    "id": 18762,
    "slug": "mperc-micro-grid-renewable-energy-generation-and-supply-regulations-2016",
    "title": "MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016",
    "short_title": "MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016",
    "act_number": "Published vide Notification No. 1439-MPERC-2016, d",
    "act_year": 2016,
    "act_type": "STATE",
    "location": "Madhya Pradesh",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short Title and Commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions and Interpretations.",
            "chapter": null,
            "content": "(a) \"Act\" means Electricity Act, 2003 (36 of 2003);\n(b) \"Billing Cycle\" means the billing frequency for electricity bill raised by the Micro-Grid Operator to the consumer or to the Distribution Licensee;\n(c) \"Commission\" means the Madhya Pradesh Electricity Regulatory Commission constituted under the Act.\n(d) \"Detailed Project Report (DPR)\" means a detailed report consisting of technical, financial and environmental aspects, etc. related to the Micro-Grid project;\n(e) \"Distribution Franchisee (DF)\" means a person authorized by a Distribution Licensee to supply electricity on its behalf in a particular area within his area of supply;\n(f) \"Distribution Franchisee Agreement\" (DFA) means the Agreement between the Distribution Licensee or M.P. Power Management Co. Ltd. on behalf of Distribution Licensee and the Micro-Grid Operator for the services rendered by Micro-Grid Operator as DF;\n(g) \"Distribution Franchisee Fees\" is the fee for services rendered by the Micro-Grid Operator on behalf of Distribution Licensee as per the DFA;\n(h) \"Distribution Licensee's System\" means the system of wires and associated facilities between the delivery points on the transmission lines or the generating station connection and the point of connection to the installation of the consumers;\n(i) \"Feed-in-Tariff\" (FiT) means the tariff for procurement of electricity by the Distribution Licensee from the Micro-Grid based renewable energy system as determined by Madhya Pradesh Electricity Regulatory Commission pursuant to Section 61(h) of the Act;\n(i) \"Grid Arrival\" means extension of Distribution Licensee's system in the Micro-Grid area;\n(k) \"Interconnection Point\" means the interface point for supply of electricity from the Micro-Grid Renewable Energy System to the Distribution Licensee's System;\n(l) \"Micro-Grid Area\" means the areas where electricity would be supplied through Micro- Grid projects by the Micro-Grid Operator under these Regulations;\n(m) \"Micro-Grid Operator\" (MGO) means a person, a group of persons, local authority, Panchayat Institution, users' association, co-operative societies, non-governmental organizations, a company that constructs, commissions, operates and maintains Micro- Grid Renewable Energy System within the State of Madhya Pradesh for generation and supply of electricity in the Micro-Grid areas and has agreed to operate under these Regulations;\n(n) \"Micro-Grid Project\" means the Micro-Grid Renewable Energy System generating and supplying electricity to consumers or selling electricity to Distribution Licensee;\n(o) \"Micro-Grid Renewable Energy System (MRES)\" means the stand alone power plant generating electricity using renewable energy source in the Micro-Grid area for supply to consumers and/or to Distribution Licensee;\n(p) \"Obligated Entity\" means the entity mandated under clause (e) of sub-section (1) of Section 86 of the Act to fulfill the Renewable Purchase Obligation and identified under MPERC (Cogeneration and generation of electricity from renewable sources of energy) (Revision-I) Regulations, 2010 and subsequent amendments thereof;\n(q) \"Power Purchase Agreement\" (PPA) is an Agreement between Distribution Licensee and MGO for the purchase of electricity generated from the MRES upon interconnection with grid;\n(r) \"Primary Distribution Network\" (PDN) means the distribution infrastructure owned by MGO for supplying electricity generated from the MRES to the consumers in the Micro- Grid area as per safety measures specified under Section 53 of the Act and technical standards in the implementation guidelines specified by CEA.\n(s) \"Renewable Energy Certificates\" (REC) means the Certificates issued in accordance with the procedures specified by the Central Electricity Regulatory Commission through Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate Renewable Energy Generation) Regulations, 2010 as amended from time to time;\n(t) \"Renewable Energy Sources\" means renewable sources such as small hydro, wind, solar, biomass, bio fuel, urban or municipal solid waste and other such sources as approved by the MNRE from time to time for generation of electricity;\n(u) \"Renewable Purchase Obligation\" (RPO) means the requirement as specified under clause (e) of sub-section (1) of Section 86 of the Act, for the obligated entity to purchase electricity generated from renewable energy sources;\n(v) \"State Nodal Agency\" means the nodal agency at the State level for promotion of grid connected and off-grid renewable energy in the state of Madhya Pradesh. As per the existing arrangement MPUVNL shall act as the State Nodal Agency for Micro-Grid projects;\n(w) \"Tariff Period\" means the period for which FiT is to be determined by the Commission for the electricity generated from MRES;\n(x) \"Wheeling Agreement\" means the agreement signed by Distribution Licensee with MGO for supply of electricity through PDN;\n(y) \"Year\" means a Financial Year.\nPart - A\nScope and Application",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Scope of Regulations and Extent of Application.",
            "chapter": null,
            "content": "Part - B\nGeneral Principles",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Model for Business Operations.",
            "chapter": null,
