            "number": "1",
            "title": "Preamble / Statement of Objects",
            "chapter": null,
            "content": "2.48 \"Encroachment\" means an act to enter into the possession or rights either of permanent or temporary nature on a land or buildup property of local body or state/central Government;",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "1",
            "title": "1. Short title, Extent and commencement.",
            "chapter": null,
            "content": "i. All Regional Development Authorities.\nii. All Urban Local Bodies.\niii. Mineral Area Development Authority.\niv. All Industrial Area Development Authorities.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "2.2 \"Act\" means the JRDA Act 2002 (Adopted), Jharkhand Municipal Act, 2011 & Mineral Area Development Authority Act 2001, Ranchi Regional Development Authority Act 2001 & Jharkhand Industrial Area Development Authority Act 2001.\n2.3 \"Advertising Sign\" means any surface or structure with characters, letters or illustrations applied there to and displayed in any manner whatsoever outdoors for the purpose of advertising or giving information or to attract the public to any place, person, public performance, article, or merchandise, and which surface or structure is attached to, forms part of; or is connected with any building, or is fixed to the ground or to any pole, screen, fence or hoarding or displayed in space, or in or over any water body included in the jurisdiction of the Authority;\n2.4 \"Affordable Housing\"\n(a) \"Affordable Housing Project\" shall mean housing projects where 35% of the houses are constructed for EWS/LIG category.\n(b) \"Affordable Housing Units\" shall mean dwelling units for EWS and LIG households only.\n(c) Economically Weaker Section (EWS): EWS households are defined as households having an annual income up to Rs.3,00,000 (Rupees Three Lakhs) or State shall have the flexibility to re-define the annual income criteria as per local conditions in consultation with the Centre.\n(d) EWS House: An all weather single unit or a unit in a multi-storied super structure having carpet area of up to 30sqm. with adequate basic civic services and infrastructure services like toilet, water, electricity etc.\n2.5 \"Agricultural use\" means use of land for the purpose of agriculture, horticulture, sericulture, animal husbandry, poultry farming, plant nursery, piggery, dairy farming, vegetable farming and any activity related to agriculture or milk chilling plant;\n2.6 \"Air-Conditioning\" means the process of treating air so as to control simultaneously its temperature, humidity, cleanliness and distribution to meet the requirement of conditioned space;\n2.7 \"Air Port Reference Point\" means a designated point, which is established in the horizontal plain at or near the geometric center of the landing area as defined by the concerned airport authority;\n2.8 \"Amenity\" means roads, street, open spaces, parks, recreational grounds, play grounds, gardens, water supply, electric supply, street lighting, sewerage, drainage, public works and other utilities, services and conveniences;\n2.9 \"Annexure\" means an Annexure appended to these bye laws;\n2.10 \"Apartment (Flat)\" means a part of the property, provided by the promoter/developer in a multi-storied building including one or more rooms or enclosed spaces located on one or more floors or any part for residential or for the practice of any profession or for the carrying on of any occupation, trade or for business or such other type of independent uses as may be prescribed, and with a direct exit to a public street, road or highway or to a Common area or room (whether or not adjacent to the multi-storied building in which such Apartment is located) provided by the promoter for use by the owner of such Apartment for parking any vehicle or as the case may be for the residence of any domestic aide employed in such an Apartment.\n2.11 \"Addition/Alteration\" means structural change, such as addition to the covered area or height or the removal of part of a building or construction or cutting into or removal of any load bearing/wall/partition/column, beam, joist, floor or other support etc. excluding opening and closing of a window or door or ventilator providing intercommunicating doors or providing partitions.\n2.12 \"Applicant\" means the person who is the owner of the land or building or has title to a land lease or building and includes:\nA. A trustee who is entrusted with or is concerned with any building. Approved by the Authority having jurisdiction.\nB. A receiver, executor or administrator or a manager appointed by any Court of competent jurisdiction to have the charge of or to exercise the rights of the owner.\nC. A mortgagee in possession;\nD. A builder or developer engaged by the owner.\n2.13 \"Authority\" means Ranchi Regional Development Authority/Urban Local Bodies (ULB)/Mineral Area Development Authority, Industrial Area Development Authority.\n2.14 \"Balcony\" means a Horizontal projection to serve as passage or sit out place including parapet;\n2.15 \"Barsati\" means a covered space of the roof used as a shelter during rain. It will have at least one side open and will not cover more than 20% of the area of the roof and in no case such covered area will not exceed more than 20sqm. Barsati shall be a common area of the building and shall not be sold out as a separate unit. In case construction is made in violation of the norms mentioned the barsati shall be treated and accounted for as a separate floor under these bye laws.\n2.16 \"Basement or cellar\" means part of building below or partly below the ground level.\n2.17 \"Builder\" means an applicant, land owner, contractor, holder of power of attorney of the land owner, partnership, trust or company which has responsibility for construction, leasing, selling or disposing otherwise of a building for residential and other purposes and duly registered by the Authority.\n2.18 \"Board\" means a Board constituted by the State Government/Authority/U LBs.\n2.19 \"Building\" means any structure or erection or part of a structure or erection which is intended to be used for residential, commercial. industrial or any other purpose including boundary wall whether in actual use or not, and in particular. The building shall be classified as below:\n2.19.1. \"Assembly Building\" refers to a building or part of a building where group of people congregate or gather for amusement, recreation, social, religious, patriotic and similar purposes and includes theaters, assembly halls, auditoria, exhibition halls, museum, skating rink. gymnasium, dance hall, club rooms recreation places and stadia;\n2.19.2 \"Commercial Building\" refers to a building or part of a building, which is used for transaction of business, keeping of accounts and records or for similar purposes and includes Banks and Commercial Offices and Corporate offices. It shall include mercantile buildings like shops, stores, market display and sale of merchandise either in wholesale or retail, or offices, storage or services facilities incidental to the sale of merchandise and includes Cinema Halls, Petrol Pumps. Hotels, Restaurants, Clinics, Pathology Labs, Nursing Homes, Lodge-cum-guesthouses & Dharm Kantas, Hospitals, Dispensaries etc.;\n2.19.3 \"Educational Building\" refers to a building used for school, college, or daycare purpose for more than 8 hours per week involving assembly, instructions, education or recreation;\n2.19.4 \"Hazardous Building\" refers to a building or part of a building which is used for the storage, handling, manufacture or processing of highly combustible or explosive materials or products which are liable to burn with extreme rapidity and/or producing poisonous fumes, or the storage, handling, manufacturing or processing of which involves highly corrosive, toxic, obnoxious alkalis, acids or other liquids, gases or chemicals, producing flame, fumes and explosion, poisonous irritant or corrosive gasses and for the storage, handling or processing of any material producing explosive mixture of dust or which result in the division of matter into line particles subject to spontaneous ignition. This shall include petrol filling stations;\n2.19.5 \"Industrial Building\" refers to a building or part of a building in which products or materials of all kind and properties are fabricated, assembled or processed such as assembly plants, laboratories, power plants, smoke houses, refineries, gas plants, mills, dairies or factories;\n2.19.6 \"Institutional Building\" refers to a building or part of a building which is used for purposes such as Research and Training Centre, Public/Semi Public offices, Mental Health Care Center and Hospitals with teaching facilities;\n2.19.7 \"Mercantile Buildings\" refers to arty building or part of a building which is used as shops, stores, market, for display and sale of merchandise, either wholesale or retail, office, stores, and service facilities incidental to the sale of merchandise and located in the same building shall be included under this group;\n2.19.8 \"Residential Building\" refers to a building in which sleeping accommodation is provided for normal residential purpose with or without cooking or dining or both facilities and includes one or two or multi-family dwelling dormitories, apartment houses, flats and hostels;\n2.19.9 \"Public Utility Building\" means and includes Post Office, Police Station, Fire Station, Hospital, Dispensary, Health Centre, and Telephone Exchange, sub-station, water works, Taxi Stands, Bus Terminals, etc.;\n2.19.10 \"Storage Building\" refers to a building or part of building used primarily for the storage or sheltering of goods, storehouses. hangers. terminal depot. grain elevators, barn or stables;\n2.19.11. \"Multi-Level Car Parking Building\" means a building partly below ground level having two or more basements or above ground level, primarily to be used for parking of cars. scooters or any other type of light motorized vehicles;\n2.20 \"Accessory Building\" means a subordinate building, use of which is incidental to that of a principal building, on the same plot such as garage, coal or fuel shed, peons, chowkidars, or domestic help quarters, etc;\n2.21 \"Building Height\" means the vertical distance measured. in the case of flat roofs, from the average level of the centre line of the adjoining street or plinth subject to limit of 0.90m. from the existing average level of the Centre line of the adjoining street to the highest point of the building wall adjacent to the street and in case of pitched roofs, up to the point where the external surface of the outer wall intersects the finished surface of the sloping roofs, and in the case of gables facing the road the mid point between the eaves level and ridge. Architectural features serving no other function except that of decoration shall be excluded for the purpose of measuring heights of the building.\n2.22 \"Building line\" means the line up to which the plinth of a building adjoining a street or an extension of a street or on a future street may lawfully extend and includes the lines prescribed in any development plan in operation for any area under the jurisdiction of the Authority or specification indicated in any Planning or Development Scheme, or in these Bye Laws;\n2.23 \"Built up Area\" means the total covered areas on all floors of an immovable property;\n2.24 \"Canopy\" means cantilevered projection over any entrance;\n2.25 \"Carpet area\" means the covered area of the usable rooms of an apartment unit at any floor (excluding the area covered by walls, columns and partitions;\n2.26 \"Cornice\" means a sloping or horizontal structural overhang usually provided over openings or external walls to provide protection from sun and rain; or for architectural consideration;\n2.27 \"Chajja/Sun-Shade\" means a sloping or horizontal structural overhang, usually provided at lintel level for protection from sun and rain or for architectural considerations;\n2.28 \"Chimney\" means an upright shaft containing and encasing one or more flues provided for the conveyance to the outer air of any product of combustion; resulting from the operation of any heat producing appliance or equipment employing solid, liquid or gaseous fuel;\n2.29 \"Combustible materials\" means a material, which bums or adds to a fire when used for combustibility in accordance with good practice;\n2.30 \"Competent Authority\" shall mean the Authority Notified by the Government of Jharkhand Urban Development & Housing Department. It shall be the VC of RRDA/MD of MADA/MD of AIDA & MC/EO of the respective municipalities/ULBs;\n2.31 \"Conversion\" means the change of occupancy to another occupancy or change in building structure or part thereof resulting in change of space or use requiring additional occupancy certificate;\n2.32 \"Corner plot\" means a plot at the junctions of and fronting on two or more intersecting streets the frontage could be on the street having larger width. In cases, where the two streets are of same width, then the larger side of the plot will decide the frontage. In such case, the location of a garage (on a corner plot) if provided, within the open space shall be located diagonally opposite the point intersection;\n2.33 \"Courtyard\" means a space permanently open to sky, with or without pergola, enclosed fully or partially by buildings and may be at ground level or any other level within a building;\n2.34 \"Coverage\" means percentage of covered area on the ground floor which is not open to sky excluding the chajja/roof/balcony projections up to 0.75 meter width overhanging the open space to the total plot area;\n2.35 \"Covered Area\" means in respect of ground floor, area covered immediately above the plinth level by the building but does not include the open space covered by:\n2.35.1 Gardens, rockery, well and well-structures, rainwater harvesting structures, plant nursery, water-pool (if uncovered), platform round a tree, tank, fountain, bench, chabutara with open top unenclosed on sides by walls. boundary wall. swing, and area covered by chhajja without any pillars etc, touching the ground;\n2.35.2 Drainage culvert conduit. catch-pit, gully pit, inspection chamber, gutter and the like;\n2.35.3 Compound wall, Porch and Portico without any construction over it, gate, slide/swing door, canopy, and areas covered by chajjas or similar projections steps leading to the plinth not higher than 0.9m;\n2.35.4 Watchmen booths, pump houses, garbage shafts, electric cabins or substations, and such other utility structure meant for the services of the building under construction;\n2.36 \"Development\" means such dead end means of access with an additional turning space not less than 81 square meters in area having no dimension less than 9 m.;\n2.37 \"Damp-Proof Course\" means course consisting of some appropriate water proofing material provided to prevent penetration of dampness;\n2.38 \"Detached building\" means a building whose walls and roof are independent of any other building with open spaces on all sides;\n2.39 \"Development\" means carrying out of building, engineering, mining or other operations in, or over, or under land or water, or in the use of any building or land, and includes redevelopment and layout an subdivision of any land; and to develop shall be construed accordingly;\n2.40 \"Department\" means an Urban Development and Housing Department, Government of Jharkhand;\n2.40.1 \"Development Authority\" means an authority as defined by the Jharkhand Regional Development Authority Act-2001, Jharkhand Industrial Area Development Authority Act-2001 and MADA;\n2.41 \"Development Plan/Comprehensive Development Plan\" includes any development plan either interim or comprehensive or zonal plan in operation for the area under the jurisdiction of the Authority;\n2.42 \"Deviation\" means any construction made in departure from the approved plan by way of alterations or additions, modifications in the total floor area, coverage, floor area ratio (FAR), setbacks, height, parking space, provision of public utilities etc.