{
    "act_title": "Rajasthan Minor Mineral Concession Rules, 2017",
    "act_slug": "rajasthan-minor-mineral-concession-rules-2017",
    "section_label": "Section",
    "section": {
        "number": "92",
        "title": "92. Transit Pass.",
        "chapter": null,
        "content": "Schedule I\nMinimum Area For Grant of Mining Lease\nMinimum Area For Grant of Mining Lease\n[ See rule 7(2)]\nPart-A\nPart-A\nPart-B\nPart-B\nS. No.\nS. No.\nMineral\nMineral\nArea (in hectare)\nArea (in hectare)\nS. No.\nS. No.\nMineral\nMineral\nArea (in hectare)\nArea (in hectare)\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n1.\nBajri (river sand)\n5.00\n1.\nAgate\n4.00\n2.\nBajri (other than river sand)\n1.00\n2.\nBall Clay\n4.00\n3.\nBrick earth\n1.00\n3.\nBarytes\n4.00\n4.\nChert\n1.00\n4.\nBentonite\n4.00\n5.\nDiorite\n1.00\n5.\nCalcareous sand\n4.00\n6.\nDolerite\n1.00\n6.\nCalcite\n4.00\n7.\nGneisses\n1.00\n7.\nChalk\n4.00\n8.\nGranite\n1.00\n8.\nChina clay\n4.00\n9.\nJhanjhara / Dhandhala\n1.00\n9.\nClay others\n4.00\n10.\nKankar\n1.00\n10.\nCorundum\n4.00\n11.\nLime kankar\n1.00\n11.\nDiaspore\n4.00\n12.\nLimestone\n4.00\n12.\nDolomite\n4.00\n13.\nLimestone (dimentional)\n4.00\n13.\nDunite / Pyroxenite\n4.00\n14.\nMarble\n4.00\n14.\nFelsite\n4.00\n15.\nMasonary Stone\n1.00\n15.\nFeldspar\n4.00\n16.\nMurram\n1.00\n16.\nFireclay\n4.00\n17.\nOrdinary Clay\n1.00\n17.\nFuller's earth\n4.00\n18.\nOrdinary earth\n1.00\n18.\nGypsum\n4.00\n19.\nPhyllites\n1.00\n19.\nJasper\n4.00\n20.\nRhyolite\n1.00\n20.\nKaolin\n4.00\n21.\nSandstone\n1.00\n21.\nLaterite\n4.00\n22.\nSchist\n1.00\n22.\nMica\n4.00\n23.\nSerpentine\n4.00\n23.\nOchre\n4.00\n24.\nShale\n1.00\n24.\nPyrophyllite\n4.00\n25.\nSlate stone\n1.00\n25.\nQuartz\n4.00\n26.\nSurkhi\n1.00\n26.\nQuartzite\n4.00\n27.\nAll other minerals not specified in this Schedule\n1.00\n27.\nSalt petre\n4.00\n28.\nSilica sand\n4.00\n29.\nSteatite / Talc / Soapstone\n4.00\nSchedule II\nRate of Royalty\nRate of Royalty\n[ See rule 28(2)(i), 28(3)(i)]\nPart-A\nPart-A\nS. No.\nS. No.\nName of Mineral\nName of Mineral\nQuality shape and size of mineral\nQuality shape and size of mineral\nRate of Royalty (Rs. Per/Tonne)\nRate of Royalty (Rs. Per/Tonne)\n1\n1\n2\n2\n3\n3\n4\n4\n1.\nSandstone\nDimensional stones -\n(i) Dressed, polished or cut slabs, patti\n\t\t\t\tkatla, ashlar, tiles, flooring and roofing stones and blocks.\n240.00\n(ii)Undressed,\n\t\t\t\tirregular or rough slabs, patti katla, ashlar, tiles, flooring\n\t\t\t\tand roofing stones.\n(a) Bharatpur, Dholpur and Karauli districts\n(b) Kota and Bundi districts\n(c)All other districts\nCobbles\nMill Stone\nKhanda\n(i) Bharatpur,\n\t\t\t\tDholpur, Karauli and Jodhpur Districts\n(ii) Other Districts\n155.00\n130.00\n100.00\n100.00\n100.00\n30.00\n23.00\n2.\nLimestone\nDimensional stones -\n[(i) Used as flooring,\n\t\t\t\troofing and pillaring stone etc. :-\n(a) Kota and Jhalawar\n\t\t\t\tdistricts]\n(b) Jaisalmer\n\t\t\t\tdistrict\n(c) Jaisalmer Ashlar\n(d) All other\n\t\t\t\tdistricts\n(ii) Mineral waste of\n\t\t\t\tLimestone (Dimensional) used for purposes other than raw material\n\t\t\t\tby an industry.\n(iii)Mineral waste if\n\t\t\t\tused in industries.\nCobbles\n110.00\n[115.00]\n100.00\n23.00\n90.00\n100.00\n3.\nLimestone and Lime\nSuitable for lime making lime\n90.00\n135.00\n4.\nLime Kanker, Jhajhara Kanker\nLime Kanker and Jhajhara Kanker\n20.00\n5.