    "id": 27642,
    "slug": "madhya-pradesh-electricity-supply-code-2013",
    "title": "Madhya Pradesh Electricity Supply Code, 2013",
    "short_title": "Madhya Pradesh Electricity Supply Code, 2013",
    "act_number": "Published vide Notification No. 2164/MPERC/2013, d",
    "act_year": 2013,
    "act_type": "STATE",
    "location": "Madhya Pradesh",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Madhya Pradesh Electricity Supply Code, 2013",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Consumer -",
            "chapter": null,
            "content": "(a)\n\t\t\t\tName of the person/organization\n: .....................................\n(b)\n\t\t\t\tName of father/husband/Director/Partner/Trustee\n: .....................................\n(c) Full Address of the premises (with PIN)\nWhere\n\t\t\t\ta new connection is being applied for/the existing connection is\n\t\t\t\tproposed to be shifted Telephone No.\n(i)\n\t\t\t\tFactory/Premises..........\n: .....................................\n(ii)\n\t\t\t\tRegistered Office (along with Postal address)\n: .....................................\n(iii)\n\t\t\t\tResidence (Postal address)\n: .....................................\nE-mail\n: .....................................\nBank\n\t\t\t\tA/C No. and name of Bank (optional)\n: .....................................\nExisting\n\t\t\t\tsanctioned load/contract Demand if any,\n: .....................................\nService\n\t\t\t\tconnection no. (For existing connection)\n: .....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Built-up area of the premises/plot area",
            "chapter": null,
            "content": ": .....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Category of supply",
            "chapter": null,
            "content": ": .....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Purpose of supply",
            "chapter": null,
            "content": ": .....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Type of Supply",
            "chapter": null,
            "content": ": Permanent/Temporary\n(Please\n\t\t\t\tstrike-off type not applicable and tick the type applicable)\nIf\n\t\t\t\ttemporary specify period - From :\n\t\t\t\t.................................. To :\n\t\t\t\t...........................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Proposed Load -",
            "chapter": null,
            "content": "(a) For domestic connection : ................................................... Watts\nPlease fill-up and attach format for determination of connected load.\n(b) For Non-domestic category please fill up the following table\n(Attach duly signed separate list if required)\nItem\nItem\nConnected Load per item (Watts)\nConnected Load per item (Watts)\nNo.\nNo.\nTotal Connected Load (Watts)\nTotal Connected Load (Watts)\n(c) If opted for two part tariff, then Contract Demand = ____________ KVA. w.e.f. _______________ in case supply is required in phasing.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Any electricity dues outstanding in the licensee's area of operation in the consumer's name           Yes/No",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Any electricity dues outstanding for the premises for which connection applied for           Yes/No",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Any electricity dues outstanding with the licensee against any firm/company with which the consumer is associated as an Owner, Partner, Director or Managing Director           Yes/No",
            "chapter": null,
            "content": "(For serial nos. 7, 8 & 9 if answer is 'Yes' in any case please provide details)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Whether the boundary within which electricity shall be consumed is clearly shown in the Plan (Map) of the premises.           Yes/No",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. I/We hereby declare that -",
            "chapter": null,
            "content": "(a) The information provided in the form above is true to my knowledge.\n(b) I/We have read the Madhya Pradesh Electricity Supply Code and agree to abide by the condition mentioned therein.\n(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.\n(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.\n(e) I/We enclose all necessary documents as per list with the application form. (If 'No', please provide details with reasons).\nSignature of the Consumer/Authorized Signatory\nNote. - Following documents may be attached with the application form :-\nNote.\nFor domestic and non-domestic connections in urban area.\nFor domestic and non-domestic connections in rural area.\nAnnexure -2\nAnnexure -2\nApplication Form -For Extra High Tension/high Tension/Other Low Tension Service Connection\nApplication Form -For Extra High Tension/high Tension/Other Low Tension Service Connection\nNew Connection/Shifting of Premises/Change in Contract\nNew Connection/Shifting of Premises/Change in Contract\nDemand/Change of Tariff Category/Change of Name of Consumer etc.\nDemand/Change of Tariff Category/Change of Name of Consumer etc.\n(Please strike-off the purpose that is not applicable)\n-----------------------\nAffix Pass Port\n\t\t\t\t\t\t\t\tSize Photo .\nAffix Pass Port\n\t\t\t\t\t\t\t\tSize Photo\n.\n-----------------------\n-----------------------",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "1",
            "title": "1. Consumer -",
            "chapter": null,
            "content": "(a) Name of the person/organization\n: .......................................\n(b) Name of father/husband/Director/Partner/Trustee\n: ........................................\n(c) Full Address of the premises (with PIN)\nWhere a new connection is being applied for/the existing\n\t\t\t\tconnection is proposed to be shifted Telephone No.\n: ..........................................\n(i) Factory/Premises\n: ......................................\n(ii) Registered Office (along with Postal address)\n: ......................................\n(iii) Residence (Postal address)\n: .....................................\nE-mail\n: ......................................\nBank A/C No. and name of Bank (optional):\n: ......................................\nExisting sanctioned load/contract Demand if any,\n: ................................(EHT/HT/LT)\nService connection no. (For existing connection)\n: ......................................\nLT Supply.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "2",
            "title": "2. Built-up area\n\t\t\t\tof the premises/plot area",
            "chapter": null,