\n2.43 \"Drain\" means a line of pipes including all fittings and equipment such as manholes, inspection chamber, traps, gullies and floor traps, used for the drainage of a building or a number of buildings, or yards appurtenant to the buildings within the same cartilage and includes open channels used for conveying surface water;\n2.44 \"Drainage\" means the removal of any liquid by a system constructed for this purpose;\n2.45 \"Dwelling Unit\" means an independent housing unit with facilities for living, cooking and sanitary requirements;\n2.46 \"EWS House\" means a house/flat or dwelling unit intended for Economically Weaker Sections with maximum carpet area of 30sqm. or as decided by the State Government;\n2.47 \"EWS Plot\" means a residential plot intended for Economically Weaker Sections having maximum plot area of 48sqm. or as decided by the State Government;\n2.48 \"Encroachment\" means an act to enter into the possession or rights either of permanent or temporary nature on a land or buildup property of local body or state/central Government;\n2.49 \"Existing Use\" means use of a building or structure existing authorized with the approval of the Authority before the commencement of these Bye laws;\n2.50 \"Enclosed stair-case\" means a stair-case, separated by fire resistant walls from the rest of the building;\n2.51 \"Existing Building or Use\" means a building, structure or its use as sanctioned/approved/regularized by the Competent Authority, existing before the commencement of these Bye laws;\n2.52 \"Exit\" means a passage, channel or means of egress from any building, storey or floor area to a street or other open space of safety;\n2.53 \"External Wall\" means an outer wall of a building even though adjoining to a wall of another building and also means a wall abutting on an interior open space of a building;\n2.54 \"Farm House\" means a plot of land including construction thereon in the area designated for agricultural use by the Authority.\n2.55 \"Farm Shed\" shall include permanent or temporary structures erected in the plot used for farmhouse;\n2.56 \"Fire Alarm System\" means an arrangement of call points or detectors, sounders and other equipment for the transmission and indication of alarm and sometimes used as signals for testing of circuits and whenever required for the operation of auxiliary services.\n2.57 \"Fire Lift\" means lift specially designed for use by fire service personnel in the event of fire;\n2.58 \"Fire Proof Door\" means a door or shutter fitted to a wall opening, and constructed and erected with the requirement to check the transmission of heat and fire for a specified period;\n2.59 \"Fire Resisting Material\" means the material, which is normally used for fire resistance;\n2.60 \"Flat\" means a dwelling unit in building.\n2.61 \"Floor\" means the lower surface in a storey on which one normally walks in a building;\n2.62 \"Floor Area\" means accessible covered area of a building on any floor.\n2.63 \"Floor Area Ratio (FAR)\" means the quotient obtained by dividing the total covered area on all floors with the area of the plot;\n2.64 \"Footing\" means the part of a structure, which is in direct contact with the ground and transmitting loads to the ground;\n2.65 \"Forms\" means forms appended to these bye laws\n2.66 \"Foundation\" means that part of a structure, which is indirect contact with and meant for transmitting loads to the ground;\n2.67 \"Gallery\" means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor area. additional seating accommodation, etc. It shall also include structures provided for seating in stadia;\n2.68 \"Garage-Private\" means a building or a portion thereof designed for parking of privately owned motor vehicles or any other vehicles;\n2.69 \"Garage-Public\" means a building or a portion thereof designed or used for repairing, servicing, hiring, selling or parking of motor driven or any other vehicles;\n2.70 \"Ground Floor\" shall mean storey, which has its floor surface nearest to the ground around the building;\n2.71 \"Group Housing\" means the development normally and preferably in two or more multi-storeyed blocks shall not be customary sub-division of land into street and plots. It may be also of low rise buildings in many clusters.\n2.72 \"Group Housing Scheme\" is reckoned as development of Residential Buildings in a Campus or Site of 3000sqrn. and above in area and could be row houses, semi-detached/detached Houses, Apartment blocks or High-Rise buildings or mix or combination of the above.\n2.73 \"Habitable room\" means a room having area of not less than 9.5sqm., minimum width of 2.4m. and minimum height of 2.75m. (2.40 m. in case of air conditioned rooms or areas) occupied or designed for occupancy by one or more persons for study, living, sleeping, eating, cooking if it is used as a living room, but does not include bathrooms, water closet compartments, laundries, serving and storage pantries, corridors, cellars, attics and spaces that are not used frequently or during extended periods;\n2.74 \"Hazardous material\"\n2.74.1 Means material which are highly combustible or explosive and or which may produce poisonous fumes explosive emanations, or storage. handling, processing or manufacturing of which may involve highly corrosive, toxic, obnoxious alkalis or acids or other liquids or radioactive substances;\n2.74.2 Other liquids or chemicals producing flame, fumes, explosive, poisonous, irritant or corrosive gases or which may produce explosive mixtures of dust or fine particles capable of spontaneous ignition;\n2.75 \"Hazardous and obnoxious industry\" means industry which creates nuisance to the surrounding development in the form of smell, smoke, gas, dust, air pollution, water pollution and other unhygienic conditions;\n2.76 \"Natural hazard prone areas\" means areas likely to have moderate to high intensity earthquake, or cyclonic storm, or significant flood flow or inundation, or landslides/mud flows/avalanches, or one or more of these hazards;\nNote: Moderate to very high damage risk zones' of' earthquakes are shown in Seismic Zones III. IV and V specified in IS: 1893 and flood prone areas in river plains (unprotected and protected) are indicated in the Flood Atlas of India prepared by the Central Water Commission, besides,. Other areas which can be flooded under conditions of heavy intensity rains, inundation in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area and landslide prone areas as identified by State Government/Land surveys;\n2.77 \"heritage Zone\" means the area as delineated in Development Plan/MP/ZDP;\n2.78 \"Illuminated Exit Signs\" means a device for indicating the means of escape during normal circumstances and power failure;\n2.79 \"Jhamp\" means a downward vertical or sloping projection hanging below the balcony to provide protection from direct sun or rain.\n2.80 \"Katra/Chawl\" means a building so constructed as to be suitable for living in separate tenements each consisting a single room, or of two, but not more than two rooms and with common sanitary arrangements;\n2.81 \"Land Use\" means use of the land proposed in the Development Plan/Master Plan/Zonal Plan. Before coming into operation of the Development Plan/Master Plan/Zonal Plan, for the purpose of the application of these bye laws, the authority may designate land use zone with the approval of the Government;\n2.82 \"Latrine-connected\" means a latrine connected to the municipal sewer system;\n2.83 \"Latrine-unconnected\" means a latrine not connected to the municipal sewer system: it may be connected to a septic tank or suitable treatment or disposal system;\n2.84 \"Lay by\" means a place at the side of a road where a vehicle can turn or can stop for a short time without interrupting other traffic, this area Should be in level of the road and suitably paved;\n2.85 \"Ledgell Tand\" means a shelf-like projection supported in any manner whatsoever, except by means of vertical supports within a room itself but not having projection wider than 1.0 meter and at a minimum clear height of 2.1 meters from the floor level;\n2.86 \"LIG House\" means a house or dwelling unit intended for low income groups with a carpet area of maximum 60sqm. or as specified by the State Government;\n2.87 \"LIG Plot\" means a residential plot intended for low income groups with a plot area of maximum 60sqm. or as specified by the State Government;\n2.88 \"Loft\" means an intermediate floor between two floors or a residual space in a pitched roof, above normal floor level with a maximum height of 1.5 meters and which is constructed or adopted for storage purposes only;\n2.89 \"Licensed Technical Person\" means Architect registered with the Council of Architecture or Civil Engineer/Structural Engineer/Town Planner/Supervisor licensed by the Authority;\n2.90 \"Masonry\" means an assemblage of masonry units properly bonded together with mortar;\n2.91 \"Master Plan\" means any document prepared under the Jharkhand Regional Development Authority Act-2002/Jharkhand Municipal Act-2011 and erstwhile Jharkhand Town Planning and Improvement Trust Act-1951 and any other Ordinance or enactments to be formulated from time to time by the Authorities set up under the provisions of the above enactments or prepared in consistent with any relevant act by Jharkhand State Town and Country Planning Organization for ensuring organized urban development.\n2.92 \"Mezzanine Floor\" means an intermediate floor between any two floors;\n2.93 \"Mixed Land Use\" means mixed use of the building/premises consisting of more than one compatible use of which the principal use shall not be less than 2/3rd of total built up area;\n2.94 \"Multi-Storey or high Rise Building\" means a building whose height is 16.40 meters or more: but for purpose of fire regulation of any building of 15 metre and above in height shall be considered as Multi Stored building;\n2.95 \"Mumty or Stair Cover\" means a structure with a covering roof over staircase and its landing built to enclose only the stairs for the purpose of providing protection from weather and not used for human\n2.96 \"Mitigation\" means measures taken in advance of a disaster aimed at minimizing or eliminating its impact on society and on environment including preparedness and prevention;\n2.97 \"New Area\" means such area as notified by the Authority with approval of Urban Development & Housing Department;\n2.98 \"Non-Combustible Material\" means a material, which does not burn nor add heat to a fire when tested for combustibility in accordance with good practice;\n2.99 \"Non -Conforming Use of a Building or Land\" means the use of a building or land existing at the time of commencement of these Bye laws, and which does not conform to the Bye laws pertaining to the zone in which it is located;\n3.0 \"Occupancy or Use\" means the principal occupancy for which a building or a part of a building is used or intended to be used.\n3.1 \"Old Area\" means such area as notified by the Authority/ULBs with approval of Urban Development & Housing Department. In case of Ranchi area under jurisdiction of Ranchi Municipal Corporation as on Dec, 2015 shall be consider as Old Area and area beyond that shall be deemed to be New Area;\n3.2 \"Open Space\" means an area forming an integral part of the plot, left open to the sky;\n3.3 \"Owner\" means a person, group of persons, a company, trust, Institute, Registered body, State or Central Government and its departments, undertakings and the like in whose name the property stands registered in revenue records. The owner shall include:\n3.3.1 An agent or trustee who receives the rent on behalf of the owner;\n3.3.2 An agent or trustee who receives the rent of or is entrusted with or is concerned with any building, devoted to religious or charitable purpose;\n3.3.3 A receiver, executor or administrator or a manager appointed by any court of competent jurisdiction to have the charge of or to exercise rights of the owners, and\n3.3.4 A mortgage in possession\n3.4 \"Parapet\" means a low wall or railing built along the edge of a roof or a floor having a minimum height of 1.0m;\n3.5 \"Parking Space\" means an area enclosed or unenclosed, covered or open, of sufficient size to park vehicles, together with a driveway connecting the parking space with a Street or any public area and permitting ingress and egress of the vehicles;\n3.6 \"Parking Complex/Parking Lot\" means premises either built or open which is utilized purely for parking of vehicles permitted in specific areas,\n3.7 \"Partition\" means an interior non-load bearing wall, one storey or part of a storey in height,\n3.8 \"Permit\" means a permission or authorization in writing by the Authority to carry out the work regulated by these Bye-laws;\n3.9 \"Plantation\" means plantation of plants and trees;\n3.10 \"Plinth\" means the portion of a structure between the surface of the surrounding ground and the surface of the floor, immediately above the ground;\n3.11 \"Plinth Area\" means the built up area measured at the floor level of ground floor;\n3.12 \"Porch\" means a covered surface supported on pillar or otherwise for the purpose of pedestrian or vehicular approach to a building;\n3.13 \"Public Utility service\" means drainage, sewerage, electricity, water supply, solid waste disposal, sanitation, fire services, roads and any other support or infrastructure and the like for which a building has to depend on public bodies, authorities or agencies;\n3.14 \"Ramp\" means a passage with gradual slope joining two level surfaces;\n3.15 \"Real Estate Development\" means development undertaken for sale;\n3.16 \"Registered Architect\" means an Architect registered with the Council of Architecture and who has not been debarred by the Authority:\n3.17 \"Registered Builder/Developer\" means a builder registered with the Authority and who Ids not been debarred by the Authority;\n3.18 \"Registered Engineer\" means a engineer empanelled/registered with the Authority and who has not been debarred by the Authority;\n3.19 \"Road\" means any access vise, highway, street, lane, pathway, alley, or bridge, whether a thoroughfare or not, over which the public have right of passage or access or have passed and had access uninterruptedly for a specified period and includes all bunds, channels, ditches, storm water drains, culverts, side tracks, traffic islands, road side trees and hedges, retaining walls, fences barriers and railings within the road line;\n3.20 \"Road Width or Width of Road/Street\" means the whole extent of space within the boundaries of a road when applied to a new road/street as laid down in the city survey or development plan Master Plan/Zonal Plan or prescribed road lines by any act of law and measured at right angles;\n3.21 \"Row Housing\" means a row of contiguous houses with only front, rear and interior open spaces;\n3.22 \"Room Height\" means the vertical distance measured from the finished floor level to the finished ceiling;\n3.23 \"Schedule\" means a Schedule appended to these bye laws;\n3.24 \"Section\" means section of the Regional Development Authority Act/Jharkhand Municipal Act-2011, Jharkhand Area Development Authority Act-2001 and Mineral Area Development Authority Act-2001;\n3.25 \"Sanction Plan\" means the set of plans and specifications submitted under the Bye-laws in connection with a building and development of land and duly approved and sanctioned by the authorities/ULBs.\n3.26 \"Semi-Detached Building\" means building detached on three sides (front, rear and side) with open spaces as specified under the Bye laws.\n3.27 \"Set back\" means the distance between the plinth lines of the building and the boundary/property line of the plot. The setback shall be measured at ground level.\n3.28 \"Setback line\" means a line usually parallel to the plot boundaries and laid down in each case by the Authority beyond which nothing can be constructed towards the plot boundaries.\n3.29 \"Settlement\" means a human settlement, whether urban or rural in character. It includes habited villages, towns, townships, cities and the areas notified under the control of the Authority.\n3.30 \"Site\" means a parcel or piece of land enclosed by definite boundaries.\n3.31 \"Site with Double Frontage\" means a site having frontage on two streets other than corner plot.\n3.32 \"Service Floor\" means floor used for services in hotel or commercial building above ground floor in case of more than four storied buildings.\n3.33 \"Service Lane\" means a lane provided at rear or side of a plot for service purposes.\n3.34 \"Service Road\" means a road/lane provided at the front, rear or side of a plot for service purpose.\n3.35 \"Site Depth\" means horizontal distance between the front and rear side boundaries.\n3.36 \"Smoke Stop Door\" means a door for preventing or checking the spread of smoke from one area to another.\n3.37 \"Stilt floor\" means a floor supported by pillars with all sides open to be used for parking, switch room, generator room, society room, information room, entrance lobby, guard room and visitors' toilet with minimum clear height of 2.4 meter from floor to ceiling and not less than 2.10m. from the soffit of beams.\n3.38 \"Storage Space\" means a space where goods of non-hazardous nature are stored and includes cold storage and banking safe vaults.\n3.39 \"Store Room\" means a room used as storage.\n3.40 \"Spiral Staircase\" means a staircase forming continuous winding curve round a central point or axis provided in a open space having tread without risers.\n3.41 \"Storey\" means the space between the surface of any floor and the surface of the floor next above it, or if there be no floor above it then the space between any floor and the ceiling next above it, but shall not include a service or mezzanine floor;\n3.42 \"Supervisor\" means a person having Diploma in Architectural Assistant-ship/Diploma in Civil Engineering/equivalent qualification.\n3.43 \"Tenements\" means room or rooms in the occupation of, or meant for the occupation of one tenement;\n3.44 \"To abut\" means to abut on a road so that any portion of the building or land is on the road boundary;\n3.45 \"To erect\" a building means:\n3.45.1 To erect new building on any site whether previously built upon or not;\n3.45.2 To re-erect any building of which portions above the plinth level have been pulled down or destroyed;\n3.46 \"Tribunal\" means A Tribunal created under JRDA Act 2002/Jharkhand Municipal Act 2011.\n3.47 \"Unsafe Building\" means buildings which are structurally and constructional unsafe, or in-sanitary, or do not provide adequate means of egress, or which constitute fire hazard, or are otherwise dangerous to human life or property, or which in relation to existing use constitute a hazard to safety/health/public welfare by reason of inadequate maintenance, dilapidation or abandonment.\n3.48 \"Unauthorized Construction\" means the erection or re-erection, addition or alternation, which is not approved or sanctioned by the Authority.\n3.49 \"Underground/Overhead Tank\" means an underground/overhead water tank, constructed or placed to store water.\n3.50 \"Verandah\" means space with at least one side open to the outside with the exception of one-meter parapet on the upper floors to be provided on the open side.\n3.51 \"Ventilation\" means the supply of outside air into a building through window or other openings due to wind outside and convection effects arising from temperature, or vapor pressure differences (or both) between inside and outside of the building.\n3.52 \"Water Closet'/W.C.\" means a privy with arrangement for flushing the pan with water but does not include a bath room;\n3.53 \"Watercourse\" means a natural channel or an artificial channel formed by draining or diversion of a natural channel meant for carrying storm and waste-water.\n3.54 \"DAKHAL KABJA\" means an opening to the outside other than a door, which provides all or part of the required light or ventilation, or both to an interior space.\n3.55 Risk based classification of Buildings-\nCriteria\nCriteria\nHigh Risk\nHigh Risk\nMedium Risk\nMedium Risk\nLow Risk\nLow Risk\nHazardous Building\nStoring explosives and inflammable\nNot so\nNot so\nFly Zone\nAbove 30 meters in any place and within funnel\n\t\t\t\tzone of Airport.\nLess than 30 meters and within funnel zone of\n\t\t\t\tAirport\nOutside funnel zone of Airport\nFire\nGround Coverage of more than 500 sqm. on any\n\t\t\t\tfloor of building and more than 15 meters height\nGround coverage of more than 300 sqm. on any\n\t\t\t\tfloor of building or more and 11 meters height\nNone\nBuilding Stability (Concrete Building)\nMore than 60 year of age of building\n50-70 years\nLess than 50 years\nType of usage\nclose assembly building\nOpen assembly building\nNon assembly building\n3.56 There are four categories inspections have been mentioned in Bye-laws. These four categories inspections have been linked to risk category of building. The following tables have exhibited the relationship between inspection category and risk category of building\nName of Inspection\nName of Inspection\nRisk Category of Building\nRisk Category of Building\nLow\nLow\nMedium\nMedium\nHigh\nHigh\nInspection\nMandatory\nMandatory\nMandatory\nThird Party inspection cum certification\nOptional\nMandate\nMandatory\nJoint Inspection\nOptional\nMandate\nMandatory\nSurprise Inspection\nOptional\nOptional\nNote:- As per above table, inspections is compulsory for all categories of buildings. Joint inspection and third party inspection-cum-certification are mandatory to medium an high risk category of building. Surprise inspection will be based complain received and observation by concern authority.\nChapter -II\nAdministration",
            "footnote": "",
            "is_definition": true,
            "sort_order": 2
        },
        {
            "number": "3",
            "title": "3. Applicability.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "4",
            "title": "4. Deemed Permission.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "5",
            "title": "5. Application.",
            "chapter": null,
            "content": "Table 1: Coloring notation of the plans\nTable 1: Coloring notation of the plans\nSl.\nSl.\nItem\nItem\nSite Plan\nSite Plan\nBuilding Plan\nBuilding Plan\nComputer Print/White Print\nComputer Print/White Print\nBlue Print\nBlue Print\nAmmonia Print\nAmmonia Print\nComputer Print/White Print\nComputer Print/White Print\nBlue Print\nBlue Print\nAmmonia Print\nAmmonia Print\n1\n2\n3\n4\n5\n6\n7\n8\n1\nPlot Line\nThick Black\nThick Black\nThick Black\nThick Black\nThick Black\nThick Black\n2\nExisting Street\nGreen\nGreen\nGreen\n-\n-\n-\n3\nFuture Street\nGreen dotted\nGreen dotted\nGreen dotted\nGreen dotted\n-\n-\n4\nPermissible Building\nThick dotted black\nThick dotted black\nThick dotted black\nThick\nThick\nThick\n5\nOpen Spaces\nNo Colour\nNo Colour\nNo Colour\nNo Colour\nNo Colour\nNo Colour\n6\nExisting outline\nBlack\nWhite\nBlue\nBlack\nWhite\nBlack\n7\nWork Proposed to be demolished\nYellow hatched\nYellow hatched\nYellow hatched\nYellow hatched\nYellow hatched\nYellow hatched\n8\nProposed work-\n(a) Additions and alterations\nRed tilled\nRed\nRed\nRed\nRed\nRed\n(b) Entirely new work\nNot to be coloured\nNot to be coloured\nNot to he coloured\nNot to be coloured\nNot to be coloured\nNot to be coloured\n9\nDrainage and sewerage work\nRed dotted\nRed dotted\nRed dotted\nRed dotted\nRed dotted\nRed dotted\n10\nWater Supply work\nBlack dotted thin\nBlack dotted thin\nBlack dotted thin\nBlack dotted thin\nBlack dotted thin\nBlack dotted thin\n5.3.1 Key Plan- This shall show the location of land proposed to be subdivided. This shall also show the North point and scale used.\n5.3.2 Site Plan- This shall be drawn on a scale of not less than 1:1000 for plots up to 10 hectares and not less than 1:2000 for plots above 10 hectares and shall show-\n5.3.2.1 The boundaries of the site with dimensions and the details of contiguous land belonging to application indicating the kheasra numbers or any other equivalent local denomination, and in case, the continuous land owned by the applicant had been subdivided earlier, public facilities provided in it and all streets within it opening out in the site for which the permission is being sought.\n5.3.2.2 The means of access for existing street (name and width of the street is to be mentioned) to the land. which, the applicant intends to subdivide.\n5.3.2.3 The position of all existing structures and features like high tension line, telegraph and electrical poles, underground pipe lines, trees, grave yards, religious buildings, railway lines, etc. within a distance of 30 meters from the nearest edge of the site.\n5.3.2.4 All major physical characteristics of land proposed to be developed which include the approximate location and size of water body, normal flood-affected areas and contours at an interval of 0.5 meters in case of the site which has a slope of more than I in 20.\n5.3.2.5 Location of the site in Master Plan/Zonal Development Plan or in zoning as specified by the authority. Copies of Master Plan/Zonal Development Plan shall be supplied by the Authority on Payment. The Master Plan/Zonal Plan shall also be made available on the Web Site of the Authority which could be downloaded by the applicant for use.\n5.3.2.6 Present and proposed use of land.\n5.3.2.7 Scale used and north point.\n5.3.3 Sub-division layout Plan- This shall be drawn on a scale of not less than 1:500 for Plot upto 10 hectares and not less than 1:1000 for plots above 10 hectares. This shall apply to plans for integrated development schemes also. This shall contain the following-\n5.3.3.1 Scale used and north point,\n5.3.3.2 The location of all proposed and existing roads with their widths within the land,\n5.3.3.3 Building lines showing the set backs with dimensions within each plot where applicable,\n5.3.3.4 The location of drains, sewers, public facilities and services and electrical lines etc. and their connections to existing public utility services system,\n5.3.3.5 An analysis indicating, size, area and use of all the plots in the subdivision lay out plan,\n5.3.3.6 A statement indicating the total area of the site area utilized under roads, open spaces, schools, shopping and other public places along with their percentage with reference to the total area of the site proposed to be subdivided,\n5.3.3.7 In case of plots which are subdivided in built up areas in addition to the means of access to the subdivision from existing streets and the exiting service lines laid.\n5.3.4 Specification-Every application for permission of sub-division of land shall also be accompanied by the following statements-\n5.3.4.1 A statement containing general specification of all improvements proposed to be made within the area for example, grading and paving of roads and lanes, provision of gutters, side drains, provision of sufficient, safe and assured water supply, arrangement of sewage disposal, street lighting and development of parks and play fields and public utilities,\n5.3.4.2 The purpose for which the land is to be used and a written analysis of distribution of land under different uses,\n5.3.4.3 General specifications of the materials to be used;\n5.3.4.4 The quality and quantity of effluent in respect of industrial units. Any other statement required by the Authority.\n5.4.1 Self Attested copy of the original sale/lease deed, and\n5.4.2 Self Attested copy of the revenue receipt (Malguzari receipt) Municipal Holding Tax receipt with khesra/holding No., Khatiyan or mutation records.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "6",
            "title": "6. Application for building permit.",
            "chapter": null,
