    "title": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
    "short_title": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
    "act_number": "Published vide Notification No. 1709/MPERC/2015, d",
    "act_year": 2015,
    "act_type": "STATE",
    "location": "Madhya Pradesh",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Preamble.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Short title, extent of application and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Definitions.",
            "chapter": null,
            "content": "(a) \"Act\" means the Electricity Act, 2003 (36 of 2003);\n(b) \"Buyer\" means a person, including beneficiary, purchasing electricity through a transaction scheduled in accordance with the regulations applicable for short-term open access, medium-term open access and long-term open access;\n(c) \"CERC\" means the Central Electricity Regulatory Commission referred to in section 76 of the Act;\n(d) \"CMRI\" means Common Meter Reading Instrument used for downloading and storage of data from electronic energy meters of multiple make;\n(e) \"Commission\" means the Madhya Pradesh Electricity Regulatory Commission (MPERC) constituted under Section 82 of the Act;\n(f) \"Day\" means a continuous period starting at 00.00 hours and ending at 24.00 hours;\n(g) \"Despatch Schedule\" means the ex-Power Plant net Mega Watt and Mega Watt Hour output of a Generating Station, Scheduled to be exported to the Grid from time to time;\n(h) \"Detailed Procedure\" means the detailed operating procedure issued by the State Load Despatch Centre under this code;\n(i) \"Deviation\" in a time-block for a seller means its total actual injection minus its total scheduled generation and for a buyer means its total actual Drawls minus its total scheduled Drawls;\n(j) \"Deviation Charges\" means the charges computed as per the rates corresponding to average Frequency of the grid in a 15-minute time block as specified by the Central Electricity Regulatory Commission from time to time;\n(k) \"Deviation Settlement Mechanism Regulations\" means Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2014 including any subsequent amendments thereof;\n(l) \"Discom Control Centre (DCC)\" means the Control Room established at each Discom Headquarters with necessary Infrastructure and Human Resources for implementation of this Code (DCC shall be built, owned, operated and maintained by respective Discom);\n(m) \"Discom Energy Accounting Group (DEAG)\" means the group to be formed by each Discom (at DCC) which would be responsible for implementation of this Code in coordination with State Load Despatch Centre (wherever required);\n(n) \"Distribution Licensee or Discom\" means a Licensee authorized to operate and maintain a Distribution System for supplying electricity to the consumers in his area of supply;\n(o) \"Drawls Schedule\" means the ex-Power Plant, Mega Watt that a Discom or an Open Access Customer is Scheduled to receive from an Electricity Generating Station, including Bilateral and Collective transactions from time to time;\n(p) \"Energy Accounting Group (EAG)\" means the group to be formed at the State Load Despatch Centre which would be responsible for implementation of this Code;\n(q) \"Entitlement\" means share of a Discom or an Open Access Customer (in Mega Watt and Mega Watt Hour) in the installed Capacity/output Capability of an Electricity Generating Station;\n(r) \"Ex-Power Plant\" means net Mega Watt / Mega Watt hour output of an Electricity Generating Station, after deducting Auxiliary consumption and Transformation losses;\n(s) \"Generator Control Centre (GCC)\" means the control room established at Headquarters of the generating company with necessary Infrastructure and Human Resources for implementation of this Code (GCC shall be built, owned, operated and maintained by Madhya Pradesh Power Generating Company. Limited);\n(t) \"Grid\" means the high Voltage backbone system of inter-connected Transmission lines,Sub-Stations and Generating plants;\n(u) \"Independent Power Producer (IPP)\" means an Electricity generating company not owned or controlled by the Central / State Government;\n(v) \"Indian Electricity Grid Code (IEGC)\" means the Grid Code specified by the Central Electricity Regulatory Commission under Clause (h) of Sub-section(1) of Section 79 of the Act;\n(w) \"Inter-State Generating Station (ISGS)\" means a Central/other Electricity Generating Station in which two or more States have shares and whose Scheduling is to be coordinated by the Regional Load Despatch Centre (RLDC);\n(x) \"Intra-State Entity\" means a person whose metering is done by the State Transmission Utility or the Distribution Licensee, as the case may be and the energy accounting is done by the State Load Despatch Centre or by any other authorized State Agency.