\nMarble, Serpentine, and other decorative stone\n[Slabs and tiles\n(i) Slabs and tiles having one dimension\n\t\t\t\t (width) 35cm and above and other finished products:-\n(a) For Makrana Area\n(b) For All other\n\t\t\t\tArea of Rajasthan\n(ii) Tiles having one\n\t\t\t\tdimension (width) less than 35cm Blocks\nBlocks\n(i) Irregular blocks]\n(ii)Irregular blocks\n\t\t\t\tprocessed by single wheel cutters whose diameter is not more than\n\t\t\t\t60cm located within the State of Rajasthan:\nProvided that such\n\t\t\t\tblocks are not processed in the factory premises where other\n\t\t\t\twheel cutters having diameter more than 60cm or Gangsaw of any\n\t\t\t\tdesign are installed.\nKarezi\nKhanda/Karezi used in\n\t\t\t\tthe industries Khanda used as masonary stone\n(i) Alwar, Bharatpur,\n\t\t\t\tJaipur, Jhunjhunu and Sikar districts.\n(ii) Other districts\n[420.00\n475.00\n385.00\n265.00]\n65.00\n90.00\n30.00\n23.00\nProvided that no royalty shall be payable on\n\t\t\t\tmarble slurry/marble powder.\n6.\nGranite, Diorite and other igneous rock types\n\t\t\t\tsuitable for polishing\n[Blocks\n(i) Blocks having any\n\t\t\t\tdimension more than 70cm.]\n(ii)Blocks having no\n\t\t\t\tdimension more than 70cm.\nKhanda used as Masonary Stone\n[280.00]\n90.00\n23.00\n7.\nChips making minerals like Dolomite, Limestone,\n\t\t\t\tMarble, Rhyolite, Chert, Serpentine, Quartzite etc.\nUsed for making chips.\n65.00\n8.\nMasonary Stone (Dolomite, Granite, Limestone,\n\t\t\t\tRhyolite, Sandstone, Quartzite, Schist, Phyllites etc.)\n(i)Used as khanda,\n\t\t\t\tballast, road metal, fatchere, gitty/grit, papada, crusher dust,\n\t\t\t\tgravel, jhajhara, quarry rubbish, Granular Sub-Base (G.S.B.)\n\t\t\t\tetc.-\n(a) Alwar, Bharatpur,\n\t\t\t\tJaipur, Jhunjhunu and Sikar districts.\n(b) Other districts\n(ii)Used for making cobbles\n30.00\n23.00\n100.00\n9.\nBajri, Kanker and ordinary earth\nBajri, Kankar-\n(i) Bharatpur,\n\t\t\t\tJhunjhunu, Dholpur, Tonk and Sikar districts.\n(ii) Other districts\n\t\t\t\tOrdinary earth used for -\n(i) Manufacturing of\n\t\t\t\tEarthenware's, tiles etc.\n(ii) Filling or leveling purposes in\n\t\t\t\tconstruction of embankment, roads, railways etc.\n35.00\n30.00\n12.00\n3.00\n10.\nBrick earth, Murram, Surkhi\nBrick earth, Murram, Surkhi\n25.00\n11.\nPhyllite and Schist\nDimensional Stone used as Pati, kattla, roofing,\n\t\t\t\tflooring etc.\n60.00\n12.\nSlate stone\n120.00\n13.\nOrdinary clays used for colour washing\n15.00\n14.\n(a) Bricks earth,\n\t\t\t\tPhyllite and Schist, Bajri\n(b) Shale, any other rocks/ minerals use\n\t\t\t\tGneisses, andd for special purposes.\nUsed for special purposes in industry.\n120.00\n100.00\nPart-B\nPart-B\nS. No.\nS. No.\nName of Mineral\nName of Mineral\nQuality shape and size of mineral\nQuality shape and size of mineral\nRate of Royalty (Rs. Per Tonne)\nRate of Royalty (Rs. Per Tonne)\n1\n1\n2\n2\n3\n3\n4\n4\n1.\nAgate\n110.00\n2.\nBall Clay\nCrude\n60.00\nProcessed\n120.00\n3.\nBarytes\nWhite\n70.00\nOff Colour\n55.00\n4.\nBentonite\n110.00\n5.\nCalcite\n120.00\n6.\nChalk\n60.00\n7.\nChina Clay\nCrude\n50.00\nProcessed\n400.00\n8.\nClay(Others)\n50.00\n9.\nCorundum\n325.00\n10.\nDiaspore\n120.00\n11.\nDolomite\nBlocks\n240.00\nLumps\n90.00\n12.\nDunite/Pyroxenite\n30.00\n13.\nFelsite\n80.00\n14.\nFelspar Blocks\n215.00\nLumps\n60.00\n15.\nFireclay\n70.00\n16.\nFuller's earth\n100.00\n17.\nGypsum\n125.00\n18.\nJasper\n100.00\n19.\nKaolin\nCrude\n50.00\nProcessed\n400.00\n20.\nLaterite\n60.00\n21.\nMica Crude\n500.00\nWaste & scrap\n80.00\n22.\nOchre\n24.00\n23.\nPyrophyllite\n75.00\n24.\nQuartz\n60.00\n25.\nQuartzite\nBlock\n265.00\nLumps\n65.00\n26.\nSalt petre\n2500.00\n27.\nSilica Sand\n70.00\n28.\nSteatite or Talc or Soapstone\nKharda(Tehsil Dungarpur, Simalwada, Bicchiwada\n\t\t\t\tof District Dungarpur and Tehsil Kherwada, Rishabhdev of District\n\t\t\t\tUdaipur)\n30.00\nInsecticide Grade\n75.00\nOther than insecticide Grade\n350.00\n29.\nOther minerals not specified above.