            "content": "6.1.1 The boundary of the site with the contiguous land around it.\n6.1.2 The position of site in relation to neighboring street along with the municipal plot number and revenue plot number the name of the street in which the building is proposed to be situated, if any;\n6.1.3 The name of street in which the building is proposed to be situated if any;\n6.1.4 All existing buildings standing on over or under the site;\n6.1.5 The position of the building or of all other building (if any) which the application intents to erect upon his contiguous land to in relation to:\n6.1.5.1 The boundaries of the site and in case where the site has been partitioned, the boundaries of the portion owned by the applicant and also of the portion owned by the others.\n6.1.5.2 All adjacent streets, buildings (with number of the stories) and premises within a distance of 15m of the site of the contiguous land (if any).\n6.1.5.3 If there is no street within a distance 15rn of the site, the nearest existing street.\n6.1.6 The means of access from the Street to the building and all other building which the owner intends to erect upon his contiguous land;\n6.1.7 Dimension of the spaces to be left in and around the building to secure a free circulation of air, admission of light and access for scavenging purposes and details of projection (if any) on the open spaces;\n6.1.8 The width of the Street (if any) in front and of any street (if any) at the site of rear of the proposed building;\n6.1.9 Scale used and the direction of north point relating to plan of ...the building.\n6.1.10 any existing physical features, such as wells, drains etc.\n6.1 11 Sewerage and drainage lines up to discharge point and water supply lines.\n6.1.12 location of trees.\n6.1.13 such other particulars as may be prescribed by the authority.\n6.2.1 Include the floor plans/mezzanine plan/service floor of all floors together with the covered area clearly indicating the spacing of all framing members and sizes of rooms and the position of staircase, ramps and lift wells;\n6.2.2 Show the use or occupancy of all parts of the building;\n6.2.3 Details of the parking spaces with calculations;\n6.2.4 Show exact location of essential services for example: WC, sink, bath and the like including the water supply and drainage line;\n6.2.5 Including two elevation (front and sides) and sectional drawing with their materials and size and locations of doors, windows and other openings. The sections shall indicate the heights of building and rooms and also the height of the parapet and the drainage and slope of the roof. At least one section should be taken through the staircase;\n6.2.6 Show all street elevations (levels), finished ground level;\n6.2.7 Indicate details of compound walls (including height and sections) around the boundary;\n6.2.8 Give dimensions of the permissible projected portions within open spaces;\n6.2.9 Rain water harvesting system, terrace plan indicating the drainage and the slope of the roof;\n6.2.10 Give indications of the north point relative to the plan and scale used; and\n6.2.11 Any other particulars as desired by the Authority.\n6.5.1 Self Attested copy of the original sale/lease deed, and\n6.5.2 Self Attested copy of the Revenue Survey sheet/Municipal Survey sheet with Khesra no. or mutation record.\nNote: The above sub-section of byelaws as applicable 6.10, 6.11, 6.12, 6.13, 6.14, 6.15, 6.16, 6.17, 6.18 & 6.19 shall be as per the approval of Fire Service Department.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "7",
            "title": "7. Certificates/Clearances.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "8",
            "title": "8. Signing the Plans.",
            "chapter": null,
            "content": "Note:- 1. The registered Architect/Technical Person who has prepared the plan shall put the empanelment number/Registration No. and seal on all plans and documents signed by him and shall also furnish a certificate to the effect that he shall supervise the construction of the building and shall he responsible for any deviation from the approved plan except if the Owner/Architect/Technical person intimates that their agreement for services has been terminated. The constructions shall be stopped immediately until agreement with another architect/technical person is executed and intimated immediately to the authority.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "2",
            "title": "2. Wherever required under these bye-laws, the registered Structural Engineer, who has prepared the structural design, shall put his seal, and address on all the documents signed by him and shall also furnish a certificate to the effect that he shall supervise the structural part of the construction and shall be responsible for any structural failure except caused by unprecedented natural calamities in Form-W and except if the owner intimates that his services have been terminated.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "3",
            "title": "3. All aspects related to structural design, building surface, plumbing, electrical installation, sanitary arrangements, fire protection shall adhere to the specification, standards and code of practice recommended in the National Building Code of India, 2005 and any breach' thereof shall be deemed to be a breach of the requirements tinder these Bye laws.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "9",
            "title": "9. Fees.",
            "chapter": null,
            "content": "9.1.1 Every application for permission for building operation or development shall be accompanied by a building fee as specified in these bye laws.\n9.1.2 Fees for retention of structures for temporary period shall he as decided by the Authority from time to time.\n9.1.3 Fees for change of occupancy as decided by the Authority from time to time.\n9.1.4 Fees for change of land use as decided by the Authority with permission to State Government from time to time.\n9.1.5 Any other fee decided by the authority with the approval of the Urban Development and Housing Department or concern Department.\n9.1.6 The concern department may change the fees prescribed in these bye laws through a notification from time to time.\nTable 2 : Development permit fees\nTable 2 : Development permit fees\nSl.\nSl.\nArea of Plot\nArea of Plot\nNagar Panchayat (Rs)\nNagar Panchayat (Rs)\nMunicipal Council (Rs)\nMunicipal Council (Rs)\nMunicipal Corporation/RRDA\n\t\t\t\tMADA/IADA\nMunicipal Corporation/RRDA\n\t\t\t\tMADA/IADA\n(i)\n(ii)\n(iii)\n(iv)\n(v)\n1\nupto 1.0 hectare\n6000\n8000\n10000\n2\nabove 1.0 hectare & up to 2.5 hectare\n12000\n15000\n20000\n3\nabove 2.5 hectare & up to 5.0 hectare\n16000\n20000\n30000\n9.2.1 For development permit above 5 hectare for every addition of 1 hectare or part there will be an additional fee of Rs.2000 per hectare.\n9.2.2 In the case of development permit for non residential use the above fees shall be doubled for different sizes of land\nTable-3.1 Residential buildings up to 500sqm. permit Fees-Rs. Per sqm.\nSl.\nSl.\nHeight of Building\nHeight of Building\nNagar Panchayat\nNagar Panchayat\nMunicipal Council\nMunicipal Council\nMunicipal Corporation/Development\n\t\t\t\tAuthorities/IADA\nMunicipal Corporation/Development\n\t\t\t\tAuthorities/IADA\n(i)\n(ii)\n(iii)\n(iv)\n(v)\n1\n1\nupto 10.0 m\n10.0\n15.0\n20.0\n2\n2\nmore than 10 up to 16.4m\n20.0\n25.0\n40.0\n3\n3\nMore than 16.4 m\n30.0\n35.0\n50.0\nTable-3.2 Residential buildings more than 500sqm. permit Fees-Rs. Per sqm\nSl.\nSl.\nHeight of Building\nHeight of Building\nNagar Panchayat\nNagar Panchayat\nMunicipal Council\nMunicipal Council\nMunicipal Corporation/Development\n\t\t\t\tAuthorities/IADA\nMunicipal Corporation/Development\n\t\t\t\tAuthorities/IADA\n(i)\n(ii)\n(iii)\n(iv)\n(v)\n1\n1\nupto 10.0 m\n15.0\n20.0\n30.0\n2\n2\nmore than 10 up to 16.4m\n25.0\n35.0\n50.0\n3\n3\nMore than 16.4 m\n35.0\n45.0\n60.0\nNote.- (1) Minimum fees for residential building shall be Rs. 2000/-\n(2) Fee at the time of submission of the map will be 50% of the total fee calculated at the time of submission. The final fee will be deposited before issuing the sanctioned Plan. The deposited fees will not be refunded under any circumstances.\n9.6.1 The department may alter various aforementioned fees from time to time as per requirement and circumstances.\n9.6.2 The department may exempt various aforementioned fees as case to case basis as per requirement and circumstances.\n9.7.1 For re-erection of existing building, the fees chargeable shall be the same as that for erection of new building.\n9.7.2 For additions and alterations in the existing building, the fees shall be chargeable on the added portions only, and on the same scale as for a new building.\n9.7.3 For revision and revalidation of a plan of a building, which the Authority has already sanctioned, the fees chargeable shall be 1/4 of the fees chargeable on the original plan subject to the condition that the covered area of the building has not increased than in the original sanctioned plan.\n9.7.4 In case of additions and alterations of building, if the use of the building is also changed, then the chargeable fees shall be calculated on the use proposed.\n9.7.5 In case of basements, for the purpose of calculating the fees the area covered under the basement shall .be counted towards the covered area.\n9.7.6 In the case of buildings with principal and subsidiary occupancies, in which the fees to be levied are different, and then the fees for the total building scheme shall be calculated as per the rates applicable for respective occupancies.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "10",
            "title": "10. Permission.",
            "chapter": null,
            "content": "10.1.1 Opening and closing of a window or door or ventilator;\n10.1.2 Providing intercommunicating doors;\n10.1.3 Providing or removing partitions;\n10.1.4 Providing false ceiling;\n10.1.5 Gardening;\n10.1.6 White washing;\n10.1.7 Painting;\n10.1.8 Re-tiling and reproofing;\n10.1.9 Plastering and patch work;\n10.1.10 Re-flooring; and\n10.1.11 Construction of sunshades on one's own land.\n10.8.1 The applicant shall submit an application to the Authority as prescribed in bye law 5(4) along with a certificate from the registered Engineer/Architect that the building plan and the design complies with the Earthquake Safety.\n10.8.2 The height is not more than 10 meters,\n10.8.3 The number of floors does not exceed ground plus two floors,\n10.8.4 No basement is to be constructed,\n10.8.5 The road, drainage, sewerage and other infrastructure have been developed as per the approved layout plan or provisions for their development has been made in the building plan,\n10.8.6 A notice in Form-X is submitted to the Authority, with a copy of the plan, documents mentioned at above and the record of rights, statement of compliances made to the objection raised by the Authority (if any) 60 days prior to commencement of construction; and\n10.8.7 All other conditions of the bye laws are met;\n10.8.8 The owner shall have to submit completion certificate to the Authority in proforma of Annexure-VI.\n10.8.9 The owner shall remain responsible for any violation of the norms prescribed under the Bye laWs: Nothing in this provision will enable the owner to violate any of the provisions of the Bye laws. The registered architects/engineers/town planners and other technical personnel shall also be responsible for any violation of norms prescribe under the bye-laws.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "11",
            "title": "11. Duration of Permission.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "12",
            "title": "12. Information at the site of construction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "13",
            "title": "13. Periodic report of Construction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "15",
            "title": "15. Third Party certification.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "16",
            "title": "16. Accreditation and gradation of Architects/Engineers.",
            "chapter": null,
            "content": "16.3.1 Architect:-\nGrade\nGrade\nMinimum Experience\nMinimum Experience\nWork Assigned\nWork Assigned\nA\n10 Yrs and above\nAny work\nB\nMore than 8 Yrs\nUp to 16.4 meter height\nC\nMinimum 3Yrs\nUp to 10 meter height\n16.3.2 Engineer:-\nGrade\nGrade\nMinimum Experience\nMinimum Experience\nWork Assigned\nWork Assigned\nA\n10 Yrs with PG and above\nAny work\nB\nMore than 8 Yrs\nUp to 16.4 meter height\nC\nMinimum 3Yrs\nUp to 10 meter height",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "17",
            "title": "17. Cancellation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "18",
            "title": "18. Completion of Construction.",
            "chapter": null,
            "content": "18.2.1 Three copies of as built building plans.\n18.2.2 A fee of Rs. 1000/-.\n18.2.3 Copy of approved plan and approval letter as or case may be approval letter.\n18.2.4 Certificate of installation of fire safety appliances by the nominated authority/agency wherever applicable.\n18.2.5 Evidence to the effect of all public utility services, and in particular, sewerage, drainage, water supply, and electricity have been linked to the main public utility system.\n18.2.6 A certificate obtained from concern structural Engineer certifying the structural safety and stability of the building.\n18.2.7 A certificate from concern architect that the building has been constructed as per the provision of these bye-laws.\n18.4.1 Number of floors\n18.4.2 Building height\n18.4.3 External Setbacks\n18.4.4 Building Line, if any\n18.4.5 Parking space provision\n18.4.6 Abutting road width\n18.4.7 FAR\n18.4.8 Coverage percentage\n18.4.9 Tree Cover\n18.4.10 Water harvesting structures\n18.4.11 Land if required to be surrendered.\n18.4.12 Lifts, water pumps and storage tanks,\n18.4.13 Internal roads/paving\n18.4.14 Parking areas and external lighting\n18.4.15 Lightening arrestors\n18.4.16 Fire Fighting installations\n18.4.17 Lifts\n18.4.18 Water pump\n18.4.19 Drainage and arrangement for waste water and sewerage disposal\n18.4.20 Copy of agreement with the apartment Owner's Association/Society if any.\n18.4.21 The team shall record and report to the Authority the deviations made from the approved plan.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "19",
            "title": "19. Certificate for occupancy.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "20",
            "title": "20. Construction not according to plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "21",
            "title": "21. Single Window Clearance.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "22",