\n(y) \"Madhya Pradesh Electricity Grid Code (MPEGC)\" means the Grid Code specified by the MPERC under Clause (h) of sub-section(1) of Section 86 of the Act;\n(z) \"Month\" means a Calendar month as per the British Calendar;\n(z-a) \"MPPMCL\" means Madhya Pradesh Power Management Company Ltd. notified by the Government of Madhya Pradesh on 29th June' 2012;\n(z-b) \"Net Drawls Schedule\" means the Drawls Schedule of a Discom or an Open Access Customer after deducting the apportioned Transmission Losses (estimated);\n(z-c) \"Open Access Customer\" means a person who has availed or intends to avail of Open Access under Central Electricity Regulatory Commission (Open Access in Inter-State Transmission) Regulations 2008 as amended and Madhya Pradesh Electricity Regulatory Commission (Terms and conditions for intra state open access in Madhya Pradesh) Regulations, 2005 and amendments thereof or a Generating Company (including Captive Generating Plant) or a licensee or a Consumer permitted by the Madhya Pradesh Electricity Regulatory Commission to receive supply of electricity from a person other than Distribution Licensee of his area of supply, or a State Government Entity authorized to sell or purchase electricity;\n(z-d) \"Seller\" means a person, including an Electricity generating station, supplying electricity through a transaction schedule in accordance with the regulations applicable for short-term open access, medium-term open access and long-term open access;\n(z-e) \"State Load Despatch Centre (SLDC)\" means the Centre established under Subsection( 1) of Section 31 of the Act;\n(z-f) \"State\" means the State of Madhya Pradesh;\n(z-g) \"State Energy Account (SEA)\" means monthly State Energy Account prepared by State Load Despatch Centre for the billing and settlement of Capacity charges, Energy charges and incentives, if any, applicable;\n(z-h) \"State Reactive Account (SRA)\" means weekly State Reactive Energy Account prepared by State Load Despatch Centre for the billing and settlement of Reactive Energy Charges;\n(z-i) \"State Deviation Settlement Mechanism Account (SDSMA)\" means weekly State Deviation Settlement Mechanism Account prepared by State Load Despatch Centre for the billing and settlement of Deviation charges;\n(z-j) \"State Sector Generating Station (SSGS)\" means any Electricity Generating Station within the State including bench hydro power station (operated by Madhya Pradesh Power Generating Company Limited), except Inter-State Generating Stations (ISGS) and Independent Power producer generating stations (IPPs) / Captive Power Producer (CPP) located within the State of MP in which state has its share;\n(z-k) \"State Transmission Utility (STU)\" means the Board or the Government Company specified as such by the State Government under Sub-section(1) of Section 39 of the Act;\n(z-l) \"Time Block\" means Block of 15-minute each for which special energy meters record specified electrical parameters and quantities with first Time Block starting and 00.00 hours;\n(z-m) \"Week\" means a period of consecutive seven days commencing from 00.00 hours on the Monday and ending at 24.00 hours on following Sunday as per the British Calendar;",
            "footnote": "",
            "is_definition": true,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Infrastructure and Capability Requirements.",
            "chapter": null,
            "content": "(a) Detailed procedure for Scheduling and Despatch;\n(b) Detailed procedure for Energy Metering (including data collection, data processing, data transfer, data archiving, etc.);\n(c) Detailed procedure for Energy Accounting, Demand Side Management Accounting, Reactive Accounting and Settlement (including management of dedicated Bank Account, management of Letters of Credit, payments/receipts, etc.)\n(d) Any other procedure which State Load Despatch Centre feels necessary for the successful implementation of this Code.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Scheduling and Despatch.",
            "chapter": null,
