflict of interest; or\n(c) violating of any Applicable Law; and\n(v) \"Restrictive Practice\" means forming a cartel or arriving at any understanding or arrangement among bidders with the objective of restricting or manipulating a full and fair competition in the tender process.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Grant of mining lease.",
            "chapter": null,
            "content": "(i) pay the second installment being twenty five percent of the minimum guaranteed premium [khatedar within sixty days from date of issuance of letter of intent in ease of khatedari land having an area more than four hectare] ;\n(ii) furnish the performance security as specified in rule 20 and submits approved mining plan within six months from date of issuance of letter of intent; and\n(iii) obtain and submit all consents and approvals as may be required under applicable laws within eighteen months from date of issuance of letter of intent:\n(i) for mineral masonary stone, one third of total delineated plots shall be kept reserved for the persons belonging to domicile schedule tribe category and remaining two third plots shall be granted by way of e-auction. For reserved plots, the centralized bidding cell at Directorate shall issue notice for inviting applications in two daily news papers, at least one of which is state level and other having wide publicity in the area where lease is being granted. The notice shall be published at least thirty days before the intended date of inviting applications and shall contained the date or the period within which applications shall be received. The notice shall also be uploaded on the departmental website:\n(ii) for mineral bajri (river sand), priority shall be given to the registered society of domicile schedule tribe. The centralized bidding cell at Directorate shall issue notice for inviting applications in two daily news papers, at least one of which is state level and other having wide publicity in the area where lease is being granted. The notice shall be published at least thirty days before the intended date of inviting applications and shall contained the date or the period within which applications shall be received. The notice shall also be uploaded on the departmental website:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Grant of quarry licence.",
            "chapter": null,
            "content": "(i) pay the second installment being twenty five percent of the offered premium amount [khatedar within sixty days from date of issuance of letter of intent in ease of khatedari land having an area more than four hectare] ;\n(ii) furnishes the performance security as specified in rule 2 and submits approved mining plan or simplified mining scheme within six months from date of issuance of letter of intent;\n(iii) obtain and submit all consents and approvals as may be required under applicable laws within eighteen months from date of issuance of letter of intent:\n[17A. Grant of mining lease or quarry licence in khatedari land.\n(i) in case of mining lease, one hectare; and\n(ii) in case of quarry licence, as per sub-rule (2) of Rule 8.\n(i) first installment, twenty percent of the premium amount before the end of first financial year (i.e. 31st March) after execution of mining lease deed or issuance of quarry licence.\n(ii) second and subsequent three installments, twenty percent of the premium amount at the end of respective Financial year;\n(i) a copy of PAN card or TIN;\n(ii) a copy of driving licence or voter identification card or aadhar card for photo identity and address proof;\n(iii) a copy of partnership deed and firm registration certificate in case of partnership firm issued under the Indian Partnership Act, 1932 or Limited Liability Partnership Act, 2008 or a copy of memorandum of association, articles of association and certificate of incorporation in case of company registered under the Companies Act, 2013;\n(iv) a copy of resolution passed by the Board of Directors in favour of a person who is authorized to sign the application on behalf of the company;\n(v) a copy of registered power of attorney in favour of a person who is authorized to sign the application, on behalf of the firm or association of persons where application is not signed by all the partners or persons as the case may be;\n(vi) a coy of no dues certificate from the Mining Engineer or Assistant Mining Engineer, concerned, if the applicant or his/her family member holds or has held, any mineral concession or royalty or excess royalty collection contract in the State:\n(vii) a copy of an affidavit giving particulars of areas already held by the applicant under mineral concession including the area held jointly with other persons, area applied but not granted and granted but not executed or registered;\n(viii) e-mail address and mobile number of an individual or all members of association of persons or firm or all partners of the partnership firm or company or all the directors of the company or Government undertakings, as the case may be;\n(ix) a recent passport size color photo of applicant and all the partners, members or directors in case the applicant is a firm or association of persons or company, as the case may be;\n(x) a copy of plan and description report of the applied area with latitude and longitude in WGS 84 Datum of all the corner pillers of the applied area; and\n(xi) a copy of revenue details of the applied area with khasra naksha trace, khasra or araji number, jamabandi and extent of the area of the khasra or aaraji falling in the applied area along with superimposed map.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. Bid security of e-auction for mineral concession.",
            "chapter": null,
            "content": "(i) an amount equal to the annual dead rent for mining lease; and\n(ii) an amount equal to the annual licence fee of same quarry boundary and in case of quarry licence in new area, nearby quarry boundary.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "19",
            "title": "19. Security deposit.",
            "chapter": null,
            "content": "(i) an amount equal to one fourth of the annual dead rent for mining lease; and\n(ii) an amount equal to one fourth of the annual licence fee for quarry licence.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "20",
            "title": "20. Performance Security.",
            "chapter": null,
            "content": "(i) a sum equal to annual dead rent for mining lease; and\n(ii) a sum equal to annual licence fee for quarry licence.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "21",
            "title": "21. Execution of mining lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "22",
            "title": "22. Registers for mineral concession.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "23",
            "title": "23. Dead rent, royalty of mining leases and its revision.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "24",
            "title": "24. Annual licence fee for quarry licence.",
            "chapter": null,
            "content": "(i) Additional Director Mines (HQ);\n(ii) Financial Adviser;\n(iii) Superintending Mining Engineer (HQ-III); and\n(iv) Superintending Mining Engineer concerned.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "25",
            "title": "25. Surrender of mineral or area of mining lease.",
            "chapter": null,
            "content": "(i) As far as possible the retained area shall be rectangular; and\n(ii) The retained area in each block shall not less than the minimum area specified in Schedule I:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "26",
            "title": "26. Surrender of quarry licence.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "27",
            "title": "27. Transfer of mineral concession.",
            "chapter": null,
            "content": "(i) assign, sublet, mortgage or in any other manner transfer the lease or licence or any right, title or interest therein; and\n(ii) enter into or make any bona-fide arrangement, contract or understanding whereby the lessee or licencee will or may be directly or indirectly financed to a substantial extent by or under which the mining operations or undertakings will or may be substantially controlled by, any person or body of persons other than the lessee or licencee:\n(i) a non-refundable application fee of rupees twenty five thousand for mining lease or ten thousand for quarry licence, as the case may be;\n(ii) undertaking to pay one time premium on the basis of residual period of lease or licence as per sub-rule (9):\n(iii) a valid no dues certificate of transferor, transferee and their family members from the Mining Engineer or Assistant Mining Engineer concerned if they holds or has held any mineral concession, royalty collection contract or excess royalty collection contract in the State:\n(iv) an affidavit giving particulars of mineral-wise areas already held under mining lease, prospecting licence or quarry licence by the transferor and transferee or with any person having joint interest or already granted but not executed or registered or applied but not granted;\n(v) an affidavit by the transferee stating that he shall be abide by all the terms, conditions and liabilities of lease or licence; and\n(vi) an affidavit by the transferor and transferee stating that the amount of transaction agreed between them for transfer of lease or licence in lieu of investment incurred by the transferor.\n(i) change from one form of business organization to another form of business organization i.e. partnership, limited liability partnership, private limited company, public limited company or any form of business activities recognized by any law to another form of business organization;\n(ii) change in partner of a partnership firm;\n(iii) the transfer of shares in a company, resulting in the change of control of management or ownership right of the said company;\n(iv) merger or amalgamation of the lessee's or licensee's company into another company; and\n(v) change of a private limited company to limited company:\nS. No.\nS. No.\nResidual period of lease or licence\nResidual period of lease or licence\nPremium\nPremium\n1\n1\n2\n2\n3\n3\n1.\nUpto five years\nTwo times of annual dead rent or annual licence\n\t\t\t\tfee\n2.\nMore than five years and upto ten years\nFour times of annual dead rent or annual licence\n\t\t\t\tfee\n3.\nMore than ten years and upto fifteen years\nSix times of annual dead rent or annual licence\n\t\t\t\tfee\n4.\nMore than fifteen years and upto twenty years\nEight times of annual dead rent or annual\n\t\t\t\tlicence fee\n5.\nMore than twenty years\nTen times of annual dead rent or annual licence\n\t\t\t\tfee per rates specified in the District Mineral\nChapter IV\nTerms and Conditions of Mineral Concession",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "28",
            "title": "28. Terms and Conditions of mining lease or quarry licence.",
            "chapter": null,
            "content": "(i) No person shall undertake any mining operations of any minor mineral in any area within the state except under and in accordance with these rules;\n(ii) (a) The lessee or licencee shall pay contribution to the District Mineral Foundation Trust fund as Foundation Trust Rules, 2016, as amended from time to time;\n(b) The lessee or licencee of lease or licence granted after commencement of these rules, shall also pay premium amount as specified in rule 4, 5, 6 and 13; and\n(c) The lessee or licencee shall also pay surface rent of government land to the Revenue Department for surface area used by him for the purpose of mining, as per the rates prevalent in the area;\n(iii) The lessee or licencee shall pay all dues in the office of such officer, in such manner, at such place and time as may be specified by the Government;\n(iv) The lessee or licencee shall at his own expense erect and at all-time maintain and keep in repair boundary pillars and marks according to the plan and demarcation report in following manner: -\n(a) each corner of the lease or licence area shall have a boundary pillar (corner pillar);\n(b) there shall be erected intermediate boundary pillars between the corner pillars in such a way that each pillar is visible from the adjacent pillar located on either side of it;\n(c) the pillars shall be of square pyramid frustum shaped above the surface and cuboid shaped below the surface;\n(d) each pillar shall be of reinforced cement concrete;\n(e) the corner pillars shall have a base of 0.30m X 0.30m and height of 1.30m of which 0.70m shall be above ground level and 0.60m below the ground;\n(f) the intermediate pillars shall have a base of 0.25m X 0.25m and height of 1.0m of which 0.70m shall be above ground level and 0.30m below the ground;\n(g) all the pillars shall be painted in yellow colour and the top ten centimeters in red colour by enamel paint and shall be grouted with cement concrete;\n(h) on all corner pillars, distance and bearing to the forward and backward pillars and latitude and longitude shall be marked;\n(i) each pillar shall have serial number in a clockwise direction and the number shall be engraved on the pillars;\n(j) the serial number of pillar shall be the number of the individual pillar as per the lease or licence;\n(k) the location and number of the pillars shall also be shown in the surface plan and other plans maintained by the lessee or licencee; and\n(l) in case of forest area within the lease or licence, the size and construction and colour of the boundary pillars shall be as per the norms specified by the Forest Department in this behalf;\n(v) The lessee or licencee shall not erect, set-up or place any building or thing and shall not carry on surface operations in or upon any public pleasure ground, burning or burial ground or place held sacred by any class of persons or any house or village site, public road or other place which the Government may determine as public ground or in such a manner as to injure or prejudicially affect any building, works, property or rights of other persons;\n(vi) The lessee or licencee shall not carry on his operations in a manner that would injure or prejudicially effect any buildings, works, property or rights of other persons and no land will be used by the lessee or licencee for surface operations which is already occupied by persons other than the Government for works or purposes not included in the mining lease;\n(vii) The lessee or licencee shall give notice of commencement of any mining operations to the authorities as per section 16 of the Mines Act, 1952 and also to the Mining Engineer or Assistant Mining Engineer concerned at least one month before the commencement of any mining operation;\n(viii) The lessee or lessees shall commence mining operations within six months from the date of commencement of the lease or licence and thereafter carry on such operations effectively in a proper skilful and workman like manner both as regards prevention of waste by removal of sufficient overburden, careful storage of waste and drainage and as regards removal of all valuable minerals within the mine. The lessee or licencee shall work in workman like manner for systematic, scientific and environment friendly mining so as to ensure systematic development, conservation of mineral deposits, protection of environment and safety of man and machinery.\n(ix) The lessee or licencee shall allow reasonable facilities for access to mineral concession holder of any land which is comprised in or is reached by the land held by the lessee or licencee:\n(x) The lessee or licencee shall allow any officer authorised by the Central or State Government to enter upon any building, excavation or land comprised in the lease or licence for the purpose of inspecting the same and shall abide by the instructions issued by him;\n(xi) The lessee or licencee shall pay such compensation as may be assessed by lawful authority in accordance with the law or rules or order in force on the subject for all damages, injuries or disturbances which may be done by him and shall indemnify and keep indemnified fully and completely, the Government against such damages, injury or disturbance and all cost and expenses in connection therewith;\n(xii) The lessee or licencee shall strengthen and support to the satisfaction of the railway administration concerned or the Government, as the case may be, any part of the mine which, in his opinion, requires such strengthening or support for the safety of any railway, reservoir, canal, road and any other public works or structures;\n(xiii) The lessee or licencee shall forthwith report to the Mining Engineer or Assistant Mining Engineer  concerned any accident which occurs at or in the said premises;\n(xiv) The lessee or licencee shall report to the Mining Engineer or Assistant Mining Engineer concerned the discovery of any mineral not specified in the lease or licence within thirty days of such discovery. If lessee or licencee does not apply for inclusion of such mineral, lease or licence may be terminated and new lease or licence shall be granted through e-auction.\n(xv) The lessee or licencee shall not win and disposed off any minor mineral not specified in the lease or licence unless it is included in the lease or licence or a separate lease or licence is obtained. In such case the dead rent shall be charged for the mineral whose dead rent is higher as specified in Schedule III and royalty shall be payable for each mineral separately. If lessee or licencee does not apply for inclusion of such mineral, lease or licence may be terminated and new lease or licence shall be granted through e-auction:\n(xvi) The lessee or licencee shall not carry on, or allow to be carried on, any mining operations at any point within a distance of forty five meters from any railway line, except under and in accordance with the written permission of the railway administration concerned or under or beneath any ropeway or ropeway trestle or station, except under and in accordance with the written permission of the authority owning the ropeway or from any public roads (excluding mines approach road or village roads), reservoir, canal or other public place or buildings, pillars of railway and road bridge or inhabited site except with the previous permission of the Collector or any other officer authorised by the State or Central Government and otherwise then in accordance with such instructions, restrictions and conditions either general or specific as may be attached to such permissions. The said distance of forty five meters shall be measured in the case of public roads (excluding mines approach road  or village roads), railway, reservoir or canal horizontally from the outer toe of the bank or the outer edge of the cutting, as the case may be and in case of a building, horizontally from the plinth thereof;\n(xvii) The lessee or licencee shall not, in the case of mines approach road or village roads (including any track shown in the revenue record as village road), allow any working to be carried on within a distance of ten meters of the outer edge of the cutting except with the previous permission of the Collector or any other officer duly authorized by the State or Central Government in this behalf and otherwise than in accordance with such directions, restrictions and additions, either general or specific, which may be attached to such permission;\n(xviii) The lessee or licencee shall not pay a wage less than the minimum wages prescribed by the Central or the State Government under the Minimum Wages Act, 1948;\n(xix) The lessee or licencee shall intimate to the Mining Engineer or Assistant Mining Engineer concerned about any change of, -\n(a) one form of business organization to another form of business organization i.e. proprietorship, partnership, limited liability partnership, private limited company, public limited company or any form of business activities recognized by any law to another form of business organization;\n(b) change in partner of a partnership firm;\n(c) the transfer of shares in a company, resulting in the change of control of management or ownership right of the said company;\n(d) merger or amalgamation of one company into another company; and\n(e) change of a private limited company to limited company, as the case may be, within sixty days from the date of commencement of these rules or from the date of such change, whichever later:\n(xx) The lessee or licencee may, after paying the rents and royalties payable hereunder or under the lease deed or licence, on the expiry or termination of the lease or  licence term or within three calendar months thereafter, take down and remove for its own benefit, all or any mineral excavated during the currency of the lease or licence, engines, machinery, plant, buildings structures, tramways, railways and other works, erections and conveniences which may have been erected, set up or placed by the lessee or licencee in or upon the leased or licenced lands and which the lessee or licencee is not bound to deliver to the Government or which the Government does not desire to purchase:\n(xxi) If at the end of three calendar months after the expiry or termination of the lease or licence term there shall remain in or upon the leased or licenced land, any mineral, engines, machinery, plant, buildings structures, tramways, railways and other work, erections and conveniences or other property which are not required by the lessee or licencee in connection with operations in any other lands held by it under lease or licence, the same shall, if not removed by the lessee or licencee within one calendar month of being notified to do so by the Government, be deemed to become the property of the Government and may be sold or disposed off in such manner as the Government shall deem fit without liability to pay any compensation or to account to the lessee or licencee in respect thereof;\n(xxii) A mining lease or licence may contain such other conditions as the Government may deem necessary in regard to the following, namely: -\n(a) compensation for damage to land in respect of which the lease or licence has been granted;\n(b) restrictions regarding felling of trees on unoccupied and unreserved Government land;\n(c) the restriction of surface operations in any area prohibited by any authority;\n(d) the entering and working in a reserved or protected forest;\n(e) the securing of pits and shafts;\n(f) the power to take possession of the plant, machinery, premises and mines in the event of war or emergency; and\n(g) filing of civil suits or petitions relating to disputes arising out of the area under lease or licence;\n(xxiii) Subject to the conditions mentioned in this rule, the lessee or licencee shall, with respect to the land leased or licenced to him, have the right for the purpose of mining operations on that land, -\n(a) to work the mines;\n(b) to sink pits and shafts and construct roads;\n(c) to erect building, plant and machinery;\n(d) to quarry and obtain building and road materials and make bricks;\n(e) to use water;\n(f) to use land for stacking purpose; and\n(g) to do any other thing specified in the lease or licence;\n(xxiv) If the lessee or licencee holding a mining lease or licence, is convicted of illegal mining and there are no interim orders of any court of law suspending the operation of the order of such conviction in appeals pending against such conviction in any court of law, the Government may, without prejudice to any other proceedings that may be taken under the Act or the rules made thereunder, after giving such lessee or licencee an opportunity of being heard and for reasons to be recorded in writing and communicated to the lessee or licencee, terminate such mining lease or licence and forfeit whole or part of the security; and\n(xxv) The Mining Engineer or Assistant Mining Engineer concerned may, by an order in writing prohibit mining in whole or part of the lease or licence area, if in his opinion such operation is likely to cause premature collapse of any part of the workings or otherwise endanger the mine or quarry or the safety of persons employed therein, or there is danger as regards to outbreak of fire or flooding or such operations may cause damage to any property:\n(i) The holder of a lease granted before or on or after the commencement of these rules, shall notwithstanding anything contained in the instrument of lease or any law or rules in force at such commencement, pay royalty in respect of any mineral removed by him and/ or consumed within the leased area at the rates specified in Schedule II;\n(ii) The lessee shall pay, for every year, such yearly dead rent in advance, as may be fixed by the Government and if the lease is granted for more than one mineral, the dead rent for the mineral which is higher as per Schedule III shall be charged, but separate dead rent shall not be charged in respect of each mineral:\n(iii) The lessee may erect on the area granted to him, any building required for bonafide purpose and such building shall be the property of the Government after the expiry of the lease or earlier determination or surrender of the lease:\n(iv) (a) The lessee shall keep accurate and faithful accounts of all minerals excavated from the mines, the quantity lying in stock at the mines, the quantity dispatched and utilised along with the number of persons employed in Form -13 and record of rawanna issued in rawanna register in Form -14. It shall contain particulars regarding the quantity of mineral sold or utilized, its value and name of person or firm to whom sold;\n(b) The lessee shall keep production of all the minerals within the limits of mine plan or permitted under applicable laws:\n(c) The lessee shall maintain upto date plans of the mines and shall also allow any officer of the department authorised by the Director to examine or audit such accounts and plans at any time and shall furnish him other information as may be required;\n(d) The lessee shall furnish monthly online return in the Form -15 by the 15th day of the following month and online annual return in Form -16 within three month from the date of expiry of the financial year. The receipt of annual return shall be acknowledged in Form -17:\n(e) The lessee shall not remove, dispatch or utilize the mineral from the mines without valid rawanna generated by the system or issued by the department in Form -18 or any other system notified by the Government; and\n(f) the lessee shall store and maintain proper accounts of unutilized or non-saleable sub-grade minerals stored within the lease area for future beneficiation;\n(v) The lessee shall comply with the provisions of the Act and rules made thereunder including the rules made under section 18;\n(vi) The Government or competent authority shall from time to time and at all times during the term of lease have the right (to be exercised by notice, in writing to the lessee) of pre-emption of the said minerals (and all products  thereof) lying in or upon the said land hereby demised or elsewhere under the control of the lessee and the lessee shall deliver all minerals or products to the Government at current market rates in such quantities and in the manner and at the place specified in the notice exercising the said right;\n(vii) The lessee shall have to deliver the possession of area of the lease, where the lease is declared as a protected area under the Ancient Monuments Preservation Act, 1904 or any other law to the State Government without claiming any compensation;\n(viii) The lessee shall permit to the representative of the Government, to collect sample of all rocks found in mines or raised therefrom and all intermediate and finished products sold or intended to be sold by the lessee;\n(ix) The lessee shall be abstain from entering upon the surface of any occupied Government land or of any private land comprised within the leased area without obtaining prior consent of the occupant in writing;\n(x) The competent authority may with the prior approval of the Government impose such special conditions as deemed necessary, in the interest of mineral development;\n(xi) In case of mining lease of mineral bajri (river sand) or area where letter of intent holder has been permitted for extraction of bajri (river sand), the lessee or letter of intent holder shall, -\n(a) abstain from mining beyond a depth of three meters from the surface or below the water level of river or nallah whichever is less and shall work in such a manner that natural flow path of river or nallah is not altered;\n(b) have no claims whatsoever under any circumstances for non-operation due to floods or heavy rains or any other situation during the lease period;\n(c) carry out mining operations after leaving a buffer zone of three meters from the river bank;\n(d) make their own arrangement for installation of computerised weigh bridge and CCTV camera on check post; and\n(e) not extract bajri within five hundred meters from any crucial hydraulic structure such as pumping station, water intake and bridge;\n(xii) The existing lessees on the day of commencement these rules, shall obtain surface rights or consent of the landowner on mutually agreed before starting mining operation in the area or part thereof where land is not owned by lessee:\n(xiii) The lessee shall, in the matter of employment, give preference to the tribal's and to the persons who become