\n12% of pit month value.\nSchedule III\nDead Rent\nDead Rent\n[ See rule 28(2)(ii)]\nPart-A\nPart-A\nS.No.\nS.No.\nName of Mineral\nName of Mineral\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\n1\n1\n2\n2\n3\n3\n1.\nDimensional stone:\nSandstone, Limestone, Slate stone and other\n\t\t\t\tDimensional stones which have not been mentioned anywhere in this\n\t\t\t\tschedule. Phyllite and schist\n70.00\n35.00\n2.\nMineral used for lime\n\t\t\t\tmaking :\nLimestone Lime Kankar, Dhandhla and jhajhara\n\t\t\t\tkankar\n60.00\n25.00\n3.\nMineral used for\n\t\t\t\tmaking chips:\nLimestone, Marble, Chert, Serpentine, Rhyolite,\n\t\t\t\tQuartzite and other rocks\n60.00\n4.\nMineral used as\n\t\t\t\tBlocks and sawn as slabs and tiles:\nMarble, Serpentine and other rocks Granite,\n\t\t\t\tDiorite, Rhyolite, Dolerite and other rocks\n100.00\n60.00\n5.\nMasonary stone and mineral used in construction\n\t\t\t\tworks such as ballast, road metal, brick earth, murrum, kankar,\n\t\t\t\tbajri or surkhi etc.\n30.00\n6.\nBajri (river sand)\n3.00\n7.\nOrdinary white/yellow/red clays\n20.00\n8.\nOther minerals not specified above\n50.00\nPart-5\nPart-5\nS.No.\nS.No.\nName of Mineral\nName of Mineral\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\nRate of Dead Rent in Rs. per ten square meter\n\t\t\t\tor part thereof\n1\n1\n2\n2\n3\n3\n1.\nAgate, Ball Clay, Calcareous Sand, Calcite,\n\t\t\t\tChalk, China Clay, Clay(Others), Corundum, Diaspore, Dolomite,\n\t\t\t\tDunite/Pyroxenite, Felsite, Fireclay, Gypsum, Jasper, Kaolin,\n\t\t\t\tLaterite, Mica, Ochre, Pyrophyllite, Quartzite, Silica Sand and\n\t\t\t\tSteatite/Talc/Soapstone\n30.00\n2.\nFelspar, Quartz\n25.00\n3.\nBarytes, Bentonite\n45.00\n4.\nFuller' earth\n25.00\n5.\nSaltpeter\n15.00\n6.\nOther minerals not specified above\n50.00\nSchedule IV\nPenalties for Non-Observance of the Terms and Conditions of Mining Lease Agreement\nPenalties for Non-Observance of the Terms and Conditions of Mining Lease Agreement\n[ See rule 28(2)(xvii)(a)]\nS No.\nS No.\nRule\nRule\nClause of agreement\nClause of agreement\nBrief content of the breach\nBrief content of the breach\nPenalty\nPenalty\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\n28(2)(i)\n28(2)(ii),\n28(1)(ii)\n28(1)(iii)\n4(1),\n4(2),\n4(3),\n4(4),\n4(6)\nNon-payment of royalty, dead rent and other\n\t\t\t\tcharges.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, ten percent of security deposit or\n\t\t\t\trupees five thousand, whichever higher, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of the security deposit or rupees\n\t\t\t\tten thousand, whichever higher, shall be forfeited.\n2\n29(14),\n19(3),\n19(4),\n20(3),\n20(4)\n4(5)\nNon-payment of financial assurance, difference\n\t\t\t\tof security deposit and performance security.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, ten percent of security deposit or\n\t\t\t\trupees five thousand, whichever higher, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of the security deposit or rupees\n\t\t\t\tten thousand, whichever higher, shall be forfeited.\n3.\n28(1)(iv)\n4(9)\nNon-erection of boundary pillars and its proper\n\t\t\t\tmaintance\n(i) If the breach is\n\t\t\t\t\tremedied erection of boundary pillars and its proper maintenance\n\t\t\t\t\t. after notice period but within forty five days from the date\n\t\t\t\t\tof receipt of notice, ten percent of security deposit shall be\n\t\t\t\t\tforfeited subject to minimum rupees five thousand and maximum\n\t\t\t\t\trupees ten thousand.\n(ii) If the breach\n\t\t\t\t\tis not remedied after forty five days, the lease shall be\n\t\t\t\t\tdetermined with forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of security deposit shall be\n\t\t\t\tforfeited subject to minimum rupees ten thousand and maximum\n\t\t\t\trupees twenty thousand.