            "content": ": .....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "3",
            "title": "3. Category of supply",
            "chapter": null,
            "content": ": .....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "4",
            "title": "4. Purpose of supply",
            "chapter": null,
            "content": ": .....................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "5",
            "title": "5. Type of Supply",
            "chapter": null,
            "content": ": Permanent/Temporary\n(Please strike-off type not applicable and tick the type\n\t\t\t\tapplicable)\nIf temporary specify period - From :\n\t\t\t\t............................. To : ............................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "6",
            "title": "6. Proposed Load (fill up the following) -",
            "chapter": null,
            "content": "(a) (Attach duly signed separate list, if required)\nItem\nConnected Load per item (Watts)\nNo.\nTotal Connected Load (Watts)\n(b) If opted for two part tariff, then Contract Demand = ____________ KVA. w.e.f. _______________ in case supply is required in phasing.\nEHT/HT Supply",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "7",
            "title": "7. Voltage at which supply is required (KV) :",
            "chapter": null,
            "content": "11 KV\n33 KV\n132 KV\n220 KV",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "8",
            "title": "8. Type of supply : Temporary/Permanent/standby/synchronization of CPPs or Generators with Grid",
            "chapter": null,
            "content": "(Please strike-off category not applicable and tick the category applicable)\nFor other than permanent supply, specify period - From : ............... To : ...............",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "9",
            "title": "9. Steps taken by the consumer so far to set-up the installation",
            "chapter": null,
            "content": "(a) ...................................................................................................\n(b) ...................................................................................................\n(c) ...................................................................................................\n(d) ...................................................................................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "10",
            "title": "10. Basis of projection of Contract Demand required -",
            "chapter": null,
            "content": "(a) Diversity factor assumed :.....................................................\n(b) Total Connected Load :.....................................................\nAttach List of Machines",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "11",
            "title": "11. Whether connection is required in phases :.....................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "12",
            "title": "12. Phasing of contract demand (CD) :.....................................................",
            "chapter": null,
            "content": "SI. No.\nCD required (KVA)\nTentative Date From which required\nRemarks\nNote. - The tentative dates of phasings should not be beyond the date of expiry of initial period of agreement.\nNote.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "13",
            "title": "13. Purpose of installation :..........................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "14",
            "title": "14. Category of tariff opted for :..........................................................",
            "chapter": null,
            "content": "(as per tariff order)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "15",
            "title": "15. Probable date of production :..............................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "16",
            "title": "16. Category of Industry : SSI/MSI/LSI",
            "chapter": null,
            "content": "(Please strike-off category not applicable and tick the category applicable)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "17",
            "title": "17. Status of land acquisition :............................................................",
            "chapter": null,
            "content": "(Please provide proof of ownership and statutory clearances)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "18",
            "title": "18. Expected date by which finance would be available : ..........................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "19",
            "title": "19. Whether the requisite consent/NOC (where applicable according to the list of Pollution Control Board) has been obtained from M.P. State Prevention and Control of Water Pollution Boards, Bhopal as per statutory requirements",
            "chapter": null,
            "content": "(If yes, a copy should be furnished): .............................................................\nFor All Consumers",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "20",
            "title": "20. Any electricity dues outstanding in the licensee's area of operation in the consumer's name        Yes/No",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "21",
            "title": "21. Any electricity dues outstanding for the premises for which connection applied for :         Yes/No",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "22",
            "title": "22. Any electricity dues outstanding with the licensee against any firm/company with which the consumer is associated as an Owner, Partner, Director or Managing Director         Yes/No",
            "chapter": null,
            "content": "(For serial nos. 20, 21 & 22 if answer is 'Yes' in any case please provide details)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "23",
            "title": "23. Whether the boundary within which electricity shall be consumed is clearly shown in the Plan (Map) of the premises.        Yes/No",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "24",
            "title": "24. I/We hereby declare that -",
            "chapter": null,
            "content": "(a) The information provided in the form above is true to my knowledge.\n(b) I/We have read the Madhya Pradesh Electricity Supply Code as amended and agree to abide by the condition mentioned therein.\n(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.\n(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.\n(e) I/We enclose all necessary documents as per list with the application form. (If 'No', please provide details with reasons).\nSignature of the Consumer/Authorized Signatory\nNote. - Following documents may be attached with the application form :-\nNote.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "1",