displaced because of the taking up of mining operations;\n(xiv) The lessee shall permit students of mining and geological institutions approved by the Government to acquire practical training of the mines and plants operated by him and provide all necessary facilities required for the training;\n(xv) The lessee or lessees shall, when mandated by the Government, provide and at all times keep at or near the pit head or each of the pit heads or in nearby cluster area at which the minerals shall be brought to bank, a properly constructed and efficient computerized weighing machine and shall weigh or cause to be weighed thereon all the said minerals, from time to time, brought to bank, sold, exported and converted and also the converted products. The lessee shall at the close of each day cause the total weights, ascertained by such means of the said minerals raised, sold, exported and converted during the previous twenty four hours, to be entered in the books of accounts maintained by the lessee. The lessee shall at all times during the term of the lease, permit the Government to employ any person or persons to be present at the weighing of the said minerals as aforesaid and to keep accounts thereof and to check the accounts kept by the lessee:\n(xvi) The lessee shall at any time or times during the term of the lease, allow any person or persons appointed in that behalf by the Government to examine and test every computerized weighing machine to be provided and kept as aforesaid and the weights used therewith in order to ascertain whether the same respectively are correct and  in good repair and order. If upon any such examination or testing, any such weighing machine or weights shall be found incorrect or out of repair or order, the Government may require that the same be adjusted, repaired and put in order by and at the expense of the lessee. If such requisition is not complied with within thirty days after the same has been made, the Government may cause such weighing machine or weights to be adjusted, repaired and put in order at the expense of the lessee. If upon any such examination or testing as aforesaid, any error is discovered in any weighing machine or weights to the prejudice of the Government, such error shall be regarded as having existed for three calendar months prior to the discovery thereof or from the last occasion of so examining and testing the same weighing machine and weights, in case such occasion is within the said period of three months, and the lessee shall pay the royalty accounted for accordingly;\n(xvii) (a) In case of any breach on the part of the lessee of any covenant or condition contained in the lease, the competent authority may determine the lease with prior approval of next higher authority and take possession of the said premises and forfeit the security deposit or in the alternative may impose penalty as specified in Schedule IV:\n(b) The competent authority may also at any time after serving the aforesaid notice enter upon the said premises and seize all or any of the minerals or movable property therein and may carry away or order the sale of the property so seized or so much of it as will suffice for the satisfaction of the rent or royalty due and all cost and expenses occasioned by the non-payment thereof:\n(xviii) The lessee shall deliver up the lease premises and all mines (if any) dug therein in a proper and workable state (save in respect of any working as to which the Government might have sanctioned abandonment) to the concerned authority as soon as the lease is determined; and\n(xx) The Government may determine the lease, if it considers that the mineral under the lease is required for establishing an industry beneficial to the public by delivering a six month prior notice in writing:\n(i) The licencee or his agent, contractor, assignee, transporter etc. shall pay in addition to the annual licence fee, royalty at departmental 'Naka' or to the royalty collection contractor, as the case may be, at the rate specified in the Schedule II;\n(ii) The licencee shall pay annual licence fee in advance to the Government on or before 1st day of April. If the annual licence fee is not paid on the due date, the same shall be recoverable along with a penalty equivalent to ten percent of the annual licence fee upto a period of three months from the due date of payment. Failing which licence may be terminated after giving a thirty day's notice;\n(iii) The licencee shall deposit a sum equal to one fourth of the annual licence fee as security deposit and the annual licence fee as performance security for the due observance of the terms and conditions of the licence. The existing licencee shall also have to deposit a sum equal to annual licence fee as performance security to the Mining Engineer or Assistant Mining Engineer concerned within six months from the date of commencement of these rules;\n(iv) The licencee shall pay such amount per year or part thereof to the Government for removal of dump from the quarry at such rate and at such time as may be fixed by the Government;\n(v) The licencee shall have the liberty at all times during the period of the licence in respect of the plot or land for which licence is sanctioned to enter upon the area and to mine, bore, dig, drill, win, work, stock, dress, process, convert, carry away and dispose of the said mineral or to install, erect, maintain, construct and use cutting, processing unit or stock;\n(vi) The licencee shall confine workings within the limits of the plot or area allotted to him. In case the licencee is found working outside the boundary of his allotted plot or area, the licence may be cancelled by the Mining Engineer or Assistant Mining Engineer concerned:\n(vii) The licencee shall take all necessary measures to ensure health and safety of labours employed in the quarry and shall comply with all the provisions of law time being in force;\n(viii) The licencee shall maintain and keep ready for inspection, daily attendance register of labours employed in the quarry, in the performa as prescribed in the Mines Rules, 1955. The licencee shall also furnish a list of labours, along with their addresses, employed by him in the preceding quarter to the Mining Engineer or Assistant Mining Engineer concerned and district level officer of the Labour Department, Government of Rajasthan within seven days from the end of each quarter;\n(ix) The Mining Engineer or Assistant Mining Engineer concerned may issue directions in respect of mining methods, removal and disposal of over burden, stacking of minerals, payment of royalties and other connected matters; and\n(x) If the licencee commits breach of any terms of the licence or any provision of the rules or fails to comply with the directions given by the Mining Engineer or Assistant Mining Engineer concerned within the period specified by him, the Mining Engineer or Assistant Mining Engineer concerned may after giving thirty day's notice to remedy the breach or to comply the directions, may impose penalty upto rupees ten thousand or may cancel the licence after obtaining prior approval from  Superintending Mining Engineer concerned and forfeit the security deposits and licence fee:\nChapter V\nMineral Conservation and Development",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "29",
            "title": "29. Mine plan and mine closure plan.",
            "chapter": null,
            "content": "(i) the plan of the precise area showing the nature and extent of the mineral deposit, spot or spots where the  excavation is to be done in the first year and its extent, a detailed cross-section and detailed plan of spots of excavation based on the prospecting data gathered by the applicant and a tentative scheme of mining for the first five years of the lease, licence or short term permit;\n(ii) details of the geology and lithology of the precise area including mineral reserves of the area;\n(iii) the extent of manual mining or mining by the use of machinery and mechanical devices on the precise area;\n(iv) the plan of the precise area showing natural water courses, limits of reserved and other forest areas and density of trees, if any, assessment of impact of mining activity on forest, land surface and environment including air and water pollution, details of scheme for restoration of the area by afforestation, land reclamation, use of pollution control devices and of such other measures as may be directed by the Government, from time to time;\n(v) annual programme and plan for excavation on the precise area from year to year for five years;\n(vi) progressive mine closure plan, if the mining plan is for the area exceeding one hectare; and\n(vii) any other matter which the Director or any officer so authorised may require the applicant to provide in the mining plan or simplified mining scheme.\n(i) a progressive mine closure plan; and\n(ii) a final mine closure plan.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "30",
            "title": "30. Employment of qualified persons.",
            "chapter": null,
            "content": "(i) a whole-time Mining Engineer or a person possessing first class mine manager's certificate of competency issued by the Director General of Mines Safety and geologist, where mining operations are carried out by deployment of heavy mining machinery for deep hole drilling, excavation, loading and transport, or where the average employment exceeds one hundred and fifty per day;\n(ii) a whole-time Mining Engineer or the person possessing second class mine manager's certificate of competency issued by the Director General of Mines Safety, where mining operations are carried out by deployment of heavy mining machinery for deep hole drilling, excavation, loading and transport, or where the average employment exceeds seventy five but less than one hundred and fifty per day; and\n(iii) in case of any other mine, a person having degree in mining or diploma in mining with two year's experience in mining operations or geologist or the person possessing foreman's certificate of competency issued by the Director General of Mines Safety:\n(i) A degree in Mining Engineering granted by a Institution or University established or incorporated by or under a Central Act, a Provincial Act or a State Act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification;\n(ii) A post graduation degree in Geology granted by a Institution or University established or incorporated by or under a Central Act, a Provincial Act or a State Act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification; and\n(iii) Three years full time diploma certificate in mining engineering awarded by the State Technical Education Boards or All India Council of Technical Education.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "31",
            "title": "31. Duties of qualified person.",
            "chapter": null,
            "content": "(i) be responsible for the preparation and maintenance of all statutory plans, sections, reports and schemes in accordance with these rules.\n(ii) be responsible for carrying out the study of the associated rocks and minerals, identifying them and stacking the various minerals produced separately.\n(iii) carry out all such orders and directions as may be given in writing under these rules by any officer authorised to inspect the mine and shall forward a copy of such orders or directions to the holder of lease or licence.\n(iv) ensure that there is a sufficient provision of proper materials, appliances and facilities at all times at mining lease for the purpose of carrying out the provisions of these rules and orders issued there under and where he is not the owner or agent of the mining lease, he shall make requisition in writing to the owner or agent for anything required for the aforesaid purpose. A copy of every such requisition shall be recorded in bound paged book kept for the purpose.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "32",
            "title": "32. Role of Revenue Department.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "33",
            "title": "33. Role of Forest Department.",
            "chapter": null,
            "content": "Chapter VI\nSustainable Mine Development",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "34",
            "title": "34. Environmental safeguard.",
            "chapter": null,
            "content": "(i) carry out the mining operations in such a manner so as to ensure systematic development of the mine or quarry, conservation of mineral, protection of the environment and safety of the man and machinery;\n(ii) ensure that no natural watercourse or water resources is obstructed due to any mining operation. Adequate measures shall be taken for protection of the older-streams, if any, emanating or passing through the lease or licence area during the course of mining operation;\n(iii) keep mine working restricted to above ground water level till approval of the Ground Water Department of the State is obtained;\n(iv) temporarily store the top soil, at the place earmarked in the mine plan or scheme;\n(v) dump over burden generated during the mining operations at earmarked dump site shown in the mine plan or scheme;\n(vi) take effective safeguard, such as regular water sprinkling in critical areas prone to air pollution and having high levels of particulate matter such as around crushing and screening plant, loading and unloading point and all transfer points;\n(vii) practice controlled blasting and implement mitigative measures for control of ground vibrations and to arrest fly rocks and boulders. Blasting shall be done only by a person holding blaster certificate from the Director General of Mines Safety. Deep hole blasting shall be carried out only after approval of the Director General of Mines Safety;\n(viii) maintain the bench height and slope as per the Metalliferous Mines Regulations, 1961;\n(ix) take all mitigative measures during the mining operations to ensure that the buildings or structures in the nearby areas shall not be affected due to blasting;\n(x) use drills either equipped with dust extractors or operated with water injection system for wet drilling to control the pneumoconiosis and silicosis;\n(xi) provide protective wears or respiratory devices to the personnel working in mining area and shall also provide adequate training and education on safety, environment and health aspects;\n(xii) undertake to ensure minimum losses to the agriculture crops and undertake to contribute suitably for compensation to the loss or damage to the crops;\n(xiii) organize regular health check up camps for the workers engaged in mines and also periodically organize occupational health surveillance program for the workers to observe any contractions due to exposure to dust and take corrective measures, if needed;\n(xiv) keep vehicular emissions under control and regularly monitor the same. Measures shall be taken for maintenance of vehicles used in mining operations and in transportation of mineral;\n(xv) provide insurance cover to all workers engaged in mines;\n(xvi) take measures for control of noise levels within permissible limit;\n(xvii) The non-saleable mineral rejects at mine bottom shall regularly be collected and transported to the surface and the mine floor shall be kept reasonably clear of debris;\n(xviii) Small lumps of mineral shall, as far as possible, be segregated from the dumps and stored separately for future use; and\n(xix) The ground selected for dumping of top soil, overburden, waste material or non-saleable mineral shall be away from workings of the mine.\nChapter VII\nGrant of Royalty or Excess Royalty Collection Contract",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "35",
            "title": "35. Registration of contractor.",
            "chapter": null,
            "content": "(i) a non- refundable application fee, a scanned copy of net worth certificate issued by a Charted Accountant on the basis of balance sheet as per income tax returns in Form-20 and a scanned copy of fixed deposit receipt of a nationalised or scheduled bank or national saving certificate as security deposit duly pledged in favour of the Additional Director (Mines) concerned and made from the bank account of the contractor to be registered as specified below: -\nS. No.\nS. No.\nClass of contractor\nClass of contractor\nApplication Fees (in Rs.)\nApplication Fees (in Rs.)\nMinimum net worth certificate (Rs. in lacs)\nMinimum net worth certificate (Rs. in lacs)\nSecurity deposit (Rs. in lacs)\nSecurity deposit (Rs. in lacs)\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\nAA\nFifteen thousand\nFive hundred\nFifty\n2.\nA\nTwelve thousand five hundred\nTwo hundred\nTwenty\n3.\nB\nTen thousand\nHundred\nTen\n4.\nC\nSeven thousand five hundred\nFifty\nFive\n(ii) a scanned copy of an affidavit stating details regarding mineral concession or contract held in the name of the applicant or his family members;\n(iii) a scanned copy of an affidavit stating that no dues of the department are outstanding against him or any member of his family; and\n(iv) scanned copies of all relevant documents mentioned in chartered accountant's certificate to explain its title.\nDepartment/Registration Authority/Class/S.No./Year.\n(i) Name and address of the contractor;\n(ii) Registration or code no.;\n(iii) Registration authority;\n(iv) Class of contractor;\n(v) Validity of registration; and\n(vi) Name of power of attorney holders or authorised signatory with attested photo and signature.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "36",
            "title": "36. Grant of royalty collection contract or excess royalty collection contract.",
            "chapter": null,
            "content": "S. No.\nS. No.\nClass of Contractor\nClass of Contractor\nReserve price (in Rs)\nReserve price (in Rs)\n1\n1\n2\n2\n3\n3\n1.\nAA\nAny amount\n2.\nA\nUpto fifty crore\n3.\nB\nUpto twenty five crore\n4.\nC\nUpto ten crore",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "37",
            "title": "37. Procedure for e-auction and grant of contract.",
            "chapter": null,
            "content": "(i) First round of auction shall be held in following manner, namely: -\n(a) A technical bid shall be submitted by the bidder fulfilling following requirements: -\n(I) A scanned copy of bid letter in Form -3;\n(II) Bid security as specified in rule 39;\n(III) An initial price offer which shall be equal to or above the reserve price;\n(IV) A scanned copy of affidavit regarding no-dues of the department;\n(V) A scanned copy of no-dues certificate from the Mining Engineer or Assistant Mining Engineer concerned where the bidder holds or had held mineral concession or royalty collection contract or excess royalty collection contract;\n[(VI) A scanned copy of contractor's registration with the department] ;\n(VII) A scanned copy of copy of power of attorney in format as specified in Form -4 or resolution of board of directors in favour of person submitting bid in case of a firm or company;\n(VIII) A scanned copy of PAN card or TIN;\n(IX) A scanned copy of address proof;\n(X) A scanned copy of balance sheet certified by the chartered accountant or income tax returns of preceding financial year; and\n(XI) E-mail address and mobile number;\n(b) Failure to comply with the provisions of clause (a) for whatsoever reason, shall lead to non-admission of technical bid;\n(c) The bids shall be opened by the following committee: -\n(I) Additional Director Mines (HQ);\n(II) Financial Adviser; and\n(III) Superintending Mining Engineer (HQ-II or III) concerned;\n(d) Evaluation report of technical bids shall be prepared and shall be informed to all the bidders individually through e-mail or SMS. Initial price offer of all technically qualified bidders shall be opened by the committee mentioned in clause (c) on the schedule date of e-auction;\n(e) The technically qualified bidders shall be ranked on the basis of the descending initial price offer submitted by them and the technically qualified bidder holding the first fifty percent of the ranks (with any fraction rounded off to higher integer) or the top five technically qualified bidder, whichever is higher, shall qualify as qualified bidder for participating in the second round of electronic auction:\n(f) Qualified bidders shall be intimated about their qualification for electronic auction against specific items in accordance with the terms and conditions of the bid, through notice on the web site of agency appointed for auction through their secured login as well a system generated e-mail; and\n(g) The highest initial price offer amongst the qualified bidders shall be the floor price for the second round of online electronic auction and all the qualified bidders shall participate in the second round of electronic auction:\n(ii) Second round of e-auction shall be held in following manner, namely: -\n(a) The qualified bidders may submit their final price offer exclusive all taxes and duties which shall not be less than the floor price. The bidder will have the sole responsibility to make payment of all applicable taxes and duties to the concern authorities directly and produce the proof of the same to the department:\n(b) The date, time and period of e-auction shall be as per the schedule mentioned in notice inviting bid. However the closing time of e-auction shall be automatically extended in the event a bid is received during the last eight minutes before the scheduled closing time of electronic auction. The closing time of electronic auction will be automatically extended by eight minutes from the last received bid time to give equal opportunity to all other qualified bidders. This process of auto extension will continue till the last highest bid remains unimproved for a period of eight minutes;\n(c) The successful bidder shall be decided by the system solely on the basis of highest financial bid submitted by the qualified bidders. No negotiation shall be conducted with any bidder;\n(d) The auction process shall be annulled if none of qualified bidders submit a final price offer on online electronic auction platform. In case the e-auction process is annulled due to non submission of at least one final price offer on the electronic auction platform, the bid security of the qualified bidder who has submitted the highest initial price offer i.e. the applicable floor price for the second round of e-auction, shall be forfeited;\n(e) On close of e-auction, the highest bidder shall be declared as successful bidder and thereafter bid sheet indicating the name of the successful bidder and bid price etc. shall be made available by the agency through e-mail within twenty four hours. The bid sheet may be downloaded through Management Information System (MIS) reports; and\n(f) On deposition of performance security by the successful bidder, bid security of the successful bidder shall be refunded by the agency appointed for auction, within seventy two hours.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "38",
            "title": "38. Reserve price.",
            "chapter": null,
            "content": "(i) Physical quantities of mineral produced and dispatched from the area;\n(ii) Last year's collection of royalty from that area;\n(iii) Expected increase in revenue in the proposed contract period due to increased demand of mineral; and\n(iv) Any other relevant matter about the area.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "39",
            "title": "39. Bid security.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "40",
            "title": "40. Security deposit.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "41",
            "title": "41. Performance Security.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "42",
            "title": "42. Bid amount.",
            "chapter": null,
            "content": "(i) Where the yearly bid amount does not exceed rupees twenty five lacs, twenty five percent of the bid amount shall be deposited as first quarterly installment and remaining three quarterly installments shall be deposited in advance on the dates specified in the agreement; and\n(ii) Where the yearly bid amount exceed rupees twenty five lacs, it shall be deposited in equal monthly installments but the first installment shall be deposited before execution of the agreement. The remaining monthly installments shall be deposited in advance on the dates specified in the agreement.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "43",
            "title": "43. Execution of contract.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "44",
            "title": "44. Conditions of royalty collection contract and excess royalty collection contract.",
            "chapter": null,
            "content": "(1) The contractor shall make his own arrangements for collection of royalty and other permissible charges.\n(2) The royalty receipt shall be in Form -23 or Form -24, as the case may be, duly stamped and issued by the Mining Engineer or Assistant Mining Engineer concerned.\n(3) The contractor shall collect the royalty as far as possible, close to lease or licence area and if not possible or practical then at any other place near the lease or licence area but within the jurisdiction of the contract area:\n(4) The contractor shall issue valid royalty receipts in Form -23 or Form -24 for the amount of royalty or excess royalty, permit fee or other charges collected for every dispatch of the said mineral and shall fill all the columns of the receipt. The contractor shall, give first copy of receipt to the in-charge of the vehicle, submit second copy of the receipt to the Mining Engineer or Assistant Mining Engineer concerned and shall retain third copy with him.\n(5) The excess royalty collection contractor shall collect excess royalty only from such vehicles which are having valid rawanna issued by the lessees. The contractor shall retain second copy of the rawanna with him and shall return first copy after stamping to vehicle owner. The contractor shall deposit second copy of rawanna with second copy of receipt issued by him with monthly statement in Form -26 to the Mining Engineer or Assistant Mining Engineer concerned.\n(6) The contractor shall not recover any royalty from the vehicles having royalty paid rawanna issued against yearly dead rent:\n(7) The contractor shall not recover any royalty, if the mineral specified in the contract is used by the State Government Departments themselves under a valid short term permit or permit granted by the Mining Engineer or Assistant Mining Engineer concerned.\n(8) The contractor shall not recover royalty and/or permit fee from short term permit or permit issued under these rules and same shall not be adjusted against the contract amount.\n(9) The royalty shall be collected on the dispatch of minor minerals from the area specified in the contract and not on minor minerals brought from outside the contract area or from the major mineral leases.\n(10) The contractor shall not recover royalty and/or permit fee for the minerals used in construction, repair or renewal of National, Mega  Highways, Four or Six lane roads, laying and repair of Railway Tracks. For construction or repair of such works, a separate short term permit shall be issued [to the works contractor and if the mineral is obtained from existing leases, separate paid rawanna for the aforesaid purpose shall be issued by the Mining Engineer or Assistant Mining Engineer concerned to the lessee, Royalty or Excess royalty and/or permit fee received from such works contractor shall be adjusted against the contract amount.]\n(11) No royalty shall be recovered on the minor minerals removed from the areas which are not working pits of a lessee or licencee as provided in rule 74.\n(12) The contractor shall not recover any royalty and/or permit fee from the minerals used in special works or schemes as specified by the Government, from time to time.\n(13) The contractor shall submit online monthly statement of royalty collection and/or excess royalty collection with, or without permit fee or other charges in the Form -25 and Form -26 respectively within fifteen days.\n(14) Where the contractor recovers royalty or other charges in excess of the specified rates, the excess amount so collected shall be recovered from the contractor and the contract shall be terminated after giving a fifteen day's notice and the contractor may be blacklisted or debarred for further royalty collection contract or excess royalty collection contract for a period of next five years.\n(15) The contractor shall have no rights regarding leases or licences in the contract area except collection of royalty, permit fee or other charges mentioned in the contract for the actual weight of the mineral transported at the prevailing rates for which contract has been awarded.\n(16) Cancellation and surrender of lease or licence, sanctioning of new lease or licence, revision of dead rent of existing lease, temporary or permanent closure of lease or licence by the Government or Court or due to any other reason in the area concerned, shall not have any impact on the yearly contract amount.\n(17) The Contractor shall pay the installment of contract amount in advance on due date and if any amount is not paid on due date, it shall be collected as an arrears of land revenue and an interest at the rate of eighteen percent shall be charged from due date irrespective of any other action being taken for cancellation of contract or imposition of penalty.\n(18) Where the contract amount is equal to or more than ten crore, the contractor shall install at least one electronic weigh bridge system on the route covering maximum transportation or dispatches of mineral in the contract area along with sufficient web cameras, computer with net connectivity and generator. The weigh bridge shall be integrated with that of departmental online system and shall hand over the weigh bridge along with all above equipment to the department in proper working condition after expiry or termination of the contract otherwise security deposit shall be forfeited. Government will explore the possibility of prescribing GPS tracking system.\n(19) The contractor shall inform his registering authority about any contract allotted to him within fifteen day from the allotment.\n(20) Contractor shall issue photo identity card duly signed and stamped by the Mining Engineer or Assistant Mining Engineer concerned to all nakedars or persons employed by him for royalty collection. The contractor shall submit a list of nakedars or persons to be engaged for royalty collection along with photo identity card and a fee of rupees one hundred for each identity card. Such identity cards shall be valid during the currency of the contract only. All the nakedars or persons shall keep the identity card displaying with them during collection of royalty.\n(21) Contractor shall erect reflecting sign boards at each Naka or Check post clearly visible and legible from a distance mentioning name of the contractor, area of the contract, name of mineral, rate of royalty, permit fee and other applicable charges (if any) and name and contact number of the Mining Engineer or Assistant Mining Engineer concerned for any complaint.\n(22) The contractor shall abide by all the terms and conditions of the contract and any amendment made under these rules and shall also follow all the instructions issued by the Government or any officer of the department.\n(23) The contract may be terminated by the State Government if considered by it to be in public interest, after giving a fifteen day's notice.\n(24) The contractor shall not transfer the contract as a whole or in part and shall also not grant any sub-contract to or in the name of any other person.\n(25) The contractor shall intimate the change in their permanent address along with address proof to the Mining Engineer or Assistant Mining Engineer concerned within one month of such change.\n(26) In case of default in the due observance of the terms and conditions of the contract, the Mining Engineer or Assistant Mining Engineer concerned may terminate the contract and forfeit the security deposit or alternatively may impose penalty as specified in Schedule V after providing an opportunity of being heard by issuing a notice of fifteen day's.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "45",