            "content": "General Principles: Scheduling\n(a) State Load Despatch Centre shall check that the resulting power flows do not give rise to any Transmission constraint. In case of any constraints, State Load Despatch Centre shall moderate the Schedule to the required extent by intimation to concerned Discoms; and\n(b) State Load Despatch Centre shall check that Schedules are operationally reasonable particularly in terms of ramping-up/ ramping-down rates and ratio between minimum and maximum generation levels. State Load Despatch Centre shall moderate the Schedule to the required extent by intimation to concerned Discoms. The ramping up/ ramping down rates in respect of different categories of Stations would be based on the technical data as substantiated by Electricity Generating Stations and as mutually agreed by Discoms or Madhya Pradesh Power Management Company Limited on behalf of Discoms with due consent of State Load Despatch Centre.\n(a) State Transmission loss for a given Week = (Total net injection into the State Grid in a week) - (Total net Drawls from the State Grid in a Week);\n(b) Loss of nth Week shall be computed by the 5th day of the (n+1)th Week;\n(c) This loss figure shall then be used in the Scheduling process from the beginning of the (n+2)th Week;\n(d) State Load Despatch Centre shall round-off actual loss of nth Week to nearest 0.01% for the purpose of Scheduling for the (n+2)th Week (e.g. 4.705% is rounded-off to 4.71%, 3.442% is rounded off to 3.44% and so on);\n(e) Events in the Grid of an exceptional nature could result in abnormally high or low losses in any Week. This could be either a Load crash in the State due to a Weather disturbance or closure of any Major Hydro Power Station during the monsoon for flushing of silt/debris froM the Reservoir or Outage of any major Transmission Lines etc. The losses for these abnormal weeks shall generally be ignored as far as the Scheduling process is concerned. State Load Despatch Centre decision in this regard will be final.\nGeneral Principles: Revision of Schedules\nImplemented Schedules\nTimelines and responsibility matrix (Madhya Pradesh Balancing and Settlement Code)\nTimelines and responsibility matrix (Madhya Pradesh Balancing and Settlement Code)\nTime (Furnish by)\nTime (Furnish by)\nPrimary Activity\nPrimary Activity\nResponsibility\nResponsibility\n10:00 hours\n(i) Western Regional\n\t\t\t\tLoad Despatch Centre intimates MegaWatt and MegaWatt hours\n\t\t\t\tentitlements of Madhya Pradesh in each Inter State Generating\n\t\t\t\tStation to State Load Despatch Centre for the next day i.e.\n\t\t\t\tbetween 00.00 hrs to 24.00 hrs of the following day, in each\n\t\t\t\t15-minute time block;\n(ii) Madhya Pradesh\n\t\t\t\tPower Generating Company Limited* shall advise State Load\n\t\t\t\tDespatch Centre the Station wise ex-Power Plant Mega Watt and\n\t\t\t\tMega Watt hour Capabilities foreseen for the next day i.e.\n\t\t\t\tbetween 00.00 hrs to 24.00 hrs of the following day, in each\n\t\t\t\t15-minute Time Block;\n(iii) Independent\n\t\t\t\tPower Producer and eligible Renewable Energy Generators shall\n\t\t\t\tadvise State Load Despatch Centre the Station wise ex-Power Plant\n\t\t\t\tMegaWatt and MegaWatt hour Injections for the next day i.e.\n\t\t\t\tbetween 00.00 hours to 24.00 hours of the following day,\n\t\t\t\tIndependent Power Producers /Renewable Energy Generators in each\n\t\t\t\t15-minute Time block;\n(iv) Indira Sagar Project, Omkareshwar\n\t\t\t\tHydro-Electric Project, Shared Stations and any other Stations\n\t\t\t\tnot covered under above Serial. Number (i),(ii) and (iii) shall\n\t\t\t\tadvise State Load Despatch Centre the Station wise ex-Power Plant\n\t\t\t\tRespective MegaWatt and MegaWatt hour Capabilities foreseen for\n\t\t\t\tthe next day i.e. between 00.00 Station hours to 24.00 hours of\n\t\t\t\tthe following day, in each 15-minute Time Block.\nWestern Regional Load\n\t\t\t\tDespatch Centre\nMadhya Pradesh Power\n\t\t\t\tGenerating Company Limited/ GCC\nIndependent Power\n\t\t\t\tProducers/Renewable Energy Generators\nRespective Station\n10.30 hours\n(i) State Load\n\t\t\t\tDespatch Centre shall compile total ex- Power Plant MegaWatt. and\n\t\t\t\tMegaWatt hour availability from all the Generating Stations;\n(ii) State Load\n\t\t\t\tDespatch Centre shall compute Station wise and total MegaWatt and\n\t\t\t\tMegaWatt hour Entitlement of each Discom for the next day in each\n\t\t\t\t15-minute Time Block and shall intimate to Madhya Pradesh Power\n\t\t\t\tManagement Company Limited;\n(iii) Each Discom shall intimate to Madhya\n\t\t\t\tPradesh Power Management Company Limited its total MegaWatt\n\t\t\t\tdemand in each 15-minute Time Block for the next day based on\n\t\t\t\tday-ahead demand forecasts grossed up for actual State\n\t\t\t\tTransmission Losses.\nState Load Despatch\n\t\t\t\tCentre\nState Load Despatch\n\t\t\t\tCentre\nMadhya Pradesh Power Management Company Limited/\n\t\t\t\tRespective Discom\n11.00 hours\n(i) Madhya Pradesh\n\t\t\t\tPower Management Company Limited shall compute the shortage and\n\t\t\t\tsurplus of power for State as a whole in consultation with\n\t\t\t\tDiscoms;\n(ii) Madhya Pradesh Power Management Company\n\t\t\t\tLimited shall take decisions for transaction of power through\n\t\t\t\tpower exchanges on day ahead/term ahead basis\nMadhya Pradesh Power Management Company Limited.