            "title": "1. Proof of ownership/legal occupancy of the premises.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "2",
            "title": "2. A map indicating therein in the proposed location of the plant/office and the point where supply is required. The map should normally be of the scale of 1cm representing 1200cm for EHT/HT connection.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "3",
            "title": "3. Licensee/NOC from statutory authority, if required or a declaration by the applicant is that his connection does not fall under the requirement of NOC under any statute.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "4",
            "title": "4. In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor of the firm.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "5",
            "title": "5. In case of partnership firm, a certified copy of partnership deed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "6",
            "title": "6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "7",
            "title": "7. In case of agricultural consumer, copy of Khasra/Bahi be attached.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "8",
            "title": "8. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "9",
            "title": "9. Letter of intent for production/enhancement in production for industrial connection.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "10",
            "title": "10. List of equipment proposed to be installed along with their connected load.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "11",
            "title": "11. Resolution for authorization in respect of where connection required in name of firm, limited/Pvt. Ltd. firm, company etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "12",
            "title": "12. Registration from Industries Department wherever applicable.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "13",
            "title": "13. Extract of project report relevant to power and process requirement (in case of industries).",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "14",
            "title": "14. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with agreement after completion of formalities.",
            "chapter": null,
            "content": "Annexure 3\nAnnexure 3\nStandard Agreement Form for Supply of Electrical Energy to Low Tension Consumers.\nStandard Agreement Form for Supply of Electrical Energy to Low Tension Consumers.\n1 Duration of Agreement. - This agreement shall commence from the date of supply or the day immediately following the expiry of thirty days' notice of intimation served by the licensee on the consumer that supply of electrical energy is available under this agreement, whichever is earlier. This Agreement shall continue to be in force until the expiry of TWO years from the date of commencement of agreement and thereafter shall be deemed to be continued from year to year unless the agreement is terminated as per clause 4 of this agreement. For domestic and single phase non-domestic consumer, there shall be no initial period of agreement.\nDuration of Agreement.\n2 Electricity Supply Code. - The consumer has obtained and perused a copy of the Madhya Pradesh Electricity Supply Code,2013 including amendments & addendum's made to it from time to time and has understood its contents, and undertakes to observe and abide by all the terms and conditions stipulated therein to the extent they are applicable to him. The said Code as modified from time to time, to the extent they are applicable, shall be deemed to form part of this Agreement. Any regulation framed by the Commission in regard to supply of electricity shall also be deemed to form part of this agreement.\nElectricity Supply Code.\n3 Quantum of Supply. - Subject to the provisions hereinafter contained and during the continuance of this Agreement, the licensee shall supply the consumer and the consumer shall take from the licensee, by any other course as permitted under law, a supply up to but not exceeding a contract demand of ....................kVA/kW/HP from............................................................................... ....................kVA/kW/HP from .......................................................................\nQuantum of Supply.\n4 Type of Supply. - The aforesaid supply shall be from a 50 Hz alternating current system at a normal pressure of......... Volts at ........ phase. The frequency and pressure of the supply at the point of supply shall be subject to fluctuations that are incidental to generation and transmission of electrical energy. But such fluctuations shall not, except for reasons beyond the control of the licensee, exceed the limits provided in IE Rules 1956 and any other applicable rules & regulations\nType of Supply.\n5 Security Deposit. - The consumer shall pay 'Security Deposit' as prescribed under regulations issued by the Commission. The consumer undertakes to make any additional security deposit, as and when called upon by the licensee under regulations issued by the Commission. Failure to pay the deficient security deposit will entitle the licensee to disconnect the supply after serving 15 clear days notice to comply with the deficiency.\nSecurity Deposit.\n6 Metering. - For the purpose of registering the electrical energy taken by the Consumer under this Agreement, a suitable meter and metering equipment shall be provided and maintained by the licensee.\nMetering.\n7 Charges to be paid by the consumer. - The consumer shall pay to the licensee, for power demanded and electrical energy supplied under this agreement, charges in accordance with the Tariff, including other terms and conditions as applicable to the ............................................. category of service and also as per the 'Schedule of Miscellaneous Charges' as in force from time to time. After the commencement of the agreement no further option in the selection of alternative tariffs (within the same category) will be allowed except once in initial agreement period of two years in addition to any option that may be specified in Tariff Order issued by the Commission from time to time.\nCharges to be paid by the consumer.