            "title": "22. Construction near important buildings.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "23",
            "title": "23. Construction near river front.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "24",
            "title": "24. Unsafe building.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "25",
            "title": "25. Demolition of building.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "26",
            "title": "26. Responsibility and Duty of the Applicant/Builder/Owner.",
            "chapter": null,
            "content": "26.2.1 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for purpose of enforcing the bye laws;\n26.2.2 Obtain, where applicable, from the competent Authority permissions/clearance required in connection with the proposed work;\n26.2.3 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "27",
            "title": "27. Responsibility of Authority.",
            "chapter": null,
            "content": "27.2.1 The title over the land or building;\n27.2.2 Easement rights;\n27.2.3 Variation in area from recorded area of a plot or a building.\n27.2.4 Quality of building services and amenities in the construction of the building,\n27.2.5 The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc.\n27.2.6 Other requirements or licenses or clearances required for the site/premises or activity under various other laws.\nChapter - III\nLand Use Classification and Permissible Uses",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "28",
            "title": "28. Zoning.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "29",
            "title": "29. Different use of land.",
            "chapter": null,
            "content": "29.4.1 The land is not a leasehold land;\n29.4.2 The coverage is not more than 20%;\n29.4.2 The height is not more than 7.0 (seven) meters; and at least 60% of land is used for plantation/agriculture;\nTable 4; Land use permitted/prohibited in different use zones\nTable 4; Land use permitted/prohibited in different use zones\nSl.\nSl.\nLand Uses\nLand Uses\nUse Zones in which permitted\nUse Zones in which permitted\nR\nR\nC\nC\nI\nI\nP\nP\nT\nT\nG\nG\nE\nE\nCUI\nCUI\nCUII\nCUII\nA\nA\n1.\nAirport, Helipad, Flying Club\n•\n•\n2.\nArt gallery, museum, exhibition centre\n•\n•\n•\n•\n•\n3.\nAuto Supply store and show room for motor\n\t\t\t\tvehicle and machinery\n•\n•\n•\n•\n4.\nAutomobile service and repairing station\n•\n•\n5.\nBank and Safe deposit vault\n•\n•\n•\n•\n•\n•\n•\n6.\nBird Sanctuary\n•\n•\n7.\nBoarding or lodging house\n•\n•\n•\n•\n•\n8.\nBotanical garden\n•\n9.\nBus Depot\n•\n•\n•\n•\n10.\nBus Terminal\n•\n•\n11.\nCanteen and eating house serving the industries\n•\n•\n12.\nCemetery, crematorium, burial ground, electric\n\t\t\t\tcrematorium\n•\n•\n13.\nChildren Traffic Park\n•\n•\n14.\nCinema\n•\n•\n•\n•\n•\n15.\nClinic for pets\n•\n•\n•\n•\n•\n•\n16.\nClinical Laboratory\n•\n•\n•\n•\n•\n17.\nClub house not conducted primarily as business\n•\n•\n•\n•\n•\n•\n18.\nClub house or other recreational actives\n\t\t\t\tconducted as business\n•\n•\n•\n19.\nCold storage and ice factory\n20.\nCollege\n•\n•\n•\n21.\nCommercial/business Offices\n•\n•\n•\n•\n22.\nCommercial hall & welfare center,\n•\n•\n•\n•\n•\n•\n23.\nContractor plant and storage for building\n\t\t\t\tmaterial\n•\n•\n24.\nConvenience Shopping Center\n•\n•\n•\n•\n•\n•\n•\n25.\nConvention Center\n•\n•\n•\n•\n26.\nCottage, Handloom and Household Industries\n•\n•\n•\n•\n•\n27.\nCourt\n•\n•\n•\n28.\nCreche and Day Care Center\n•\n•\n•\n•\n•\n•\n29.\nCultural and information Center\n•\n•\n•\n•\n30.\nCustomary home occupation\n•\n•\n•\n•\n31.\nDefence\n•\n•\n•\n•\n•\n•\n•\n32.\nDairy and poultry industry\n•\n•\n33.\nDispensary\n•\n•\n•\n•\n•\n•\n34.\nDry Cleaners-cleaning and dyeing\n•\n•\n•\n•\n35.\nEducational and research Institution\n•\n•\n•\n•\n•\n•\n36.\nElectric Sub-station\n•\n•\n•\n•\n•\n•\n•\n•\n•\n37.\nExisting Village\n•\n•\n•\n•\n•\n•\n•\n•\n•\n•\n38.\nFair Ground\n•\n•\n•\n39.\nFilm studio\n•\n40.\nFish curing\n•\n•\n•\n41.\nFlatted Group Industry\n•\n•\n•\n•\n42.\nFlood control work\n•\n•\n•\n•\n•\n•\n•\n•\n•\n•\n43.\nForensic Science Laboratory\n•\n•\n•\n•\n44.\nForest\n•\n•\n•\n45.\nGas Godown\n•\n•\n•\n•\n•\n46.\nGeneral Industries\n•\n•\n47.\nGolf course\n•\n48.\nGreen house\n•\n•\n•\n•\n•\n•\n49.\nGymnasium\n•\n•\n•\n•\n•\n•\n50.\nHealth Centre\n•\n•\n•\n•\n•\n•\n51.\nHospital\n•\n•\n•\n•\n•\n•\n52.\nHostels for educational institution\n•\n•\n•\n•\n•\n53.\nHotel\n•\n•\n•\n•\n54.\nIndoor Games Hall\n•\n•\n•\n•\n•\n•\n•\n55.\nJail\n•\n56.\nJunk yard\n•\n57.\nLocal, Municipal, State or Central Government\n\t\t\t\toffice\n•\n•\n•\n•\n•\n•\n•\n58.\nMechanical workshop with lathes, drills,\n\t\t\t\tgrinders, spot welding set\n•\n•\n59.\nMedical, eye and dental practitioners' clinic\n•\n•\n•\n•\n•\n•\n60.\nMonument\n•\n•\n•\n•\n•\n•\n•\n•\n•\n•\n61.\nMotor Driving Training Center\n•\n•\n•\n•\n•\n62.\nMunicipal facility (as listed inedia Annex VII)\n•\n•\n•\n•\n•\n•\n•\n63.\nMusic, dance, drama training centre\n•\n•\n•\n•\n•\n64.\nNeighbourhood Shopping Centre-convenience and\n\t\t\t\tlocal shopping with vegetables, fruits, flowers, fish and meat.\n•\n•\n•\n•\n65.\nNight Shelter\n•\n•\n•\n•\n•\n•\n•\n66.\nNursery, Horticulture and Orchards\n•\n•\n•\n•\n•\n•\n•\n•\n•\n67.\nNursing Home\n•\n•\n•\n•\n•\n•\n68.\nOil Depot\n•\n•\n•\n69.\nOpen Air Theatre\n•\n•\n•\n•\n•\n•\n•\n70.\nOrphanage\n•\n•\n•\n•\n•\n71.\nPark, play ground, playfield and recreational\n\t\t\t\tarea\n•\n•\n•\n•\n•\n•\n•\n72.\nPersonal Service Shop\n•\n•\n•\n•\n•\n•\n•\n73.\nPetrol filling station\n•\n•\n•\n•\n•\n•\n•\n74.\nPhotograph studio and laboratory\n•\n•\n•\n•\n•\n•\n75.\nPiggery\n•\n•\n76.\nPlanetarium\n•\n•\n•\n•\n•\n77.\nPolice Headquarter and Police Lines\n•\n78.\nPolice Station, Out Post and Fire Station\n•\n•\n•\n•\n•\n•\n•\n79.\nPost office, Telephone Exchange, Telegraph\n\t\t\t\tOffices\n•\n•\n•\n•\n•\n•\n•\n80.\nProfessional office of a resident of the premise\n•\n•\n•\n•\n81.\nPublic library\n•\n•\n•\n•\n•\n•\n82.\nRadio broadcasting studio\n•\n•\n•\n83.\nRailway Station\n•\n•\n•\n84.\nReformatory(Juvenile Home)\n•\n•\n•\n85.\nRefinery\n•\n86.\nReligious Place like temple, Namghar, Same\n\t\t\t\tSathal, mosque, church etc\n•\n•\n•\n•\n•\n•\n87.\nResearch and Development Centre\n•\n•\n•\n88.\nResidence cum Work Plot\n•\n•\n•\n•\n89.\nResidential Dwelling\n•\n•\n•\n•\n•\n90.\nResidential Plot- Plotted Housing\n•\n•\n•\n•\n91.\nRestaurant, cafeteria, milk bar\n•\n•\n•\n•\n•\n•\n•\n•\n92.\nRetail Shop\n•\n•\n•\n•\n•\n•\n•\n93.\nSatellite and Telecommunication Center\n•\n•\n•\n94.\nSchools\n•\n•\n•\n•\n•\n95.\nService Centre\n•\n•\n•\n•\n•\n•\n96.\nSewerage treatment plant\n•\n•\n•\n97.\nSocial, cultural and religious institution\n•\n•\n•\n•\n•\n98.\nSpecialised Park/Ground\n•\n•\n•\n•\n•\n99.\nSports Training Center\n•\n•\n•\n•\n100.\nStadium\n•\n101.\nStorage of petroleum and other inflammable\n\t\t\t\tmaterials\n•\n•\n102.\nStorage, Warehouses and Godown\n•\n•\n•\n•\n103.\nSwimming Pool\n•\n•\n•\n•\n•\n•\n104.\nTaxi stand and bus stand, cycle and rickshaw\n\t\t\t\tstand\n•\n•\n•\n•\n•\n•\n•\n•\n105.\nTheatre, assembly or concert hall, dance and\n\t\t\t\tmusic hall and such other place of entertainment;\n•\n•\n•\n•\n•\n106.\nTruck terminal\n•\n•\n107.\nVending Booth\n•\n•\n•\n•\n•\n•\n•\n•\n108.\nVocational Training/Technical Training Institute\n•\n•\n•\n•\n•\n•\n109.\nWatchmen or caretaker's lodges\n•\n•\n•\n•\n•\n•\n•\n•\n110.\nWater Treatment Plant\n•\n•\n•\n•\n•\n•\n•\n•\n111.\nWeekly Market/informal Sector Unit\n•\n•\n•\n•\n•\n•\n112.\nWholesale Trade\n•\n113.\nWireless transmitting and weather station,\n\t\t\t\tTransmission Tower\n•\n•\n•\n114.\nZoological park\n•\nIndex of Use Zones:\nNote:\nNote:\n1\nAll Existing non\n\t\t\t\tnuisance, non-polluting uses to continue in the following use\n\t\t\t\tzones:\n- Residential\n- Commercial\n- Industrial\n- Public/Semi-public\n- Transportation and\n\t\t\t\tCommunication\n- Composite Use I\n- Composite Use II\nAll existing non\n\t\t\t\tnuisance, non-polluting uses may be allowed to continue\n\t\t\t\t/discontinue after an application for special permission to the\n\t\t\t\tAuthority in the following use zones:\n- Recreational\n- Eco-sensitive\n-Agricultural\n2\nTo be permitted in commercial areas to be\n\t\t\t\tindicated in Industrial Use Zones in Local Area Plans/Layout\n\t\t\t\tPlans\n3\nIn Residential use zone, existing uses to\n\t\t\t\tcontinue and new ones to come on special permission from the\n\t\t\t\tauthority. Refer Annexure - 13.1\n4\nIn the New Development proposed Recreational\n\t\t\t\tArea\n5\nOnly Existing uses to continue\n6\nOnly those industries as listed in Annexure -\n\t\t\t\t13.1\n7\nPermitted only in Heavy Industrial Zone\n8\nExisting locations to continue\n9\nPermitted only in Heavy Industrial Zone\n10\nPermitted only in Heavy Industrial Zone\n11\nIn commercial centers\n12\nIn industrial areas\n13\nThe provision of table 4 shall also be\n\t\t\t\tapplicable for village settlement as defined in Master Plan.\nChapter - IV\nGeneral Requirements",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "30",
            "title": "30. Restriction on permission.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "31",
            "title": "31. Requirement of Site.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "32",
            "title": "32. Distance from Electric lines.",
            "chapter": null,
            "content": "Table - 5: Minimum distance from electric line\nTable - 5: Minimum distance from electric line\nVertical distance in meters\nVertical distance in meters\nHorizontal distance in meters\nHorizontal distance in meters\nLow and medium voltage lines and service lines\n2.5\n2.5\nHigh voltage lines up to and including 11.000\n\t\t\t\tVolt\nNot Permitted\n3.7\nHigh voltage lines above 11.000 volt and up to\n\t\t\t\tand including 33,000 Volt\nNot Permitted\n3.7\nExtra high voltage line beyond 33.000 Volt\nNot Permitted\n3.7 (Plus 0.3 meters for every additional 33,000\n\t\t\t\tvolts or part thereof)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "33",
            "title": "33. Plantation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "34",
            "title": "34. Means of Access.",
            "chapter": null,
            "content": "Table 6; Length of road limitation\nTable 6; Length of road limitation\nOld Area\nOld Area\nSI. No.\nSI. No.\nMaximum Length of the road in Meter\nMaximum Length of the road in Meter\nMinimum width of road of street in Meter\nMinimum width of road of street in Meter\n(i)\n(ii)\n(iii)\n1\nUpto 50 meter\n3.6 meter\n2\nExceeding 50 meter and upto 100 meter\n5.1 meter\n3\nExceeding 100 up to 300 meter\n6.6 meter\n4\nExceeding 300 meter\n7.5 meter\nNote -On less\n\t\t\t\tthan 6.1 m. wide roads the encroachment from both sides will be\n\t\t\t\tremoved by measuring 3.05 m. from the centre line of the width of\n\t\t\t\troads declared by or belonging to Road Construction Department\n\t\t\t\tJharkhand. Municipal Authorities, Housing Board, Cooperative\n\t\t\t\tSocieties, Government and Semi-Government Organizations In other\n\t\t\t\tcases maximum 3.05 m. land from such revenue plot on either side\n\t\t\t\twill be taken into account to make it 6.1 m. wide road and the\n\t\t\t\tconstruction falling in between the said width of road will be\n\t\t\t\tremoved as an encroachment.\nNote\nSimilarly 1.80 m. and 2.55 m. land from each\n\t\t\t\tRevenue plot on either side will be taken into account to make it\n\t\t\t\t3.1 m. and 5.1 m. wide road correspondingly\nNew Area (Residential)\nNew Area (Residential)\nSI. No.\nSI. No.\nMaximum Length of the road in Meter\nMaximum Length of the road in Meter\nMinimum width of road of street in Meter\nMinimum width of road of street in Meter\n1\nUp to 100\n6.10\n2\nMore than 100 to 250\n7.5\n3\nMore than 250 to 500\n9.10\n4\nMurc than 500 tv 1000\n12.20\n5\nMore than 1000\n15.30\nNote - If the developments only on one\n\t\t\t\tside of the means of access, the prescribed widths maybe reduced\n\t\t\t\tby 1.0 meter each case. In no case, development on plots shall be\n\t\t\t\tpermitted unless it is accessible by a public street of width not\n\t\t\t\tless than 6 m.\nNote\nNew Area (Non residential)\nNew Area (Non residential)\nSl. No.\nSl. No.\nMaximum Length of the road in Meter\nMaximum Length of the road in Meter\nMinimum width of road of street in Meter\nMinimum width of road of street in Meter\n1\n200\n7.5\n2\n400\n9.1\n3\n600\n12.2\n4\nabove 600\n15.30",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "35",
            "title": "35. Minimum size of plots and road width.",
            "chapter": null,
            "content": "Table - 7: Category wise size of plots\nTable - 7: Category wise size of plots\nCategory\nCategory\nMin. road width (m)\nMin. road width (m)\nMin. size of plot in Sqm.\nMin. size of plot in Sqm.\nMarriage Halls\n12.20\n1000\nCinema, Multiplex, Shopping Malls, Convention\n\t\t\t\tcenters, Game centers.\n18.30\n2000\nSocial clubs and amenities\n12.20\n1000\nMulti storey car parking\n12.20\n1000\nOffice buildings\n12.20\n300\nPrimary/Upper Primary school\n09.00\n2000\nI figh School, Residential School\n12.20\n6000\n+2 College/Junior College\n12.20\n4000\nDegree College\n12.20\n6000\nTechnical educational institution\n12.20\n10000\nPetrol Pumps/Fill ing stations\n12.20\n500\nRestaurant\n12.20\n500\nLPG storages\n12.20\n500\nPlaces of congregation\n12.20\n500\nPublic libraries\n12.20\n300\nConference hall\n12.20\n1000\nCommunity hall\n12.20\n500\nNursing homes/polyclinics/Hospital\n12.20\n300\nHotel (below three star)\n12.20\n1000\nHotel (three star and above)\n18.30\n2000\nR&D Lab\n18.30\n1500\nGroup Housing\n6.10\n3000\nNote:- (1) In exceptional cases the Authority may consider revising the minimum size of plot with the approval of the Government.\n(2) The above (requirement) area of minimum size of the plot may be relaxed by 5% while sanctioning the plan.\n(3) No high rise building (building with a height above 16.4 meters) shall be allowed on a plot size less than 1000 sqm.\n(4) Minimum existing road width for building more than 13.3 m in height shall be not less than 6.1 m.\n(5) For all plots abutting a road less than 12.2m width for proposed to he used for Primary/Upper Primary School a lay-by of paved area contiguous to the road for turning of vehicles and fire engines should be left. This lay-by should be of minimum dimension of 9m x 9m.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "36",
            "title": "36. Minimum setbacks & Height for non-high rise buildings.",
            "chapter": null,
