{
    "id": 18771,
    "slug": "m-p-electricity-supply-code-2004",
    "title": "M.P. Electricity Supply Code, 2004",
    "short_title": "M.P. Electricity Supply Code, 2004",
    "act_number": "Published vide Notification No. 861-MPERC-04, date",
    "act_year": 2004,
    "act_type": "STATE",
    "location": "Madhya Pradesh",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "M.P. Electricity Supply Code, 2004",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Proof of legal occupation of the premises alongwith the copy map of the premises/land, indicating proposed point of supply, duly approved by the local authority. In case of street lights the location of street light poles shall be indicated in the map.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Approval/permission of the local authority, if required under any law/statute.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. In case of partnership firm, partnership deed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. In case of a Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. In case of industries, copy of certificate of registration with Industries Department.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately.",
            "chapter": null,
            "content": "Annexure-2\nAnnexure-2\nApplication form-High Tension Service Connection\nApplication form-High Tension Service Connection\nNew Connection/Shifting of Premises/Change in Contract Demand/ Change of Tariff Category/Change of Name of Consumer\n(Please strike-off the purpose that is not applicable)\n(a) Name of the person/organization :..................................\n(b) Name of father/husband/Director/Partner/Trustee :..................\n(c) Full Address of the premises where a new connection is hereby applied for/the existing connection is proposed to be shifted :...........................\nPIN ..................................................................\nTelephone No :\nFactory/Premises :.....................\nRegistered Office :....................\nResidence ............................\nE-mail .....................................\nBank A/C No. (optional):....................\n11 kV\n33 kV\n132 kV\n220 kV\n(a) ...............................\n(b) ...............................\n(c) ...............................\n(d) ...............................\n(a) Diversity factor assumed................\n(b) Total Connected Load....................\nSl. No.\nCD required (kVA)\nTentative Date from which required\nRemarks\n(a) The information provided in the form above is true to my knowledge.\n(b) I/We have read the Madhya Pradesh Electricity Supply Code and agree to abide by the conditions mentioned therein.\n(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.\n(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.\nNote. - The following documents shall be attached with the application form :\nNote.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "1",
            "title": "1. Proof of ownership of the premises.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "2",
            "title": "2. A map indicating therein the proposed location of the plant/office and the point where supply is required. The map should normally be of the scale of 1 cm representing 1200 cm.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "3",
            "title": "3. Licence/NOC from statutory authority, if required or a declaration by the applicant that his connection does not fall under the requirement of NOC under any statute.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "4",
            "title": "4. In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor of the firm.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "5",
            "title": "5. In case of partnership firm, partnership deed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "6",
            "title": "6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "7",
            "title": "7. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "8",
            "title": "8. Letter of intent for production/enhancement in production may be furnished.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "9",
            "title": "9. List of equipments proposed to be installed along with the expected load.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "10",
            "title": "10. Resolution for authorised signatory.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "11",
            "title": "11. Registration from Industries Department.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "12",
            "title": "12. Extract of project report relevant to power and process requirements (in case of industries).",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "13",
            "title": "13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.",
            "chapter": null,
            "content": "Annexure-3\nAnnexure-3\nDetermination of Connected Load\nDetermination of Connected Load\nDomestic Connection\nDomestic Connection\nItem\nLoad per item (Watts)\nNo.\nTotal load (Watts)\n1\n2\n3\n4 = 2 x 3\nBulb\n60\nTube light\n50\nFan\n60\nTape-recorder/Music system\n100\nTelevision\n90\nMixie\n375\nElectronic iron\n750\nFridge\n150\nCooler\n250\nHeater (for cooking and water heating)\n1000\nWashing machine\n750\nGeyser\n2000\nMicrowave oven\n2000\nAir Conditioner (1 ton)\n1500\nAir Conditioner (1.5 ton)\n2250\nComputer\n100\nPrinter\n150\nPump-set\n375\nTotal\n(a) Spare socket points/holders shall not be counted towards connected load.\n(b) In some domestic connections Geyser, Room Heater and Air-conditioner (without heater) are installed. If both Geyser(s) and Room Heater(s) are present, the load of these two types of items shall be added and compared with the load of Air-conditioner(s). The higher load between the two (that is load of Geyser(s) plus Room Heater(s) vis-a-vis load of Air-conditioner(s) shall be considered for determination of connected load.\nSignature of the Consumer\nSignature of the licensee's representative\nDate :.....................\nDate :.....................\nPlace :...................\nPlace :.....................\nAnnexure-4\nAnnexure-4\nTest Report\nTest Report\nTo be filled up by licensed Electrical Contractor\nBook No..........................\nForm No...............\nTo be filled up by the licensee\nTo be filled up by the licensee\nTo be filled up by the licensed electrical contractor\nTo be filled up by the licensed electrical contractor\n(a) I have........... class license valid till................. The license number is...........\n(b) I have completed this work for Mr./Mrs./Ms.............. for his.........\nDetails of Job\nDetails of Job\nSl. No.\nItem\n220/230 Volts\n440/400 Volts\nRed Phase\nGreen Phase\nBlue Phase\nNo.\nTotal Watts\nNo.\nTotal Watts\nNo.\nTotal Watts\nNo.\nTotal Watts\n1\n2\n3\n4\n5\n6\n7\n(c) (i) The particulars of the employees who executed the job are tabulated below.\nSl. No.\nName of the Wireman/Trainee\nDesignation\nPeriod\nFrom\nTo\n(ii) The work was carried out under the supervision of.............. (Supervisor Wireman) whose certificate number is........ He is responsible for work carried out during the period...............\n(d) This installation specifications adhere to all the provisions of India Electricity Rules, 1956.\n(a)\nThe installed switches are of correct ratings:\nYes/No\n(b)\nAll the switches and wiring are permanent and of correct\n specifications\nYes/No\n(c)\nAll plugs are of three pin type and controlled by separate\n switches\nYes/No\n(d)\nAll the Single Pole switches connected to the phase\nYes/No\n(e)\nRequired permanent mark is provided on the main-switch board\n for Neutral point\nYes/No\n(f)\nArrangement for earthing is according to Rule 61 of Indian\n Electricity Rules, 1956\nYes/No\n(g)\nIn case of three phase installation\nYes/No\n(i) Danger board, fire extinguisher with buckets, shock chart\n and first aid kit have been provided for\nYes/No\n(ii) The installation specifications of the switch board is as\n per Rule 15 of Indian Electricity Rules, 1956\nYes/No\nDate of testing..............\nInsulation of Earth\nInsulation between conductors\nPhase 1\nPhase 2\nPhase 3\nEarth Resistance\nDate of testing\nElectrode No. 1\nElectrode No. 2\nSignature of the Licensed Electrical Contractor\nCertificate from Supervisor wireman\nCertificate from Supervisor wireman\nSignature of Supervisor wireman\nReceipt\nReceipt\nSignature of Officer in Charge\nName\nDesignation\nDate\nCertificate from Supervisor wireman\nCertificate from Supervisor wireman\nSignature of Supervisor, wireman\nReceipt\nReceipt\nSignature of Officer in Charge\nName\nDesignation\nDate",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        }
    ],
    "metadata": {
        "Act ID": "mp240",
        "Act Number": "Published vide Notification No. 861-MPERC-04, dated 27th March, 2004, M.P. Rajpatra, Part 4 (Ga), dated 16-4-2004",
        "Enactment Date": "",
        "Act Year": "2004",
        "Short Title": "M.P. Electricity Supply Code, 2004",
        "Type": "STATE",
        "Location": "Madhya Pradesh"
    },
    "updated_at": "2026-09-29 21:55:20"
}