            "content": "(a) MGO shall construct, commission, operate and maintain Micro-Grid projects for generation and supply of electricity through PDN in areas where Distribution Licensee's System doesn't exist.\n(b) MGO shall be entitled to supply entire quantum of electricity generated from the Micro-Grid projects to the consumers at mutually agreed tariff. Upon grid arrival, MGO shall generate and supply entire electricity generated to the Distribution Licensee at the interconnection point at FiT determined by the Commission and shall be governed by MPERC Regulations regarding Renewable Energy.\n(c) MGO shall transfer ownership of PDN conforming to the standards of Distribution Licensee's system to Distribution Licensee with mutual consent based on book value of assets on the date of transfer. The MGO shall rectify the shortcomings as per CEA Standards, if pointed out by the Dis-com while taking over the PDN. The book value of the asset shall be determined by a third party agency appointed for a time period of three years by the Commission. The cost for valuation of assets shall be equally borne by the concerned MGO and the concerned Distribution Licensee.\nPart - C\nTechnical Framework",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Technical Standards for Construction of PDN.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Technical Standards for Interconnection with the Grid.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Safety Measures for Micro-Grid projects.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Metering Arrangement.",
            "chapter": null,
            "content": "(a) Generation meter at the Micro-Grid project to record the generation of electricity. This shall also serve the purpose of RPO fulfillment for obligated entities; and\n(b) Meter(s) at each of the outgoing feeder(s) from the Micro-Grid project.\nPart - D\nOperational Framework",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Distribution Franchisee Framework.",
            "chapter": null,
            "content": "Part - E\nCommercial Framework",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Energy Accounting and Settlement for supply to consumers.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Energy Accounting and Settlement for supply to Distribution Licensee.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Energy Accounting and Settlement for Distribution Franchisee activities.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Renewable Purchase Obligation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Renewable Energy Certificate mechanism.",
            "chapter": null,
            "content": "Part - F\nContractual Framework",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. Power Purchase Agreement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Revocation of Agreements.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Exit Options.",
            "chapter": null,
            "content": "Part - G\nRoles And Responsibilities Of Stakeholders",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. State Nodal Agency.",
            "chapter": null,
            "content": "(a) Provide inputs to the Commission in determination of FiT for MRES as and when required;\n(b) To institute a process to keep track of Micro-Grid project development in the state;\n(c) To submit technical standards for interconnection in consultation with Distribution Licensee to the Commission within three months from the date of official notification of these Regulations;\n(d) To facilitate MGO in migration within an applicable supply model to operate the Micro-Grid project;\n(e) To support the Commission and furnish information sought from time to time in order to effectively implement the. Regulations.\n(f) To administer exit and migration requests of MGO; and\n(g) To facilitate third party verification of PDN for confirmation of technical standards and safety measures for new Micro-Grid projects and existing projects willing to operate under specified Regulations.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "19",
            "title": "19. Distribution Licensee.",
            "chapter": null,
            "content": "(a) To specify and share the technical standards of Distribution Licensee's system;\n(b) To enter into PPA with MGO within one month of receiving application from MGO; and\n(c) With Mutual consent, enter into DFA upon receiving application from MGO.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "20",
            "title": "20. Micro-Grid Operator.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "21",
            "title": "21. Consumers in the Micro-Grid area.",
            "chapter": null,
            "content": "Part - H\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "22",
            "title": "22. Payment Security.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "23",
            "title": "23. Formation of Technical Committee.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "24",
            "title": "24. Grievance Redressal Mechanism.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "25",
            "title": "25. Implementation Guidelines.",
            "chapter": null,
            "content": "(a) Technical standards for construction of PDN;\n(b) Technical standards for inter connectivity of the Micro-Grid project with the grid;\n(c) Migration options within a model;\n(d) Principles of Distribution Franchisee agreement; and\n(e) Any other relevant matter for implementation of the Regulations.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "26",
            "title": "26. Power to give directions.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "27",
            "title": "27. Power to Relax.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "28",
            "title": "28. Power to remove difficulties.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "29",
            "title": "29. Power to amend.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 10th February, 2020 [mp915]",
        "Act Number": "Published vide Notification No. 1439-MPERC-2016, dated 02.09.2016",
        "Enactment Date": "",
        "Act Year": "2016",
        "Short Title": "MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016",
        "Type": "STATE",
        "Location": "Madhya Pradesh"
    },
    "updated_at": "2026-09-29 21:55:20"
}