            "title": "45. Debarring or Black listing of a contractor.",
            "chapter": null,
            "content": "(i) where the contractor does not execute contract, deposits security, performance security or advance installment after sanction of the contract;\n(ii) where the contractor is found guilty of recovering royalty and/or permit fees and/or other charges in excess of the specified rates;\n(iii) where the contractor is found to have directly or indirectly or through an agent, engaged or indulged in  any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice during the tender process, or after the grant or execution of the contract and there are sufficient reasons to believe that the contractor or his employee has been guilty of malpractices such as bribery, corruption, fraud, vitiating fair auction process;\n(iv) where the contractor or his partner or his representative is found guilty of misbehavior with any officer or official of the Government connected with the contract directly or indirectly; and\n(v) where the contractor or his partner or his representative has been convicted by a court of law for offence involving moral turpitude arising out of the contract.\nChapter VIII\nRoyalty Assessment",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "46",
            "title": "46. Self Assessment of royalty.",
            "chapter": null,
            "content": "(i) the return came under scrutiny; and\n(ii) the assessing authority has sufficient reasons to believe that the online returns are incorrect.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "47",
            "title": "47. Assessment on failure to deposit royalty or submit returns.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "48",
            "title": "48. Assessment of royalty incorrectly assessed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "49",
            "title": "49. Re-opening of cases of best judgment of assessment.",
            "chapter": null,
            "content": "(i) that the assessee did not receive the summon or notice issued to him for the purpose of assessment; and\n(ii) that the assessee was prevented by sufficient cause for complying with any summon or notice.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "50",
            "title": "50. Creation of special division or circle for royalty assessment.",
            "chapter": null,
            "content": "Chapter IX\nGrant of Permit",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "51",
            "title": "51. Short term permit.",
            "chapter": null,
            "content": "(i) copy of work order or concessionary agreement;\n(ii) copy of G-Schedule or bill of quantities;\n(iii) plan and description of the area from where mineral will be excavated;\n(iv) revenue record of the area; and\n(v) consent of the khatedar in case land does not belong to the applicant.\nS.No.\nS.No.\nQuantity of mineral\nQuantity of mineral\nPermit fee (in Rs.)\nPermit fee (in Rs.)\n1\n1\n2\n2\n3\n3\n1.\nUpto ten tonnes\nTwenty\n2.\nExceeding ten tonnes and upto twenty tonnes\nFifty\n3.\nExceeding twenty tonnes and upto fifty tonnes\nHundred\n4.\nExceeding fifty tonnes and upto hundred tonnes\nOne hundred and twenty five\n5.\nExceeding hundred tonnes\nRupees one hundred and fifty + rupees fifty for\n\t\t\t\tevery additional hundred tonnes or part thereof\n(i) apply for permit along with bill of quantity or G-schedule, permit fees and opting for deduction of royalty and contribution in the District Mineral Foundation Trust fund from running bills by the department concerned. The contractor shall submit the record for the assessment, along with consumption certificate issued by the competent authority and get a no-dues certificate from the Mining Engineer or Assistant Mining Engineer concerned. If any refund has to be claimed, such application shall be submitted within thirty days of completion of the work;\n(ii) apply for permit along with bill of quantity or G-schedule, permit fees, contribution in the District Mineral Foundation Trust and royalty amount. The contractor shall submit the record for the assessment, along with consumption certificate issued by the competent authority and get a no-dues certificate from the Mining Engineer or Assistant Mining Engineer concerned;\n(iii) apply for permit along with bill of quantity or G-schedule and a self-certified undertaking stating that the entire quantity of mineral will be procured or used royalty paid:\n(iv) apply for royalty deduction from running bills to the Mining Engineer or Assistant Mining Engineer concerned along with bill of quantity or G-schedule and a self-certified undertaking stating that the entire quantity of mineral used shall be royalty paid. In such case, no assessment shall be required by the department and the deduction of royalty shall be done from the running bill by the works department concerned in following manner: -\n(a)\nFor construction/widening of roads and building\n\t\t\t\tconstruction\nThree percent of bill amount\n(b)\nFor repairing and other works\nOne and half percent of bill amount",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "52",
            "title": "52. Permit.",
            "chapter": null,
            "content": "(i) the Mining Engineer or Assistant Mining Engineer concerned may grant permit to a person for dispatch of over burden or ordinary earth or murram lying inside or outside any lease area or quarry licence area on payment of special permit fee to be computed at the rate of rupees ten per ton or as may be revised from time to time which shall be in addition of the royalty, contribution to the District Mineral Foundation Trust fund as per rates specified in the District Mineral Foundation Trust Rules, 2016, as amended from time to time. Such permit shall be granted for a maximum period of six month for the quantity as desired by the applicant. Royalty, so deposited, shall not be adjusted against the dead rent or annual licence fee payable by the lessee or licencee:\n(ii) every application for permit shall be accompanied by a sketch map showing approximate location of such dump, quantity applied for and the period required for dispatch:\n(iii) the permit holder shall not dispatch minerals in excess of the quantity mentioned in the permit:\n(iv) the Mining Engineer or Assistant Mining Engineer concerned may refuse to grant a permit with reasons to be recorded in writing and communicated to the applicant; and\n(v) the permit holder shall be responsible for submission of record within fifteen days of the expiry of permit.\n(i) the Mining Engineer or Assistant Mining Engineer concerned may after verification, grant permit for removal of minor mineral from major mineral lease area to the concerned lessee on advance payment of royalty, contribution to the District Mineral Foundation Trust fund as per rates specified in the District Mineral Foundation Trust Rules, 2016, as amended from time to time. Such permit shall be granted for a maximum period of six month for the quantity as desired by the  lessee. Royalty, so deposited, shall not be adjusted in the dead rent payable by the lessee:\n(ii) every application for permit shall be accompanied by a sketch map showing location of minor mineral stock, quantity and period required:\n(iii) the Mining Engineer or Assistant Mining Engineer concerned may refuse to grant permit for any minor mineral with reasons to be recorded in writing and communicated to the applicant.\n(iv) the lessee shall not dispatch minerals in excess of the quantity mentioned in the permit:\n(i) Notwithstanding anything contained in these rules, permit for excavation and removal of gypsum from the khatedari land shall be granted to the khatedar for improvement of his land after approval of the committee consisting of, -\n(a) District Collector;\n(b) Sub Divisional Officer of the area concerned;\n(c) Mining Engineer or Assistant Mining Engineer; and\n(d) Senior Geologist or Geologist.\n(ii) Superintending Mining Engineer concerned shall issue notification in two daily news papers, atleast one of which is state level and other having wide publicity in the area where permits are being granted, for inviting online application for grant of permit in khatedari land;\n(iii) Application for permit shall be made online by the khatedar as per the conditions mentioned in the notification issued under clause (ii) of this sub-rule;\n(iv) On receipt of application for permit, Mining Engineer or Assistant Mining Engineer concerned shall inspect the area along with Senior Geologist or Geologist and Tehsildar and forward their recommendation regarding depth of gypsum deposition, quantity of gypsum, necessity of removal of gypsum from the land for which permit is sought to the committee specified in clause (i) of this sub-rule within fifteen days of receipt of the application;\n(v) On receipt of the recommendation submitted under clause (iv) of this sub-rule, the committee specified in clause (i) of this sub-rule, shall examine and communicate it's decision to the Mining Engineer or Assistant Mining Engineer concerned within thirty days;\n(vi) After approval of the Committee, the Mining Engineer or Assistant Mining Engineer concerned shall, within seven days, inform the applicant to submit environment clearance, if applicable, issued by the competent authority and deposit the security amount of rupees forty thousand in the form of fixed deposit receipt of any Nationalized or Scheduled bank or National Saving Certificates pledged in favour of the Mining Engineer or Assistant Mining Engineer concerned;\n(vii) On completion of the formalities mentioned in clause (vi) of this sub-rule, the Mining Engineer or Assistant Mining Engineer concerned shall issue permit to the khatedar and also issue ravanna for despatch of mineral after deposition of the following amount: -\n(a) permit fee at the rate of rupees one thousand + rupee one per tonne of mineral to be despatched;\n(b) royalty as per Schedule II;\n(c) premium amount at the rate of rupees one hundred per tonne of mineral to be despatched; and\n(d) contribution to the District Mineral Foundation Trust as per the rates specified in the District Mineral Foundation Trust Rules, 2016, as amended from time to time:\n(viii) The permit holder shall remove the mineral gypsum as per terms and conditions specified in the permit. The permit holder shall not despatch mineral in excess of quantity specified in the permit:\n(ix) The Mining Engineer or Assistant Mining Engineer concerned may refuse to grant permit with the previous approval of the committee, specified in clause (i) of this sub-rule, after recording the reasons and same shall be communicated in writing to the applicant;\n(x) The permit holder khatedar shall not, -\n(a) assign, sublet, mortgage or transfer the permit in any other manner or any right, title or interest therein; and\n(b) enter into, or make any arrangement, contract or understanding whereby the permit holder will or may be directly or indirectly financed to a substantial extent and by or under which the excavations will or may be substantially controlled by, any person or body of persons other than the permit holder.\n(xi) In case of any violations of terms and conditions of the permit, the permit shall be cancelled by the Mining  Engineer concerned after taking approval of the committee mentioned in sub-clause (i) of this sub-rule with forfeiture of security with immediate effect; and\n(xii) The permit holder shall submit quarterly records to the Mining Engineer or Assistant Mining Engineer concerned for assessment of royalty and further ravanna shall only be issued after assessment of royalty and deposition of assessed amount.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "53",
            "title": "53. Brick earth permit.",
            "chapter": null,
            "content": "(i) in khatedari land, to a person other than khatedar or without obtaining written consent of the khatedar duly attested by Notary Public or Oath Commissioner;\n(ii) if area is less than 1.00 hectare; and\n(iii) if depth of brick earth is more than two meters from the surface.\n(i) a non refundable application fee of rupees two thousand;\n(ii) a scanned copy of khasra map and revenue record showing location of area applied for permit from where brick earth will be excavated duly verified by the Patwari concerned;\n(iii) a scanned copy of khasra map and revenue record showing existing or proposed location of brick kiln;\n(iv) a scanned copy of an affidavit of the applicant that no dues of the department are outstanding against him or any member of his family and also against a firm or company to which he/she is or was a partner or director;\n(v) a scanned copy of notarised consent from the land owner where land is not owned by the applicant for excavation of brick earth;\n(vi) a scanned copy of an affidavit of the applicant that he shall get land conversion from the Revenue Department for making brick kiln;\n(vii) a scanned copy of agreement between applicant and brick kiln owner, in case brick kiln is not owned by the applicant;\n(viii) annual permit fees of rupees fifteen thousand; and\n(ix) security deposit of rupees fifteen thousand in the form of fixed deposit receipt of any nationalized or scheduled bank or national saving certificates or any other form of securities which may be notified by the Government and duly pledged in favour of the Mining Engineer or Assistant Mining Engineer concerned.\n(i) The permit holder shall deposit annual permit fees in advance every year;\n(ii) Before excavation of brick earth from permit area, the permit holder shall remove top soil upto depth of one foot and store it separately for reclamation of the land after excavation of brick earth;\n(iii) Next permit shall only be issued after verification of reclamation of stored top soil;\n(iv) The permit holder shall transport such brick earth only to that brick kiln for which permit has been issued;\n(v) Royalty alongwith contribution to the District Mineral Foundation Trust fund shall be collected at check post or naka from vehicles carrying finished (pakki) bricks. Weight of brick earth shall be calculated as per the provisions of sub-rule (2);\n(vi) The owner of every brick kiln shall obtain a separate permit for each brick kiln. Brick earth excavated under  the permit issued for one brick kiln shall not be used for another brick kiln;\n(vii) Where the quality of brick earth in area granted under permit is not suitable for making bricks or mineral is exhausted, in such case surrender of permit may be accepted by the Mining Engineer or Assistant Mining Engineer concerned if there are no dues against permit holder;\n(viii) The permit holder shall have the liberty at all times during the period of the permit in respect of the land for which permit is granted to enter upon the area and to mine, bore, dig, drill, win work, stock, dress, process, convert, carry away and dispose of the said mineral;\n(ix) The permit holder shall confine his working within the limits of the permit area and upto depth of two meters from the surface;\n(x) The permit holder shall not obstruct approach to the adjoining leases, licences or permits. In case of any dispute about the approach road, directions of the Mining Engineer or Assistant Mining Engineer concerned shall be final and binding;\n(xi) The permit may be cancelled by the Mining Engineer or Assistant Mining Engineer concerned if holder of a permit commits any breach of terms and conditions of the permit after giving a fifteen day notice with forfeiture of the security deposit:\n(xii) Transfer of permit shall not be allowed.\nChapter X\nOffences, Penalties and Prosecutions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "54",
            "title": "54. Illegal mining, transportation and storage of minerals.",
            "chapter": null,
            "content": "S.N\nS.N\nVehicle/Equipment\nVehicle/Equipment\nCompound fee (in Rs.) per unit\nCompound fee (in Rs.) per unit\n1\n2\n2\n3\n3\n1.\nTractor trolley\nTwenty five thousand\n2.\n[Truck/Dumper/any other vehicles having \n\t\t\t\tgross vehicle weight more than sixteen tonnes (as per registration certificate\n\t\t\t\t of the vehicle)]\nFifty thousand\n3.\n[Truck/Dumper/any\n\t\t\t\t other vehicles having gross vehicle weight more than sixteen tonnes (as per \n\t\t\t\tregistration certificate of the vehicle) and]\nOne lacs\nNote: - Cost of the mineral shall be taken as ten times of royalty in lieu of rent, royalty, compensation for environmental degradation and tax chargeable on the land occupied without lawful authority, etc..\nNote:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "55",
            "title": "55. Contravention of certain conditions of lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "56",
            "title": "56. Offence cognizable only on written complaint.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "57",
            "title": "57. Role of police.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "58",
            "title": "58. Investigation of offences.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "59",
            "title": "59. Power to take evidence on oath.",
            "chapter": null,
            "content": "(i) Enforcing the attendance of any person and examining him on oath or affirmation;\n(ii) Compelling production of documents; and\n(iii) Issuing commission for examination of witnesses and any proceedings before the appellate authority, the assessing authority and investigating officer shall be deemed to be a \"Judicial Proceedings\" within the meaning of section 193, 196 and 228 of the Indian Penal Code, 1860.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "60",
            "title": "60. Establishment of check posts or barriers and inspection of minerals in transit and weighment.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "61",
            "title": "61. Powers of entry, inspection of records and seizure of books of accounts of a dealer or assessee.",
            "chapter": null,
            "content": "(i) who transports or holds in custody for delivery to or on behalf of any dealer or assessee, any mineral, to give any information likely to be in his possession in respect of such mineral or to permit inspection thereof as the case may be; and\n(ii) who maintains or has in his possession any accounts, books or documents relating to the business or mining operations, to produce such accounts, books or documents for inspection.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "62",
            "title": "62. Power to summon.",
            "chapter": null,
            "content": "Chapter XI\nAppeal and Revision",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "63",
            "title": "63. Appeal.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "64",
            "title": "64. Revision.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "65",
            "title": "65. Procedure of appeal and revision.",
            "chapter": null,
            "content": "Chapter XII\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "66",
            "title": "66. Amalgamation of mining leases or quarry licences.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "67",
            "title": "67. Application of these rules.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "68",
            "title": "68. Assessment of compensation for damage.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "69",
            "title": "69. Change of name, nationality, etc., to be intimated.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "70",
            "title": "70. Delegation of powers.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "71",
            "title": "71. Dues may be recovered as arrears of land revenue.",
            "chapter": null,
            "content": "72. e-Payment.\n73. e-Rawanna.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        },
        {
            "number": "74",
            "title": "74. Exemptions.",
            "chapter": null,
            "content": "(i) excavation of ordinary clay including brick making clay and masonary stone from areas, which are not working pits of a holder of mineral concession, by a tenant for bonafide purpose of construction or repairs of, -\n(a) irrigation tanks, channels and drains;\n(b) wells;\n(c) compound walls for fields; or\n(d) residential house including compound walls and cattle sheds in rural areas:\n(I) such excavation and removal of aforesaid mineral shall be on the basis of the permits issued by the Panchayat or Patwari of the  village, where the tenant resides. The permit shall contain the details of the total quantity of mineral, period, its area of excavation and removal and name and address of the tenant; and\n(II) nothing in this sub-rule shall abridge the rights of cultivators under section 36 of the Rajasthan Tenancy Act, 1955.\n(ii) excavation of ordinary earth from village ponds or tanks situated in gram panchayat for de-silting and further use of such earth by tenants for filling or leveling in agricultural fields or any other community work in village;\n(iii) excavation of ordinary clay by hereditary kumhars who prepare earthen pots on a cottage industry basis;\n(iv) excavation of ordinary clay manually by earthen tile makers who prepare earthen tiles (kawelus) on a cottage industry basis;\n(v) search for and obtaining the samples of minerals on the surface by chipping of outcrops without involving any disturbance of the soil by way of bore hole, pit, trench or otherwise;\n(vi) cutting and filling or leveling of any land to make it suitable for colonisation work;\n(vii) channelisation of any river system for protection works from any incidence of inundation or flooding, provided the mineral extracted in the process is used at the same place for creation of safety embankments and is not disposed off outside such area;\n(viii) excavation of masonary stone, murrum and bajri from areas which are not the working pits of a holder of mineral concession by any person or institution, for construction of public utility buildings such as schools and hospitals in the rural areas from donation or contribution:\n(ix) excavation of ordinary earth from the borrow land and used in the construction of road or embankment, anicuts in government works except construction of national highway, state highway, railways tracks and dams;\n(x) excavation of ordinary earth from sources situated in gram panchayat for personal use or community work in village; and\n(xi) community works like rural roads or any other departmental activities undertaken by the rural development department or panchayat raj institutions.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 71
        },
        {
            "number": "75",
            "title": "75. Null and void.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 72
        },
        {
            "number": "76",
            "title": "76. Mutation of mineral concession, contract and permit.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 73
        },
        {
            "number": "77",
            "title": "77. Rate of interest.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 74
        },
        {
            "number": "78",
            "title": "78. Recognition of bapi and proprietary rights.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 75
        },
        {
            "number": "79",
            "title": "79. Rectification of mistakes.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 76
        },
        {
            "number": "80",
            "title": "80. Refund.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 77
        },
        {
            "number": "81",
            "title": "81. Register to be open for inspection.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 78
        },
        {
            "number": "82",
            "title": "82. Regulation of transportation of mineral.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 79
        },
        {
            "number": "83",
            "title": "83. Relaxation of rules.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 80
        },
        {
            "number": "84",
            "title": "84. Reservation of area by the Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 81
        },
        {
            "number": "85",
            "title": "85. Requirement of no dues certificate.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 82
        },
        {
            "number": "86",
            "title": "86. Service of notice.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 83
        },
        {
            "number": "87",
            "title": "87. Special mode of recovery.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 84
        },
        {
            "number": "88",
            "title": "88. Status of the grant on the death of applicant.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 85
        },
        {
            "number": "89",
            "title": "89. Status of pending applications.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 86
        },
        {
            "number": "90",
            "title": "90. Stoppage of mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 87
        },
        {
            "number": "91",
            "title": "91. Survey and demarcation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 88
        },
        {
            "number": "92",
            "title": "92. Transit Pass.",
            "chapter": null,
