{
    "act_title": "Maharashtra Factories Rules, 1963",
    "act_slug": "maharashtra-factories-rules-1963",
    "section_label": "Section",
    "section": {
        "number": "3",
        "title": "3. Approval of plans.",
        "chapter": null,
        "content": "[(a) A flow chart of the manufacturing process supplemented by a brief description of the process in its various stages, list of the raw materials used, intermediate products, including emission of toxic gases, etc. finished products, by-products, their quantities, methods of storage and handling, loading and transport and details of the arrangements for the disposal of trade waste and effluents, the likely hazards and the methods to control or eliminate them.]\n(b) Plans in duplicate drawn to scale showing -\n(i) the site of the factory and immediate surrounding including adjacent buildings and other structures, roads, drains etc.;\n(ii) the plan, elevation and necessary cross-section of the various buildings, indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire. The plans shall also clearly indicate the position of the plant and machinery, aisles and passage ways; and\n(c) Such other particulars as the Chief Inspector may require:\n[3A. Certificate of Stability.\n(i) A Member or Associate Member of Institute of Civil Engineers; or\n(ii) A Member of Institute of Structural Engineers;\n(iii) A Full Member or Associate Member of Institute of Engineers (India), in the branch of Civil Engineering or Structural Engineering;\n(iv) A Civil Engineer of Public Works, not below the rank of Executive Engineer.\n[4. Use of premises as a factory.\n(1) The plans are got approved from the Chief Inspector of Factories or the Deputy Inspector of Factories as the case may be, in respect of the following items namely:-\n(a) site on which the factory is to be situated;\n(b) buildings and extension used for the purposes of manufacturing process;\n[(c) The layout of plant and machinery, including the storages for raw materials and finished products, intermediate by-products] ;\n(d) any changes total or partial in manufacturing processes.\n(2) The factory building, extensions, processes, and machinery layout are in conformity with the approved plans;\n(3) The conditions subject to which plans are approved are complied with;\n(4) A licence is obtained under rule 6 from the Chief Inspector of Factories or renewed under rule 8 by the Deputy Chief Inspector of Factories and the said licence is valid at the relevant time;\n(a) the fees including additional fees, if necessary, are paid;\n(b) the employment of workers for which licence is granted is not exceeded;\n(c) the limit of the installed power for which licence is granted is not exceeded.\n[(5) Necessary Certificates under Rule 22 are obtained] ;\n[(6) The conditions subject to which the licence is granted or renewed as the case may be are complied with.] ]",
        "footnote": "",
        "is_definition": false,
        "sort_order": 2
    },
    "prev_section": "2",
    "next_section": "5"
}