\n4.\n28(1)(viii)\n4(11)\nNon-commencement of mining operation within six\n\t\t\t\tmonths from the date of excution of   the lease and there after\n\t\t\t\tcarry on effectively.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within ninety days from the date\n\t\t\t\tof receipt of notice, ten percent of security deposit or rupees\n\t\t\t\tfive thousand, whichever higher, shall be forfeited.\n(ii) If the breach\n\t\t\t\t\tis not remedied after ninety days, the lease shall be determined\n\t\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied in full\n\t\t\t\t\tbefore the lease termination order is issued, the lease shall\n\t\t\t\t\tnot be determined and twenty percent of the security deposit or\n\t\t\t\t\trupees ten thousand, whichever higher, shall be forfeited.\n5.\n28(2)(iv)\n4(12)\nNot-maintaining correct account of mineral\n\t\t\t\tproduction.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, twenty percent of security deposit\n\t\t\t\tshall be forfeited subject to minimum rupees five thousand and\n\t\t\t\tmaximum rupees twenty thousand.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and forty percent of the security deposit shall be\n\t\t\t\tforfeited subject to minimum rupees ten thousand and maximum\n\t\t\t\trupees forty thousand.\n6.\n28(1)(xiv)\n28(1)(xv)\n4(17)\n4(18)\n(a) Failure to report\n\t\t\t\tdiscovery of new mineral in the area\n(b) Dispatch of mineral not included in the\n\t\t\t\tlease.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit\n\t\t\t\tshall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the\n\t\t\t\tbreach is remedied before the lease termination order is issued,\n\t\t\t\tthe lease shall not be determined and the security deposit shall\n\t\t\t\tbe forfeited.\nCost of mineral dispatched shall be recovered as\n\t\t\t\tper rule 54.\n7.\n28(2)(xi)(a)\n4(11)\nBajri (river sand) mine working beyond the\n\t\t\t\tdepth of three meter from the surface\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit or\n\t\t\t\trupees twenty five thousand, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and the security deposit or rupees fifty thousand,\n\t\t\t\twhichever less, shall be forfeited.\n8.\n11(1)(ii)\n4(25)\nEmployment of personnel other than Indian\n\t\t\t\tNational without Government's permission\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit or\n\t\t\t\trupees twenty thousand, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and the security deposit or rupees fifty thousand,\n\t\t\t\twhichever less, shall be forfeited.\n9.\n29\n4(12)\nNon submission of mine plan / mining scheme and\n\t\t\t\tits modification\n(i) If the breach is\n\t\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\t\tdate of receipt of notice, twenty five percent of security\n\t\t\t\t\tdeposit or rupees twelve thousand and five hundred, whichever\n\t\t\t\t\tless, shall be forfeited.\n(ii) If the breach\n\t\t\t\t\tis not remedied after forty five days, the lease shall be\n\t\t\t\t\tdetermined with forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and fifty percent of the security deposit or rupees\n\t\t\t\ttwenty five thousand, whichever less, shall be forfeited.\n10.\n28(1)(viii)\n4(11)\nNot working the mines in workman like manner\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, fifty percent of security deposit or\n\t\t\t\trupees twenty five thousand, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and the security deposit or rupees fifty thousand,\n\t\t\t\twhichever less, shall be forfeited.\n11.