            "content": "Schedule I\nMinimum Area For Grant of Mining Lease\nMinimum Area For Grant of Mining Lease\n[ See rule 7(2)]\nPart-A\nPart-A\nPart-B\nPart-B\nS. No.\nS. No.\nMineral\nMineral\nArea (in hectare)\nArea (in hectare)\nS. No.\nS. No.\nMineral\nMineral\nArea (in hectare)\nArea (in hectare)\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n1.\nBajri (river sand)\n5.00\n1.\nAgate\n4.00\n2.\nBajri (other than river sand)\n1.00\n2.\nBall Clay\n4.00\n3.\nBrick earth\n1.00\n3.\nBarytes\n4.00\n4.\nChert\n1.00\n4.\nBentonite\n4.00\n5.\nDiorite\n1.00\n5.\nCalcareous sand\n4.00\n6.\nDolerite\n1.00\n6.\nCalcite\n4.00\n7.\nGneisses\n1.00\n7.\nChalk\n4.00\n8.\nGranite\n1.00\n8.\nChina clay\n4.00\n9.\nJhanjhara / Dhandhala\n1.00\n9.\nClay others\n4.00\n10.\nKankar\n1.00\n10.\nCorundum\n4.00\n11.\nLime kankar\n1.00\n11.\nDiaspore\n4.00\n12.\nLimestone\n4.00\n12.\nDolomite\n4.00\n13.\nLimestone (dimentional)\n4.00\n13.\nDunite / Pyroxenite\n4.00\n14.\nMarble\n4.00\n14.\nFelsite\n4.00\n15.\nMasonary Stone\n1.00\n15.\nFeldspar\n4.00\n16.\nMurram\n1.00\n16.\nFireclay\n4.00\n17.\nOrdinary Clay\n1.00\n17.\nFuller's earth\n4.00\n18.\nOrdinary earth\n1.00\n18.\nGypsum\n4.00\n19.\nPhyllites\n1.00\n19.\nJasper\n4.00\n20.\nRhyolite\n1.00\n20.\nKaolin\n4.00\n21.\nSandstone\n1.00\n21.\nLaterite\n4.00\n22.\nSchist\n1.00\n22.\nMica\n4.00\n23.\nSerpentine\n4.00\n23.\nOchre\n4.00\n24.\nShale\n1.00\n24.\nPyrophyllite\n4.00\n25.\nSlate stone\n1.00\n25.\nQuartz\n4.00\n26.\nSurkhi\n1.00\n26.\nQuartzite\n4.00\n27.\nAll other minerals not specified in this Schedule\n1.00\n27.\nSalt petre\n4.00\n28.\nSilica sand\n4.00\n29.\nSteatite / Talc / Soapstone\n4.00\nSchedule II\nRate of Royalty\nRate of Royalty\n[ See rule 28(2)(i), 28(3)(i)]\nPart-A\nPart-A\nS. No.\nS. No.\nName of Mineral\nName of Mineral\nQuality shape and size of mineral\nQuality shape and size of mineral\nRate of Royalty (Rs. Per/Tonne)\nRate of Royalty (Rs. Per/Tonne)\n1\n1\n2\n2\n3\n3\n4\n4\n1.\nSandstone\nDimensional stones -\n(i) Dressed, polished or cut slabs, patti\n\t\t\t\tkatla, ashlar, tiles, flooring and roofing stones and blocks.\n240.00\n(ii)Undressed,\n\t\t\t\tirregular or rough slabs, patti katla, ashlar, tiles, flooring\n\t\t\t\tand roofing stones.\n(a) Bharatpur, Dholpur and Karauli districts\n(b) Kota and Bundi districts\n(c)All other districts\nCobbles\nMill Stone\nKhanda\n(i) Bharatpur,\n\t\t\t\tDholpur, Karauli and Jodhpur Districts\n(ii) Other Districts\n155.00\n130.00\n100.00\n100.00\n100.00\n30.00\n23.00\n2.\nLimestone\nDimensional stones -\n[(i) Used as flooring,\n\t\t\t\troofing and pillaring stone etc. :-\n(a) Kota and Jhalawar\n\t\t\t\tdistricts]\n(b) Jaisalmer\n\t\t\t\tdistrict\n(c) Jaisalmer Ashlar\n(d) All other\n\t\t\t\tdistricts\n(ii) Mineral waste of\n\t\t\t\tLimestone (Dimensional) used for purposes other than raw material\n\t\t\t\tby an industry.\n(iii)Mineral waste if\n\t\t\t\tused in industries.\nCobbles\n110.00\n[115.00]\n100.00\n23.00\n90.00\n100.00\n3.\nLimestone and Lime\nSuitable for lime making lime\n90.00\n135.00\n4.\nLime Kanker, Jhajhara Kanker\nLime Kanker and Jhajhara Kanker\n20.00\n5.\nMarble, Serpentine, and other decorative stone\n[Slabs and tiles\n(i) Slabs and tiles having one dimension\n\t\t\t\t (width) 35cm and above and other finished products:-\n(a) For Makrana Area\n(b) For All other\n\t\t\t\tArea of Rajasthan\n(ii) Tiles having one\n\t\t\t\tdimension (width) less than 35cm Blocks\nBlocks\n(i) Irregular blocks]\n(ii)Irregular blocks\n\t\t\t\tprocessed by single wheel cutters whose diameter is not more than\n\t\t\t\t60cm located within the State of Rajasthan:\nProvided that such\n\t\t\t\tblocks are not processed in the factory premises where other\n\t\t\t\twheel cutters having diameter more than 60cm or Gangsaw of any\n\t\t\t\tdesign are installed.\nKarezi\nKhanda/Karezi used in\n\t\t\t\tthe industries Khanda used as masonary stone\n(i) Alwar, Bharatpur,\n\t\t\t\tJaipur, Jhunjhunu and Sikar districts.\n(ii) Other districts\n[420.00\n475.00\n385.00\n265.00]\n65.00\n90.00\n30.00\n23.00\nProvided that no royalty shall be payable on\n\t\t\t\tmarble slurry/marble powder.\n6.\nGranite, Diorite and other igneous rock types\n\t\t\t\tsuitable for polishing\n[Blocks\n(i) Blocks having any\n\t\t\t\tdimension more than 70cm.]\n(ii)Blocks having no\n\t\t\t\tdimension more than 70cm.\nKhanda used as Masonary Stone\n[280.00]\n90.00\n23.00\n7.\nChips making minerals like Dolomite, Limestone,\n\t\t\t\tMarble, Rhyolite, Chert, Serpentine, Quartzite etc.\nUsed for making chips.\n65.00\n8.\nMasonary Stone (Dolomite, Granite, Limestone,\n\t\t\t\tRhyolite, Sandstone, Quartzite, Schist, Phyllites etc.)\n(i)Used as khanda,\n\t\t\t\tballast, road metal, fatchere, gitty/grit, papada, crusher dust,\n\t\t\t\tgravel, jhajhara, quarry rubbish, Granular Sub-Base (G.S.B.)\n\t\t\t\tetc.-\n(a) Alwar, Bharatpur,\n\t\t\t\tJaipur, Jhunjhunu and Sikar districts.\n(b) Other districts\n(ii)Used for making cobbles\n30.00\n23.00\n100.00\n9.\nBajri, Kanker and ordinary earth\nBajri, Kankar-\n(i) Bharatpur,\n\t\t\t\tJhunjhunu, Dholpur, Tonk and Sikar districts.\n(ii) Other districts\n\t\t\t\tOrdinary earth used for -\n(i) Manufacturing of\n\t\t\t\tEarthenware's, tiles etc.\n(ii) Filling or leveling purposes in\n\t\t\t\tconstruction of embankment, roads, railways etc.\n35.00\n30.00\n12.00\n3.00\n10.\nBrick earth, Murram, Surkhi\nBrick earth, Murram, Surkhi\n25.00\n11.\nPhyllite and Schist\nDimensional Stone used as Pati, kattla, roofing,\n\t\t\t\tflooring etc.\n60.00\n12.\nSlate stone\n120.00\n13.\nOrdinary clays used for colour washing\n15.00\n14.\n(a) Bricks earth,\n\t\t\t\tPhyllite and Schist, Bajri\n(b) Shale, any other rocks/ minerals use\n\t\t\t\tGneisses, andd for special purposes.\nUsed for special purposes in industry.\n120.00\n100.00\nPart-B\nPart-B\nS. No.\nS. No.\nName of Mineral\nName of Mineral\nQuality shape and size of mineral\nQuality shape and size of mineral\nRate of Royalty (Rs. Per Tonne)\nRate of Royalty (Rs. Per Tonne)\n1\n1\n2\n2\n3\n3\n4\n4\n1.\nAgate\n110.00\n2.\nBall Clay\nCrude\n60.00\nProcessed\n120.00\n3.\nBarytes\nWhite\n70.00\nOff Colour\n55.00\n4.\nBentonite\n110.00\n5.\nCalcite\n120.00\n6.\nChalk\n60.00\n7.\nChina Clay\nCrude\n50.00\nProcessed\n400.00\n8.\nClay(Others)\n50.00\n9.\nCorundum\n325.00\n10.\nDiaspore\n120.00\n11.\nDolomite\nBlocks\n240.00\nLumps\n90.00\n12.\nDunite/Pyroxenite\n30.00\n13.\nFelsite\n80.00\n14.\nFelspar Blocks\n215.00\nLumps\n60.00\n15.\nFireclay\n70.00\n16.\nFuller's earth\n100.00\n17.\nGypsum\n125.00\n18.\nJasper\n100.00\n19.\nKaolin\nCrude\n50.00\nProcessed\n400.00\n20.\nLaterite\n60.00\n21.\nMica Crude\n500.00\nWaste & scrap\n80.00\n22.\nOchre\n24.00\n23.\nPyrophyllite\n75.00\n24.\nQuartz\n60.00\n25.\nQuartzite\nBlock\n265.00\nLumps\n65.00\n26.\nSalt petre\n2500.00\n27.\nSilica Sand\n70.00\n28.\nSteatite or Talc or Soapstone\nKharda(Tehsil Dungarpur, Simalwada, Bicchiwada\n\t\t\t\tof District Dungarpur and Tehsil Kherwada, Rishabhdev of District\n\t\t\t\tUdaipur)\n30.00\nInsecticide Grade\n75.00\nOther than insecticide Grade\n350.00\n29.\nOther minerals not specified above.\n12% of pit month value.\nSchedule III\nDead Rent\nDead Rent\n[ See rule 28(2)(ii)]\nPart-A\nPart-A\nS.No.\nS.No.\nName of Mineral\nName of Mineral\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\n1\n1\n2\n2\n3\n3\n1.\nDimensional stone:\nSandstone, Limestone, Slate stone and other\n\t\t\t\tDimensional stones which have not been mentioned anywhere in this\n\t\t\t\tschedule. Phyllite and schist\n70.00\n35.00\n2.\nMineral used for lime\n\t\t\t\tmaking :\nLimestone Lime Kankar, Dhandhla and jhajhara\n\t\t\t\tkankar\n60.00\n25.00\n3.\nMineral used for\n\t\t\t\tmaking chips:\nLimestone, Marble, Chert, Serpentine, Rhyolite,\n\t\t\t\tQuartzite and other rocks\n60.00\n4.\nMineral used as\n\t\t\t\tBlocks and sawn as slabs and tiles:\nMarble, Serpentine and other rocks Granite,\n\t\t\t\tDiorite, Rhyolite, Dolerite and other rocks\n100.00\n60.00\n5.\nMasonary stone and mineral used in construction\n\t\t\t\tworks such as ballast, road metal, brick earth, murrum, kankar,\n\t\t\t\tbajri or surkhi etc.\n30.00\n6.\nBajri (river sand)\n3.00\n7.\nOrdinary white/yellow/red clays\n20.00\n8.\nOther minerals not specified above\n50.00\nPart-5\nPart-5\nS.No.\nS.No.\nName of Mineral\nName of Mineral\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\n1\n1\n2\n2\n3\n3\n1.\nAgate, Ball Clay, Calcareous Sand, Calcite,\n\t\t\t\tChalk, China Clay, Clay(Others), Corundum, Diaspore, Dolomite,\n\t\t\t\tDunite/Pyroxenite, Felsite, Fireclay, Gypsum, Jasper, Kaolin,\n\t\t\t\tLaterite, Mica, Ochre, Pyrophyllite, Quartzite, Silica Sand and\n\t\t\t\tSteatite/Talc/Soapstone\n30.00\n2.\nFelspar, Quartz\n25.00\n3.\nBarytes, Bentonite\n45.00\n4.\nFuller' earth\n25.00\n5.\nSaltpeter\n15.00\n6.\nOther minerals not specified above\n50.00\nSchedule IV\nPenalties for Non-Observance of the Terms and Conditions of Mining Lease Agreement\nPenalties for Non-Observance of the Terms and Conditions of Mining Lease Agreement\n[ See rule 28(2)(xvii)(a)]\nS No.\nS No.\nRule\nRule\nClause of agreement\nClause of agreement\nBrief content of the breach\nBrief content of the breach\nPenalty\nPenalty\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\n28(2)(i)\n28(2)(ii),\n28(1)(ii)\n28(1)(iii)\n4(1),\n4(2),\n4(3),\n4(4),\n4(6)\nNon-payment of royalty, dead rent and other\n\t\t\t\tcharges.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, ten percent of security deposit or\n\t\t\t\trupees five thousand, whichever higher, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of the security deposit or rupees\n\t\t\t\tten thousand, whichever higher, shall be forfeited.\n2\n29(14),\n19(3),\n19(4),\n20(3),\n20(4)\n4(5)\nNon-payment of financial assurance, difference\n\t\t\t\tof security deposit and performance security.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, ten percent of security deposit or\n\t\t\t\trupees five thousand, whichever higher, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of the security deposit or rupees\n\t\t\t\tten thousand, whichever higher, shall be forfeited.\n3.\n28(1)(iv)\n4(9)\nNon-erection of boundary pillars and its proper\n\t\t\t\tmaintance\n(i) If the breach is\n\t\t\t\t\tremedied erection of boundary pillars and its proper maintenance\n\t\t\t\t\t. after notice period but within forty five days from the date\n\t\t\t\t\tof receipt of notice, ten percent of security deposit shall be\n\t\t\t\t\tforfeited subject to minimum rupees five thousand and maximum\n\t\t\t\t\trupees ten thousand.\n(ii) If the breach\n\t\t\t\t\tis not remedied after forty five days, the lease shall be\n\t\t\t\t\tdetermined with forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of security deposit shall be\n\t\t\t\tforfeited subject to minimum rupees ten thousand and maximum\n\t\t\t\trupees twenty thousand.\n4.\n28(1)(viii)\n4(11)\nNon-commencement of mining operation within six\n\t\t\t\tmonths from the date of excution of   the lease and there after\n\t\t\t\tcarry on effectively.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within ninety days from the date\n\t\t\t\tof receipt of notice, ten percent of security deposit or rupees\n\t\t\t\tfive thousand, whichever higher, shall be forfeited.\n(ii) If the breach\n\t\t\t\t\tis not remedied after ninety days, the lease shall be determined\n\t\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied in full\n\t\t\t\t\tbefore the lease termination order is issued, the lease shall\n\t\t\t\t\tnot be determined and twenty percent of the security deposit or\n\t\t\t\t\trupees ten thousand, whichever higher, shall be forfeited.\n5.\n28(2)(iv)\n4(12)\nNot-maintaining correct account of mineral\n\t\t\t\tproduction.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, twenty percent of security deposit\n\t\t\t\tshall be forfeited subject to minimum rupees five thousand and\n\t\t\t\tmaximum rupees twenty thousand.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and forty percent of the security deposit shall be\n\t\t\t\tforfeited subject to minimum rupees ten thousand and maximum\n\t\t\t\trupees forty thousand.\n6.\n28(1)(xiv)\n28(1)(xv)\n4(17)\n4(18)\n(a) Failure to report\n\t\t\t\tdiscovery of new mineral in the area\n(b) Dispatch of mineral not included in the\n\t\t\t\tlease.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit\n\t\t\t\tshall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the\n\t\t\t\tbreach is remedied before the lease termination order is issued,\n\t\t\t\tthe lease shall not be determined and the security deposit shall\n\t\t\t\tbe forfeited.\nCost of mineral dispatched shall be recovered as\n\t\t\t\tper rule 54.\n7.\n28(2)(xi)(a)\n4(11)\nBajri (river sand) mine working beyond the\n\t\t\t\tdepth of three meter from the surface\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit or\n\t\t\t\trupees twenty five thousand, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and the security deposit or rupees fifty thousand,\n\t\t\t\twhichever less, shall be forfeited.\n8.\n11(1)(ii)\n4(25)\nEmployment of personnel other than Indian\n\t\t\t\tNational without Government's permission\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit or\n\t\t\t\trupees twenty thousand, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and the security deposit or rupees fifty thousand,\n\t\t\t\twhichever less, shall be forfeited.\n9.\n29\n4(12)\nNon submission of mine plan / mining scheme and\n\t\t\t\tits modification\n(i) If the breach is\n\t\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\t\tdate of receipt of notice, twenty five percent of security\n\t\t\t\t\tdeposit or rupees twelve thousand and five hundred, whichever\n\t\t\t\t\tless, shall be forfeited.\n(ii) If the breach\n\t\t\t\t\tis not remedied after forty five days, the lease shall be\n\t\t\t\t\tdetermined with forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and fifty percent of the security deposit or rupees\n\t\t\t\ttwenty five thousand, whichever less, shall be forfeited.\n10.\n28(1)(viii)\n4(11)\nNot working the mines in workman like manner\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit or\n\t\t\t\trupees twenty five thousand, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and the security deposit or rupees fifty thousand,\n\t\t\t\twhichever less, shall be forfeited.\n11.\n30(1,2)\n6(17)\nNon employment of qualified personnel\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, twenty five percent of security\n\t\t\t\tdeposit or rupees twelve thousand and five hundred, whichever\n\t\t\t\tless, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and fifty percent of the security deposit or rupees\n\t\t\t\ttwenty five thousand, whichever less, shall be forfeited.\n12.\n34(2)(v)\n4(11)\nNon dumping of overburden\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days at\n\t\t\t\tearmarked places from the date of receipt of notice, twenty five\n\t\t\t\tpercent of security deposit or rupees twelve thousand and five\n\t\t\t\thundred, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and fifty percent of the security deposit or rupees\n\t\t\t\ttwenty five thousand, whichever less, shall be forfeited.\n13.\n-\n-\nAll other remedial breaches not mentioned above.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, ten percent of security deposit shall\n\t\t\t\tbe forfeited subject to minimum rupees one thousand and maximum\n\t\t\t\trupees seven thousand and five hundred.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of the security deposit shall be\n\t\t\t\tforfeited subject to minimum rupees two thousand and maximum\n\t\t\t\trupees fifteen thousand.\n14.\n-\n-\nAll other non -remedial breaches not mentioned\n\t\t\t\tabove.\n(i) If the breach\n\t\t\t\t\tdoes not continue after receiving legal notice by lessee, twenty\n\t\t\t\t\tpercent of security deposit or rupees twenty five thousand,\n\t\t\t\t\twhichever less, shall be payable by the lessee.\n(ii) If the breach continues even after\n\t\t\t\t\treceiving notice, the lease shall be determined with forfeiture\n\t\t\t\t\tof security deposit.\nSchedule-V\nPenalties for Non-Observance of the Terms and Conditions of Royalty Collection\nPenalties for Non-Observance of the Terms and Conditions of Royalty Collection\nContract/excess Royalty Collection Contract Agreement\nContract/excess Royalty Collection Contract Agreement\n[ See rule 44(26)]\nS. No.\nS. No.\nRule\nRule\nClause of agreement\nClause of agreement\nBrief content of the breach\nBrief content of the breach\nPenalty\nPenalty\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\n44(4)\n3(iv)\nIssuing incomplete royalty receipts\n(i) If the breach does not\n\t\t\t\t\tcontinue after receipt of notice, ten percent of security\n\t\t\t\t\tdeposit or rupees ten thousand, whichever less, shall be payable\n\t\t\t\t\tby the contractor.\n(ii) If the breach continues after notice period, the\n\t\t\t\t\tcontract shall be terminated with  forfeiture of security\n\t\t\t\t\tdeposit: Provided that if the breach is remedied before\n\t\t\t\t\ttermination of the contract, the contract shall not be\n\t\t\t\t\tterminated and twenty percent of security deposit or rupees\n\t\t\t\t\ttwenty thousand, whichever less, shall be payable by the\n\t\t\t\t\tcontractor.\n2.\n44(6),\n44(7),\n44(8),\n44(9),\n44(10),\n44(11)\n3(vi),\n3(vii),\n3(viii),\n3(ix),\n3(x),\n3(xi)\n(a) Collection of royalty from the\n\t\t\t\tvehicles having royalty paid rawanna issued against yearly dead\n\t\t\t\trent.\n(b) Collection of royalty from\n\t\t\t\tshort term permit/ permit holders issued under these rules.\n(c) Collection of Royalty from the\n\t\t\t\tminor minerals brought from outside the contract area or from the\n\t\t\t\tmajor mineral leases.\n(d) Collection of royalty for the\n\t\t\t\tminerals used in construction/repair/ renewal/of National\n\t\t\t\thighway/ Mega highway/ Four/Six lane roads, laying and repair of\n\t\t\t\tRailway Tracks.\n(e) Collection of royalty on the minor minerals removed from\n\t\t\t\tthe areas which are not working pits of a lessee or licencee.\n(i) If the breach does not\n\t\t\t\t\tcontinue after receiving legal notice by contractor, amount so\n\t\t\t\t\tcollected by the contractor shall be recovered alongwith ten\n\t\t\t\t\tpercent of security deposit or rupees fifty thousand, whichever\n\t\t\t\t\tless.\n(ii) If the breach continues even after receiving notice, the\n\t\t\t\t\tcontract shall be terminated with forfeiture of security\n\t\t\t\t\tdeposit.\n3.\n44(13)\n3(xiii)\nNon-submission of monthly statement with or without permit fee\n\t\t\t\t/ other charges along with counterfoils of receipts and other\n\t\t\t\trecords\n(i) If the breach is remedied\n\t\t\t\t\tafter the notice period but within thirty days from the date of\n\t\t\t\t\treceipt of notice, ten percent of security deposit or rupees\n\t\t\t\t\ttwenty five thousand, whichever less, shall be payable by the\n\t\t\t\t\tcontractor.\n(ii) If the breach is remedied\n\t\t\t\t\tafter thirty days but before sixty days of receiving the notice,\n\t\t\t\t\ttwenty percent of security deposit or rupees fifty thousand,\n\t\t\t\t\twhichever less, shall be payable by the contractor.\n(iii) If the breach is not remedied after sixty days of\n\t\t\t\t\treceiving the notice, the contract shall be terminated with\n\t\t\t\t\tforfeiture of security deposit.\n4.\n44(14)\n3(xiv)\nCharging of royalty at a rate higher than as specified in\n\t\t\t\tSchedule-II and charging of permit fee / other charges higher\n\t\t\t\tthan prescribed under these rules or otherwise.\n(i) If the breach does not\n\t\t\t\t\tcontinue after receiving the legal notice, the excess amount\n\t\t\t\t\tcollected by the contractor, on higher rates than as specified\n\t\t\t\t\tin rules, shall be recovered alongwith eighteen percent interest\n\t\t\t\t\tand ten percent of security deposit or rupees fifty thousand\n\t\t\t\t\twhichever less.\n(ii) If breach continues after notice period, the contract\n\t\t\t\t\tshall be terminated with forfeiture of security deposit.\n5.\n44(17)\n3(xvii)\nNon-payment of installments of contract money in advance as\n\t\t\t\tspecified in agreement.\n(i) If the breach is remedied by\n\t\t\t\t\tthe contractor within the notice period, no penalty shall be\n\t\t\t\t\timposed.\n(ii) If the breach is remedied by\n\t\t\t\t\tthe contractor after notice period but before termination of\n\t\t\t\t\tcontract, twenty percent of security deposit or rupees one lac,\n\t\t\t\t\twhichever less, shall be payable by the contractor.\n(iii) If the breach is not remedied by the contractor after\n\t\t\t\t\tnotice period, contract shall be terminated with forfeiture of\n\t\t\t\t\tsecurity deposit.\n6.\n40(3),\n41(2)\n3(xxii)\nNon-payment of difference of security deposit and performance\n\t\t\t\tsecurity due to enhancement of contract amount.\n(i) If the breach is remedied\n\t\t\t\t\twithin the notice period, no penalty shall be imposed.\n(ii) If the breach is remedied\n\t\t\t\t\tafter notice period but before termination of contract, four\n\t\t\t\t\tpercent of security deposit or rupees forty thousand, whichever\n\t\t\t\t\tless, shall be payable by the contractor.\n(iii) If the breach is not remedied by the contractor after\n\t\t\t\t\tnotice period, contract shall be terminated with forfeiture of\n\t\t\t\t\tsecurity deposit.\n7.\n-\n-\nAll other remedial breaches not mentioned above.\n(i) If the breach is remedied\n\t\t\t\t\tafter notice period but within thirty days from the date of\n\t\t\t\t\treceipt of notice, ten percent of security deposit shall be\n\t\t\t\t\tforfeited subject to minimum rupees ten thousand and maximum\n\t\t\t\t\trupees fifty thousand.\n(ii) If the breach is not\n\t\t\t\t\tremedied after thirty days, the contract shall be terminated\n\t\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before the contract\n\t\t\t\t\ttermination, the contract shall not be terminated and twenty\n\t\t\t\t\tpercent of the security deposit shall be forfeited subject to\n\t\t\t\t\tminimum rupees twenty thousand and maximum rupees one lac.\n8.\n-\n-\nAll other non-remedial breaches not mentioned above.\n(i) If the breach does not\n\t\t\t\t\tcontinue after receiving legal notice by contractor, twenty\n\t\t\t\t\tpercent of security deposit or rupees fifty thousand, whichever\n\t\t\t\t\tless, shall be payable by the contractor.\n(ii) If the breach continue even after receiving notice, the\n\t\t\t\t\tcontract shall be terminated with forfeiture of security\n\t\t\t\t\tdeposit.\nSchedule VI\nDelegation of Powers\nDelegation of Powers\n[ See rule 70(1)]\nItem No.\nItem No.\nOfficer or authority by whom the powers are to\n\t\t\t\tbe exercised\nOfficer or authority by whom the powers are to\n\t\t\t\tbe exercised\nRule\nRule\nMatters in relation to which powers may be\n\t\t\t\texercised\nMatters in relation to which powers may be\n\t\t\t\texercised\nExtent of Powers\nExtent of Powers\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\nDMG\n4(7),  4(8),\n5, 16(2),\n16(3),\n16(4)\nTo grant letter of intent/extension of letter of\n\t\t\t\tintent period/sanction/rejection of mining lease application.\nFor mineral bajri (river sand) dead rent upto\n\t\t\t\trupees twenty lacs and other minerals Agate, Bayrites, [***] Calcite, Corundum, Diaspore, Dolomite, Gypsum, Jasper,\n\t\t\t\tLaterite, Ochre, Pyrophyllite, Quartzite, Soapstone.\n2.\nADM\n4(7), 4(8),\n5, 16(2),\n16(3),\n16(4)\nTo grant letter of intent/extension of letter of\n\t\t\t\tintent period/sanction/ rejection of mining lease application.\nFor mineral bajri (river sand) dead rent upto\n\t\t\t\tten lacs and other minerals Ball clay, China clay, Chalk, Clays\n\t\t\t\t(others), Dunite/ Pyroxenite, Felsite, Felspar, Fire clay,\n\t\t\t\tKaolin, Mica, Quartz, Silicasand, Calc. sand.\n3.\nSME\n4(7), 4(8),\n5, 16(2),\n16(3),\n16(4)\nTo grant letter of intent/extension of letter of\n\t\t\t\tintent period/sanction/ rejection of mining lease application.\nFor mineral bajri (river sand) dead rent upto\n\t\t\t\tfive lacs and minerals other than mentioned at sr. no. 1 and 2\n\t\t\t\twithin his jurisdiction.\n4.\nSME\n4(7), 4(8),\n5, 16(2),\n16(3),\n16(4)\nTo reject application of mining lease withdrawn\n\t\t\t\tby applicant.\nFull powers within their jurisdiction.\n5.\nSME\n19(5), 20(5)\nTo refund security deposit/ performance\n\t\t\t\tsecurity.\nFull powers within their jurisdiction.\n6.\nSME\n21(4)\nTo extend period for execution of mining lease.\nFull powers within their jurisdiction.\n7.\nDMG,\nADM,\nSME\n21(4)\nTo revoke sanction order.\nMinerals for which mining leases can be granted\n\t\t\t\tby him.\n8.\nSME\n25\nTo allow surrender of mineral/area.\nFull powers within their jurisdiction.\n9.\nDMG,\nADM,\nSME\n27(3),\n27(6)\nTo allow/reject application for transfer of\n\t\t\t\tmining lease and to revoke sanction of transfer of mining lease.\nMinerals for which mining leases can be granted\n\t\t\t\tby him.\n10.\nSME\n27(3)\nTo reject application for transfer of mining\n\t\t\t\tlease withdrawn by lessee.\nFull powers within their jurisdiction.\n11.\nSME\n27(4)\nTo extend period for execution of transfer of\n\t\t\t\tmining lease.\nFull powers within their jurisdiction.\n[11-A.\nME/AME\n27\nTo dispose off application for transfer \n\t\t\t\tof quarry licence.\nFull powers within their jurisdiction.]\n12.\nADM / SME / ME / AME / Suptdg. Geo./ Sr.Geo. / Geologist / MF,\n\t\t\t\tSurveyor / Field Assistant\n28(1)(x)\nTo inspect mine, plans, accounts etc..\nFull powers within their jurisdiction.\n13.\nDMG\n28(1)(xv)\nTo grant inclusion of mineral in mining\n\t\t\t\tlease/quarry licence.\nFull powers.\n14.\nME / AME\n28(2)(xvii)\nTo issue notice for any breach of terms and\n\t\t\t\tconditions.\nFull powers within their jurisdiction.\n15.\nSME\n28(2)(xvii)\nTo impose penalty as per Schedule-IV.\nFull powers within their jurisdiction.\n16.\nDMG,\nADM,\nSME\n28(2)(xvii)\nTo determine the mining lease.\nMinerals for which mining lease can be granted\n\t\t\t\tby him.\n17.\nME / AME\n28(1)(xxi)\nTo seize any mineral or movable property and\n\t\t\t\tsell the same.\nFull powers within their jurisdiction.\n18.\nSME\n29\nTo approve mine plan/mining scheme/simplified\n\t\t\t\tmining scheme for mining lease and simplified mining scheme for\n\t\t\t\tquarry licence having area more than 1.0 hectare.\nFull powers within their jurisdiction.\n19.\nME / AME\n29\nTo approve simplified mining scheme for quarry\n\t\t\t\tlicence having area up to 1.0 hectare, short term permit and\n\t\t\t\tpermit.\nFull powers within their jurisdiction.\n20.\nSME\n29(17)\nTo release financial assurance.\nFull powers within their jurisdiction.\n21.\nADM\n35\nContractor's registration, renewal, refusal,\n\t\t\t\tcancellation of registration.\nFull powers within their jurisdiction.\n22.\nDMG\n36(5), 37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess royalty collection contract.\nFull powers.\n23.\nADM\n36(5), 37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess royalty collection contract.\nFull powers for bid amount upto rupees three\n\t\t\t\thundred lacs.\n24.\nSME\n36(5), 37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess   royalty collection contract.\nFull powers for bid amount upto rupees one\n\t\t\t\thundred lacs.\n25.\nME\n36(5),\n37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess royalty collection contract.\nFull powers for bid amount upto rupees fifty\n\t\t\t\tlacs.\n26.\nDMG\n43(3)\nTo reject bid or to revoke sanction with\n\t\t\t\tforfeiture of bid security/security deposit and to extend period\n\t\t\t\tfor execution of the contract.\nFull powers.\n27.\nDMG\n45\nTo debar/blacklist a contractor.\nFull powers.\n28.\nDMG\n66\nTo amalgamate mining leases/quarry licences.\nFull powers.\n29.\nADM\n76\nTo allow mutation of mineral concession/contract\n\t\t\t\tand revocation of order.\nFull powers within their jurisdiction.\n30.\nDMG,\nADM,\nSME,\nME / AME\n80\nTo refund any claim.\nAs per GF&AR.\nNote: - (1) Notwithstanding anything contained herein above, any mining lease except mineral bajri (river sand) having area more than 10.00 hectare shall be granted by the Government.\nNote:\n(2) These powers shall be used in consultation with senior most accounts personnel posted in the office in all matters having financial or revenue implications.\nForm -1\nForm -1\n[Application For Mining Lease/quarry Licence\n[Application For Mining Lease/quarry Licence\n[ See rule 4(2) and 17A(4)]]\nTo The Mining Engineer/ Assistant Mining Engineer, Department of Mines and Geology, Rajasthan....................................\nAffix passport size photograph",
            "footnote": "",
            "is_definition": false,
            "sort_order": 89
        },
        {
            "number": "1",
            "title": "1. I/we request you to grant me/us [mining lease/quarry licence] for mineral.......................over an area of................hectares for a period of ................ years under the Rajasthan Minor Mineral Concession Rules, 2017.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 90
        },
        {
            "number": "4",
            "title": "2. I/we have deposited Rs.........as the application fee payable under [Rule 4(2) and 17A(4).] through e-payment, bank name ............. GRN No.. ..............dated.....................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 91
        },
        {
            "number": "3",
            "title": "3. Following are the required particulars: -",
            "chapter": null,
            "content": "(A) Name of the applicant and address.................................................\n(B) Telephone No. Office ............... Residence ...............................\nBank a/c No. .............................................\n(C) In case the applicant is an individual:\n(1) Father's Name/Husband's Name\n(2) Caste\n(3) Occupation\n(4) Nationality\n(D) In case the applicant is Firm/Company/Association/Society:\n(1) Type of applicant\n(2) Kind of business\n(3) Place of business\n(4) Place of registration\n(5) Nationality of Director/Partners",
            "footnote": "",
            "is_definition": false,
            "sort_order": 92
        },
        {
            "number": "4",
            "title": "4. Details of mineral concessions held by the applicant in the State: -",
            "chapter": null,