            "content": "Table - 8: Minimum Front and Rear setbacks and height of residential buildings\nTable - 8: Minimum Front and Rear setbacks and height of residential buildings\nSl.\nSl.\nAverage Depth of plot (In meters)\nAverage Depth of plot (In meters)\nBuilding Height Upto G+2 Maximum-10m\nBuilding Height Upto G+2 Maximum-10m\nBuilding Height Upto G+3 Maximum-13.3m\nBuilding Height Upto G+3 Maximum-13.3m\nBuilding Height Upto G+4 Maximum-16.4m\nBuilding Height Upto G+4 Maximum-16.4m\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back (m)\nMinimum Rear set back (m)\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back (m)\nMinimum Rear set back (m)\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back (m)\nMinimum Rear set back (m)\n(i)\n(ii)\n(iii)\n(iv)\n(v)\n(vi)\n(vii)\n(viii)\n1\nUpto 10m\n1.5\n0.90\nNo construction shall be permitted\nNo construction shall be permitted\n2\nExceeding 10m & upto 15m\n2.0\n1.5\n3.0\n1.5\nNo construction shall be permitted\n3\nExceeding 15m & upto 21m\n2.5\n1.5\n3.0\n1.8\n3.0\n3.0\n4\nExceeding 21m & upto 27m\n3.0\n1.8\n3.0\n2.0\n3.5\n3.0\n5\nExceeding 27m & upto 33m\n4.0\n2.5\n4.0\n3.0\n4.0\n3.5\n6\nExceeding 33m & upto 39m\n4.0\n3.0\n4.5\n4.0\n4.5\n4.0\n7\nExceeding 39m & upto 45m\n4.0\n4.0\n4.5\n4.0\n5.0\n4.5\n8\nMore the 45m\n4.0\n4.0\n5.0\n5.0\n6.0\n5.0\nTable 9. Minimum Side setbacks for residential buildings\nTable 9. Minimum Side setbacks for residential buildings\nSl.\nSl.\nAverage Width of plot (in meters)\nAverage Width of plot (in meters)\nBuilding Height Upto G+2 Maxmimum-10m\nBuilding Height Upto G+2 Maxmimum-10m\nBuilding Height G+3 Upto Maxmimum-13.3m\nBuilding Height G+3 Upto Maxmimum-13.3m\nBuilding Height Upto G+4 Maximum-16.4m\nBuilding Height Upto G+4 Maximum-16.4m\n(i)\n(i)\n(ii)\n(ii)\n(iii)\n(iii)\n(iv)\n(iv)\n(v)\n(v)\n(vi)\n(vi)\n(vii)\n(vii)\n(viii)\n(viii)\n1\nUpto 10m\nAt least one side from 0.90 m.\nNo construction shall be permitted\nNo construction shall be permitted\n2\nExceeding 10m & upto 15m\n0.90\n0.90\n0.90\n0.90\nNo construction shall be permitted\n3\nExceeding 15m & upto 21m\n1.0\n1.0\n1.5\n1.5\n2.0\n2.0\n4\nExceeding 21 m & upto 27m\n1.5\n1.5\n2.0\n2.0\n2.5\n2.5\n5\nExceeding 27m & upto 33m\n1.5\n1.5\n2.5\n2.5\n3.0\n3.0\n6\nExceeding 33m & upto 39m\n2.0\n2.0\n3.0\n3.0\n3.66\n3.66\n7\nExceeding 39m & upto 45m\n3.0\n3.0\n3.66\n3.66\n4.50\n4.50\n8\nMore the 45m\n3.66\n3.66\n4.00\n4.00\n5.00\n5.00\nTable 10. Minimum front and rear setback for commercial/mercantile buildings\nTable 10. Minimum front and rear setback for commercial/mercantile buildings\nSl.\nSl.\nAverage Depth of plot (In meters)\nAverage Depth of plot (In meters)\nBuilding Height up to 16.4 m\nBuilding Height up to 16.4 m\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back (m)\nMinimum Rear set back (m)\n(i)\n(i)\n(ii)\n(ii)\n(iii)\n(iii)\n(iv)\n(iv)\n1\nUpto 10m\nNo construction is allowed\n2\nExceeding 10m & upto 15m\n4.5\n3.0\n3\nExceeding 15m & upto 21m\n5.5\n4.0\n4\nExceeding 2Im & upto 27m\n6.0\n4.0\n5\nExceeding 27m & upto 33m\n6.5\n4.0\n6\nExceeding 33m & upto 39m\n7.0\n4.5\n7\nExceeding 39m & upto 45m\n7.5\n4.5\n8\nMore than 45m\n8.0\n5.0\nTable 11. Minimum side setbacks for commercial/mercantile buildings\nTable 11. Minimum side setbacks for commercial/mercantile buildings\nSl.\nSl.\nAverage width of plot (In meters)\nAverage width of plot (In meters)\nBuilding Hei ht up to16.4m\nBuilding Hei ht up to16.4m\nMinimum Left set back (m)\nMinimum Left set back (m)\nMinimum Right set back (m)\nMinimum Right set back (m)\n(i)\n(i)\n(ii)\n(ii)\n(iii)\n(iii)\n(iv)\n(iv)\n1\nUpto 10m\nAt least one side 1.5 m.\n2\nExceeding 10m & upto 15m\n2.0\n2.0\n3\nExceeding 15m & upto 2Im\n2.5\n2.5\n4\nExceeding 21m & upto 27m\n3.0\n3.0\n5\nExceeding 27m & upto 33m\n4.0\n4.0\n6\nExceeding 33m & upto 39m\n4.0\n4.0\n7\nExceeding 39m & upto 45m\n5.0\n5.0\n8\nMore than 45m\n5.5\n5.5\nTable 12. Open spaces around industrial buildings\nTable 12. Open spaces around industrial buildings\nSl.\nSl.\nPlot Size\nPlot Size\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back (m)\nMinimum Rear set back (m)\nMinimum Sides set back (m)\nMinimum Sides set back (m)\n(i)\n(ii)\n(iii)\n(iv)\n(v)\n1\n550 sqm to 1000 sqm\n9.0\n4.5\n4.5\n2\n1000 sqm to 5000 sqm\n10.0\n6.0\n6.0\n3\n5000 sqm to 30000 sqm\n12.0\n9.0\n9.0\n4\nAbove 30000 sqm\n15.0\n12.0\n10.0\nTable 13. Minimum set back for industrial building constructed over plot size upto 550 sqm.\nTable 13. Minimum set back for industrial building constructed over plot size upto 550 sqm.\nSl.\nSl.\nWidth of Plot\nWidth of Plot\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back (m)\nMinimum Rear set back (m)\nMinimum Sides set back (m)\nMinimum Sides set back (m)\n(i)\n(i)\n(ii)\n(ii)\n(iii)\n(iii)\n(iv)\n(iv)\n(v)\n(v)\n1\nUpto 10 mtrs.\n3.0\n3.0\n1.5\n2\nExceeding 10m & upto 12m\n4.0\n3.0\n2.0\n3\nExceeding 12m & upto 15m\n5.0\n3.0\n3.0\n4\nExceeding 15m & upto 18m\n6.0\n4.0\n4.0\n5\nExceeding 18m\n6.0\n4.5\n4.5",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "37",
            "title": "37. Minimum setbacks for high rise buildings.",
            "chapter": null,
            "content": "Table -14: Minimum exterior open spaces around the buildings for all type of high rise buildings unless otherwise specified\nTable -14: Minimum exterior open spaces around the buildings for all type of high rise buildings unless otherwise specified\nSl.\nSl.\nHeight of the Building Upto (m)\nHeight of the Building Upto (m)\nExterior open spaces to be left out on all\n\t\t\t\tsides in m.\nExterior open spaces to be left out on all\n\t\t\t\tsides in m.\nFront setback\nFront setback\nSide and Rear setback\nSide and Rear setback\n1\nMore than 16.4 and upto 19.25m\n6.5\n4.5\n2\nMore than 19.25m and upto 23.10m\n7.5\n4.5\n3\nMore than 23.10m and upto 30m\n8.0\n5.0\n4\nIn case of buildings of more than 30m height, for\n\t\t\t\tevery increase in height of 3.35m. or fraction thereof or\n\t\t\t\taddition of one floor, 1m. in the front set back and 0.75 m. in\n\t\t\t\tthe sides and rear setbacks shall be added.\nNote:- (1) In no case the minimum setbacks shall be less than those specified in sub-section 42.1 of these Bye Law for high rise buildings in the mentioned category.\n(2) In case of multi storied buildings the exterior open space around a building shall be of hard surface capable of taking load of fire, engine weighting up to 45 tones.\nCoverage of Building\nMaximum ground coverage",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "1",
            "title": "1. Up to 235 sqm. of plot and building ht. not\n\t\t\t\texceeding 10m.",
            "chapter": null,
            "content": "-70%",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "2",
            "title": "2. Up to 1000 sqm. of plot and building ht. up\n\t\t\t\tto 16.4m.",
            "chapter": null,
            "content": "-60%",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "3",
            "title": "3. Above 1000 sqm. of plot area or building ht.\n\t\t\t\tof more than 16.4m.",
            "chapter": null,
            "content": "-50%",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "4",
            "title": "4. For commercial uses ground coverage is 50% of\n\t\t\t\tthe plot area.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "38",
            "title": "38. General Conditions for Setback.",
            "chapter": null,
            "content": "38.2.1 Educational buildings - In case of educational buildings the open spaces around the building shall not be less than 6 meter. The front set back shall be not less than 9 m.\n38.2.2 Institutional buildings-The open spaces around the building shall not be less than 6 m. The front setback shall be not less than of 9m.\n38.2.3 Assembly buildings- The open space in front shall be not less than 12m and the other open spaces around the building shall not be less than 6m.\n38.2.4 Malls and Multiplex- The front set back shall not be less than 12 m, the rear set back shall not be less than 7 m and the side set back shall not be less than 7m.\n38.2.5 Commercial & Storage buildings - In case of plots with more than 1000 sqm. area, the open spaces around the building shall not be less than 6.0 in. The front setback shall be of 9m. In all other cases it shall be as per Table 10. and table 14\n38.2.6 Industrial buildings - The setbacks shall be as per Table 12 and 13.\n38.2.7 Hazardous occupancies -The open spaces around the building shall not be less than 9 m. The front set back shall be of 12m.\n38.2.8 Slum Improvement- The setback norms shall not apply to slums taken up under an approved programme of the Government subject to the specific sanction of the Government.\n38.2.9 IT/ITES Buildings-Abutting a means of access of 12 m or more the setback, height, number of floors and FAR shall be applicable as per commercial building in respect of corresponding road width.\n38.5.1 Road junction corner plots shall have sufficient weaving angle. In no case it shall be less than the space arrived at by drawing a quadrant of a circle of 4.5m radius at the edge of the actual road lines leaving the width of pedestrian walks (foot path) and the plot boundaries shall be rounded of by drawing a quadrant of the circle of 2.7m radius at the edge of plot boundaries.\n38.5.2 The height of the boundary wall shall be restricted to 0.75m for a length of 5m on the front and side of the intersections and the remaining height of 1.5m shall be made up of steel grill work.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "39",
            "title": "39. Floor Area Ratio.",
            "chapter": null,
            "content": "Table 15: Road width and FAR table for (Old Area)\nTable 15: Road width and FAR table for (Old Area)\nCategory\nCategory\nRoad Width (in meter)\nRoad Width (in meter)\nFAR\nFAR\nFloor\nFloor\nMaximum Height (in meter)\nMaximum Height (in meter)\nConditions\nConditions\nResidential\nNon residential\n0-I\n3.60(12 ft.)to less than 4.80m\n1.5\nNil\nC+2\n10.0\n0-II\n4.80 (16 ft.)to less than6.10m\n1.8\nNil\nG+2\n10.0\n0-III\n6.10 (20 11.) to less than 7.5m\n2.0\n2.0\nG+4, S+4\n16.4\nParking shall be\n\t\t\t\tallowed on any floor. Under no circumstances the parking floors\n\t\t\t\tor\nprovision for parking shall be used for any\n\t\t\t\tother purposes. Mezaninine floors or any floor partition shall be\n\t\t\t\tcomputed under FAR and counted as a floor.\n0-IV\n7.5 (25 ft.)to less than 9.10m\n2.5\n2.5\nG+5 S+5\n19.25\n0-V\n9.10 (30 ft.)to less than 12.20m\n2.5\n2.5\nG+6 S+6\n23.10\n0-VI\n12.20 (40 ft.)to less than 18.30m\n2.5\n2.5\nMaximum Height 30 meter\n0-VII\n18.30 (60 II) and above\n2.5\n3.00\nNo restriction on height and number of floors\n\t\t\t\thowever it may be regulated by the master plan/development\n\t\t\t\tplan/zonal plan.\nNote:- i) A plot abutting on less than 3.60 m. width road shall have only maximum 7m. height and maximum F.A.R - 1.2\nii) In all cases the height of any building shall be not more than as prescribed in 40.1.1\nTable. 16: Road width and FAR table (New Area)\nTable. 16: Road width and FAR table (New Area)\nCategory\nRoad Width (in meter)\nFAR\nFloor\nMaximum Height (in meter)\nConditions\nResidential\nNon residential\nN-I\n6.10 (20 ft.) to less than 7.5m\n2.0\n2.0\nG+4 S+4\n16.4\nParking shall be allowed on any floor. Under no\n\t\t\t\tcircumstances the parking floors or provision for parking shall\n\t\t\t\tbe used for any other purposes. Mezzanine floors or any floor\n\t\t\t\tpartition shall be computed under FAR and counted as a floor.\nN-II\n7.5 (25 ft.)to less than 9.10m\n2.5\n2.5\nG+4 S+4\n19.25\nN-III\n9.10 (30 ft.)to less than 12.20m\n2.5\n2.5\nS+5\n23.10\nN-IV\n12.20 (40 ft.)to less than 18.30m\n2.5\n2.5\nMaximum Height 30 meter\nN-V\n18.30 (60 ft) to less than 24.40m\n2.5\n3.0\nHeight restriction as per rule-39 and 40.1.1\nN-VI\n24.40 (80 ft.) and above\n3.0\n3.0\nNote: In all cases the height of any building shall be not more than as prescribed in 40.1.1\n39.9.1 Basements or cellars and space/floors under a building constructed on stilts and used only as a parking space, and air conditioning or other plant room which are to be used as accessory to the principal use of the building;\n39.9.2 Multi-storied Parking built as per NBC norms\n39.9.3 Electric cabin/panel room or substation, watchman booth of maximum size of 4sqm. with minimum width or diameter of 2m., pump house, garbage shaft/garbage bins, space required for location of fire hydrants, electric fittings and water tank, Service Ducts, society room of maximum 12 sqm., entrance lobby of maximum 12 sqm., common toilet of maximum 5sqm., guard room of maximum of 10 sq.m. with toilet for guards and drivers of maximum 5sqm.\n39.9.4 Projections and buildings accessories as specifically exempted from the open space/setback requirement.\n39.9.5 Staircase room and lift rooms above the topmost storey, architectural features, chimneys and elevated tanks. The area of the lift shaft shall be taken only on one floor.\n39.9.6 Fire escape staircases.\n39.9.7 Parking area on stilts in one or more floors\n39.9.8 Balconies/Terrace more than one story in height and open on minimum two sides.\n39.10.1 Government Buildings/Government Projects/Projects developed by any government agency with the prior approval of Urban Development and Housing Department.\n39.10.2 For other buildings as per provision in Annexure-III with the approval of Urban Development and Housing Department.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "40",
            "title": "40. Height of a building.",
            "chapter": null,
            "content": "40.1.1 The maximum height of a building shall in no case exceed (1.5 times the width of the road on which the plot abuts) + Road widening + the front setback.\n40.1.2 If a building abuts on two or more streets of different widths, the building shall be deemed to face upon the street that has the greater width and the height of the building shall be regulated by the width of that street.\nTable- 17 Height restriction with respect to approach funnels\nTable- 17 Height restriction with respect to approach funnels\nDistance from nearest runway end (In metres)\nMaximum Permissible height above the elevation of\n\t\t\t\tthe nearest runway end\nUp to 360\n0\n631 to 510\n6\n511 to 660\n9\n661 to 810\n12\n811 to 960\n15\n961 to 1110\n18\n1111 to 1260\n21\n1261 to 1410\n24\n1411 to 1560\n27\nMore than 1560\n30\nTable -18: Height restriction with respect to transitional area\nTable -18: Height restriction with respect to transitional area\nDistance of the Inner Boundary of the\n\t\t\t\tTransitional Area (Outer Boundary of the Air Port) [Metres]\nMaximum Permissible height above the elevation of\n\t\t\t\tthe airport reference point [metres]\nUp to 21\n0\n22 to 42\n3\n43 to 63\n6\n64 to 84\n9\n85 to 105\n12\n106 to 126\n15\n127 to 147\n18\n148 to 168\n21\n169 to 189\n24\n190 to 210\n27\nMore than 210 M\n30",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "41",