\n13.30 hours\n(i) Madhya Pradesh\n\t\t\t\tPower Management Company Limited on receipt of Provisional\n\t\t\t\tTransaction Report of power through power exchanges shall run\n\t\t\t\tMerit Order Dispatch for State as a whole for all power plants\n\t\t\t\tincluding power plants allocated to Madhya Pradesh Power\n\t\t\t\tManagement Company Limited.\n(ii) For each Discom,\n\t\t\t\tMadhya Pradesh Power Management Company Limited shall compare\n\t\t\t\t(for each time block) :-\n(a) Total ex-power plant MegaWatt entitlement of a given Discom\n(b) Total ex-power plant MegaWatt demand for a given Discom\n(iii) Madhya Pradesh Power Management Company\n\t\t\t\tLimited shall allocate the power from Madhya Pradesh Power\n\t\t\t\tManagement Company Limited allocation to each Discom as per their\n\t\t\t\tpower requirement for each 15 minutes time block.\nMadhya Pradesh Power Management Company Limited\n\t\t\t\tin consultation with discoms.\n14.00 hours\nMadhya Pradesh Power Management Company Limited\n\t\t\t\tshall intimate to State Load Despatch Centre, the Discom wise\n\t\t\t\tex-Power Plant MegaWatt requisition in each of the Generating\n\t\t\t\tStations along with Long-term Bilateral transactions, Medium Term\n\t\t\t\tTransactions, approved Short term Bilateral transactions and\n\t\t\t\tcollective transactions through power exchanges.\nMadhya Pradesh Power Management Company Limited.\n15.00 hours\nState Load Despatch Centre shall intimate to\n\t\t\t\tWestern Regional Load Despatch Centre, Madhya Pradesh composite\n\t\t\t\trequisition in each of the Inter State Generating Station /\n\t\t\t\tIndependent Power Producers along with other Long-term Bilateral\n\t\t\t\ttransactions, Medium Term Transactions\nState Load Despatch Centre.\n17.00 hours\nWestern Regional Load Despatch Centre intimates\n\t\t\t\tto State Load Despatch Centre, Madhya Pradesh Drawls Schedule at\n\t\t\t\tEx-power plant basis and at Central Transmission Unit- State\n\t\t\t\tTransmission Unit Interface in each 15-minute Time Block for the\n\t\t\t\tnext day.\nWestern Regional Load Despatch Centre.\n17.30 hours\n(i) Madhya Pradesh\n\t\t\t\tPower Management Company Limited on receipt of Final Transaction\n\t\t\t\tReport of power State Load Despatch Centre Western Regional Load\n\t\t\t\tDespatch Centre Madhya 1 Pradesh Power through power exchanges\n\t\t\t\tshall run Merit Order Dispatch for State as a whole for all power\n\t\t\t\tplants including power plants allocated to Madhya Pradesh Power\n\t\t\t\tManagement Company Limited.\n(ii) For each Discom,\n\t\t\t\tMadhya Pradesh Power Management Company Limited shall compare\n\t\t\t\t(for each time block)\na. Total ex-power plant MegaWatt entitlement of a given Discom\nb. Total ex-power plant MegaWatt demand for a given Discom\n(iii) Madhya Pradesh Power Management Company\n\t\t\t\tLimited shall allocate the power from Madhya Pradesh Power\n\t\t\t\tManagement Company Limited allocation to each Discom as per their\n\t\t\t\tpower requirement for each 15 minutes time block.\nMadhya Pradesh Power Management Company Limited\n\t\t\t\tin consultation with discoms.\n18.00 hours\n(i) State Load\n\t\t\t\tDespatch Centre shall finalize ex-Power Plant MegaWatt Generation\n\t\t\t\tSchedules of each seller and MegaWatt Drawls Schedules (at\n\t\t\t\tex-Power Plant and State Transmission Unit-Buyer Interface) of\n\t\t\t\teach Buyer\n(ii) State Load\n\t\t\t\tDespatch Centre shall intimate Generation Schedules to respective\n\t\t\t\tSeller\n(iii) State Load Despatch Centre shall intimate\n\t\t\t\tDrawal Schedules to Madhya Pradesh Power Management Company\n\t\t\t\tLimited / respective Buyer.\nState Load Despatch Centre\n21.30 hours\nState Area Generating Station / Independent\n\t\t\t\tPower Producers /Discoms may inform the modifications to be made,\n\t\t\t\tif any, in the above Schedules to State Load Despatch\n\t\t\t\tCentre/Discoms\nState Area Generating Station /Discoms.\n22.00 hour\nState Load Despatch Centre shall intimate to\n\t\t\t\tWestern Regional Load Despatch Centre, all the modifications\n\t\t\t\tpertaining to Inter State Generating Station / Independent Power\n\t\t\t\tProducers Schedules and Inter-State transactions (if any).\nState Load Despatch Centre\n23.30 hours\nAfter receipt of final Drawls Schedule of Madhya\n\t\t\t\tPradesh from Western Regional Load Despatch Centre at 23.00 hours\n\t\t\t\tand taking into account all the modifications indicated by\n\t\t\t\tDisdoms, State Load Despatch Centre shall issue the final\n\t\t\t\tGeneration Schedules to respective Seller and final Drawls\n\t\t\t\tSchedules to Madhya Pradesh Power Management Company Limited /\n\t\t\t\trespective Buyer.