\n30(1,2)\n6(17)\nNon employment of qualified personnel\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, twenty five percent of security\n\t\t\t\tdeposit or rupees twelve thousand and five hundred, whichever\n\t\t\t\tless, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and fifty percent of the security deposit or rupees\n\t\t\t\ttwenty five thousand, whichever less, shall be forfeited.\n12.\n34(2)(v)\n4(11)\nNon dumping of overburden\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days at\n\t\t\t\tearmarked places from the date of receipt of notice, twenty five\n\t\t\t\tpercent of security deposit or rupees twelve thousand and five\n\t\t\t\thundred, whichever less, shall be forfeited.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and fifty percent of the security deposit or rupees\n\t\t\t\ttwenty five thousand, whichever less, shall be forfeited.\n13.\n-\n-\nAll other remedial breaches not mentioned above.\n(i) If the breach is\n\t\t\t\tremedied after notice period but within forty five days from the\n\t\t\t\tdate of receipt of notice, ten percent of security deposit shall\n\t\t\t\tbe forfeited subject to minimum rupees one thousand and maximum\n\t\t\t\trupees seven thousand and five hundred.\n(ii) If the breach is\n\t\t\t\tnot remedied after forty five days, the lease shall be determined\n\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before\n\t\t\t\tthe lease termination order is issued, the lease shall not be\n\t\t\t\tdetermined and twenty percent of the security deposit shall be\n\t\t\t\tforfeited subject to minimum rupees two thousand and maximum\n\t\t\t\trupees fifteen thousand.\n14.\n-\n-\nAll other non -remedial breaches not mentioned\n\t\t\t\tabove.\n(i) If the breach\n\t\t\t\t\tdoes not continue after receiving legal notice by lessee, twenty\n\t\t\t\t\tpercent of security deposit or rupees twenty five thousand,\n\t\t\t\t\twhichever less, shall be payable by the lessee.\n(ii) If the breach continues even after\n\t\t\t\t\treceiving notice, the lease shall be determined with forfeiture\n\t\t\t\t\tof security deposit.\nSchedule-V\nPenalties for Non-Observance of the Terms and Conditions of Royalty Collection\nPenalties for Non-Observance of the Terms and Conditions of Royalty Collection\nContract/excess Royalty Collection Contract Agreement\nContract/excess Royalty Collection Contract Agreement\n[ See rule 44(26)]\nS. No.\nS. No.\nRule\nRule\nClause of agreement\nClause of agreement\nBrief content of the breach\nBrief content of the breach\nPenalty\nPenalty\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\n44(4)\n3(iv)\nIssuing incomplete royalty receipts\n(i) If the breach does not\n\t\t\t\t\tcontinue after receipt of notice, ten percent of security\n\t\t\t\t\tdeposit or rupees ten thousand, whichever less, shall be payable\n\t\t\t\t\tby the contractor.\n(ii) If the breach continues after notice period, the\n\t\t\t\t\tcontract shall be terminated with  forfeiture of security\n\t\t\t\t\tdeposit: Provided that if the breach is remedied before\n\t\t\t\t\ttermination of the contract, the contract shall not be\n\t\t\t\t\tterminated and twenty percent of security deposit or rupees\n\t\t\t\t\ttwenty thousand, whichever less, shall be payable by the\n\t\t\t\t\tcontractor.\n2.\n44(6),\n44(7),\n44(8),\n44(9),\n44(10),\n44(11)\n3(vi),\n3(vii),\n3(viii),\n3(ix),\n3(x),\n3(xi)\n(a) Collection of royalty from the\n\t\t\t\tvehicles having royalty paid rawanna issued against yearly dead\n\t\t\t\trent.\n(b) Collection of royalty from\n\t\t\t\tshort term permit/ permit holders issued under these rules.\n(c) Collection of Royalty from the\n\t\t\t\tminor minerals brought from outside the contract area or from the\n\t\t\t\tmajor mineral leases.