\n8 Disconnection. - In the event of the consumer failing to comply with the terms & conditions of this agreement or any of them, then the licensee is free to discontinue the supply of energy to the consumer, as per the applicable rules and regulations and the licensee shall not be liable for any compensation or damages, if any, so suffered by consumer without prejudice to the right of the licensee to recover the outstanding dues and the applicable demand/minimum charges during the period of such disconnection.\nDisconnection.\n9 Termination of the agreement either by the licensee or the consumer. - Domestic and single-phase Non-domestic category of consumers may terminate the agreement after giving a 15 days' notice. Other consumers can terminate the agreement after the expiry of the initial period of two years on giving one-month's notice. The licensee may also terminate the agreement by providing similar notice to the consumer and stating the reasons of such termination in writing. Provided that if power supply remains disconnected for a period of sixty days for non-payment of dues or non-compliance of the directions issued under the Madhya Pradesh Electricity Supply Code'2013, and even after issue of a show cause notice by the licensee, no effective steps are taken by the consumer for removing the cause of disconnection and for restoration of power supply within the period specified in the notice, the agreement of the licensee with the consumer for power supply shall be deemed to have been terminated on expiry of the period specified in the notice. The period of the show cause notice shall be seven days.\nTermination of the agreement either by the licensee or the consumer.\n10 Special clause(s). (see note given at the end of form)\nSpecial clause(s).\n11 Correspondence.\nCorrespondence.\n(a) Any letter, order or document addressed to the consumer shall be served by post or left at the address given in the preamble to this agreement in the manner prescribed in Section 171 of the Electricity Act, 2003.\n(b) All communication to the licensee shall be addressed to ........................................... or to any other office authorised or designated in this behalf.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "12",
            "title": "12. Stamp Duty. The consumer agrees to bear the cost of the stamp duty and all costs incidental to the execution of this Agreement in full.",
            "chapter": null,
            "content": "Stamp Duty.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "13",
            "title": "13. Disputes. This agreement shall be deemed to be entered into at the location of registered office of the licensee and all disputes and claim, if any, in respect of this contract are to be settled at such locations as mentioned in the Guidelines for Redressal of Consumer Grievances or be triable only in any competent court situated within the area of operation of the licensee.",
            "chapter": null,
            "content": "Disputes.\nSignature of the\n\t\t\t\tconsumer, name & address\nSignature of Authorized Signatory of Licensee\n\t\t\t\tname\nSignature of witness to the execution by the\n\t\t\t\tconsumer, name & address\nSignature of witness to the execution by the\n\t\t\t\tperson of the licensee, name & address\n1.\n1.\n2.\n2.\nNote. * The map of premises attached with the application form by the applicant and verified by the licensee, indicating point of supply thereon, shall become a part of the agreement and both the parties shall be signatory on this map.\nNote.\n** Any other condition(s) that may be mutually agreed between the licensee and the consumer and that is (are) in accordance with the prevailing Rules/Regulations.\nAnnexure 4\nAnnexure 4\nMadhya Pradesh ......... Kshetra Vidyut Vitaran Company Limited, ..........\nMadhya Pradesh ......... Kshetra Vidyut Vitaran Company Limited, ..........\nAgreement for Extra High Tension/High Tension Supply\nAgreement for Extra High Tension/High Tension Supply\nNow it is Hereby Declared and Agreed as Follows. -\nNow it is Hereby Declared and Agreed as Follows.\n1 (a) Subject to the provisions hereinafter contained and during the continuance of this Agreement, the ............ Discom shall supply to the Consumer and the Consumer shall take from the ............ Discom all such electrical energy as the Consumer shall require for the purpose of his own use and for the above mentioned purpose at his premises referred to above, up to a maximum of:-\nKVA from\nKVA from\nKVA from\n(Hereinafter called the contract demand) subject to provisions of clause 13 hereof.\n(b) The consumer shall not sell or transfer or redistribute the electrical energy taken under sub-clause (a) without obtaining the sanction in writing of the Madhya Pradesh Electricity Regulatory Commission (hereinafter called MPERC) under the Electricity Act, 2003.\n2. (a) Commencement of this Agreement shall date either from the actual date on which the Consumer has begun to take electrical energy under this Agreement or the day immediately following the expiry of specified notice period of intimation of ---- days as per Electricity Supply Code, 2013 as in force and as amended from time to time served by the ............ Discom's Executive Engineer of the area on the Consumer that Supply of electrical energy is available under this Agreement, whichever is earlier.\n(b) Subject to the foregoing sub-clause (a) the Consumer shall commence to take electrical energy under the conditions of this Agreement within the specified notice period from the date of notice of the intimation referred to in sub-clause (a) foregoing ; and shall further complete the electrification of his premises within a reasonable time. In the event of non availing the supply by the consumer as per the above terms, he/it shall be liable to pay minimum charges as specified in the tariff as in force from time to time.\n3. (a) The ............ Discom agrees to provide the necessary ......................... volts supply line; from the............ Discom's mains to the premises of the Consumer up to the point of supply required to supply power to the Consumer under this Agreement and the fuses, isolators or oil circuit breakers as may be necessary at the point of supply as per standard practice of the ............ Discom and the Consumer shall pay to the ............ Discom the cost of supply line and plant(s) as may be specified by the ............ Discom in accordance with the relevant Regulations notified by MPERC. Rent on metering equipment and/or any equipment installed by the ............ Discom at the Consumer's request will be charged in accordance with the regulations/orders issued by the MPERC and amendments from time to time.\n(b) Notwithstanding that cost of the supply line and plant(s) is paid for by the Consumer, the ownership of the entire supply line and plant(s) paid for by the Consumer shall vest in the............ Discom and will be maintained by the ............ Discom at its cost.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "4",