\nState Load Despatch Centre\nDuring the day of operation\nAs per the\n\t\t\t\trequisition submitted by the Discoms or Madhya Pradesh Power\n\t\t\t\tManagement Company Limited on behalf of Discoms or the. revised\n\t\t\t\tDC submitted by the generators State Load Despatch Centre shall\n\t\t\t\trevise the Drawls Schedule / Injection Schedule as per provisions\n\t\t\t\tof this Seller/Buyer Code.\nThe injection schedule of eligible renewable\n\t\t\t\tgenerators shall be revised by State Load Despatch Centre on\n\t\t\t\treceipt of requisition from such generators or coordinating\n\t\t\t\tagency as per provisions of Indian Electricity Grid Code and\n\t\t\t\tother Central Electricity Regulatory Commission / Madhya Pradesh\n\t\t\t\tElectricity Regulatory Commission regulations/orders on renewable\n\t\t\t\tgeneration as amended from time to time.\nMadhya Pradesh Power\n\t\t\t\tManagement Company Limited/Discom/seller/buyer/state load\n\t\t\t\tDespatch Centre.\nRenewable Energy Generating / State Load\n\t\t\t\tDespatch Centre\nWithin 3 days\nState Load Despatch Centre shall prepare\n\t\t\t\timplemented State Load Schedules and final ex-power plant\n\t\t\t\tcapabilities of State Despatch Area Generating Station /\n\t\t\t\tIndependent Power Producers Centre within 3 days or on receipt of\n\t\t\t\timplemented Schedule from Western Regional Load Despatch Centre.\nState Load Despatch Centre.\n*AII Hydro Power Stations of Madhya Pradesh Power Generating Company Limited shall furnish day ahead Declared Capacity (DC) as per Madhya Pradesh Electricity Regulatory Commission (Terms and conditions for determination of Generation Tariff) Regulations, 2012 and amendment from time to time.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Energy Metering.",
            "chapter": null,
            "content": "(i) For generating stations - On the basis of hourly generation data available at State Load Despatch Centre.\n(ii) For interface points of Discoms -The data shall be assessed on the basis of data available for previous week of the ABT meter installed at the same interface point and shall be adjusted in line with load pattern of the adjoining transformers/feeder.\n(iii) For Open Access Customers (OAC) - In case of OAC's, if ABT meter data of main meter / check meter / standby meter or any other meter is not available, then State Load Despatch Centre shall substitute the actual with schedule while calculating the deviation charges.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Energy Accounting and Settlement.",
            "chapter": null,
            "content": "(a) Details of PAFM (Plant Availability Factor achieved during the Month in %) for each State Area Generating Station/ Independent Power Producer;\n(b) Details of mis-declaration of Declared Capability by State Area Generating Station/ Independent Power Producer (if any);\n(c) Details of Energy scheduled to Discoms from Inter State Generating Station and State Area Generating Station /Independent Power Producer;\n(d) The details of energy injection of Renewable Energy Generators (REG) at common metering point, energy purchased by Madhya Pradesh Power Management Company Limited and energy wheeled to Discoms for own use / third party sale as furnished by respective Discoms/ Madhya Pradesh Power Transmission Company Limited; and\n(e) Any other details which State Load Despatch Centre feels necessary to complete the State Energy Account;\nState DSM Account (SDSMA)\n(a) Details of Deviation Settlement Method Tariff Structure currently in force;\n(b) Details of Day-wise and total Deviation transactions for each Entity (details shall include Scheduled Energy, actual Energy, Deviation Charges (unadjusted) and Deviation charges (Adjusted), capping amount and additional deviation charges);\n(c) Summary table listing all {laying Entities (along with net amount payable by them) on left-hand side and all receiving Entities (along with net amount receivable by them) on right-hand side;\n(d) Details of time-blocks of suspension of Deviation due to Transmission constraints and Grid disturbances;\n(e) Any other details which State Load Despatch Centre feels necessary to complete the Deviation Settlement Method Account.\n(a) Amount payable (+) by Intra-State Entity for Over-Drawls;\n(b) Amount receivable (-) by Intra-State Entity for Under-Drawls;\n(c) Amount payable (+) by Intra-State Entity for Under-Generation;\n(d) Amount receivable (-) by Intra-State Entity for Over-Generation.