\n(d) Collection of royalty for the\n\t\t\t\tminerals used in construction/repair/ renewal/of National\n\t\t\t\thighway/ Mega highway/ Four/Six lane roads, laying and repair of\n\t\t\t\tRailway Tracks.\n(e) Collection of royalty on the minor minerals removed from\n\t\t\t\tthe areas which are not working pits of a lessee or licencee.\n(i) If the breach does not\n\t\t\t\t\tcontinue after receiving legal notice by contractor, amount so\n\t\t\t\t\tcollected by the contractor shall be recovered alongwith ten\n\t\t\t\t\tpercent of security deposit or rupees fifty thousand, whichever\n\t\t\t\t\tless.\n(ii) If the breach continues even after receiving notice, the\n\t\t\t\t\tcontract shall be terminated with forfeiture of security\n\t\t\t\t\tdeposit.\n3.\n44(13)\n3(xiii)\nNon-submission of monthly statement with or without permit fee\n\t\t\t\t/ other charges along with counterfoils of receipts and other\n\t\t\t\trecords\n(i) If the breach is remedied\n\t\t\t\t\tafter the notice period but within thirty days from the date of\n\t\t\t\t\treceipt of notice, ten percent of security deposit or rupees\n\t\t\t\t\ttwenty five thousand, whichever less, shall be payable by the\n\t\t\t\t\tcontractor.\n(ii) If the breach is remedied\n\t\t\t\t\tafter thirty days but before sixty days of receiving the notice,\n\t\t\t\t\ttwenty percent of security deposit or rupees fifty thousand,\n\t\t\t\t\twhichever less, shall be payable by the contractor.\n(iii) If the breach is not remedied after sixty days of\n\t\t\t\t\treceiving the notice, the contract shall be terminated with\n\t\t\t\t\tforfeiture of security deposit.\n4.\n44(14)\n3(xiv)\nCharging of royalty at a rate higher than as specified in\n\t\t\t\tSchedule-II and charging of permit fee / other charges higher\n\t\t\t\tthan prescribed under these rules or otherwise.\n(i) If the breach does not\n\t\t\t\t\tcontinue after receiving the legal notice, the excess amount\n\t\t\t\t\tcollected by the contractor, on higher rates than as specified\n\t\t\t\t\tin rules, shall be recovered alongwith eighteen percent interest\n\t\t\t\t\tand ten percent of security deposit or rupees fifty thousand\n\t\t\t\t\twhichever less.\n(ii) If breach continues after notice period, the contract\n\t\t\t\t\tshall be terminated with forfeiture of security deposit.\n5.\n44(17)\n3(xvii)\nNon-payment of installments of contract money in advance as\n\t\t\t\tspecified in agreement.\n(i) If the breach is remedied by\n\t\t\t\t\tthe contractor within the notice period, no penalty shall be\n\t\t\t\t\timposed.\n(ii) If the breach is remedied by\n\t\t\t\t\tthe contractor after notice period but before termination of\n\t\t\t\t\tcontract, twenty percent of security deposit or rupees one lac,\n\t\t\t\t\twhichever less, shall be payable by the contractor.\n(iii) If the breach is not remedied by the contractor after\n\t\t\t\t\tnotice period, contract shall be terminated with forfeiture of\n\t\t\t\t\tsecurity deposit.\n6.\n40(3),\n41(2)\n3(xxii)\nNon-payment of difference of security deposit and performance\n\t\t\t\tsecurity due to enhancement of contract amount.\n(i) If the breach is remedied\n\t\t\t\t\twithin the notice period, no penalty shall be imposed.\n(ii) If the breach is remedied\n\t\t\t\t\tafter notice period but before termination of contract, four\n\t\t\t\t\tpercent of security deposit or rupees forty thousand, whichever\n\t\t\t\t\tless, shall be payable by the contractor.\n(iii) If the breach is not remedied by the contractor after\n\t\t\t\t\tnotice period, contract shall be terminated with forfeiture of\n\t\t\t\t\tsecurity deposit.\n7.\n-\n-\nAll other remedial breaches not mentioned above.