            "content": "S. No.\nS. No.\nML/ PL/ QL/ RCC /ERCC\nML/ PL/ QL/ RCC /ERCC\nMineral\nMineral\nNear village\nNear village\nTehsil\nTehsil\nDistrict\nDistrict\nAME/ME office concerned\nAME/ME office concerned\nArea in hectare/ contract area\nArea in hectare/ contract area\nPeriod\nPeriod\nRemark\nRemark\nfrom\nfrom\nto\nto\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11\nS. No.\nS. No.\nML/ QL\nML/ QL\nMineral\nMineral\nNear village\nNear village\nTehsil\nTehsil\nDistrict\nDistrict\nAME/ME office concern\nAME/ME office concern\nArea in hectare\nArea in hectare\nRemark\nRemark\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9",
            "footnote": "",
            "is_definition": false,
            "sort_order": 93
        },
        {
            "number": "5",
            "title": "5. Total area already acquired for (in hectares)..................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 94
        },
        {
            "number": "6",
            "title": "6. If already set up mineral based industry for consumption of mineral. If so, give detail of location, annual requirement of mineral and various resources from where raw material is being procured at present including the quality of mineral used from the existing lease. .................................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 95
        },
        {
            "number": "7",
            "title": "7. If intending to set up mineral based industry in the area (if so, give particulars of the same) .................................................................................",
            "chapter": null,
            "content": "8. (a) Enclose plan and description report of the applied area with latitude and longitude of all the corner pillars (Datum WGS 84)as per [Rule 4(3)(x) and 17A(5)(x).]\n(b) Enclose a copy of revenue details of the applied area with khasra naksha trace, khansra or araji number, jamabandi and extent of the area of the khasra/aaraji falling in the applied area along with superimposed map as per [Rule 4(3)(xi) and 17A(5)(xi).]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 96
        },
        {
            "number": "9",
            "title": "9. Number and date of No Dues Certificate (Copy attached). ............ (If on the date of application the applicant does not hold any mineral concession/contract etc., an affidavit to this effect shall be enclosed)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 97
        },
        {
            "number": "10",
            "title": "10. Please indicate the distance of the following from the applied area:",
            "chapter": null,
            "content": "(a) Any important tank or dam falling within 1.00Km. radius from applied area.\n..........................................................................\n(b) Any important temple, mosque or any other place of worship or place of archaeological, tourist importance including burial ground etc. falling within 1.00 Km. radius from the applied area..............................\n(c) Any river, canal/pucca road/rail line passing within 1.00 Km. radius from the applied area. ....................................\n(d) Any permanent structure like power line/Microwave tower/water reservoir etc. within a radius of 1.00 Km. from the applied area. .......................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 98
        },
        {
            "number": "11",
            "title": "11. Self-attested copy of PAN Card, photo identity and address proof enclosed (any two out of following documents) -",
            "chapter": null,
            "content": "(i) Aadhar Card;\n(ii) Copy of Driving licence;\n(iii) Copy of Voter Identification Card;\n(iv) Copy of Passport;\n(v) Bank Pass Book;\n(vi) Latest Electricity; or\n(vii) Telephone bill/Water Bill.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 99
        },
        {
            "number": "12",
            "title": "12. In case of Company/Partnership firm/Association of persons, following additional documents shall be attached: -",
            "chapter": null,
            "content": "(1) a self-attested copy of partnership deed and copy of firm registration certificate in case of partnership firm, a self-attested copy of memorandum and articles of association and certificate of incorporation in case of private limited company and a self-attested copy of document of association of persons in case of association of persons.\n(2) where applicant is a company, an attested copy of resolution passed by the board of directors in favour of a person who is authorised to sign the application.\n(3) where applicant is a firm/association of persons and application is not signed by all partners of the firm/members of association of persons as the case may be, an attested copy of power of attorney in favour of a person, executed by the partners of firm or members of association of persons, who is authorised to sign the application.\nPlace:.............................. Date:..............................\nYours Faithfully\nSignature of applicant Submitted by\nSignature\n\t\t\t\t.................................................\nName and\n\t\t\t\taddress.................................................\nForm -2\nForm -2\n[Mining Lease/Quarry Licence]\n[Mining Lease/Quarry Licence]\n[ See rule 4(5) and 17-A(6)]\nS.No.______Name of office _______ML No.__________Date _______\nEnclosures: -\nSignature and designation of receiving officer\nForm -3\nForm -3\nBid Letter\nBid Letter\n[ See rule 14(8)(i)(a)(I) and 37(7)(i)(a)(I)]\n(1) The technical bid is unconditional and unqualified.\n(2) We have reviewed the terms of the notice inviting bid and hereby unconditionally and irrevocably accept, agree and acknowledge the terms thereof.\n(3) We acknowledge that the Government will be relying on the information provided in the technical bid and the documents accompanying the technical bid for selection of the admitted bidder and subsequent selection of the successful bidder, and we certify that all information provided therein is true and correct, nothing has been omitted which renders such information misleading and all documents accompanying the technical bid are true copies of their respective originals.\n(4) This statement is made for the express purpose of our participation in the tender process and possible selection as successful bidder.\n(5) We hereby confirm that we satisfy all the eligibility conditions specified in the notice inviting bid. Documents with respect to our being an Indian national are enclosed.\n(6) We hereby acknowledge that if we submit or produce any document and it is discovered subsequently that such document was false or incorrect then we shall be liable under the applicable law for the time being in force.\n(7) We shall make available to the Government any  additional information it may find necessary or require to supplement or to authenticate the technical bid.\n(8) I acknowledge the right of the Government to reject our technical bid and/or the final price offer without assigning any reason or otherwise and hereby waive, to the fullest extent permitted by applicable law, our right to challenge the same on any account whatsoever.\n(9) We declare that:\n(i) we have examined and understood the Act, all rules framed thereunder, the notice inviting bid and all documents referred therein;\n(ii) we have not directly or indirectly or through an agent engaged or indulged in any Corrupt Practice, Fraudulent Practice, Coercive Practice, Undesirable Practice or Restrictive Practice, in respect of any tender or request for proposal issued by or any agreement entered into with the Government or any other public sector enterprise or any government, central or state; and\n(iii) we hereby certify that we have taken steps to ensure that in conformity with the provisions of rules, no person acting for us or on our behalf has engaged or will engage in any Corrupt Practice, Fraudulent Practice, Coercive Practice, Undesirable Practice or Restrictive Practice.\n(10) We understand that you may cancel the tender process at any time and that you are neither bound to accept any bid that you may receive nor to invite the bidders to bid, without incurring any liability to the bidders, in accordance with the rules.\n(11) We hereby irrevocably waive any right or remedy which we may have at any stage at law or howsoever otherwise arising to challenge or question any decision taken by the Government in connection with the selection of the successful bidder, or in connection with the tender process itself, in respect of the notice inviting bid and the terms and implementation thereof.\n(12) In the event of we being declared as the successful bidder, we agree to pay such amounts and provide such security as required therein.\n(13) We have ensured compliance the notice inviting bid and to the best of our knowledge this bid is conforming to the terms thereof.\n(14) We agree and understand that the bid is subject to the provisions of the rules. In no case, we shall have any claim or right of whatsoever nature if the mining lease, quarry licence, royalty collection contract or excess royalty collection contract is not awarded to us or our bid is not opened or rejected.\n(15) The initial price offer has been quoted and the final price offer shall be quoted by us after taking into consideration all the terms and conditions stated in the notice inviting bid.\n(16) We shall keep this offer valid for 180 days from the bid due date specified in the notice inviting bid or such extended duration as may be agreed with Government.\n(Signature, name and designation of the authorised signatory) Name and seal of bidder\nEnclosed:\nForm 4\nForm 4\nPower of Attorney\nPower of Attorney\n[ See rule 14(8)(i)(a)(VII)]\nFor................................... (Signature, name, designation and address)\n1.................................\n2.................................\nForm -5\nForm -5\nBank Guarantee for Performance Security\nBank Guarantee for Performance Security\n[ See rule 20 & 41]\nDate\nA. [Name] incorporated in India under the Companies Act, [1956/2013] with corporate identity number [CIN of the Applicant], whose registered office is at [address of registered office], India and principal place of business is at [address of principal place of business, if different from registered office]1 (the -Applicant) is required to provide an unconditional and irrevocable bank guarantee for an amount equal to INR [figures] (Indian Rupees [words]) as a performance security valid until [date of expiry of performance bank guarantee] (-expiry date). Mentioned only for companies, the format to include individuals/other applicants also\nB. The Performance Security is required to be provided to Mining Engineer/Assistant Mining Engineer concern and address [Name of Mining Engineer/Assistant Mining Engineer] [-State], for discharge of certain obligations under the [reference to the principal documents -mining lease/royalty collection contract/excess royalty collection contract, [date] with respect to [particulars of concession] (collectively the -concession document).\nC. We, [name of the bank] (the -bank) at the request of the Applicant do hereby undertake to pay to the State an amount not exceeding INR [figures] (Indian Rupees [words]) (-guarantee amount) to secure the obligations of the applicant under the concession document on demand from the State on the terms and conditions herein contained herein.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 100
        },
        {
            "number": "1",
            "title": "1. The bank for the purpose hereof unconditionally and irrevocably undertakes to pay to the State without any demur, reservation, caveat, protest or recourse, immediately on receipt of first written demand from the State, a sum or sums (by way of one or more claims) not exceeding the guarantee amount in the aggregate without the State needing to prove or to show to the bank grounds or reasons for such demand for the sum specified therein and notwithstanding any dispute or difference between the ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 101
        },
        {
            "number": "2",
            "title": "2. The bank acknowledges that any such demand by the State of the amounts payable by the bank to the State shall be final, binding and conclusive evidence in respect of the amounts payable by applicant to the State under the concession document.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 102
        },
        {
            "number": "3",
            "title": "3. The bank hereby waives the necessity for the State from demanding the aforesaid amount or any part thereof from the applicant and also waives any right that the bank may have of first requiring the State to pursue its legal remedies against the applicant, before presenting any written demand to the bank for payment under this guarantee.",
            "chapter": null,
            "content": "Note: - To be modified if the applicant is not a company.\nNote:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 103
        },
        {
            "number": "4",
            "title": "4. The bank further unconditionally agrees with the State that the State shall be at liberty, without the bank's consent and without affecting in any manner the bank's obligation under this guarantee, from time to time to,",
            "chapter": null,
            "content": "(i) vary and/or modify and of the terms and conditions of the concession document;\n(ii) extend and/or postpone the time for performance of the obligations of the applicant under the concession document, or\n(iii) forbear or enforce any of the rights exercisable by the State against the Applicant under the terms and conditions of the Concession Document.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 104
        },
        {
            "number": "5",
            "title": "5. Any payment made hereunder shall be made free and clear of and without deduction for, or on account of, any present or future taxes, levies, imposts, duties, charges, fees, commissions, deductions or with holdings of any nature whatsoever.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 105
        },
        {
            "number": "6",
            "title": "6. The bank agrees that State at its option shall be entitled to enforce this guarantee against the bank, as a principal debtor in the first instance without proceeding at the first instance against the applicant.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 106
        },
        {
            "number": "7",
            "title": "7. The bank further agree that the guarantee herein contained shall remain in full force and effect during the period that specified in the concession document and that it shall continue to be enforceable till all the obligations of the applicant under or by virtue of the said concession document with respect to the performance security have been fully paid and its claims satisfied or discharged or till the State certifies that the terms and conditions of the concession document with respect to ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 107
        },
        {
            "number": "8",
            "title": "8. The payment so made by the bank under this guarantee shall be a valid discharge of bank's liability for payment thereunder and the State shall have no claim against the bank for making such payment.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 108
        },
        {
            "number": "9",
            "title": "9. This guarantee is subject to the laws of India. Any suit, action, or other proceedings arising out of this guarantee or the subject matter hereof shall be subject to the exclusive jurisdiction of courts at the State of Rajasthan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 109
        },
        {
            "number": "10",
            "title": "10. The bank declares that it has power to issue this guarantee and discharge the obligations contemplated herein, the undersigned is duly authorised and has full power to execute this guarantee for and on behalf of the bank.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 110
        },
        {
            "number": "11",
            "title": "11. The bank undertakes not to revoke this guarantee during its currency except with the previous consent of the State in writing.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 111
        },
        {
            "number": "12",
            "title": "12. The State may, with prior intimation to the bank, assign the right under this guarantee to any other departments, ministries or any governmental agencies, which may act in the name of the Governor. Save as provided in this clause, this guarantee shall not by assignable or transferable.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 112
        },
        {
            "number": "13",
            "title": "13. Notwithstanding anything contained herein, the liability of the bank under this bank guarantee shall not exceed the guarantee amount. This bank guarantee shall be valid up to the expiry date.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 113
        },
        {
            "number": "14",
            "title": "14. The bank is liable to pay the guaranteed amount or any part thereof under this bank guarantee only and only if the State serves upon the bank a written claim or demand on or before the expiry date.",
            "chapter": null,
            "content": "Dated the [day] day of [month] [year].\nIn witness whereof the bank, through its authorized officer, has set its hand and stamp.\n____________________________________ (Signature) ____________________________________ (Name and Designation) (Bank Stamp)\nForm -6\nForm -6\nForm of Mining Lease\nForm of Mining Lease\n[ See rule 21(2)]\nand\nor\nor\nBackground:\nA. The lessee had participated in an electronic auction for grant of a mining lease, pursuant to which the lessee has become eligible for grant of a mining lease or had been granted a prospecting licence or letter of intent has been issued or mining lease has been sanctioned with respect to which the lessee has completed the requirements under the Rajasthan Minor Mineral Concession Rules, 2017 (hereinafter referred to as the said rules) for grant of a mining lease.\nB. Accordingly, the State Government is now executing this deed for grant of a lease to the lessee in consideration of the fee, royalties, covenants and agreements hereinafter reserved and contained on the part of the lessee to be paid, observed and performed.\nC. The State Government hereby grants the mining lease for ................................. mineral in respect of the lands hereinafter described in clause 1(b) and has/have deposited with the Government the sum of Rs.................................. as security, Rs. ................................. as performance security and Rs. ................................. as financial assurance.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 114
        },
        {
            "number": "1",
            "title": "1. Demises:",
            "chapter": null,
            "content": "(1) In consideration of the rents and royalties covenants and agreements hereinafter contained and on the part of the lessee/lessees to be paid, observed and performed the Government hereby grants and demises upto the lessee/lessees, all these mines/beds/veins/seams of (hereinafter referred to as the said minerals) situated, lying and being in or under the lands which are referred to hereinafter and subject of other provisions of this lease.\n(2) The area of the said lands is as follows (hereinafter referred to as the said lands or the leased area).\n(3) The lessee/lessees shall hold the premises hereby granted and demised from the date of registration for period of ..................... years thence next ensuing.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 115
        },
        {
            "number": "2",
            "title": "2. Liberties, powers and privileges to be exercised and enjoyed by the lessees: - The following liberties, powers and privileges may be exercised and enjoyed by the lessee/lessees subject to the other provisions of this lease:",
            "chapter": null,
            "content": "(1) To enter upon land and search for, win, work etc. - Liberty and powers at all times during the terms hereby demised to enter upon the said lands and to search for, mine, bore, dig, drill for, win, work, dress, process, convert, carry away and dispose of the said minerals.\n(2) To sink, drive and make pits, shaft and inclines etc. - Liberty and powers for or in connection with any of the purposes mentioned in this clause to sink, drive, make, maintain and use in the said lands, and pits, shafts, inclines, drifts, levels, water-ways, air-ways and other works and to use, maintain, deepen or extend any existing works of the like nature in the said lands.\n(3) To bring and use machinery and equipment. - Liberty and power for or in connection with any of the purposes mentioned in this clause to erect, construct, maintain and use on or under the said lands any engines, machinery, plant, dressing floors, furnaces, coke ovens, brick kilns, workshops, store houses, bungalows, godowns, sheds and other buildings and other works and conveniences on the like nature on or under the said lands.\n(4) To use water from streams etc. - Liberty and power for or in connection with any of the purposes mentioned in this clause but subject to the rights of any existing or future lessees and with the written permission of the Collector to appropriate and use water from any stream, water courses, springs or other source in or upon the said lands and to divert, step up of dam any such stream or water course and collect or impound. Any such water and to make, construct and maintain any watercourse, culverts drains or reservoirs but not so as to deprive any cultivated land, villages, buildings or watering places for a livestock of a reasonable supply of water as before accustomed nor in any way to foul of pollute any stream or spring provided that the lessee/lessees shall not interfere with the navigation in any navigable stream nor shall divert such stream without previous written permission of the government.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 116
        },
        {
            "number": "2",
            "title": "3. Restriction as to the exercise of the liberties etc.: - The liberties, powers and privileges granted under clause 2 are subject to the following restrictions and subject to the other provisions of this lease: -",
            "chapter": null,
            "content": "(1) The mining operations within 45 meters of the public works etc. - The lessee shall not carry on or allow to be carried on, any mining operations at any point within a distance of forty five meters from any railway line except under and in accordance with the written permission of the railway administration concerned or under or beneath any ropeway or ropeway trestle or station except under and in accordance with the written permission of the authority owning the ropeway or from any public roads (excluding mines approach road/village roads), reservoir, canal, other public place, buildings or pillars of railway and road bridge or inhabited site except with the previous permission of the Collector or any other officer authorised by the State or Central Government and otherwise then in accordance with such instructions, restrictions and conditions either general  or specific as may be attached to such permissions. The said distance of forty five meters shall be measured in the case of public roads (excluding mines approach road/village roads), railway, reservoir or canal horizontally from the outer toe of the bank or the outer edge of the cutting as the case may be and in case of a building horizontally from the plinth thereof. The lessee shall not, in the case of mines approach road/village roads (including any track shown in the revenue record as village road), allow any working to be carried on within a distance of ten meters of the outer edge of the cutting except with the previous permission of the Collector or any other officer duly authorized by the State/Central Government in this behalf and otherwise than in accordance with such directions, restrictions and additions, either general or special, which may be attached to such permission.\n(2) Permission for surface operation in a land not already in use- Before using for surface operation and land which has not already been used for such operations. The lessee/lessees shall give to the Collector of the District one calendar month previous notice in writing specifying the situation and the extent of the land proposed to be so used and the purpose for which the same is required and the said land shall not be so used if objection is issued by the Collector within one month after receipt by him of such notice unless the objection so stated shall on reference to the Government be a mulled or waived.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 117
        },
        {
            "number": "4",
            "title": "4. The lessee/lessees hereby covenants with the Government as following:",
            "chapter": null,