\n(i) if any Intra State entity fails to make payment of Charges for Deviation including Additional Charges for Deviation by the time specified in these regulations during the current quarter of the year, it shall be required to open a Letter of Credit equal to 110% of weekly outstanding liability in favour of Madhya Pradesh Power Management Company Limited or State Load Despatch Centre pool account as the case may be.\n(ii) Letter of Credit amount shall be increased to 110% of the payable weekly liability for Deviation in any week during the quarter, if it exceeds the previous Letter of Credit amount by more than 50%.\nIllustration.\n(iii) In case of failure to pay into the \"State Deviation Pool Account Fund\" within the specified time of 12 days from the date of issue of statement of charges for Deviations, the State Load Despatch Centre shall be entitled to en cash the Letter of Credit of the concerned entity to the extent of the default and the concerned entity shall recoup the Letter of Credit amount within 3 days.\nState Reactive Account (SRA)\n(a) Details of day-wise net Reactive Energy Injection/Drawal during low Voltage (<97%) and high Voltage (>103%) for each Discom;\n(b) Summary of weekly total net Reactive Energy Injection/Drawal during low Voltage (<97%) and high Voltage (>103%) for each Discom;\n(c) Summary of Reactive Charges payable/receivable by the Discom [Note: Rate of reactive energy shall be taken as per Indian Electricity Grid Code and subsequent amendment thereof] and\n(d) Any other details which State Load Despatch Centre feels necessary to complete the State Reactive Account.\n(a) Amount payable (+) by Discom for Drawal when V<97%;\n(b) Amount receivable (-) by Discom for Injection when V<97%;\n(c) Amount payable (+) by Discom for Injection when V>103%;\n(d) Amount receivable (-) by Discom for Drawal when V>103%.\nNomenclature:\nRPC: Total of Regional Reactive Charges. and Inter State .Bilateral Reactive Charges payable (+)-/ receivable (-) by MP.\nSRCP: Total State Reactive Charges payable (+) by Discoms.\nSRCR: Total State Reactive Charges receivable (7) by DiSC . QMS.\nRRA: Reactive Reserve Amount.available in State Reactive Account (i.e. surplus balance amount after settlement of all earlier Reactive transactions)\n(a) Case-i, If Regional Reactive Charges is payable .(+). by Madhya Pradesh and (Regional Reactive Charges +, -State Reactive Charge Receivable) < State Reactive 'Charge Payable: Balance amount shall be kept as reserve (Reactive Reserve Amount) after paying out Regional Reactive Charges and State Reactive Charges Receivable;\n(b) Case-II: If Regional Reactive Charges' is payable (+) by MP and (Regional Reactive Charges State Reactive Charges Receivable) > State Reactive Charge Payable: Surplus amount, if any, available in reserve (RRA) shall be withdrawn to match (Regional Reactive Charge + State Reactive Charge Receivable) and State Reactive Charge Payable. If there is no reserve or if it is inadequate to meet the gap, State Reactive Charge Receivable and State Reactive charge Payable shall be reduced appropriately to match the total pay ables and total receivables;\n(c) Case-Ill: If Regional Reactive Charge is receivable (-) by MP and (Regional Reactive Charge + State Reactive Charge Payable) > State Reactive Charge Receivable: Balance amount shall be kept as reserve (RRA) after paying out SRCR;\n(d) Case-IV: If Regional Reactive Charges is receivable (-) by MP and (Regional Reactive Charges + State Reactive Charge Payable ) < State Reactive Charge Receivable: Surplus amount, if any, available in reserve (RRA) shall be withdrawn to match (Regional Reactive Charges + State Reactive Charge Payable) and State Reactive Charge Receivable. If there is no reserve or if it is inadequate to meet the gap, State Reactive Charge Receivable and State Reactive Charge Payable shall be reduced appropriately to match the total pay ables and total receivables;\n(e) Case-V: If State Reactive Charges are receivable by Discoms and no Regional Reactive Charges (RRC) are receivable and reserve (RRA) has no balance available then no Reactive Charges shall be payable to the Discoms.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Procedure for Imbalance Settlement of Deviation charge.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Data Archiving Requirements.",
            "chapter": null,