\n(i) If the breach is remedied\n\t\t\t\t\tafter notice period but within thirty days from the date of\n\t\t\t\t\treceipt of notice, ten percent of security deposit shall be\n\t\t\t\t\tforfeited subject to minimum rupees ten thousand and maximum\n\t\t\t\t\trupees fifty thousand.\n(ii) If the breach is not\n\t\t\t\t\tremedied after thirty days, the contract shall be terminated\n\t\t\t\t\twith forfeiture of security deposit:\nProvided that if the breach is remedied before the contract\n\t\t\t\t\ttermination, the contract shall not be terminated and twenty\n\t\t\t\t\tpercent of the security deposit shall be forfeited subject to\n\t\t\t\t\tminimum rupees twenty thousand and maximum rupees one lac.\n8.\n-\n-\nAll other non-remedial breaches not mentioned above.\n(i) If the breach does not\n\t\t\t\t\tcontinue after receiving legal notice by contractor, twenty\n\t\t\t\t\tpercent of security deposit or rupees fifty thousand, whichever\n\t\t\t\t\tless, shall be payable by the contractor.\n(ii) If the breach continue even after receiving notice, the\n\t\t\t\t\tcontract shall be terminated with forfeiture of security\n\t\t\t\t\tdeposit.\nSchedule VI\nDelegation of Powers\nDelegation of Powers\n[ See rule 70(1)]\nItem No.\nItem No.\nOfficer or authority by whom the powers are to\n\t\t\t\tbe exercised\nOfficer or authority by whom the powers are to\n\t\t\t\tbe exercised\nRule\nRule\nMatters in relation to which powers may be\n\t\t\t\texercised\nMatters in relation to which powers may be\n\t\t\t\texercised\nExtent of Powers\nExtent of Powers\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\nDMG\n4(7),  4(8),\n5, 16(2),\n16(3),\n16(4)\nTo grant letter of intent/extension of letter of\n\t\t\t\tintent period/sanction/rejection of mining lease application.\nFor mineral bajri (river sand) dead rent upto\n\t\t\t\trupees twenty lacs and other minerals Agate, Bayrites, [***] Calcite, Corundum, Diaspore, Dolomite, Gypsum, Jasper,\n\t\t\t\tLaterite, Ochre, Pyrophyllite, Quartzite, Soapstone.\n2.\nADM\n4(7), 4(8),\n5, 16(2),\n16(3),\n16(4)\nTo grant letter of intent/extension of letter of\n\t\t\t\tintent period/sanction/ rejection of mining lease application.\nFor mineral bajri (river sand) dead rent upto\n\t\t\t\tten lacs and other minerals Ball clay, China clay, Chalk, Clays\n\t\t\t\t(others), Dunite/ Pyroxenite, Felsite, Felspar, Fire clay,\n\t\t\t\tKaolin, Mica, Quartz, Silicasand, Calc. sand.\n3.\nSME\n4(7), 4(8),\n5, 16(2),\n16(3),\n16(4)\nTo grant letter of intent/extension of letter of\n\t\t\t\tintent period/sanction/ rejection of mining lease application.\nFor mineral bajri (river sand) dead rent upto\n\t\t\t\tfive lacs and minerals other than mentioned at sr. no. 1 and 2\n\t\t\t\twithin his jurisdiction.\n4.\nSME\n4(7), 4(8),\n5, 16(2),\n16(3),\n16(4)\nTo reject application of mining lease withdrawn\n\t\t\t\tby applicant.\nFull powers within their jurisdiction.\n5.\nSME\n19(5), 20(5)\nTo refund security deposit/ performance\n\t\t\t\tsecurity.\nFull powers within their jurisdiction.\n6.\nSME\n21(4)\nTo extend period for execution of mining lease.\nFull powers within their jurisdiction.\n7.\nDMG,\nADM,\nSME\n21(4)\nTo revoke sanction order.\nMinerals for which mining leases can be granted\n\t\t\t\tby him.\n8.\nSME\n25\nTo allow surrender of mineral/area.\nFull powers within their jurisdiction.\n9.\nDMG,\nADM,\nSME\n27(3),\n27(6)\nTo allow/reject application for transfer of\n\t\t\t\tmining lease and to revoke sanction of transfer of mining lease.\nMinerals for which mining leases can be granted\n\t\t\t\tby him.\n10.\nSME\n27(3)\nTo reject application for transfer of mining\n\t\t\t\tlease withdrawn by lessee.\nFull powers within their jurisdiction.\n11.