            "title": "4. The energy supplied to the Consumer by the............ Discom shall be on 3 phase, 50 cycles, alternating current system at a normal pressure of ____ volts. The frequency and pressure of the electrical energy at the point of supply to the feeders of the Consumer shall be subject to the fluctuations that are ordinary, usual and incidental to the generation and transmission of electrical energy, but such fluctuations shall not, except for reasons beyond the control of the ............ Discom, b",
            "chapter": null,
            "content": "5. (a) The Consumer shall provide and maintain at his expense a locked and weather proof enclosure of a design to be approved by the ............ Discom for purpose of housing the ............ Discom's terminal high tension switchgear and equipment.\n(b) The Consumer shall further provide free of cost to the ............ Discom necessary land belonging to the Consumer and afford all reasonable facilities for bringing in not only the direct cables or overhead lines from the ............ Discom's system for servicing the Consumer, but also cables or overhead lines connecting ............ Discom's other consumers, and shall permit the ............ Discom to provide all requisite switchgear and connections thereto on the above premises and to furnish supply to such other Consumers through cables and terminals situated on the Consumer's premises provided supply to the Consumer in the opinion of the ............ Discom is not thereby unduly affected.\n(c) The Consumer may with the written permission of the ............ Discom house his own H.T. Switchgear and other apparatus connected with a supply of energy to him under this Agreement and as must necessarily be placed therein; but such enclosure shall not be used for any other purpose.\n(d) The representative, servants, subordinates and workmen of the ............ Discom with or without tools shall have access at all times to the said enclosure or premises and to the incoming or outgoing cables or overhead lines laid under, over or across his lands under sub-provision (b) above for purposes of inspection, testing, repairs and maintenance of its property.\n6 The point of supply shall be at the outgoing terminals of the ............ Discom's CUT OUTS that shall be installed under clause 3 or inside the premises provided by the Consumer under clauses 5 of this Agreement; and supply shall be taken to the point designated.\n7 (a) For the purpose of registering the electrical energy taken by the Consumer under this Agreement there shall be provided one____ volt metering equipment (hereinafter referred to as the main meter) on the feeder of the Consumer which shall be the property of and be kept in good condition, repaired and calibrated by the ............ Discom.\n(b) Where metering is done on the low voltage side of supply either on grounds of economy or on account of non-availability of high voltage metering equipment or such other reason, the quantity of electricity consumed in any month on the high voltage for billing purposes will be computed by adding 3% (three percent) extra on account of transformation losses as specified in Electricity Supply Code 2013 or in Tariff Order as in force from time to time, to the total monthly quantity as registered by the meter on the low voltage side.\n8 The Consumer may at his own expense install check-meters in his feeders at his premises. Nevertheless, the quantity of electrical energy and demand as recorded by the main meter installed by the ............ Discom under clause 7 here-of shall be taken at all times (subject to the provisions of clause 14 hereof) as the quantity of electrical energy actually supplied and the demand actually made from the ............ Discom's system.\n9 The meters shall be properly sealed on behalf of both parties and shall not be interfered with by either party except in the presence of a duly authorised representative of the other party.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "10",
            "title": "10. All transformers, switch-gear and other electrical equipments in the installation of the Consumer and also those directly connected to the feeders or lines of the ............ Discom shall be of suitable design and be maintained to the reasonable satisfaction of the ............ Discom. The setting of fuses and relays on the Consumer's control-gear as well as the rupturing capacity of any of his circuit breakers shall be subject to the approval of the ............ Discom. The starting curren",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "11",
            "title": "11. Save as provided herein the supply shall be available continuously except in cases of force majeure as provided in Electricity Supply Code 2013 as in force from time to time, or any cause over which the ............ Discom has no control and in any such case the ............ Discom shall not be responsible for any loss or damages for such discontinuance of the energy but shall recommence the supply as soon as it reasonably can.",
            "chapter": null,
            "content": "12. (a) The Consumer agrees to restrict or regulate consumption of electrical energy supplied to him under this Agreement during peak hours as may be directed by the Area Engineer of the ............ Discom in writing and at any other hours if so required to do, if any power position or any other emergency in the power system warrants such a course of action.\n(b) The Consumer agrees to the supply of electricity under this agreement being curtailed, staggered or cut-off altogether by the ............ Discom, if the power position or any other emergency in the power system warrants such a course of action.\n13. (a) The Consumer may be permitted such additional supply if available in excess of the contract demand as may be agreed upon by the ............ Discom and the Consumer has given due notice in writing of his desire to have the contract demand altered.\n(b) In the event of the ............ Discom agreeing to make such additional supply available, the Consumer shall pay such contribution towards the cost of making such additional supply available as may be intimated by the ............ Discom.\n(c) If such additional supply is made available by the ............ Discom the contract demand specified in clause 1 (a) hereof shall be increased to the same extent.\n(d) After completion of initial period of agreement, the consumer shall be entitled for reduction in contract demand in accordance with the provisions contained in Electricity Supply Code 2013 as in force from time to time. Such reduction in the contract demand shall not effect the consumer's liability to pay the amount of the minimum guarantee, mentioned in clause 21 (a) hereof.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "7",