            "title": "41. Off Street Parking Space.",
            "chapter": null,
            "content": "Table 19: Parking space for different category of occupancies\nTable 19: Parking space for different category of occupancies\nSl.\nSl.\nOccupancy Type\nOccupancy Type\nOne Car Parking For Every or Fraction Thereof:\n\t\t\t\t(The Minimum Size of a Car Parking Stall Shall be 2.40mx 4.80m.,\n\t\t\t\tand Minimum Stall Length of 5.40m. For Parallel Parking, With a\n\t\t\t\tMinimum Driveway Width of 4.25 M.)\nOne Car Parking For Every or Fraction Thereof:\n\t\t\t\t(The Minimum Size of a Car Parking Stall Shall be 2.40mx 4.80m.,\n\t\t\t\tand Minimum Stall Length of 5.40m. For Parallel Parking, With a\n\t\t\t\tMinimum Driveway Width of 4.25 M.)\nPopulation up to 50,000\nPopulation up to 50,000\nPopulation up to 1,50,000\nPopulation up to 1,50,000\nPopulation up to 10,00,000\nPopulation up to 10,00,000\nPopulation 10,00,000 and above\nPopulation 10,00,000 and above\n1\nResidential a)\n\t\t\t\tMulti-Family\nb) Lodging establishment, tourist homes and\n\t\t\t\thotels with lodging accommodation\n1 apartment\n8 guest rooms\n1 apartment\n6 guest rooms\n1 apartment\n4 guest rooms\nI apartment of built\n\t\t\t\tarea up to 140 sq. m. and 0.5 apartment of built area above 140\n\t\t\t\tsq.m\n3 guest rooms\n2\nEducational ( see Note 1)\n150 sq.m of area of the administrative office\n\t\t\t\tarea and public service area\n100 sq.m of area of the administrative office\n\t\t\t\tarea and public service area\n70 sq.m of area of the administrative office\n\t\t\t\tarea and public service area\n50 sq.m of area of the administrative office\n\t\t\t\tarea and public service area\n3\ninstitutional (Medical)\n10 bed (Private) 15 beds (Public)\n7 bed (Private) 12 beds (Public\n5 bed (Private) 10 beds (Public\n2 bed (Private) 5 beds (Public\n4\nBuildings for Public\n\t\t\t\tGathering a) Assembly halls, Cinema theatres and Auditoria\nb) Restaurants\n\t\t\t\t(Including Restaurants in Lodging establishment, tourist homes\n\t\t\t\tand hotels with lodging accommodation)\nc) Stadia\nd) exhibition centres\n25 seats\n20 seats\n200 seats\n15 seats\n20\n\t\t\t\tseats\n100 seats\n10 seats\n10\n\t\t\t\tseats\n40 seats\n10 seats\n10\n\t\t\t\tseats\n20 seats\n5\nCommercial a)\n\t\t\t\tBusiness offices and firms for private business\nb) Public or\n\t\t\t\tsemi-public offices\nc) Mercantile (see note 3)\n200 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n300 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n200 sq.m. of built up area excluding parking and\n\t\t\t\tservices areas\n150 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n200 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n100 sq.m. of built up area excluding parking and\n\t\t\t\tservices areas\n100 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n100 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n100 sq.m. of built up area excluding parking and\n\t\t\t\tservices areas\n75 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n75 sq.m. of built up\n\t\t\t\tarea excluding parking and services areas\n75 sq.m of built up area excluding parking and\n\t\t\t\tservices areas\nd) Industrial\ne) Storage\n400 sq.m.\n600 sq.m.\n300 sq.m.\n500 sq.m.\n200 sq.m.\n400 sq.m.\n100 sq.m.\n250 sq.m.\n41.2.1 In basements\n41.2.2 On stilt in one or more floors. (All structural precautions, like cross bracings, shall be taken in case of stilted areas for earth quack and lateral loads.)\n41.2.3 Parking in open areas or in setbacks with minimum driveway width of 4.50m.\n41.2.4 Exclusive multi-level parking\n41.2.5 Roof top parking in case of commercial/IT/ITES and corporate building\n41.2.6 A combination of any or all of the above.\nNotes:-1. In case of Auditoria for institutional and educational buildings, additional parking spaces shall be provided as per 4 (a)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "2",
            "title": "2. For other institutions, transport, communication center and occupancy types not mentioned above, parking requirements shall be decided by the authority.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "3",
            "title": "3. For shops on plots up to 50 sq.m. parking space need not be insisted upon.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "4",
            "title": "4. For all apartment/multi dwelling of residential buildings:",
            "chapter": null,
            "content": "(a) Extra 15 % of the total car parking requirement should be reserved for visitors and should not be sold/settled. Such parking space shall be indicated by painting \"Visitor's parking\" on the floor.\n(b) One number of two wheeler parking, of a minimum size of 1 m x 2 m. excluding the driveway, should be provided for every one apartment/dwelling unit",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "5",
            "title": "5. All non-residential buildings should provide one third area, out of the total car parking area, for parking of two wheelers. These two wheeler parking should have a minimum size of 1 m x 2 m. excluding the driveway. The minimum width of the drive way meant exclusively for 2 wheelers should be 3m.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "6",
            "title": "6. In addition to the parking spaces provided for building of mercantile (commercial) Industrial and storage type, one space of 3.50X7.50 meters for loading and unloading activities, for each 2000 sqm. of total area (as per FAR calculation) or fraction thereof shall be provided",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "42",
            "title": "42. Requirement of Parts of Building.",
            "chapter": null,
            "content": "42.1.1 Main Buildings: The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 450 mm from the surrounding ground level.\n42.2.1 Height: The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab). In the case of pitched roof, the average height of rooms shall not be less than 2.75 m. The minimum clear head room under a beam, folded plates or eaves shall be 2.4 m. In the case of air-conditioned rooms, a height of not less than 2.4 in measured from the surface of the floor to the lowest point of air-conditioning duct or the false ceiling shall be provided. These requirements shall apply to residential, business and mercantile buildings. For educational and industrial buildings, the following minimum requirements apply:\n42.2.2 Size: The area of habitable room shall not be less than 9.5sqm., where there is only one room with a minimum width of 2.4m. Where there are two rooms, one of these shall not be less than 9.5 Sq meter and the other not less than 7.5sqm. with a minimum width of 2.1 m.\n42.3.1 Height: The height of a kitchen measured from the surface of the floor to the lowest point in the ceiling (bottom slab) shall not be less than 2.75 m, except for the portion to accommodate floor trap of the upper floor.\n42.3.2 Size: The area of a kitchen where separate dining area is provided, shall be not less than 5.0 Sq meter with a minimum width of 1.8 m. Where there is a separate store, the area of the kitchen maybe reduced to 4.5 Sq meter. A kitchen. which is intended for use as a dining area also, shall have a floor area of not less than 7.5 Sq meter with a minimum width of 2.1 m.\n42.3.3 Other Requirements: Every room to be used as kitchen shall have:\ni unless separately provided in a pantry, means for the washing of kitchen utensils which shall lead directly or through a sink to a grated and trapped connection to the waste pipe;\nii an impermeable floor;\niii. a flue, if found necessary; and iv a window or ventilator or opening of sufficient size.\n42.4.1 Height: The height of a bathroom or water-closet measured from the surface of the floor to the lowest point in the ceiling (bottom of slab) shall not be less than 2.4 meter.\n42.4.2 Size: The area of a bathroom shall not be less than 1.8 Sq meter with a minimum width of 1.2 m. The floor area of water-closet shall be 1.2 Sq meter with a minimum width of 1.0 m. if bath and water-closet are combined, its floor area shall not be less than 2.8 Sq meter with a minimum width of 1.2 m.\n42.4.3 Other Requirements: Every bathroom or water-closet shall:\ni. Be so situated that at least one of its walls shall open to external air; or a duct/ventilation shaft or mechanically ventilated;\nii Not be directly over or under any room other than another water-closet, washing place or bath, unless it has a water-tight floor;\niii. Be provided, with an impervious floor covering, sloping towards the drain with a suitable grade and not towards verandah or any other room; and iv Have a window or ventilator, opening to a shaft/duct or open space.\n42.4.4 No room containing water-closets shall be used for any purpose except as a lavatory and no such room shall open directly into any kitchen or cooking space by a door, window or other opening. Every room containing water-closet shall have a door completely closing the entrance to it.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "43",
            "title": "43. Exit Requirements.",
            "chapter": null,
            "content": "43.1.1 In every building exit shall comply with the minimum requirement of exit.\n43.1.2 All exits shall be free from obstructions.\n43.1.3 No building shall be altered so as to reduce the number, width of protection of exits to less than that required.\n43.1.4 Exits shall be clearly visible and the routes to reach the exits shall be clearly marked and signposted to guide the population of floor concerned.\n43.1.5 Adequate and reliable illumination shall be provided for exits.\n43.1.6 Firefighting equipment shall be suitably located and clearly marked.\n43.1.7 Alarm devices shall be installed to ensure prompt evacuation of the population concerned.\n43.1.8 All exits shall provide continuous means of egress to the exterior of building or to an exterior open space leading to street.\n43.1.9 Exits shall be so arranged that they may be reached without passing through another occupied unit.\n43.3.1 The unit of exit width used to measure capacity of any exit shall be 50cm. A clear width of 25cm. shall be counted as an additional half unit. Clear width less than 25cm. shall not be counted for exit width.\n43.3.2 The occupancies per unit exit which shall- be as given in Table-20.\nTable 20: Number of occupants as per type of occupancy\nTable 20: Number of occupants as per type of occupancy\nSl.\nSl.\nType of Occupancy\nType of Occupancy\nNumber of occupants per unit exit\nNumber of occupants per unit exit\nStair Case\nStair Case\nDoor\nDoor\n(1)\n(2)\n(3)\n(4)\n1\nResidential\n25\n75\n2\nEducational\n25\n75\n3\nInstitutional\n25\n75\n4\nAssembly\n60\n90\n5\nBusiness\n50\n75\n6\nMercantile\n50\n75\n7\nIndustrial\n50\n75\n8\nStorage\n50\n75\n9\nHazardous\n25\n10\n(B) Travel distance means the distance from any point in the floor area to any exit measured along the path or egress except that when the floor areas are sub-divided into rooms, used singly or of rooms and served by suite corridors and passage, the travel distance may be measured from the corridor entrance of such rooms or suites to the nearest staircase or verandah having access to the street.\n(C) For the dormitory portions of homes for the aged, orphanages, mental hospitals, etc. these multipliers will be doubled.\n(D) The plinth or covered area shall include, in addition to the main assembly rooms or space, any occupied connecting room or space in the same storey or in the storey above or below where entrance is common to such rooms and space and they are available for use by the occupants of the assembly place.\n(E) No deductions shall be made in the gross area of the corridors, closets or other sub-divisions; all space serving the particular assembly occupancy shall be reckoned.\n43.4.1 Every exit doorway shall open into a enclosed stairway, a horizontal exit, on a corridor or passageway providing continuous and protected means of egress.\n43.4.2 No exit doorway shall be less than 1.00 in. in width. Doorways shall be not less than 2.00 m. in height.\n43.4.3 Exit doorways shall open outwards, that is away from the room but shall not obstruct the travel along any exit. No door, when opened shall reduce the required width of stairway or landing to less than 90cm. Over head or sliding doors shall not be installed.\n43.4.4 Exit door shall not open immediately upon a flight or stairs; a landing equal to at least the width of the door shall be provided in the stairway at each doorway; level of landing shall be the same as that of the floor which it serves.\n43.4.5 Exit doorways shall be operable from the side which they serve without the use of key.\n43.5.1.1 Revolving doors shall not be used as required exits except in residential, business and mercantile occupancies, but shall not constitute more than half the total required door width.\n43.5.1.2 When revolving door is considered as required exit way the following assumptions shall be made.\n43.5.2 Stairways:- 43.5.2.1 Interior stairs shall be constructe4 of noncombustible materials throughout.\n43.5.2.2 Interior staircase shall be constructed as a self-contained unit with at least one side adjacent to an external wall and shall be completely.\n43.5.2.3 A staircase shall not be arranged round a lift shaft unless the latter is entirely enclosed by a material of fire-resistance rating.\n43.5.2.4 Hollow combustible construction shall not be permitted.\n43.5.2.5 The width of the stair cases, and horizontal exists should be calculated as per clause 4.2 of part 4 (Fire and life Safety) of National Building Code.\n43.5.2.6 The minimum width of treads without nosing shall be 25 cm. for an internal staircase for residential building. In the case of other buildings the minimum tread shall be 30 cm. The treads shall be constructed and maintained in a manner to prevent slipping.\n43.5.2.7 The maximum height of riser shall be 17.5 cm in the case of residential buildings and 15 cm. in the case of other buildings. They shall be limited to 14 per flight.\n43.5.2.8 Parapet or hand rails shall be provided with a minimum height of 90 cm. from the centre of the trend\n43.5.3 Fire Escape or external stairs\n43.5.3.1 Fire escapes shall not be taken into account in calculating the evacuation time of a building.\n43.5.3.2 All fire escapes shall be directly connected to the ground.\n43.5.3.3 Entrance to fire escape shall be separate and remote from the internal staircase.\n43.5.3.4 The route .of fire escape shall be free from obstructions at all times except a doorway leading to the fire escape which shall have the required fire resistance.\n43.5.3.5 Fire escape shall be constructed of noncombustible materials.\n43.5.3.6 Fire escape stairs shall have straight flight not less than 90 cm. wide with 25cm. treads and riser not more than 20 cm. The number of riser shall be limited to 16 per flight.\n43.5.3.7 Handrails shall be of a height not less than 100cm.\n43.5.4 Spiral Stair (Fire escape)- The use of spiral staircase shall be limited to low occupant load and to a building of height 10m. unless they are connected to platforms, such as balconies and terraces to allow escapes to pause. A spiral fire escape shall be not less that 150cm. in diameter and shall be designed to give adequate headroom, up to a maximum height of 15m.\n43.5.5 Ramps:- 43.5.5.1 Minimum gradient for the ramps going down to the basement only for parking purposes of maximum of 2.4m. depth should be 1:7 and for depth more than 2.4m. it should be 1:10\n43.5.5.2 For all slopes the ramp shall be surfaced with approved non slipping materials.\n43.5.5.3 Parking may be provided along the run of Ramp if the slope is not steeper than 1:20 and the Ramp will be treated as driveway.\n43.5.5.4 Ramps may be permitted in the rear setback for the for the buildings whose width area in rear side is more or equal to 30m. after leaving requisite setback and the length of the ramp should not exceed more than 50% of such width and also an open an open space of 1.5m. should be left for drainage etc. between the ramp & boundary wall provided the side setback is not less than 4.5m.\n43.5.5.5 Ramps may also be permitted in the front setback after leaving 4.5m. from the front boundary. (excluding road widening strip if applicable)\n43.5.5.6 Ramps may also be permitted in the side back after leaving 4.5m. from the boundary.\n43.5.5.7 Ramps for Hospital: In the case of Hospitals, the slope of ramp shall not be greater than 1:20.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "44",