            "content": "S. No.\nS. No.\nDocuments / information / data\nDocuments / information / data\nMode and period of\nMode and period of\nResponsibility\nResponsibility\n1.\nShort term Open Access and associated contracts\n\t\t\t\tagreements by Intra-State Entities\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre\n2.\nDeclared Capacity of all State Area Generating\n\t\t\t\tStation / Independent Power Producers / Renewable Energy\n\t\t\t\tGenerators And Entitlements in all Inter State Generating Station\n\t\t\t\t(all revisions)\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Generator Control\n\t\t\t\tCentre\n3.\nDemand, Entitlement and Requisition of each\n\t\t\t\tDiscom (all revisions)\nElectronic -2 Years Paper 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre\n4.\nShort-term Open Access transactions: Bilateral\n\t\t\t\ttransactions (direct and through Traders) and Collective\n\t\t\t\ttransactions through Power Exchanges\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre\n5.\nSchedules of Inter State Generating Station,\n\t\t\t\tSeller and Buyer (all revisions)\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre, Generator Control Centre.\n6.\nABT meter data from Interfaces with Seller, &\n\t\t\t\tBuyer in 15-minute Time Block\nElectronic -2 Years\nState Load Despatch Centre\n7.\nDetails of State Load Despatch Centre\n\t\t\t\tinstructions to Intra-State Entities\nElectronic -2 Years\nState Load Despatch Centre\n8.\nDetails of requests from Intra- State Entities\n\t\t\t\tto State Load Despatch Centre\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre\n9.\nAny other information deemed necessary for\n\t\t\t\tOperational, Commercial Delivery Control Centre or Market Audit\n\t\t\t\tpurpose\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre, Generator Control Centre.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Standing Committee for Market Audi.",
            "chapter": null,
            "content": "(a) A Representative from State Load Despatch Centre (not below the rank of Chief Engineer)- chairperson of the Standing Committee;\n(b) A Representative from State Transmission Unit (not below the rank of Chief Engineer);\n(c) A representative from Madhya Pradesh Power Management Company Limited (not below the rank of Chief Engineer or equivalent post);\n(d) A representative from Madhya Pradesh Power Generating Company Limited L (not below the rank of Chief Engineer or equivalent post);\n(e) A representative from three discoms (on rotation for one year and not below the rank of Chief Engineer or equivalent post);\n(f) A representative from National Hydro Development Corporation, Independent Power Producers (having installed capacity 250 Mega Watt. & above) and Renewable Energy Generators (having installed capacity of 50 Mega Watt & above at single location) on rotation for one year; and\n(g) A Certified Energy Auditor from State Load Despatch Centre /Discom/ Madhya Pradesh Power Generating Company Limited / Madhya Pradesh Power Management Company Limited / State Transmission Unit as nominated by the Standing Committee, to assist the Committee for preparation of energy audit report.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Applicability of Code.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Powers to remove difficultie.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Power to amend.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Savings.",
            "chapter": null,
            "content": "Appendix\nAppendix\nProcedure For Imbalance Settlement Of Deviation Charges Of Intra State Entities\nProcedure For Imbalance Settlement Of Deviation Charges Of Intra State Entities\nThe pool balancing the first step pool balancing\n Open Access Consumers objective of including the amount of Open\n Access Deviation amount payable Step -I of Deviation Settlement\n Account shall be done in two steps; in is done of all Intra State\n entities (under long term) excluding and in the second step\n including Open Access Consumers. The Open Access Consumers in the\n second stage is that adjustment Consumers is nominal even if\n there is large amount of Regional / receivable by MP\nStep-1\nStep-1\nBlock wise Deviation charges amount payable /\n receivable by each participant of the State Pool is calculated at\n the end of the week / month. The day wise Regional Deviation\n Settlement amount payable / receivable by Madhya Pradesh is\n obtained from the Regional Deviation Settlement Method Account\n prepared by_Western Region Power Committee.\nState Deviation Settlement Method Pool Account\n (for a given day in a week / month)\nState Deviation Settlement Method Pool Account\n (for a given day in a week / month)\nAmount Payable by Participants\nAmount Payable by Participants\nAmount Receivables by Participants\nAmount Receivables by Participants\nParticipants\nRs.\nParticipants\nRs.