            "title": "14. The readings/MRI of the meter referred to in clause 7 hereof shall be taken by the authorised representative of the Consumer and the ............ Discom as specified in Electricity Supply Code 2013 as in force from time to time and the reading so taken shall be binding and conclusive between the Consumer, and the ............ Discom as to the amount of electrical energy supplied to the Consumer. In the event of the main meter or the ancillary equipment forming a part thereof being found defe",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "15",
            "title": "15. The Consumer shall at all times allow the officer or servant of the ............ Discom generally or specially authorised by the Chief Engineer in this behalf to inspect the electrical equipment of the Consumer for all or any of the purposes connected with the supply of electrical energy to the Consumer under this Agreement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "16",
            "title": "16. The meters shall be re-calibrated and standardised if so desired, by either party, by means of standard instruments by the ............ Discom in the presence of the Consumer or his representative; provided however that the ............ Discom may; conduct test-checks of the metering equipments at intervals of six months or such other period as specified in the Electricity Supply Code 2013 as in force from time to time.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "17",
            "title": "17. The Consumer shall be entitled on application to the ............ Discom or its authorised representative in this behalf to have a special test of the meters carried out at any time and the expense of such test shall be borne by the ............ Discom or the Consumer according as the meters are found to be defective or correct as a result of such a test, such meters shall be deemed to be correct if the limits of error do not exceed those laid down in the Indian Electricity Rules, 1956, as a",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "18",
            "title": "18. For the purpose of this Agreement the maximum demand of the supply to Consumer in each month shall be equal to four times the largest amount of Kwh/kvah delivered at the point of supply of the consumer in the premises during any consecutive fifteen minutes in that month as per sliding window principle of measurement of demand.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "19",
            "title": "19. The Consumer shall pay to the ............ Discom every month, charges for the electrical energy supplied to the Consumer during the preceding month at the ............ Discom's tariff applicable to the class of service and in force from time to time. A copy of the current H.T. Tariff order no. ________________ dated____ issued by MPERC as amended applicable to the Consumer is set out in the Schedule attached to this Agreement.",
            "chapter": null,
            "content": "20. (a) The tariff is subject to the variable cost adjustment charge if any detailed therein.\n(b) The incidence of the variable cost adjustment charge shall be levied in addition to any minimum charges specified under the tariff in clause 19 or any minimum of special guarantee referred to in clauses 21 hereof.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "21",
            "title": "21. Special conditions and/or charges.",
            "chapter": null,
            "content": "Special conditions and/or charges.\na.\nb.\nc.\nd.\n22. (a) If at any time during the continuance of the agreement between the licensee and the consumer, the use of electricity is not possible fully or partially by the consumer due to force majeure conditions mentioned in Supply Code 2013, as in force from time to time, the consumer may, on giving 7 days notice in writing to the ............ Discom, about such a situation with requisite thereof be permitted a reduced supply of power as may be necessary and feasible. In all cases where the consumer claims Force Majeure conditions, ............ Discom's authorised representative shall verify the same. Such a facility shall be available to the consumer only if the period of reduced supply is for a minimum period of 30 days and up to a maximum of six months as specified in Supply Code 2013. The aforesaid period of reduced supply shall not be counted towards the initial period specified in the agreement and the period of agreement shall be extended for a further period equal to the period of reduced supply.\n(b) The ............ Discom or the consumer shall not be liable for any claim for loss, damage or compensation whatsoever arising out of failure of supply when such failure of supply is due to, either directly or indirectly, to war, mutiny, civil commotion, riot, terrorist attack, flood, fire, strike (subject to certification by Labour Commissioner), lockout (subject to certification by Labour Commissioner), cyclone, tempest, lightning, earthquake or act of God. But in such event the Consumer shall not be liable to pay for any energy not actually supplied by the ............ Discom nor shall the Period of discontinuance be added to the said period of the Agreement.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "23",
            "title": "23. The average monthly power factor of the Consumer's installation shall not be less than 90 percent. Should it, however, fall below 90 per cent or as may be specified in tariff the Consumer shall pay such additional charges as may be specified in the tariff. Should the average power, factor fall below 70 percent, the ............ Discom may, without prejudice to its right to recover the minimum charges under the Agreement, disconnect the Consumer's installation till the arrangements are made t",
            "chapter": null,