            "content": "(1) Covenants in accordance with the Rajasthan Minor Mineral Concession Rules, 2017. The lessee/lessees shall pay royalty on the quantity of the said mineral dispatched from or consumed within the leased area at the rates specified in Schedule-II appended to the Rajasthan Minor Mineral Concession Rules, 2017:\n(2) Surface rent and other payments -\n(a) The lessee shall pay premium amount as specified in the Rajasthan Minor Mineral Concession Rules, 2017.\n(b) The lessee/lessees shall pay for the surface area used by him/them (for the purpose of mining) surface rent equal to the land revenue payable under the Rajasthan Land Revenue Act, 1956 or any other law in force to the Land Revenue Department of State.\n(c) The lessee shall, in addition to royalty, pay to the District Mineral Foundation Trust as per the rates specified in the District Mineral Foundation Trust Rules, 2016, as amended from time to time.\n(3) Dead Rent-The lessee/lessees shall also pay for every year, the yearly dead rent in advance as determined, from time to time:\n(4) Rate and payment of dead rent etc. - Subject to the provisions of sub-clause (3) above as from the day of the registration of the lease, the lessee/lessees shall pay to the Government for each year the minimum annual royalty as \"deal rent\" of Rs. .............. in the office of the Mining Engineer/Assistant Mining Engineer subject as aforesaid. This provision will also apply to the payment of royalty, District Mineral Foundation Trust or any other charges. Surface rent will be deposited with the Revenue Department.\n(5) Revised security, performance security and financial assurance. - The lessee shall pay difference amount of security and performance security as per revised dead rent. The lessee shall also pay difference amount of financial assurance if area used for mining and allied activities increases.\n(6) Dump removal charge. - The lessee/lessees shall pay such amount per year or part thereof to the Government for ecological restoration of mines and quarries in the said area at such time and such rate as may be fixed by the Government, from time to time.\n(7) To pay compensation for damage and indemnify the Government. - The lessee/lessees shall make and pay such reasonable satisfaction and compensation for all damage, injury or disturbance which may be done by him/them in exercise of the powers granted by the lease and shall indemnify the Government against all claims which may be made by third parties in respect of such damage, injury or disturbance.\n(a) To indemnify against all claims and to pay compensation for infringement of rights of third person. - The lessee/lessees shall make and pay such reasonable satisfaction and compensation as may be assessed by lawful authority in accordance with the law in force on the subject for all damage, injury or disturbance which may be done by him/them in exercise of the powers granted by this lease and shall indemnify and keep indemnified fully and completely the State Government against all claims which may be made by any person or persons in respect of any such damage, injury or disturbance and all costs and expenses in connection therewith.\n(b) To pay a wage not less the minimum wage prescribed by the Central or State Government from, time to time.\n(c) To comply with the provisions of the Mines Act, 1952.\n(d) To comply with the provisions of the Rajasthan Minor Mineral Concessions Rules 2017.\n(8) Not to injure tree. - The lessee/lessees shall not cut or injure any tree in area of his/their lease without the previous sanction in writing from the competent authority.\n(9) To maintain boundary and intermediate pillar. - The lessee/lessees shall at his/their own expense erect and at all times maintain and keep in repair boundary and intermediate pillars according to the demarcation shown in the plan annexed hereto and as specified in clause (iv) of sub-rule (1) of rule 28.\n(10) Not to erect buildings etc. on certain place. - The lessee/lessees shall not erect any building or carry or any surface operations on any public pleasure grounds, places of worship, scared graves, burial grounds or village sites for houses, public roads or other places which the competent authority may determine as public grounds to bring within this restriction.\n(11) To commence mining operations within six months and carry them on properly. - The lessee/lessees shall commence mining operations within six months from the date of the lease to him/them and thereafter carry on such operations effectively in a proper skilful and workman like manner both as regards prevention of waste by removal of sufficient overburden careful storage of waste and drainage and as regards removal of all valuable minerals within the mine.\n(12) Account. - The lessee/lessees shall keep correct accounts showing the quantity and particulars of all minerals obtained from the mine, detail of mineral sold or dispatched, and the number of persons employed therein and also complete plans of the mine and shall allow any officer of the Department at any time to examine such accounts and mine plan and shall furnish him with such information and return in respect of aforesaid matter as he may require.\n(13) Abiding by Rule. - The lessee/lessees shall abide by all existing Acts and rules enforced by the Government of India or the State Government and all such other Acts or rules as may be enforced, from time to time in respect of working of the mines and other matters affecting safety, health, environment and convenience of the lessee/lessees or of the public.\n(14) To allow facilities to other mineral concession or permit holder. - The lessee/lessees shall allow existing and future mineral concession or permit holders of any land which is comprised in or adjoins or is approachable by the land held by the lessee/lessees, reasonable facilities for access thereto.\n(15) To allow entry of officer. - The lessee/lessees shall allow any officer of the Department or any other officer authorised by the Central or State Government in this behalf to enter upon the premises comprised in the lease for the purpose of inspecting the same and abide by instruction issued by him from time to time regarding the conservation and development of minerals and the related matters.\n(16) Building erected by Lessee. - The lessee/lessees may erect on the area granted to him, any building required for bonafied purpose and such building shall be the property of the Government after the expiry of the lease or earlier determination or surrender of the lease:\n(17) To report accident and discovery of any other mineral. - The lessee/lessees shall without delay report to Mining Engineer/Assistant Mining Engineer concerned or any other officer authorised by them any accident which may occur at or in the said premises and also the discovery on or within any of the lands of mines demised by the lease of any minerals whether minor or otherwise not specified in the lease.\n(18) Grant/working of newly discovered mineral. - Where subsequent to the grant, any new mineral is discovered, the lessee shall not win and disposed off unless it is included in the lease or a separate lease is obtained. If lessee does not apply for inclusion of such mineral, lease may be terminated and new lease shall be granted through e-auction.\n(19) To hand over possession of protected area. - If any area out of the lease area is declared as a protected area under the Ancient Monuments Preservation Act 1904 (Central Act VII of 1904). The lessee will have to deliver the possession back to the State Government without claiming any compensation for that area.\n(20) Liberty to determine the lease. - The lessee/lessees may at any time determine this lease with immediate effect by giving a notice in writing to the State Government or to such officer or authority as the State Government may specify in this behalf and shall pay all rents, water rates, royalties compensation for damages and other moneys which may then be due and payable under these presents to lesser or any other person or persons and shall deliver these presents to competent authority and then this lease and the said term and the liberties. Powers and privileges hereby granted shall absolutely cease and determine but without prejudice to any right or remedy of the lesser in respect of any breach of any of the covenants or agreement contained in its presents.\n(21) Cancellation. - The lease shall be liable to be cancelled if the lessee/lessees ceases to work the mine for a continuous period of six months without obtaining written sanction of the competent authority.\n(22) Pre-emption. - The Government shall have the rights of preemption at current market rates over all minerals lying in or upon the lands demised by the lease and shall be indemnified be the lessee/lessees against claims of any other party in respect of such minerals.\n(23) Consequence of nonpayment of royalty or rent. - The Government shall determine the lease after serving a notice to the lessee to pay the dues within thirty days from the date of the receipt of notice and forfeit the security amount if the dead rent or royalty or dump removal charges are not paid within thirty days next after the date fixed in these presents. The Government shall have the right at any time after serving the above notice to enter upon the said lands and to distrain all or any of the minerals or movable property therein and shall carry away, distrain or order the sale of  property so distrain or so much of it as will suffice for satisfaction of the rent or royalty of dump removal charges and all costs and expenses occasioned by the non-payment thereof. These rights shall be without prejudice to the right of the Government to realise all its dues, under the Rajasthan Public Demand Recovery Act. 1952 (Act No. V of 1952) or Rajasthan Land Revenue Act.1956 (Act No.15 of 1956).\n(a) Consequence of breach of other covenant. - In case of any breach on the part of lessee/lessees of any covenant or condition contained in the lease whether contained in this clause or any other clause of this lease, the Government may determine the lease and forfeit the security amount and take possession of the said premises or in the alternatively may impose payment of a penalty as specified in Schedule-IV. Such action shall not be taken unless the lessee/lessees has/have failed to remedy the breach after thirty days' notice.\n(b) Delivery on termination of leas. - On expiry or earlier determination of the lease the lessee/lessees shall deliver up the said premises and all mines (if any) dug in respect of any working as to which the Government might have sanctioned abandonment.\n(c) (i) Determination of lease in the public interest- The Government may determine the lease if the Government considers that the minor minerals under the lease are required for establishing an industry beneficial to the public\n(ii) Determination of lease for the aforesaid purpose shall not be valid unless six months notice in writing has been given by the Government to the lessee/lessees. Such notice need not however, be given in war of emergency.\n(24) In the schedule area, the lessee shall give preference in employment, to the tribals and to the persons who become displaced because of the taking up of mining operations.\n(25) Employment of Foreign national. - The licencee/licencees shall not employ, in connection with the prospecting operations any person who is not an Indian National except with the previous approval of the Central Government.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 118
        },
        {
            "number": "5",
            "title": "5. Further covenants of the lessee: - The lessee/lessees hereby covenant/covenants with the Government as follows: -",
            "chapter": null,
            "content": "(1) The lessee/lessees shall, when mandated by the Government, provide and at all times keep at or near the pit head or each of the pit heads or in nearby cluster area at which the minerals shall be brought to bank, a properly constructed and efficient computerized weighing machine and shall weigh or cause to be weighed thereon all the said minerals, from time to time, brought to bank, sold, exported and converted and also the converted products. The lessee shall at the close of each day cause the total weights, ascertained by such means of the said minerals raised, sold, exported and converted during the previous twenty four hours, to be entered in the books of accounts maintained by the lessee. The lessee shall at all times during the term of the lease, permit the Government to employ any person or persons to be present at the weighing of the said minerals as aforesaid and to keep accounts thereof and to check the accounts kept by the lessee.\n(2) To allow test to weighing machine. - The lessee shall at any time or times during the term of the lease, allow any person or persons appointed in that behalf by the Government to examine and test every weighing machine to be provided and kept as aforesaid and the weights used therewith in order to ascertain whether the same respectively are correct and in good repair and order. If upon any such examination or testing, any such weighing machine or weights shall be found incorrect or out of repair or order, the Government may require that the same be adjusted, repaired and put in order by and at the expense of the lessee. If such requisition is not complied with within fifteen days after the same has been made, the Government may cause such weighing machine or weights to be adjusted, repaired and put in order at the expense of the lessee. If upon any such examination or testing as aforesaid, any error is discovered in any weighing machine or weights to the prejudice of the Government, such error shall be regarded as having existed for three months prior to the discovery thereof or from the last occasion of so examining and testing the same weighing machine and weights, in case such occasion is within the said period of three months, and the lessee shall pay the royalty accounted for accordingly.\n(3) Not to obstruct working of other minerals. - The lessee/lessees will exercise the liberties and powers hereby granted in such manner as to cause no unnecessary or reasonably avoidable obstruction or interruption to the development of any working within the said lands of any minerals not included in this lease and shall at all time afford to the Central and State Government and to the holders of mineral concessions in respect of any such minerals within any land or any minerals within any land adjacent to the said lands as the case may be, reasonable means of access and safe convenient passage upon and across the said lands, to such minerals for purpose of getting, working, developing and carrying away the same provided that the lessee/lessees shall receive reasonable compensation for damage or injury which he/they may sustain in consequence of the use of such passage by such lessees or holders of mineral concessions.\n(4) Forfeiture of property left more than three months after determination of lease. - If on expiration of lease or earlier determination of the lease or after the date from which any surrender by the lessee of a part or parts of the said lands under the provision contained in sub-clause (20) of clause 4 of this lease becomes effective, there remain in or upon the said land of the surrendered part or parts thereof as the case may be, any engines, machinery, plants, structures, tramways, railways and other work erections and conveniences or other property which are not required by the lessee/lessees in connection with his/their operations in those parts of the said lands they shall become the property of the Government and may be sold or disposed of in such manner after period of three months from the date of expiration or earlier determination of the lease the Government may deem fit without liability to pay any compensation.\n(5) Exemption of royalty for tenant. - No royalty shall be charged on minor minerals required by the tenant for any bonafied purposes as specified in rule 75 of the rules.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 119
        },
        {
            "number": "6",
            "title": "6. Further covenants of the lessee: - The lessee/lessees further covenant/covenants with the Government as follows: -",
            "chapter": null,
            "content": "(1) Interest. - The lessee/lessees shall pay to the Government simple interest at the rate of fifteen percent per annum on all amounts outstanding against the lessee/lessees under this lease, whether as dead rent, royalty, surface rent or otherwise.\n(2) Keeping mines etc. in good order. - The lessee/lessees shall keep throughout the terms of his/their lease all mines, building, engines, machinery and other mining plants in good repair and working order.\n(3) Taking ballast etc. for leased area only. - The lessee/lessees shall take out and use ballast, khandas and rubbles from his/their quarries for his/their bonafied use in the leased area only and shall pay royalty for minerals so used.\n(4) Delivery of samples of rocks etc. - The lessee/lessees shall deliver to or permit to be taken by the representative of the Government a sample or samples of all rocks found on mines or raised and all intermediate and finished products sold on intended for sale by the lessee/lessees.\n(5) Security of pits and Shafts and not filling them u. - The lessee/lessees shall properly secure pits and shafts and will not without permission in writing of the Mining Engineer, will fully close, fill up or choke any mine or shafts.\n(6) Setting apart land for public purposes. - The lessee/lessees shall when required by the Government so to do, set apart land for public purposes and Government may occupy the same whenever it thinks necessary of expedient but Government will, so far as is compatible with the objects aforesaid, select the land so as not to interfere with the mining operations of lessee/lessees and will from to time pay to the lessee/lessees such sums of money expended in buying surface rights over any of the lands so set apart and cost of removal of any work carried there on and for any loss or damages caused to the lessee/lessees by any interference in the mining operations.\n(7) (a) Abstaining from entering occupied land. - The lessee/lessees shall abstain from entering on the surface of any occupied Government land or of any private land comprised within the leased area without previously obtaining the consent of the occupant in writing.\n(b) The lessee/lessees shall abstain from opening any new quarry or depot in the leased area without the previous sanction of the Mining Engineer, Assistant Mining Engineer concerned.\n(8) Not to obstruct road etc. - The lessee/lessees shall keep open and in no way obstruct any road path or way by any means whatsoever.\n(9) Not to obstruct working of other mineral. - The lessee/lessees shall in the event of his/their declining to take a lease, permit the Government or other persons duly authorised by the Government in that behalf to enter into the leased area and to conduct prospecting and mining operations thereon in respect of minerals or other substance other than ............................ (name of mineral) but the Government will so far as is compatible with the objects aforesaid, select the land to be so set apart and appropriated in such a manner as not to interfere with the mining operations of the lessee/lessees and will indemnify the lessee/lessees for any loss or damage caused to the lessee by any interference with the mining operations.\n(10) To allow free use of tanks, water courses etc, to the public and Government. The lessee/lessees shall abstain from all interference with and allow to the public and the Government the free use of tanks, water courses, places of worship, scared graves, burial grounds and village sites for houses which may be existing or may hereafter be set apart or appropriated as herein before provided on the leased area.\n(11) Not to use land for other purposes. - The lessee/lessees shall not cultivate or use the land save for the purposes of the lease.\n(12) Not to enter upon or commence operations in forest land etc. - The lessee/lessees shall not enter upon or commence any mining operations in any forest land under special protection comprised in the leased area except after previously obtaining permission in writing of the competent officer.\n(13) To respect water rights and not to injure adjoining property. - The lessee/lessees shall not injure or cause to deteriorate any sources of water, power or water supply and shall not in any other way render any spring of stream of water unfit to be used or do anything to injure adjoining lands, villages or houses.\n(14) Removal of stock of minerals on expiry or determination of the lease. - The lessee/lessees shall on the termination or earlier determination of the lease remove within three months all extracted minerals from the premises of the leased areas. All extracted minerals in the said lands left over indisposed after three months of the termination or determination of lease shall be deemed to be the property of the Government:\n(15) Service of notice on lessee. - The lessee/lessees shall at all times have at the lease area a duly accredited Superintendent or Agent to whom all notices may be given and all communications from the officers of the Department or the Government may be delivered, if there be no such Superintendent or agent on the leased area, the Government shall be at liberty to treat any other person present there as such agent and to serve all notices and other documents upon the said person or in the case of there being no such other person as aforesaid, then by affixing such notice or documents on some conspicuous portion of the mining block.\n(16) Supply of stones to the Public. - The lessee/lessees shall not unless prevented by reasonable cause e.g. collapse of the quarry etc. to the satisfaction of the Government, fail or neglect or delay to supply.......... (name of mineral) to the public at pits mouth within reasonable period of......... (to be specified). In the event of unsatisfactory supply by the lessee/lessees to local public the Mining Engineer/Assistant Mining Engineer with the approval of the Director, may allow the consumers to quarry/extract with their own arrangement in the leased area outside the existing quarries or depots and the lessee/lessees will not be entitled to any royalty on this account but the same will be payable to the Government.\n(17) Employment of qualified person. - for the purpose of carrying out mining operations in accordance with the approved practices: -\n(i) a whole-time mining engineer or the person possessing I Class Mine Manager's Certificate of Competency issued by the Director General of Mines Safety and geologist, where mining operations are carried out by deployment of heavy mining machinery for deep hole drilling, excavation, loading and transport, or where the average employment exceeds one hundred and fifty per day;\n(ii) a whole-time mining engineer or the person possessing II Class Mine Manager's Certificate of Competency issued by Director General of Mines Safety, where mining operations are carried out by deployment of heavy mining machinery for deep hole drilling, excavation, loading and transport, or where the average employment exceeds seventy five per day;\n(iii) in case of any other mine, a person having degree in mining or diploma in mining with two year's experience in mining operations or Geologist or the person possessing foreman's certificate of competency issued by the Director General of Mines Safety:\n(18) The Lessee shall inform the Government of any change in his immovable property and its value within a period of fifteen days from such change.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 120
        },
        {
            "number": "7",
            "title": "7. Calculation of royalty, assignment of tax and recovery of dues: - It is hereby further agreed between the parties hereto as follows: -",
            "chapter": null,
            "content": "(1) The royalty payable hereunder shall be calculated on the quantity dispatched from or consumed within the leased area as per the rates specified in Schedule-II of the Rajasthan Minor Mineral Concession Rules, 2017;\n(2) The lessee/lessees shall not assign, sublet or part with the possession of the leased area or any part thereof except in the manner permitted by rule 27 of the said rules.\n(3) Without prejudice to any other mode of recovery under any provision of this lease or any law, all amounts falling due hereunder against the lessee/lessees may be recovered as arrears of land revenue under the law in force for such recovery.\n(4) The lessee/lessees shall duly and regularly pay to the competent authority all taxes, cess and local dues in respect of the leased area, said minerals or the working of the mines.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 121
        },
        {
            "number": "8",
            "title": "8. If in any event the orders of competent authority are revised or cancelled by the appellate authority or by the State Government in pursuance of the proceedings under Chapter XI of the Rajasthan Minor Mineral Concession Rules, 2017 or under any other provisions of the said rules, the lessee/lessees shall not be entitled to compensation for any loss sustained by him/them in exercise of the powers and privileges conferred upon him/them by these presents.",
            "chapter": "Chapter XI",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 122
        },
        {
            "number": "9",
            "title": "9. If in any event the orders of the Government or any other officer empowered under these rules are revised, reviewed or cancelled by the appellate authority or court of law, the lessee/lessees shall not be entitled to compensation for any loss sustained by the lessee/lessees in exercise of the powers and privileges conferred upon him/them by these presents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 123
        },
        {
            "number": "10",
            "title": "10. In the event of the existence of a state of war or of emergency (of which existence the Government shall be sole judge and a notification to this effect in the Rajasthan Gazette shall be conclusive proof), the Government shall from time to time and all times, during the said terms have the right (to be exercised by a notice in writing to the lessee/lessees) forthwith to take possession and control of the works, plant, machinery and premises of the lessee/lessees situated on the said lands or",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 124
        },
        {
            "number": "11",
            "title": "11. Security and forfeiture thereof: - (1) The Government may forfeit the whole or part of the amount deposited by the lessee/lessees as security under this lease in case the lessee/lessees commits/commit a breach of any covenant to be performed by the lessee/lessees under this lease.",
            "chapter": null,
            "content": "(2) Whenever the said security deposit or any part thereof or any further sum deposited with the Government in replacement thereof shall be forfeited under sub-clause (1) or applied by the Government in satisfaction of any dues of the Government under this lease (which the Government is hereby authorised to do) and the lessee/lessees shall immediately deposit with the Government such further sum as may be sufficient with the inappropriate part thereof to bring the amount in deposit with the Government upto the limit as mentioned in Rule 19.\n(3) The rights conferred by this clause shall be without prejudice to the right conferred on the Government by any other provision of this lease or by any law.\n(1) 'Department' means the Department of Mines & Geology, Rajasthan.\n(2) 'Director' means the Director of the Mines & Geology, Rajasthan for the time being and includes any officer authorised by him to perform any of his functions.\n(3) 'Government' includes an officer of the Government to whom any powers of the Government have been for the time being delegated.\n................................................ Signed by\n\t\t\t\tlessee/lessees ................................................\n........................................... Signature\n\t\t\t\t............................\nAnd by .............................................. Witness\n\t\t\t\t(1)............................ .............................................. Witness (2) ............................\nBy order and on behalf of the Governor of\n\t\t\t\tRajasthan (Designation)\nForm -7\nForm -7\nForm of Quarry Licence\nForm of Quarry Licence\n[ See rule 17(3)]\n1\nName of licencee\n:\n................................................................\n2\nFather's/Husband's Name\n:\n................................................................\n3\nAddress\n:\n................................................................\n................................................................\n................................................................\n4\nContact No.\nMobile/land line No.\ne-mail address\n:\n................................................................\n................................................................\n................................................................\n5\nPAN No.\n:\n................................................................\n6\nQuarry or plot No.\n:\n................................................................\n7\nName of block/boundary\n:\nName\n\t\t\t\t......................................................\nTehsil\n\t\t\t\t......................................................\nDistrict ....................................................\n8\nName of office\n:\n................................................................\n9\nNo. and date of order of grant\n:\n................................................................\n10\nPeriod of licence covered by initial grant\n:\nFrom\n\t\t\t\t.......................................................\nTo ...........................................................\n11\n(a) Period of extension\n:\nFrom\n\t\t\t\t.......................................................\nTo ...........................................................\n(b) Period of extension\n:\nFrom\n\t\t\t\t.......................................................\nTo ...........................................................\nDetails about Transfer/Mutation of licence:\nS. No.\nS. No.\nName, father's / husband's name and address of\n\t\t\t\ttransferee / legal heirs\nName, father's / husband's name and address of\n\t\t\t\ttransferee / legal heirs\nContact No., e-mail address and PAN No.\nContact No., e-mail address and PAN No.\nDate of application of transfer/ mutation\nDate of application of transfer/ mutation\nOrder No. and date\nOrder No. and date\nTransfer fee\nTransfer fee\nDate of Deposit\nDate of Deposit\nSignature of Transferor\nSignature of Transferor\nSignature of Transferee/legal heirs\nSignature of Transferee/legal heirs\nSignature of Mining Engineer /Assistant Mining\n\t\t\t\tEngineer\nSignature of Mining Engineer /Assistant Mining\n\t\t\t\tEngineer\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\nDetails about payment of licence fee and period of subsequent extension:\nS. No.\nS. No.\nAmount deposited\nAmount deposited\nChallan/GR No./ cash receipt No.\nChallan/GR No./ cash receipt No.\nDate of Deposits\nDate of Deposits\nLicence fee period\nLicence fee period\nSignature of licencee\nSignature of licencee\nSignature of Mining Engineer/Assistant Mining\n\t\t\t\tEngineer\nSignature of Mining Engineer/Assistant Mining\n\t\t\t\tEngineer\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\nForm -8\nForm -8\nRegister for Mining Lease Applications\nRegister for Mining Lease Applications\n[ See rule 22(1)]\nS. No.\nS. No.\nML No.\nML No.\nDate of receipt of application\nDate of receipt of application\nName of applicant\nName of applicant\nfather's/ husband' s name\nfather's/ husband' s name\nCaste and Occupation\nCaste and Occupation\nPermanent address\nPermanent address\nPAN card No.\nPAN card No.\nBank a/c No. and IFSC code\nBank a/c No. and IFSC code\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\nArea in hectare\nArea in hectare\nDescription of applied area\nDescription of applied area\nMineral/ minerals applied\nMineral/ minerals applied\nApplication fee details\nApplication fee details\nPeriod of mining lease applied\nPeriod of mining lease applied\nOrder No. and date of grant /rejection\nOrder No. and date of grant /rejection\nSignature of officer\nSignature of officer\nRemarks\nRemarks\n10\n10\n11\n11\n12\n12\n13\n13\n14\n14\n15\n15\n16\n16\n17\n17\nForm -9\nForm -9\nRegister for Mining Leases\nRegister for Mining Leases\n[ See rule 22(2)]\nS. No.\nS. No.\nML No.\nML No.\nDate of receipt of application\nDate of receipt of application\nName of Leasee\nName of Leasee\nfather's / husband's name\nfather's / husband's name\nCaste and occupation\nCaste and occupation\npermanent address\npermanent address\nPAN card No.\nPAN card No.\nBank a/c No. and IFSC code\nBank a/c No. and IFSC code\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\nArea in hectare\nArea in hectare\nArea granted with description\nArea granted with description\nMineral/ minerals granted\nMineral/ minerals granted\nPeriod of lease/ renewal\nPeriod of lease/ renewal\nOrder No.\nOrder No.\nDate of grant\nDate of grant\nAmount of dead rent original/ revised\nAmount of dead rent original/ revised\nSecurity deposited\nSecurity deposited\n10\n10\n11\n11\n13\n13\n14\n14\n15\n15\n16\n16\n17\n17\n18\n18\nPerformance security deposited\nPerformance security deposited\nName of transferee with father's/ husband's\n\t\t\t\tname and address\nName of transferee with father's/ husband's\n\t\t\t\tname and address\nDate of transfer\nDate of transfer\nDate of extension\nDate of extension\nDate of expiry/ termination/ surrender/part\n\t\t\t\tsurrender\nDate of expiry/ termination/ surrender/part\n\t\t\t\tsurrender\n19\n19\n20\n20\n21\n21\n22\n22\n23\n23\nSignature of officer\nSignature of officer\nDiversion details\nDiversion details\nEC details\nEC details\nRemark\nRemark\n24\n24\n25\n25\n26\n26\n27\n27\nForm -10\nForm -10\nRegister for Quarry Licence Applications\nRegister for Quarry Licence Applications\n[ See rule 22(3)]\nS. No.\nS. No.\nName of applicant with father's/husband's name\n\t\t\t\tand address\nName of applicant with father's/husband's name\n\t\t\t\tand address\nCaste and occupation\nCaste and occupation\nDate of receipt of application\nDate of receipt of application\nName of the boundary\nName of the boundary\nPlot No. applied\nPlot No. applied\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nSize of the plot\nSize of the plot\nMineral or minerals applied\nMineral or minerals applied\nOrder No. and date of grant/rejection\nOrder No. and date of grant/rejection\nSignature of the Officer\nSignature of the Officer\nRemarks\nRemarks\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11\nForm -11\nForm -11\nRegister for Quarry Licence\nRegister for Quarry Licence\n[ See rule 22(4)]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 125