\nD2\n3000\nD1\n4500\nD3\n2000\nSSGS3\n3500\nSSGS1\n3500\nRegional DSM\nAmount\n3000\nSSGS2\n1500\nTotal Payables\nTotal Payables\n10000\n10000\nTotal Receivables\nTotal Receivables\n11000\n11000\nWhere, D1,D2,D3 are Discoms State Region\n Generating Station 1, State Region Generating Station 2, State\n Region Generating Station 3 are State Sector Generating Stations.\n Regional DSM Amount is the Deviation amount payable / receivable\n by Madhya Pradesh.\nThe amount payable and given day In order to\n Receivables\" is taken as receivable to / from State\n Deviation Pool does not match for a match them, the average of\n the \"Total Pay ables\" and \"Total a base and\n payable / receivables are matched to average.\nParticular\nParticular\nTotal Amount Payable\nTotal Amount Payable\nTotal Amount Receivables\nTotal Amount Receivables\nSum Total\n10000\n11000\nAverage of the 'Total Amount Payable and \"Total\n Amount Receivables'\n10500\nAdjustment Ratio AR p1 (=Average / Total Amount Payable)\n1.05\nAdjustment Ratio AR R1 (=Average / Total Amount\n Receivable)\n0.954545\nFirst Stage Adjustment\nFirst Stage Adjustment\nAmount Payable by Participants - first\n Adjustment\nAmount Payable by Participants - first\n Adjustment\nParticipants\nParticipants\nOriginal Payable.\nOriginal Payable.\nAdjusted Ratio ARp1\nAdjusted Ratio ARp1\nAdjusted payable\nAdjusted payable\nD2\n3000\n1.05\n3150\nD3\n2000\n1.05\n2100\nState Region Generating Station 1\n3500\n1.05\n3675\nState Region Generating Station 2\n1500\n1.05\n1575\nTotal Pay ables\nTotal Pay ables\n10000\n10000\n10500\n10500\nAmount Receivable by the,;Participants-First\n Adjustment\nAmount Receivable by the,;Participants-First\n Adjustment\nParticipants\nParticipants\nOriginal Payable.\nOriginal Payable.\nAdjusted Ratio ARp1\nAdjusted Ratio ARp1\nAdjusted,Payable\nAdjusted,Payable\nD1\n4500\n0.954545\n4295\nState Region Generating Station 3\n3500\n0.954545\n3341\nRegional Deviation\nSettlement Method\nAmount\n3000\n0.954545\n2864\nTotal Receivables\nTotal Receivables\n11000\n11000\n10500\n10500\nSince regional Deviation adjustments, difference\n adjusted Deviation Settlement participant in proportion to\n Settlement Method amount must be paid without any actual regional\n Deviation Settlement Method amount\" and Method amount\"\n shall be recovered from remaining their original amounts\nDifference between adjusted regional Deviation\n Settlement Method amount and\n=2864-3000=-136\nActual Regional Deviation Settlement Method\n amount\nOriginal Total receivables excluding Actual\n Regional Deviation Settlement Method amount\n=11000-3000=8000\nAdjustment Ratio ARR2 for receivables\n= - 136/8000 = -0.017046\nSecond Stage Adjustment\nSecond Stage Adjustment\nParticipants\nParticipants\nOriginal Receive ables\nOriginal Receive ables\nAdjustment Ratio\nAdjustment Ratio\nARR1\nARR1\nAdjusted Receivables\nAdjusted Receivables\nD1\n4500\n-0.017046\n-77\nState Region Generating Station 3\n3500\n-0.017046\n-60\nTotal Receivables\n8000\n8000\n-136\n-136\nAmount Receiveables by Participants (for a\n given day in a week) - Final\nAmount Receiveables by Participants (for a\n given day in a week) - Final\nParticipants\nParticipants\nAmount After first Adjustment\nAmount After first Adjustment\nsecond Adjustment\nsecond Adjustment\nTotal ,(Final) Adjusted Amount\nTotal ,(Final) Adjusted Amount\nD1\n4295\n-77\n4219\nState Region Generating Station 3\n3341\n-60\n3281\nRegional Deviation Settlement Method Amount\n3000\n0\n3000\nTotal Receivables\nTotal Receivables\n10636\n10636\n-136\n-136\n10500\n10500\nFinal Balanced State Deviation Settlement Method Pool Account\nFinal Balanced State Deviation Settlement Method Pool Account\nAmount Payable by Participants\nAmount Payable by Participants\nAmount Receive able by Participants\nAmount Receive able by Participants\nParticipants\nRs.\nParticipants\nRs.\nD2\n3150\nD1\n4219\nD3\n2100\nSSGS3\n3281\nState Region Generating Station 1\n3675\nRegional DSM Amount\n3000\nState Region Generating Station .2\n1575\nTotal Pay ables\nTotal Pay ables\n10500\n10500\nTotal Receivables\nTotal Receivables\n10500\n10500\nStep -II\nStage I & lI\nAfter obtaining the balanced Deviation\n Settlement Mechanism pool account in step-I, the Open Access\n Generators/ Open Access Consumers (under short term) are included\n and same methodology is applied as of step-I for obtaining the\n balanced Deviation Settlement Mechanism pool account.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 14th February, 2020 [mp921]",
        "Act Number": "Published vide Notification No. 1709/MPERC/2015, dated 18.09.2015",
        "Enactment Date": "",
        "Act Year": "2015",
        "Short Title": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
        "Type": "STATE",
        "Location": "Madhya Pradesh"
    },