            "content": "24. (a) The ............ Discom will as far as possible within fifteen days after the expiration of each calendar month or after the date of reading deliver to the Consumer a bill of charges stating the number of units supplied to the consumer by the ............ Discom in accordance with the reading of the said meters and the amount payable thereof according to the tariff applicable together with other charges payable by the Consumer to the ............ Discom and the Consumer shall pay the same within fifteen days from the date of issue of the bill. The fuel cost adjustment charges as applicable under the tariff will be calculated and incorporated as a part of the bill as may be fixed by the MPERC from time to time.\n(b) The amount to be billed for each month shall be either the charges enumerated in clause 24 (a) above or one-twelfth (1/12) of the guaranteed annual minimum under clauses 21 whichever is higher, subject to monthly necessary adjustment without prejudice to clause 20.\n25. (a) In the event of any dispute or difference as to the correctness of any bill or bills specified under the terms hereof the Consumer shall nevertheless pay such bill or bills or a sum equivalent to average of preceding six months average bills, as specified in Supply Code,2013 within the aforesaid period of fifteen days. Any adjustment necessary due to incorrectness of such bill or bills shall be made by the ............ Discom in accordance with and within the time limit stipulated in Supply Code,2013 after the settlement of said dispute or difference.\n(b) If the Consumer fails to pay any bills as provided in clause 24 he shall be liable to pay a surcharge as specified in the tariff order in force from time to time from the date of the bill if the bill is not paid within fifteen days of the date of the bill, the ............ Discom shall give the Consumer fifteen clear days' notice of intention to discontinue the supply of electrical energy and at the expiry of such period if full payment has not been made, may forthwith disconnect the supply until full payment for all dues outstanding including surcharge and the charges for the work of disconnection and reconnection has been made.\n26. (a) The Consumer shall be required to deposit when demanded in cash and or any other form as may be specified by MPERC to the ............ Discom a sum corresponding to not less than one and half months consumption as security for purpose next hereinafter mentioned, and shall on the like requisition from time to time replenish such security in the event of the same becoming exhausted or insufficient or otherwise considered inadequate in accordance with the Security Deposit Regulations, 2009 notified by the MPERC and as amended from time to time. The ............ Discom will pay interest on the amount deposited in cash at such rate as specified by MPERC in its Security Deposit Regulations 2009 as in force from time to time. The ............ Discom shall be at liberty at any time and from time to time to appropriate and apply any security so deposited as aforesaid in or towards payment or satisfaction of all or any moneys which shall become due or owing by the Consumer to the ............ Discom in respect of supply of energy or otherwise under this agreement, but the provision in this clause contained, shall not prejudice any other remedy to which the ............ Discom may be entitled for the recovery of such moneys.\n(b) If the Consumer fails within thirty days or such other period of notice as may be specified in writing in each case to comply with the terms of any notice requiring him to give any security including additional security or to renew or replenish any security mentioned in sub-clause (a) foregoing which may have become exhausted or insufficient, the ............ Discom may without prejudice to any other remedy to which the ............ Discom is entitled, refuse or discontinue the supply so long as such failure continues.\n27. (a) This Agreement shall remain in force for a period of TWO years certain from the date of its commencement under clause 2 above. This period shall not be affected by anything stated hereinafter in this clause.\n(b) After the period of two years mentioned in sub-clause (a) above, this Agreement shall unless terminated as hereinafter provided be deemed to continue upon the same terms and conditions from year to year provided that after the period of years stated in sub-clause (a) above the Agreement shall be terminable by either party giving at least one months' notice in writing (expiring at the end of any calendar month) before the termination of such period.\n(c) Upon the expiry of such a notice, this Agreement shall terminate without prejudice to the rights which may have accrued hereunder to either party.\n28. (a) The rates and other charges set out in the Schedule referred to in clause 19 hereof and the miscellaneous charges as specified by MPERC from time to time are those in force at the time of executing/commencement of the Agreement. The consumer shall be eligible for whatever reduction in or rebate from these rates/or in charges is granted by the MPERC and will be liable for whatsoever surcharge or increases upon them as may from time to time be fixed by MPERC or be liable to pay any new rate or tariff amount which the MPERC may fix in lieu of the payment fixed under this Agreement.\n(b) The Tariff set out in the Schedule does not include any tax, duty or other charges on electrical energy that may be payable in accordance with any law in force. Such charges will be payable by the Consumer in addition to tariff charges.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "2",
            "title": "29. Where more than one method of charging of the electricity consumed exist in the tariffs applicable to the class of service, the consumer shall exercise his option for one of them at the time of commencement of this Agreement as defined in clause 2 (a) hereof. After the commencement of the Agreement no further option in the selection of alternative tariffs will be allowed except twice during the period the Agreement remain in force. Any automatic change in category that may be forced by such ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "30",
            "title": "30. The Consumer shall not without the previous consent in writing of the ............ Discom assign, transfer or part with the benefit of this Agreement either wholly or partially in favour of any person.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "36",
            "title": "31. In the event of the Consumer failing to comply with the terms of this Agreement or any of them then in addition to the powers conferred on the ............ Discom by the Acts, Rules and Regulations referred to in clause 36 hereof, it shall be lawful for the ............ Discom after giving due notice in writing to the Consumer to discontinue the supply of energy to the Consumer or even disconnect supply forthwith where permitted under law, rules & regulations. The ............ Discom shall h",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "38",