\nSME\n27(4)\nTo extend period for execution of transfer of\n\t\t\t\tmining lease.\nFull powers within their jurisdiction.\n[11-A.\nME/AME\n27\nTo dispose off application for transfer \n\t\t\t\tof quarry licence.\nFull powers within their jurisdiction.]\n12.\nADM / SME / ME / AME / Suptdg. Geo./ Sr.Geo. / Geologist / MF,\n\t\t\t\tSurveyor / Field Assistant\n28(1)(x)\nTo inspect mine, plans, accounts etc..\nFull powers within their jurisdiction.\n13.\nDMG\n28(1)(xv)\nTo grant inclusion of mineral in mining\n\t\t\t\tlease/quarry licence.\nFull powers.\n14.\nME / AME\n28(2)(xvii)\nTo issue notice for any breach of terms and\n\t\t\t\tconditions.\nFull powers within their jurisdiction.\n15.\nSME\n28(2)(xvii)\nTo impose penalty as per Schedule-IV.\nFull powers within their jurisdiction.\n16.\nDMG,\nADM,\nSME\n28(2)(xvii)\nTo determine the mining lease.\nMinerals for which mining lease can be granted\n\t\t\t\tby him.\n17.\nME / AME\n28(1)(xxi)\nTo seize any mineral or movable property and\n\t\t\t\tsell the same.\nFull powers within their jurisdiction.\n18.\nSME\n29\nTo approve mine plan/mining scheme/simplified\n\t\t\t\tmining scheme for mining lease and simplified mining scheme for\n\t\t\t\tquarry licence having area more than 1.0 hectare.\nFull powers within their jurisdiction.\n19.\nME / AME\n29\nTo approve simplified mining scheme for quarry\n\t\t\t\tlicence having area up to 1.0 hectare, short term permit and\n\t\t\t\tpermit.\nFull powers within their jurisdiction.\n20.\nSME\n29(17)\nTo release financial assurance.\nFull powers within their jurisdiction.\n21.\nADM\n35\nContractor's registration, renewal, refusal,\n\t\t\t\tcancellation of registration.\nFull powers within their jurisdiction.\n22.\nDMG\n36(5), 37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess royalty collection contract.\nFull powers.\n23.\nADM\n36(5), 37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess royalty collection contract.\nFull powers for bid amount upto rupees three\n\t\t\t\thundred lacs.\n24.\nSME\n36(5), 37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess   royalty collection contract.\nFull powers for bid amount upto rupees one\n\t\t\t\thundred lacs.\n25.\nME\n36(5),\n37(10)\nTo grant/reject royalty collection\n\t\t\t\tcontract/excess royalty collection contract.\nFull powers for bid amount upto rupees fifty\n\t\t\t\tlacs.\n26.\nDMG\n43(3)\nTo reject bid or to revoke sanction with\n\t\t\t\tforfeiture of bid security/security deposit and to extend period\n\t\t\t\tfor execution of the contract.\nFull powers.\n27.\nDMG\n45\nTo debar/blacklist a contractor.\nFull powers.\n28.\nDMG\n66\nTo amalgamate mining leases/quarry licences.\nFull powers.\n29.\nADM\n76\nTo allow mutation of mineral concession/contract\n\t\t\t\tand revocation of order.\nFull powers within their jurisdiction.\n30.\nDMG,\nADM,\nSME,\nME / AME\n80\nTo refund any claim.\nAs per GF&AR.\nNote: - (1) Notwithstanding anything contained herein above, any mining lease except mineral bajri (river sand) having area more than 10.00 hectare shall be granted by the Government.\nNote:\n(2) These powers shall be used in consultation with senior most accounts personnel posted in the office in all matters having financial or revenue implications.\nForm -1\nForm -1\n[Application For Mining Lease/quarry Licence\n[Application For Mining Lease/quarry Licence\n[ See rule 4(2) and 17A(4)]]\nTo The Mining Engineer/ Assistant Mining Engineer, Department of Mines and Geology, Rajasthan....................................\nAffix passport size photograph",
        "footnote": "",
        "is_definition": false,
        "sort_order": 89
    },
    "prev_section": "91",
    "next_section": "1"
}