        },
        {
            "number": "1",
            "title": "1. By order dated ...................... 2. .............................................. 3. ..............................................",
            "chapter": null,
            "content": "S. No .\nS. No .\nQuarry / plot No.\nQuarry / plot No.\nName of the licencee\nName of the licencee\nFather's/ husband's name\nFather's/ husband's name\nAddress\nAddress\nPAN card No.\nPAN card No.\nBank a/c No. and IFSC code\nBank a/c No. and IFSC code\nCaste and occupation\nCaste and occupation\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\nDate of receipt of the application\nDate of receipt of the application\nOrder no. and date of grant of licence\nOrder no. and date of grant of licence\nDetails of subsequent extension of licence\nDetails of subsequent extension of licence\nAmount of security deposited\nAmount of security deposited\nAmount of performance guarantee deposited\nAmount of performance guarantee deposited\nAmount of annual licence fee\nAmount of annual licence fee\nDate on which licence fee has been paid with\n\t\t\t\tamount\nDate on which licence fee has been paid with\n\t\t\t\tamount\nDate of Transfer\nDate of Transfer\n9\n9\n10\n10\n11\n11\n12\n12\n13\n13\n14\n14\n15\n15\n16\n16\nName of transferee with father's/husband's\n\t\t\t\tname and address\nName of transferee with father's/husband's\n\t\t\t\tname and address\nDate of expiry/ termination/ surrender\nDate of expiry/ termination/ surrender\nDate from which plot is free for grant\nDate from which plot is free for grant\nSignature of the Officer\nSignature of the Officer\nRemarks\nRemarks\n17\n17\n18\n18\n19\n19\n20\n20\n21\n21\nForm -12\nForm -12\nForm for Transfer of Mining Lease\nForm for Transfer of Mining Lease\n[ See rule 27(4)]\nAND\nAND\nAND\nAND",
            "footnote": "",
            "is_definition": false,
            "sort_order": 126
        },
        {
            "number": "1",
            "title": "1. In consideration of Rs.................paid by the transferee to the transferor the receipt of which the transferor hereby acknowledges, the transferor hereby conveys assigns and transfers into the transferee all the rights and obligations under the said hereinbefore recited lease and to hold the same upto the transferee with effect from date of execution of this deed for the unexpired period of the said lease",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 127
        },
        {
            "number": "2",
            "title": "2. The transferee hereby covenants with the State Government that from and after the transfer and assignment of the lease the transferee shall be bound, by and be liable to perform, observe and confirm and be subject to all provisions of all the covenants, stipulations and conditions contained in said herein before recited lease in the same manner in all respects as if the lease had been granted to the transferee as the lessee there under and he had originally executed it as such.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 128
        },
        {
            "number": "3",
            "title": "3. It is further hereby agreed and declared by the transferor of the one part and the transferee of the other part that: -",
            "chapter": null,
            "content": "(i) The transferor and the transferee declare that they have ensured that the mineral rights over the area for which the mining lease is being transferred vest to the State Government.\n(ii) The transferor hereby declares that he has not assigned, subject, mortgaged or in any other manner transferred the mining lease now being transferred and that no other person or persons has any right, title or interest where under in the present mining lease being transferred.\n(iii) The transferor further declares that he has not entered into or made any agreement, contract or understanding whereby he has been or is being directly or indirectly financed to a substantial extent by or under which the transferor's operation or understandings were or are being substantially controlled by any person or body of persons other than the transferor.\n(iv) The transferor further declares that he has furnished in affidavit along with his application for transfer of the present mining lease specifying therein the amount that he has already taken/proposes to take as consideration from the transferee.\n(v) The transferee further declares that he is financially capable of and will directly undertake mining operations.\n(vi) The transferor has supplied to the transferee the original/or certified copies of all plans of abandoned workings in the area and in belt six meters wide surroundings it.\n(vii) Transferee further declares that he shall pay one time premium amount as per the provisions of the Rajasthan Minor Mineral Concession Rules, 2017.\n(viii) The transferee hereby further declares that as a consequence of this transfer, the total areas while held by him under minor mineral concessions are not in contravention of rule 7(4) of the Rajasthan Minor Mineral Concession Rules, 2017.\n(ix) Transferor has paid all the rent, royalties and other dues towards Government till this date in respect of this lease\n(x) Registered consent of khatedaar if any obtained in favour of previous lessee will continue till the period of mining lease\n............................................ Signature of the transferor (Designation) ............................................ Signature of the transferee\n.............................. Signed on behalf of the Governor of State of Rajasthan\nDate ..................................................... Witness I ............................................... Witness II...............................................\nForm -13\nForm -13\nProduction, Despatch & Stock Register\nProduction, Despatch & Stock Register\n[ See rule 28(2)(iv)(a)]\nS. No.\nS. No.\nDate\nDate\nNo. of persons Employed\nNo. of persons Employed\nOpening stock\nOpening stock\nProduction\nProduction\nTotal\nTotal\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nApproximate quantity of mineral dispatched\nApproximate quantity of mineral dispatched\nSale price per tonne (grade wise)\nSale price per tonne (grade wise)\nApproximate stock balance\nApproximate stock balance\nActual dispatch\nActual dispatch\n7\n7\n8\n8\n9\n9\n10\n10\nClosing stock\nClosing stock\nRawanna No.\nRawanna No.\nVehicle No.\nVehicle No.\nRemarks\nRemarks\n11\n11\n12\n12\n13\n13\n14\n14\nForm -14\nForm -14\nRawanna Register\nRawanna Register\n[ See rule 28(2)(iv)(a)]\nS. No.\nS. No.\nDate\nDate\nRawanna No.\nRawanna No.\nQuality of mineral\nQuality of mineral\nPlace where mineral is being sent\nPlace where mineral is being sent\nName of person/party to whom mineral is being\n\t\t\t\tdispatched (dealers registration No. if any)\nName of person/party to whom mineral is being\n\t\t\t\tdispatched (dealers registration No. if any)\nMode of transport\nMode of transport\nVehicle No.\nVehicle No.\nApproximate quantity of mineral dispatched\nApproximate quantity of mineral dispatched\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\nActual quantity of mineral dispatched\nActual quantity of mineral dispatched\nTime of dispatch\nTime of dispatch\nSignature of authorised person\nSignature of authorised person\nRemarks\nRemarks\n10\n10\n11\n11\n12\n12\n13\n13\nForm -15\nForm -15\nMonthly E-Return for Mining Lease\nMonthly E-Return for Mining Lease\n[ See rule 28(2)(iv)(d)]\nName of\n\t\t\t\tlessee........................\nMonth......................................\nName of Mine\n\t\t\t\t........................\nPeriod of\n\t\t\t\tlease.........................\nQuantity dispatched:\nS.No.\nS.No.\nOpening stock of mineral\nOpening stock of mineral\nProduction\nProduction\nTotal\nTotal\nPurpose - captive use/ sell\nPurpose - captive use/ sell\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\nRawanna No.\nRawanna No.\nDate\nDate\nWeight mentioned in rawanna\nWeight mentioned in rawanna\nActual weight\nActual weight\nClosing balance\nClosing balance\nPlantation done in this month\nPlantation done in this month\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\nAverage no. of workers\nAverage no. of workers\nNo. of labour insured in this month\nNo. of labour insured in this month\nNo. of labour insured till this month\nNo. of labour insured till this month\nNo. of medical checkup of labour done in this\n\t\t\t\tmonth\nNo. of medical checkup of labour done in this\n\t\t\t\tmonth\nWorking days\nWorking days\nQuantity of over burden removed\nQuantity of over burden removed\nRemarks\nRemarks\n11\n11\n12\n12\n13\n13\n14\n14\n15\n15\n16\n16\n17\n17\nYours Faithfully\nSignature of Leasee/Qualified Technical person Name and Address .....................................\nForm -16\nForm -16\nAnnual E-Return for Assessment of Royalty for Mining Lease\nAnnual E-Return for Assessment of Royalty for Mining Lease\n[ See rule 28(2)(iv)(d)]\nName of lessee ......................\nName of Mine/ML No......................\nEmail address ......................\nPAN card No.......................................\nName of Office ME/AME ......................\nTehsil ......................\nAnnual dead rent ......................\nDistt.......................\nPeriod of lease ......................\nName of mineral\n\t\t\t\t......................\nPeriod of assessment ......................\nS. No.\nS. No.\nMonth or period (with year)\nMonth or period (with year)\nOpening stock of mineral\nOpening stock of mineral\nProduction on\nProduction on\nTotal\nTotal\nQuantity dispatched/sold/ used\nQuantity dispatched/sold/ used\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nClosing stock of No. of mineral\nClosing stock of No. of mineral\nlabourers mineral Details of mineral\n\t\t\t\tdispatched - captive use/sell\nlabourers mineral Details of mineral\n\t\t\t\tdispatched - captive use/sell\nTotal average No. of labourers\nTotal average No. of labourers\nTotal No. of working days\nTotal No. of working days\nMen\nMen\nWomen\nWomen\nTotal\nTotal\n7\n8\n9\n10\n11\n12\nPlantation done in the year\nPlantation done in the year\nNo. of labour insured in the year\nNo. of labour insured in the year\nNo. of labour insured till end of the\n\t\t\t\tfinancial year\nNo. of labour insured till end of the\n\t\t\t\tfinancial year\nNo. of medical checkup of labour done in the\n\t\t\t\tyear\nNo. of medical checkup of labour done in the\n\t\t\t\tyear\nQuantity of over burden removed\nQuantity of over burden removed\nRemarks\nRemarks\n13\n13\n14\n14\n15\n15\n16\n16\n17\n17\n18\n18\n(i) Rate of royalty Rs........................\nRs...............per tonne\n(ii) Total amount of royalty\nRs...................................\n(iii) Less dead rent or royalty\n\t\t\t\talready paid\nDate wise challan/GRN wise detail shall be given\nRs...................................\n(iv) Excess royalty payable\nRs....................................\nYours Faithfully Signature of Lessee Name & Address .....................................\nForm -17\nForm -17\nAcknowledgement of Receipt of Annual E-Return for Assessment of Royalty\nAcknowledgement of Receipt of Annual E-Return for Assessment of Royalty\n[ See rule 28(2)(iv)(d)]\nS.No.____ Name of office _______ML No. ______ Date ______\nEnclosures:\nEnclosures:\n........................................................................\n........................................................................\nSignature and designation\n........................................................................\nof receiving officer\n........................................................................\nPlace: ....................................\nPlace:\nDate: .....................................\nForm -18\nForm -18\nRawanna\nRawanna\n[ See rule 28(2)(iv)(e)]\nDated .................................\nSignature of Mine owner/Manager\nForm -19\nForm -19\nApplication for Registration of Royalty/excess Royalty Collection Contractor\nApplication for Registration of Royalty/excess Royalty Collection Contractor\n[ See rule 35(1)]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 129
        },
        {
            "number": "35",
            "title": "1. With reference to above, I am/we are submitting following information to register myself/us as a contractor for class AA/A/B/C and I/we have deposited Rs........................as the application fee payable under rule 35(4)(i) through e-payment, bank name ............. GRN No. ..............dated.....................",
            "chapter": null,
            "content": "2. (A) Name of the applicant and address: - ..................... .....................................................................\n(B) Telephone No. office ................. Residence ...........\n(C) In case the applicant is an individual:\n(1) Father's name/Husband's name\n(2) Caste\n(3) Occupation\n(4) Nationality\n(D) In case the applicant is Firm/Company/Association of persons/Society:\n(1) Kind of business\n(2) Place of business\n(3) Place of registration\n(4) Nationality of Directors/Partners\n(5) Email address\nN.B.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 130
        },
        {
            "number": "3",
            "title": "3. Present business:",
            "chapter": null,
            "content": ".................................... ....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 131
        },
        {
            "number": "4",
            "title": "4. Details of held contracts/mineral concession/permit in the name of applicant and his family members and partners of firm/director of private limited company/association of persons:",
            "chapter": null,
            "content": "S. No.\nS. No.\nML/ PL/QL/ RCC /ERCC\nML/ PL/QL/ RCC /ERCC\nMineral\nMineral\nNear Village\nNear Village\nTehsil\nTehsil\nDistrict\nDistrict\nAME/M E office concerned\nAME/M E office concerned\nArea in hectare\nArea in hectare\nPeriod\nPeriod\nRemark\nRemark\nFrom\nFrom\nTo\nTo\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11",
            "footnote": "",
            "is_definition": false,
            "sort_order": 132
        },
        {
            "number": "5",
            "title": "5. Enclose net worth certificate of chartered accountant for value of Rs.____________ as per Form 20.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 133
        },
        {
            "number": "6",
            "title": "6. Enclose security amount in form of FDR/NSC for due observance of terms and conditions of tender/auction pledged in favour of Additional Director (Mines) FDR/NSC No. _____________ dated______ issued for Rs._______ from _____________ (name of the bank and branch/post office) for a period of ______________ years.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 134
        },
        {
            "number": "7",
            "title": "7. Properly sworn affidavit stating that:",
            "chapter": null,
            "content": "(a) No dues of the Department is outstanding against the applicant and his family members.\n(b) The applicant is financially sound and fully capable to run such contracts.\n(c) The information furnished by an applicant is true and correct.\n(d) In case of breach of any terms and conditions of tender/auction of contract, or if any information furnished shall found incorrect, the Department may cancel the registration and impose penalty with forfeiture of security amount after serving fifteen days notice to the contractor.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 135
        },
        {
            "number": "8",
            "title": "8. Self-attested copy of PAN Card, photo identity and address proof enclosed (any two out of following documents) -",
            "chapter": null,
            "content": "(i) Aadhar Card;\n(ii) Copy of Driving licence;\n(iii) Copy of Voter Identification Card;\n(iv) Copy of Passport;\n(v) Bank Pass Book;\n(vi) Latest Electricity; or\n(vii) Telephone bill/Water Bill.\nYours faithfully, (Applicant)\nForm -20\nForm -20\nNet Worth Certificate\nNet Worth Certificate\n(To be enclosed with Form -19)\n(To be enclosed with Form -19)\n[ See rule 35(4)(i)]\nAssets\nAssets\nSub total\nSub total\nTotal\nTotal\nBasis of valuation\nBasis of valuation\nA.\nA.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 136
        },
        {
            "number": "1",
            "title": "1. Immovable Assets",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 137
        },
        {
            "number": "1",
            "title": "1. Immovable Assets",
            "chapter": null,
            "content": "(a)\n(b)\n(c)\n(d)\nProvide complete details of immovable assets\n\t\t\t\tincluding description, location, land area, built up area etc.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 138
        },
        {
            "number": "2",
            "title": "2. Movable assets",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 139
        },
        {
            "number": "2",
            "title": "2. Movable assets",
            "chapter": null,
            "content": "(a)\nInvestments\n(b)\nLoans & advance/receivable\n(c)\nCash and bank balances\n(d)\nAny other assets\nProvide complete details of movable assets list with\n\t\t\t\tdescription.\nTotal assets (A)\nTotal assets (A)\nB.\nB.\nLiabilities\nLiabilities\n(a)\nSecured loans\n(b)\nUnsecured loans and deposits\n(c)\nOther liabilities\nTotal liabilities (B)\nTotal liabilities (B)\nC.\nC.\nNet worth (A-B)\nNet worth (A-B)\nFor Chartered Accountants (                       ) Partner/Proprietor, M. No. ________\nNote: - The basis of valuation should be mentioned in detail like the 1. valuable report of approved velour, 2. income tax records, 3. original title deeds, 4. balance sheet as submitted with income tax or 5. audited balance sheet etc.\nNote:\nForm -21\nForm -21\nAcknowledgement of Application For Registration of Royalty/excess Royalty Collection Contractor\nAcknowledgement of Application For Registration of Royalty/excess Royalty Collection Contractor\n[ See rule 35(5)]\nCode : ADM ...../class ....../S.No. ......../year ........\nDate ........\nName of office ........\nName of office ........\nEnclosures:\nEnclosures:\n........................................................................\n........................................................................\nSignature and designation\n........................................................................\nof receiving officer\n........................................................................\nPlace: ....................................\nPlace:\nDate: .....................................\nForm -22\nForm -22\nModel Form of Agreement for Royalty and/or\nExcess Royalty Collection Contract\nModel Form of Agreement for Royalty and/or\nExcess Royalty Collection Contract\n[ See rule 43(1)]\nand\n(1) When the contractor is an individual .............................. ......................................................................................................................... ..............................(Name of person with address and occupation) (hereinafter referred to as the \"contractor\" which expression shall where the context so admits be deemed to include his heirs, executors, administrators, representatives, and permitted assigns)\nor\n(2) When the contractor is a registered firm .............................................................................................................................................. (Name and address of 1st partner) and ............................................................................................................................................. (Name and address of 2nd partner) and ...............................................(Name and address of 3rd partner) all carrying on business in partnership under the firm name and style of (Name of the Firm) ............................................... registered under the Indian Partnership Act, 1932 (Central Act No. 9 of 1932) and having their registered office at ................................................................................................................. (Address of the firm) (hereinafter referred to as the \"contractor\" which expression shall, when the context so admits be deemed to include all the partners of the said firm, their respective heirs, executors, legal representative and permitted assigns).\nor\n(3) When the contractor is a registered Company or .......................................(Name of the Company) and Company registered under ....................................... (Act under which incorporated) and having its registered office at ....................................... (Address of the company) (hereinafter referred to as the \"contractor\" which expression shall, where the context so admits be deemed to include its successors and permitted assigns) of the other part.\n(1) The State Government hereby grants a contract to collect *royalty/excess royalty/permit fee/other charges ...................................................... (specify) for which the contract has been given from holders of mining lease/quarry licence or from persons carrying or removing ......................................... (name of mineral) excavated from the mining leases/quarries and dispatched from the area under this agreement at the rates specified in  the schedule II and/or permit fee and/or any other charges as per provisions of the Rajasthan Minor Mineral Concession Rules, 2017 and other charges as specified in the rules made under the provisions of section 15A of Mines and Minerals (Development and Regulation) Act, 1957.\n(2) The agreement shall remain in force from ............................................ (date) to .................................................. (date).\n(3) The contractor shall abide by following terms and conditions: -\n(i) The contractor shall make his own arrangements for collection of royalty and other permissible charges.\n(ii) The royalty receipt shall be in Form-23 or Form-24, as the case may be, duly stamped and issued by the Mining Engineer or Assistant Mining Engineer concerned.\n(iii) The contractor shall collect the royalty as far as possible, close to the mining leases or quarry licence area and if not possible or practical then at any other place near the leases or licences but within the jurisdiction of the contract area:\n(iv) The contractor shall issue valid royalty receipts in Form-23 or Form-24 for the amount of royalty, excess royalty, permit fee or other charges collected for every dispatch of the said mineral and shall fill all the columns of the receipt. The contractor shall, give first copy of receipt to the in-charge of the vehicle, second copy to the Mining Engineer or Assistant Mining Engineer concerned along with online monthly statement and shall retain third copy with him.\n(v) The excess royalty collection contractor shall collect excess royalty only from such vehicles which are having valid rawanna issued by the lessees. The contractor shall retain second copy of the rawanna  with him and shall return first copy after stamping to vehicle owner. The contractor shall deposit second copy of rawanna with second copy of receipt issued by him with monthly statement in Form-26 to the Mining Engineer or Assistant Mining Engineer concerned.\n(vi) The contractor shall not recover any royalty from the vehicles having royalty paid rawanna issued against yearly dead rent:\n(vii) The contractor shall not recover any royalty, if the mineral specified in the contract is used by the State Government Departments themselves under a valid short term permit or permit granted by the Mining Engineer or Assistant Mining Engineer concerned.\n(viii) The contractor shall not recover royalty and/or permit fee from short term permit or permit issued under these rules and same shall not be adjusted against the contract amount.\n(ix) The royalty shall be collected on the dispatch of minor minerals from the area specified in the contract and not on minor minerals brought from outside the contract area or from the major mineral leases.\n(x) The contractor shall not recover royalty and/or permit fee for the mineral used in construction, repair or renewal of National, Mega Highways, Four or Six lane roads, laying and repair of Railway Tracks. For construction or repair of such works, a separate short term permit shall be issued [and if the mineral is obtained from existing lease, separate paid rawanna for the aforesaid purpose shall be issued by the Mining Engineer or Assistant Mining Engineer concerned to the lessee. Royalty or Excess royalty and/or permit fee received from such works contractor shall not be adjusted against the contract amount.]\n(xi) No royalty shall be recovered on the minor minerals removed from the areas which are not working pits of a lessee or licencee or licencee as provided in rule 74.\n(xii) The contractor shall not recover any royalty and/or permit fee from the minerals used in special works or schemes as specified by the Government from time to time.\n(xiii) The contractor shall submit online monthly statement of royalty collection and/or excess royalty collection with or without permit fee or other charges in the Form-25 and Form-26 respectively within fifteen days from the month end.\n(xiv) Where the contractor recovers royalty and other charges in excess of the specified rates, the excess amount so collected shall be recovered from the contractor and the contract shall be terminated after giving a fifteen day's notice and the contractor may be blacklisted or debarred for further royalty collection contract or excess royalty collection contract for a period of next five years.\n(xv) The contractor shall have no rights regarding leases or licences in the contract area except collection of royalty, permit fee or other charges mentioned in the contract for the actual weight of the mineral transported at the prevailing rates for which contract has been awarded.\n(xvi) Cancellation and surrender of lease or licence, sanctioning of new lease or licence, revision of dead rent of existing lease, temporary or permanent closure of lease or licence by the Government or Court or due to any other reason in the area concerned, shall not have any impact on the yearly contract amount.\n(xvii) The Contractor shall pay the installment of contract amount in advance on due date i.e. ........day of every month or quarter and if any amount is not paid on due date it shall be collected as an arrears of land revenue and an interest at the rate of eighteen percent shall be charged from due date irrespective of any other action being taken for cancellation of contract or imposition of penalty.\n(xviii) Where the contract amount is equal to or more than ten crore, the contractor shall install at least one electronic weigh bridge system on the route covering maximum transportation or dispatches of mineral in the contract area along with sufficient web cameras, computer with net connectivity and generator. The weigh bridge shall be integrated with that of departmental online system and shall hand over the weigh bridge along with all above equipment to the department in proper working condition after expiry or termination of the contract otherwise security deposit shall be forfeited. Government will explore the possibility of prescribing GPS tracking system.\n(xix) The contractor shall inform online to the registering authority about any contract allotted to him within fifteen day from the allotment.\n(xx) Contractor shall issue photo identity card duly singed and stamped by the Mining Engineer or Assistant Mining Engineer concerned to all nakedars or persons employed by him for royalty collection. The contractor shall submit a list of nakedars or persons to be engaged for royalty collection along with photo identity card and a fee of rupees one hundred for each identity card. Such identity cards shall be valid during the currency of the contract only. All the nakedars or persons shall keep the identity card displaying with them during collection of royalty.\n(xxi) Contractor shall erect reflecting sign boards at each Naka or Check post clearly visible and legible from a distance mentioning name of the contractor, area of the contract, name of mineral, rate of royalty, permit fee and other applicable charges (if any) and name and contact number of the Mining Engineer or Assistant Mining Engineer concerned for any complaint.\n(xxii)The contractor shall abide by all the terms and conditions of the contract and any amendment made under these rules and shall also follow all the instructions issued by the Government or any officer of the Department.\n(xxiii) The contract may be terminated by the State Government if considered by it to be in public interest, after giving a fifteen day's notice.\n(xxiv) The contractor shall not transfer the contract as a whole or in part and shall also not grant any subcontract to or in the name of any other person.\n(xxv) The contractor shall intimate the change in their permanent address along with address proof to the Mining Engineer or Assistant Mining Engineer concerned within one month of such change.\n(xxiv) In case of default in the due observance of the terms and conditions of the contract, the contract may be terminated by the Mining Engineer or Assistant Mining Engineer concerned after giving a fifteen day's notice with forfeiture of security deposit or alternatively may impose penalty as per penalty Schedule V.\n.....................................................................\n..................................................\n(Signature of the Contractor)\nSigned on behalf of the Governor of State of Rajasthan\nDate\n\t\t\t\t............................................................\n..................................................\n....................................................................\n(Designation)\nWitness: 1...................................................\n....................................................................\nWitness: 2. .................................................\n* Strike out whichever is not applicable.\nForm -23\nForm -23\nRoyalty Receipt\nRoyalty Receipt\nFor Royalty Collection Contract\nFor Royalty Collection Contract\n[ See rule 44(2), 44(4)]\nCode of contractor ..................................\nBook No........................\nS. No. ............................\nDated ...........................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 140