            "title": "32. In the event of the supply of energy being discontinued by the ............ Discom in consequence of any breach or default on the part of the consumer entitling the ............ Discom so to do under the provisions of the Acts, Rules and Regulations referred to in clause 38 hereof, the amount of charges for the electrical energy already supplied and all other moneys then payable under this Agreement shall become due and recoverable forthwith; Provided always and it is hereby expressly agreed",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "33",
            "title": "33. If at any time during the continuance of this Agreement the Consumer shall-",
            "chapter": null,
            "content": "(a) being a limited Company pass a resolution for winding up or be ordered to be wound up by a court of competent jurisdiction and being an individual or individuals commit any act of insolvency or be adjudged insolvent.\n(b) execute or create any mortgage charge, or other encumbrance on any property or asset of the Consumer so as to prejudicially affect the ............ Discom's rights and interests in electric meters, plant, apparatus and equipment at the Consumer's premise or any part thereof or any right exercisable by the ............ Discom in connection with said electric plant, apparatus and equipment; the ............ Discom shall be at liberty to terminate the Agreement by giving seven day's notice in writing to the Consumer and upon such termination the Consumer shall forthwith pay to the ............ Discom all the moneys then due and payable under this Agreement together with a further sum equal to the amount of the tariff minimum or special guarantee whichever is greater for the unexpired minimum agreement period of supply as and by way of liquidated damages.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "34",
            "title": "34. This Agreement for supply of electrical energy supersedes all previous contracts for supply of energy to the premises entered into and executed by the ............ Discom and the Consumer namely:-",
            "chapter": null,
            "content": "(i) Agreement dated .....................\n(ii) Agreement dated .....................\n(iii) Agreement dated .....................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "35",
            "title": "35. Notwithstanding that the ............ Discom may not have taken advantage of some previous breach, defaults or event of like nature on the part of the Consumer, it shall be lawful for the ............ Discom to enforce the terms and conditions of these presents in the event of a subsequent breach, default or event of like nature.",
            "chapter": null,
            "content": "36. (a) The Consumer shall conform to conditions of supply specified by the MPERC from time to time in its Regulations/Codes and also the provisions of the Electricity Act, 2003, and any modification or re-enactment thereof, for the time being in force or that may be enforced from time to time and to the Rules and Regulations framed there under for time being in force or that may be enforced from time to time in so far as the same respectively may be applicable. A copy of the Regulations on \"Electricity Supply Code, 2013\" has been supplied by the ............ Discom to the Consumer and the Consumer hereby acknowledges the receipt thereof.\n(b) Nothing contained in this Agreement or any amendment thereon shall restrict any rights, obligations and discretion's which the ............ Discom or the Consumer has derived under the law and also ............ Discom may derive under any legislation relating to supply and consumption of electricity enacted during the period of this Agreement.\n37. (a) Any letter, order or document addressed to the Consumer shall be served by post or left at the address given in the preamble to this Agreement in the manner specified in Section 53 of the Electricity Act, 2003.\n(b) All communications to the ............ Discom shall be addressed to the Secretary of the ............ Discom at the Corporate Office of the ............ Discom or to any other office authorised or designated in this behalf.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "38",
            "title": "38. Where any expression used in this Agreement is not defined in it or the Electricity Act, 2003, Central Electricity Authority (Measures relating to Safety and Electric Supply)Regulations, 2010, MP Vidyut Sudhar Adhiniyam 2000 and Regulations framed thereunder or in General Clause Act, 1897, such expression shall have the meaning generally assigned to it in the Electricity Supply Industry.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "39",
            "title": "39. This Agreement shall be deemed to be entered into at ............. and all disputes and claim, if any out of and in respect of this contract are to be settled at .............. or be triable only in any competent court situated at ...........",
            "chapter": null,
            "content": "(1) (Name and address)-\n(2) (Name and address) -\nSignature of Authorized Signatory of Madhya Pradesh .......\nKshetra Vidyut Vitaran Company Limited,.....\n(1) (Name and address) -\n(2) (Name and address) -\nSeal of the ............ Discom\n(1) (Name and address)-\n(2) (Name and address) -\nSignature of authorized signatory of Consumer\n(1) (Name and address) -\n(2) (Name and address)-\n(Rubber/Common Seal of the Consumer} in case of limited company\nSchedule\n(Reference Clause 19)\nNote. - Relevant portions of applicable prevailing Tariff Order at the time of execution of the agreement should be treated as above schedule. The schedule and the map of premises attached with the application form by the applicant and verified by the licensee, indicating the premises and point of supply thereon, should be signed by both parties and attached with the agreement which shall form a part of the agreement.\nNote.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 3rd March, 2020 [mp884]",
        "Act Number": "Published vide Notification No. 2164/MPERC/2013, dated 07.08.2013",
        "Enactment Date": "",
        "Act Year": "2013",
        "Short Title": "Madhya Pradesh Electricity Supply Code, 2013",
        "Type": "STATE",
        "Location": "Madhya Pradesh"
    },
    "updated_at": "2026-09-29 21:55:22"
}