        },
        {
            "number": "1",
            "title": "1. Name of the contractor ..................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 141
        },
        {
            "number": "2",
            "title": "2. Contract area ............................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 142
        },
        {
            "number": "3",
            "title": "3. Contract amount ........................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 143
        },
        {
            "number": "4",
            "title": "4. Contract period .........................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 144
        },
        {
            "number": "5",
            "title": "5. Name of mineral ...................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 145
        },
        {
            "number": "6",
            "title": "6. Royalty rate (per tonne) ..............................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 146
        },
        {
            "number": "7",
            "title": "7. Name of check post/naka ............................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 147
        },
        {
            "number": "8",
            "title": "8. Place from which mineral is being brought .........................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 148
        },
        {
            "number": "9",
            "title": "9. Place where mineral is being sent....................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 149
        },
        {
            "number": "10",
            "title": "10. Name of person/party to whom mineral is being dispatched................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 150
        },
        {
            "number": "11",
            "title": "11. Mode of transport................. Vehicle No........................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 151
        },
        {
            "number": "12",
            "title": "12. Actual weight of mineral..............................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 152
        },
        {
            "number": "13",
            "title": "13. Time of dispatch.........................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 153
        },
        {
            "number": "14",
            "title": "14. Royalty/permit fee/DMFT fund/other charges recovered (Rs.)",
            "chapter": null,
            "content": "A.\nRoyalty\nIn figures ..........................\nB.\nPermit fee\nIn figures .........................\nC.\nDMFT fund\nIn figures ..........................\nD.\nOther charges\nIn figures ..........................\n(Specify)\nE.\nTotal amount recovered In figures.........................\nIn words\n\t\t\t\t........................................................\nSignature of Naka Incharge with seal\nForm -24\nForm -24\nRoyalty Receipt\nRoyalty Receipt\nFor Excess Royalty Collection Contract\nFor Excess Royalty Collection Contract\n[ See rule 44(2), 44(4)]\nS. No.................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 154
        },
        {
            "number": "9",
            "title": "9. Rawanna No ...................................................................",
            "chapter": null,
            "content": "Quantity of mineral mentioned in the rawanna ..................... (tonne)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 155
        },
        {
            "number": "10",
            "title": "10. Place where mineral is being sent.................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 156
        },
        {
            "number": "11",
            "title": "11. Name of person/party to whom mineral is being dispatched.........",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 157
        },
        {
            "number": "12",
            "title": "12. Mode of transport............ Vehicle No.................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 158
        },
        {
            "number": "13",
            "title": "13. Actual weight of mineral .................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 159
        },
        {
            "number": "14",
            "title": "14. Excess weight of mineral (in case of paid rawanna)............... ......",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 160
        },
        {
            "number": "15",
            "title": "15. Time of dispatch...............................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 161
        },
        {
            "number": "16",
            "title": "16. Excess royalty recovered (Rs) In figures.................................",
            "chapter": null,
            "content": "In words ......................................................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 162
        },
        {
            "number": "17",
            "title": "17. DMFT fund recovered (Rs) In figures...................................",
            "chapter": null,
            "content": "In words ......................................................................\nOther charges recovered (specify) (Rs) In figures........................\nIn words .................................................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 163
        },
        {
            "number": "18",
            "title": "18. Total amount recovered (Rs) In figures....................................",
            "chapter": null,
            "content": "In words .......................................................................\nSignature of Naka Incharge with seal\nForm -25\nForm -25\nMonthly E-Return for Royalty Collection Contract\nMonthly E-Return for Royalty Collection Contract\n[ See rule 44(13)]\nCode of contractor ..................................\nName of contractor...............\nMonth..........................\nContract area ......................\nMineral .........................\nS. No.\nS. No.\nDate\nDate\nVehicle No.\nVehicle No.\nMineral\nMineral\nRoyalty receipt No.\nRoyalty receipt No.\nActual weight of mineral (tonnes)\nActual weight of mineral (tonnes)\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nRoyalty (Rs.)\nRoyalty (Rs.)\nPermit fee (Rs.)\nPermit fee (Rs.)\nOther charges (Specify)\nOther charges (Specify)\nOther charges (Specify)\nOther charges (Specify)\nTotal amount collected (Rs.)\nTotal amount collected (Rs.)\nRemarks\nRemarks\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11\n12\n12\nSignature of contractor/representative\nForm -26\nForm -26\nMonthly E-Return for Excess Royalty Collection Contract\nMonthly E-Return for Excess Royalty Collection Contract\n[ See rule 44(5), 44(13)]\nCode of contractor..................\nName of contractor.....................\nMonth...........................................\nContract area .............................\nMineral ........................................\nS. No.\nS. No.\nDate\nDate\nName of lessee\nName of lessee\nML No.\nML No.\nRavanna No.\nRavanna No.\nVehicle No.\nVehicle No.\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nName of mineral\nName of mineral\nQuantity of mineral for which ravanna was\n\t\t\t\tissued by lessee\nQuantity of mineral for which ravanna was\n\t\t\t\tissued by lessee\nRoyalty receipt No.\nRoyalty receipt No.\nActual weight of mineral (tonnes)\nActual weight of mineral (tonnes)\nExcess weight quantity of mineral (10-8)\nExcess weight quantity of mineral (10-8)\nExcess royalty collected (Rs.)\nExcess royalty collected (Rs.)\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11\n12\n12\nOther charges (Specify)\nOther charges (Specify)\nOther charges (Specify)\nOther charges (Specify)\nTotal amount collected\nTotal amount collected\n13\n13\n14\n14\n15\n15\nSignature of contractor/representative\nForm -27\nForm -27\nApplication for Permit of Brick Earth\nApplication for Permit of Brick Earth\n[ See rule 53(3)]\nTo The Mining Engineer/ Assistant Mining Engineer, Department of Mines and Geology, Rajasthan....................................\nAffix passport size photograph",
            "footnote": "",
            "is_definition": false,
            "sort_order": 164
        },
        {
            "number": "1",
            "title": "1. I/We ............................................................ request you to grant me/us a permit to excavate brick earth from an area of .................. hectares for a period of ............ year(s).",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 165
        },
        {
            "number": "53",
            "title": "2. I/we have deposited Rs.....................as the application fee payable under rule 53(4)(i) through e-payment, name of bank...................GRN No .............dated..................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 166
        },
        {
            "number": "3",
            "title": "3. Following are the required particulars: -",
            "chapter": null,
            "content": "(A) Name of the applicant and address.................................................\n.................................................................................................................\n..................\n(B) Telephone No. office ............... Residence ..................................\nCell No. ................................ PAN card No. .........\nEmail address ..............................................\n(C) In case the applicant is an individual:\n(1) Father's name/Husband's name\n(2) Caste\n(3) Occupation\n(4) Nationality\n(D) In case the applicant is Firm/Company/Association/Society:\n(1) Kind of business\n(2) Place of business\n(3) Place of registration\n(4) Nationality of Director/Partners\nN.B.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 167
        },
        {
            "number": "4",
            "title": "4. Details of mineral concessions held by the applicant in the State: -",
            "chapter": null,
            "content": "S. No.\nS. No.\nML/PL/Q L/RCC /ERCC\nML/PL/Q L/RCC /ERCC\nMineral\nMineral\nNear village\nNear village\nTehsil\nTehsil\nDistrict\nDistrict\nAME/ME office concerned\nAME/ME office concerned\nArea in hectare\nArea in hectare\nPeriod\nPeriod\nRemark\nRemark\nFrom\nFrom\nto\nto\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11",
            "footnote": "",
            "is_definition": false,
            "sort_order": 168
        },
        {
            "number": "5",
            "title": "5. Particulars of the mineral-wise areas applied by the applicant in the State: -",
            "chapter": null,
            "content": "S. No.\nS. No.\nML/ QL\nML/ QL\nMineral\nMineral\nNear village\nNear village\nTehsil\nTehsil\nDistrict\nDistrict\nAME/ME office concerned\nAME/ME office concerned\nArea in hectare\nArea in hectare\nRemark\nRemark\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9",
            "footnote": "",
            "is_definition": false,
            "sort_order": 169
        },
        {
            "number": "6",
            "title": "6. Total area already acquired for (in hectares)..................",
            "chapter": null,
            "content": "7. (a) Enclose a copy of khasra map and revenue record showing location of permit area from where brick earth will be excavated duly verified by the Patwari concerned as per rule 53(4)(ii)\n(b) Enclose a copy of khasra map and revenue record showing existing/proposed location of brick kiln as per rule 53(4)(iii)\n(c) Consent of owner of land for excavating brick earth if the land does not belong to the applicant.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 170
        },
        {
            "number": "8",
            "title": "8. Number and date of no dues certificate (Copy attached)................ (If on the date of application the applicant does not hold any mineral concession/contract/permit etc., an affidavit to this effect shall be enclosed.)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 171
        },
        {
            "number": "9",
            "title": "9. Self-attested copy of PAN Card, photo identity and address proof enclosed (any two out of following documents) -",
            "chapter": null,
            "content": "(i) PAN card;\n(i) Aadhar card;\n(ii) Copy of driving licence;\n(iii) Copy of voter identification card;\n(iv) Copy of passport;\n(v) Bank pass book; or\n(vi) Electricity bill/Water bill;\nPlace........................ Date........................\nYours Faithfully Signature of applicant Submitted by\nSignature.................... Name and address ..................................\nForm -28\nForm -28\nForm of Brick Earth Permit\nForm of Brick Earth Permit\n[ See rule 53(5)]\nS. No.\nS. No.\nDescription\nDescription\nDetails\nDetails\n1\n1\n2\n2\n3\n3\n1.\nName of permit holder\n2.\nFather's/husband's Name\n3.\nAddress\n4.\nLocation of permit area\nVillage\n\t\t\t\t.................................\nTehsil\n\t\t\t\t.................................\nDistrict .................................\n5.\nAaraji/khasra no.\n6.\nLocation of brick kiln\nVillage ...............................\nTehsil .................................\nDistrict ...............................\n7.\nAaraji / khasra no.\n8.\nName of office\n9.\nNo. and date of order of grant of permit\n10.\nPeriod of permit covered by initial grant\nFrom\n\t\t\t\t.................................\nTo .....................................\nDetails about payment of annual permit fee:\nS. No.\nS. No.\nAmount deposited\nAmount deposited\nChallan/ RN No.\nChallan/ RN No.\nDate of deposit\nDate of deposit\nFee paid for the period\nFee paid for the period\nSignature of Mining Engineer/Assistant Mining\n\t\t\t\tEngineer\nSignature of Mining Engineer/Assistant Mining\n\t\t\t\tEngineer\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n8\n8\nConditions:\n(i) The permit holder shall deposit annual permit fees in advance every year;\n(ii) Before excavation of brick earth from sanctioned permit area, the permit holder shall remove top soil upto depth of one foot and store it separately for reclamation of the land after excavation of brick earth;\n(iii) Next permit shall only be issued after verification of reclamation of stored top soil;\n(iv) The permit holder shall transport such brick earth to that brick kiln for which permit has been issued;\n(v) Royalty alongwith contribution towards District Mineral Foundation Trust shall be collected at check post or naka from vehicles carrying finished (pakki) bricks;\n(vi) The permit shall be valid only for brick kiln as mentioned above;\n(vii) Where the quality of brick earth in area granted under permit is not suitable for making bricks or mineral is exhausted, in such case surrender of permit may be accepted by Mining Engineer or Assistant Mining Engineer concerned if there is no dues against permit holder;\n(viii) The permit holder shall have the liberty at all times during the period of the permit in respect of the plot or land for which permit is sanctioned to enter upon the area and to mine, bore, dig, drill, win work, stock, dress, process, convert, carry away and disposed of the said mineral;\n(ix) The permit holder shall confine his working within the limits of the permit area and upto depth of two meters from the surface.\n(x) The permit holder shall not obstruct approach to the adjoining leases / licences / permits. In case of any dispute about the approach road, directions of the Mining Engineer / Assistant Mining Engineer shall be final and binding;\n(xi) Any breach of terms and conditions of the permit, the permit may be cancelled by the Mining Engineer or Assistant Mining Engineer concerned after giving a fifteen day notice with forfeiture of the security:\n(xii) Transfer of permit shall not be allowed.\nSignature of Mining Engineer/ Assistant Mining Engineer\nForm -29\nForm -29\nForm of Memorandum of Appeal\nForm of Memorandum of Appeal\n(To be submitted in duplicate)\n(To be submitted in duplicate)\n[ See rule 63(3)]\n1\nName and address of individual/firm or company\n:\n................................................................\n2\nProfession of individual/firm or company\n:\n................................................................\n3\nNo. and date of order against which appeal is\n\t\t\t\tfiled (copy attached)\n:\n................................................................\n4\nDesignation of the authority having passed the\n\t\t\t\tsaid order\n:\n...............................................................\n5\nMineral or minerals for which the appeal is\n\t\t\t\tfiled\n:\n................................................................\n6\nDetails of the area in respect of which the\n\t\t\t\tappeal is filed\n:\nName of the\n\t\t\t\toffice..................................\nML/PL/QL/RCC/ERCC\ndetails\nVillage\n\t\t\t\t..............................................\nTehsil\n\t\t\t\t................................................\nDistrict ..............................................\n7\nWhether application fee has been deposited\n\t\t\t\tthrough e-payment as per rule 63(3), If so, Name of bank, GRN No.\n\t\t\t\tand date\n:\nNo.\n\t\t\t\t......................................\nDate ....................................\n8\nWhether the appeal application has been filed\n\t\t\t\twithin three months of the order passed by the competent\n\t\t\t\tauthority\n:\n................................................................\n9\nIf not, the reason for not presenting it within\n\t\t\t\tthe prescribed time limit as provided for in proviso to rule\n\t\t\t\t63(4)\n:\n................................................................\n10\nName and complete address of the party/parties\n\t\t\t\timpleaded\n:\n................................................................\n11\nGrounds of appeal\n:\n.................................................................\nDated .....................................\nPlace ......................................\nYours faithfully, Signature of the applicant\nForm -30\nForm -30\nForm of Application of Revision\nForm of Application of Revision\n(To be submitted in duplicate)\n(To be submitted in duplicate)\n[ See rule 64(3)]\n1\nName and address of individual/firm or company\n:\n.......................................................................\n2\nProfession of individual/firm or company\n:\n.......................................................................\n3\nNo. and date of order against which revision is\n\t\t\t\tfiled (copy attached)\n:\n.......................................................................\n4\nDesignation of the authority having passed the\n\t\t\t\tsaid order\n:\n.......................................................................\n5\nMineral or minerals for which the revision is\n\t\t\t\tfiled\n:\n.......................................................................\n6\nDetails of the area in respect of which the\n\t\t\t\trevision is filed\n:\nName of the\n\t\t\t\toffice.........................................\nML/PL/QL/RCC/ERCC\ndetails\nVillage\n\t\t\t\t.............................................\nTehsil\n\t\t\t\t...............................................\nDistrict .............................................\n7\nWhether application fee has been deposited\n\t\t\t\tthrough e-payment as per rule 64(3). If so, Name of Bank, GRN No.\n\t\t\t\tand date\n:\nNo.\n\t\t\t\t...................................\nDate...................................\n8\nWhether the revision application has been filed\n\t\t\t\twithin three months of the order passed by the competent\n\t\t\t\tauthority\n:\n.......................................................................\n9\nIf not, the reason for not presenting it within\n\t\t\t\tthe prescribed limit as provided for in proviso to rule 64(2)\n:\n.......................................................................\n10\nName and complete address of the party/parties\n\t\t\t\timpleaded\n:\n......................................................................\n11\nGrounds of revision\n:\n......................................................................\nDated ......................\nPlace ......................\nYours faithfully, Signature of the applicant\nForm -31\nForm -31\nForm for Mutation of *Mineral\nForm for Mutation of *Mineral\nConcession/*Contract/*Permit\nConcession/*Contract/*Permit\n[ See rule 76(5)]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 172
        },
        {
            "number": "1",
            "title": "1. The legal heir/s hereby covenants with the Government that from and after the mutation and assignment of the *lease/licence/contract/permit the legal heir/s shall be bound, by and be liable to perform, observe and confirm and be subject to all provisions of the covenants, stipulations and conditions contained in said herein before recited *lease/licence/contract/permit together with all interests , losses, damages, penalty, action, demand and cost of all kind whatsoever arising out of this in",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 173
        },
        {
            "number": "2",
            "title": "2. The consents taken by the deceased for *mining/prospecting operations from any khatedar/Gram Panchayat/autonomous body/Government undertakings or from any Department of the Central or State Government will be deemed to be taken by the legal heir/s of the deceased after mutation of *lease/licence/contract/permit. In witness where of the parties hereto have signed on the date and year first above written.",
            "chapter": null,
            "content": ".............................................\n.......................................\nSignature of the legal heir/s (legal representative/s)\nSigned on behalf of the Governor of the State of Rajasthan\nDate .....................................................\nWitness I ...............................................\nWitness II ............................................\nNote. - *Strike out whichever is not applicable\nNote.\nForm -32\nForm -32\nRegister For Reservation/dereservation of Area\nRegister For Reservation/dereservation of Area\n[ See rule 84(2)]\nS. No\nS. No\nName of the area\nName of the area\nToposheet No.\nToposheet No.\nMineral\nMineral\nArea (sq. Km.)\nArea (sq. Km.)\nGazztte No.\nGazztte No.\nNotification No.\nNotification No.\nGazztte No.\nGazztte No.\nNotification No.\nNotification No.\nName of prospecting Agency\nName of prospecting Agency\nPresent status/ balance area\nPresent status/ balance area\nReserved areas which have been granted to\n Central/ State Govt. PSU's\nReserved areas which have been granted to\n Central/ State Govt. PSU's\nRemarks\nRemarks\nReservation\nReservation\nDereservation\nDereservation\nForm -33\nForm -33\nApplication For Issue of Transit Pass\nApplication For Issue of Transit Pass\n[ See rule 92(1)]\n1\nName of the dealer\n...................................................\n2\nRegistration number\n...................................................\n3\nName of mineral\n...................................................\n4\nLocation of stock\n...................................................\n5\nPresent stock and\n yearly turnover (enclose copy of upto date stock register)\n....................................................\n6\nDetails of transit\n passes issued earlier. (enclose details)\n....................................................\n7\nSource of mineral and rawanna/royalty\n receipt/transit passes by which material procured in following\n table: -\nS. No.\nS. No.\nName of lessee/ licencee/stockiest\nName of lessee/ licencee/stockiest\nPlace of mine/stock\nPlace of mine/stock\nRawanna/ royalty receipt/ transit pass no.\nRawanna/ royalty receipt/ transit pass no.\nDate\nDate\nVehicle no.\nVehicle no.\nWeight of mineral (tonnes)\nWeight of mineral (tonnes)\nDeclaration\nDeclaration\nSignature of Applicant\nForm -34\nForm -34\nTransit Pass\nTransit Pass\n[ See rule 92(3)]\nDealer's registration no. .............\nTransit pass book no. ................\nTransit pass no............................\n(1)\nName and address of consigner\n....................................................\n(2)\nLocation of stock/trading\n....................................................\n(3)\nName of mineral\n....................................................\n(4)\nName and address of consignee\n....................................................\n(5)\nQuantity (weight / volume)\n.....................................................\n(6)\n(a)\nDate of dispatch\n....................................................\n(b)\nTime of dispatch\n.....................................................\n(c)\nPlace where mineral is being ser\n.....................................................\n(7)\n(i)\nMode of transport\n....................................................\n(ii)\nVehicle no.\n....................................................\n(8)\nName and address of vehicle Driver\n...................................................\nSignature with date Driver\nSignature with date Consigner\nSignature and round seal of issuing Authority\nSignature and designation of checking Authority with Seal\nForm - 35\nForm - 35\nRegister of Issue of Transit Pass\nRegister of Issue of Transit Pass\n[ See rule 92(4)]\nS No.\nS No.\nName of Dealer\nName of Dealer\nRegistration Number\nRegistration Number\nDate of Application for Transit Pass\nDate of Application for Transit Pass\nNumber of Transit Passes issued\nNumber of Transit Passes issued\nSr. No of transit pass Issued\nSr. No of transit pass Issued\nSign of dealer with date\nSign of dealer with date\nSign of issuing authority with date\nSign of issuing authority with date\nUsed Transit Passes returned to the\n department, date\nUsed Transit Passes returned to the\n department, date\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9",
            "footnote": "",
            "is_definition": false,
            "sort_order": 174
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 10th June, 2019 [rj1055]",
        "Act Number": "Published vide Notification No. G.S.R. 118 dated 28.2.2017",
        "Enactment Date": "",
        "Act Year": "2017",
        "Short Title": "Rajasthan Minor Mineral Concession Rules, 2017",
        "Type": "STATE",
        "Location": "Rajasthan"
    },
    "updated_at": "2026-09-29 21:55:21"
}