            "title": "44. Interior open space.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "45",
            "title": "45. Height exemption of a building.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "46",
            "title": "46. Exemption in Open space.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "47",
            "title": "47. Mezzanine.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "48",
            "title": "48. Basement/Cellar.",
            "chapter": null,
            "content": "48.3.1 Storage of household or other non-combustible material\n48.3.2 Strong room, bank cellars library;\n48.3.3 Installation of air-conditioning equipments and other machines used for service and utilities of building;\n48.3.4 Parking.\n48.4.1 In all such cases the owners have to indemnify the Authority against any damage caused by her/him/them to the adjacent property (Form-XI II (A)).\n48.4.2 The portion of the basement projecting out of the building line in the setback area shall flush with the ground or of a plinth not exceeding 0.9 m height, approachable with a ramp of I :10 gradient from the road level and the roof of such the basement in the open spaces areas, if intended to be used as vehicular passage, should be designed to be able to take the load of fire engines/vehicles of 45 tones\n48.6.1 Every basement shall be in every part at least 2.4m. in height from the floor to the soffit of the roof slab or ceiling; and minimum of 2.1m below the soffit of beams.\n48.6.2 Adequate ventilation shall be provided for the basement. The standard of ventilation shall be the same as required by the particular occupancy according to bye laws. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans (one exhaust fan for 50sqm. of basement area), air conditioning system etc;\n48.6.3 The minimum height of the ceiling of upper basement shall be 0.90m. and the maximum, 1.5 m. above the average surrounding ground level;\n48.6.4 Adequate arrangement shall be made, so that surface drainage does not enter the basement;\n48.6.5 The walls and floors of the basement shall be water-tight and be so designed that the effect of the surrounding soil and moisture, if any, are taken in to account in design and adequate damp proofing treatment is given;\n48.6.6 The access to the basement shall be separate from the main and alternative staircase providing access and exit from higher floors shall be provided. Where the staircase is continuous in the case of buildings served by more than one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and higher floor.\n48.6.7 Open ramps shall be permitted if they are constructed within the building line subject to provision of above.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "49",
            "title": "49. Provision of Lift.",
            "chapter": null,
            "content": "49.1.1 For no. of flats more than 8 and up to 18, one lift of the capacity of 6 passengers will be mandatory for G+4 and above.\n49.1.2 For every 16 flats and part thereof one lift of the capacity of 6 passengers shall be provided for residential buildings up to G+4 or of the height of 12 meters and above.\n49.1.3 However in case, where part thereof is less than 50%, then the requirement can be met by increasing the passenger capacity of lift.\n49.1.4 If the number of flats in a multi-storied residential building is more than 12, the provision of lift will be compulsory for G+3, even if the height of the building is less than 12meters. The capacity and no. of lifts shall be as mentioned above.\n49.1.5 Provision of lift should be made for residential buildings of more than G+3 storied or buildings having the height of 12 meters , whichever is lower\n49.1.6 Provision of one stretcher lift every building more than 6 storey height\n49.1.7 Every lift should have Provision of automatic rescue device, door sensor and automatic fire proof door.\n49.2.1 Building above ground + 2 floor\n49.2.2 I person capacity per 500 sqm. or fraction thereof of built-up area excluding ground floor and covered parking area\n49.2.3 Minimum number of lifts to be 2 for all non-residential building above ground + 3 and the minimum capacity shall be 6 persons per floor.\nNote:- 1. All the lift requirements shall be subject to fire requirement.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "2",
            "title": "2. All sizes of lift (i.e. car inside, lift well, entrance, headroom etc.) shall be as per the requirements of N.B.C. or as per manufacturers specifications.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "3",
            "title": "3. All lifts shall be inspected at least once a year by the agency designated by the Authority. The Authority can also outsource the inspection of lifts.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "4",
            "title": "4. The area of lift well at one floor only (not the sum of total area of lift well at every floor) shall be counted for F.A.R calculation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "50",
            "title": "50. Barrier free access for the differently abled person.",
            "chapter": null,
            "content": "50.6.1 Surface parking for two car spaces shall be provided near entrance for the physically handicapped persons with maximum travel distance of 30 meter from building entrance.\n50.6.2 The width of parking bay shall be minimum 3.6 meter.\n50.6.3 The information stating that the space is reserved for handicapped persons shall be conspicuously displayed.\n50.6.4 Guiding floor materials shall be provided or a device which guides visually impaired persons with audible signals or other devices which serves the same purpose shall be provided.\n50.7.1 Approach at plinth level: Every building must have at least one entrance accessible to the handicapped and shall be indicated by proper signage.\n50.7.2 Ramp Approach: Ramp shall be finished with non-slip material. Minimum width of ramp shall be 1800 mm. with maximum gradient 1:12, length of ramp shall not exceed 9 meter having 800 mm high hand rail on both sides extending 3 00mm beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.\n50.7.3 Stepped Approach: For stepped approach width of tread shall not be less than 300 mm. and maximum riser shall be 150 mm. Provision of 800 mm. high hand rail on both sides of the stepped approach similar to the ramp approach shall be made.\n50.7.4 Exit/Entrance Door: Minimum clear opening of the entrance door shall be 900mm and it shall not be provided with a step that obstructs the passage of a wheel chair user. Threshold shall not be raised more than 12 mm.\n50.7.5 Entrance Landing: Entrance landing shall be provided adjacent to ramp with the minimum dimension 1800mm X 2000 mm. The entrance landing that adjoins the top end of a slope shall be provided with floor materials to attract the attention of visually impaired persons (limited to colored floor material whose color and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons hereinafter referred to as \"guiding floor material\"). Finishes shall have a 'non-slip surface with a texture traversable by a wheel chair. Curbs wherever provided must blend to a common level.\n50.7.6 Corridor connecting the entrance/exit for the handicapped: The corridor connecting the entrance/exit for handicapped leading directly outdoors to a place where information concerning the overall use of the specified building can be provided to visually impaired persons either by a person or by signs, shall be provided as follows:\n50.7.6.1 Guiding floor materials, shall be provided or devices that emit sound to guide visually impaired persons,\n50.7.6.2 The minimum width shall be 1250 mm.\n53.7.6.3 In case there is a difference of level, slope ways shall be provided with a slope of 1:12\n53.7.6.4 Hand rails shall be provided for ramps/slope ways at a height of 800mm.\n50.8.1 The minimum width shall be 1350 mm.\n50.8.2 Height of the riser shall not be more than 150mm and width of the tread 300mm. The steps shall not have abrupt (square) nosing.\n50.8.3 Maximum number of risers on a flight shall be limited to 12.\n50.8.4 Hand rails shall be provided on both sides and shall extend 30mm on the top and bottom of each flight of steps.\n50.9.1 A handrail not less than 600 mm. long at 1000mm. above floor level shall be fixed adjacent to the control panel.\n50.9.2 The lift lobby shall be of an inside measurement of 1800 mm x 1800mm or more.\n50.9.3 The time of an automatically closing door shall be minimum 5 seconds and the closing speed should not exceed 0.25 meter/section\n50.9.4 The interior of the cage shall be provided with a device that audibly indicates the floor the cage has reached and indicates that the door of the cage for entrance/exit is either open or closed.\n50.9.5 The control panel shall have markinu in Braille to help visually impaired.\n50.10.1 The minimum size shall be 1500 x 1750 mm.\n50.10.2 Minimum clear opening of the door shall be 900mm and the door shall swing out.\n50.10.3 Suitable arrangement of vertical/horizontal handrails with 50mm clearance from wall shall be made in the toilet.\n50.10.4 The Water Closet seat shall be 50mm from the floor.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "51",
            "title": "51. Rainwater harvesting system.",
            "chapter": null,
            "content": "51.1.1 Terrace Water Collection: The terrace shall be connected to a sump or the well through a filtering tank by PVC pipe. A valve system shall be incorporated to enable the first part of the rainwater collected to be discharged out or to the soil if it is dirty. A filtering tank measuring 0.36 Sq. m. can be constructed near the sump. The tank can be divided by a perforated slab and one part should be filled by small pebbles and other by brick jali. The bottom portion of the tank should have aslope' to avoid stagnation of water.\n51.1.2 Open Ground: Where there is open ground, a portion of topsoil shall be removed and replaced with river sand to allow slow percolation of rain water. Any other method proved to be effective in conservation and harvesting of rainwater may be adopted in each and every construction taken up.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "52",
            "title": "52. Signs and outdoor display structures.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "53",
            "title": "53. Lightening Protection.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "54",
            "title": "54. Penal Action against Builders/Technical Personnel.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "55",
            "title": "55. Builder to register an association.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "56",
            "title": "56. Reference to the standards.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "57",
            "title": "57. Life Safety.",
            "chapter": null,
            "content": "Chapter - V\nAdditional Requirements for Saftey and Services",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        },
        {
            "number": "58",
            "title": "58. For construction of Multi-storied building.",
            "chapter": null,
            "content": "58.6.1 Land left for road widening/cul-de-sac should be paved and in matching level of the existing road.\n58.6.2 All drainage inside the plot should be covered and underground.\n58.6.3 All service pipes, PVC water tanks etc. should be concealed from all side.\n58.6.4 Lighting poles with lights within the boundary wall facing towards the road. One lighting poles with minimum height of 6mtr. at every l5mtr. or fraction thereof of the length of the front boundary wall shall be provided with 150W of LED, facing towards the road for street lighting and should also be connected to the Generator.\n58.6.5 Plantation-Number and type of plantation with the boundary along the road.\nOne tree of suitable variety should be planted at every 6m. or fraction thereof of the length of the front boundary.\n58.6.6 Water harvesting system for recharge well shall be provided as per NBC norms.\n58.6.7 Solid waste disposal bins of suitable size inside the plot.\n58.6.8 Lifts, pumps, external lighting shall be connected to pollution free noiseless Generator.\n58.6.9 Minimum of 3 amp./flat to be provided from pollution free noiseless Generator\n58.6.10 Lift shall be mandatory for above G+3 or as provided in this bye-laws and should be connected to power backup generator.\n58.6.11 All electrical power generators shall be noiseless & pollution free.\n58.6.12 Recycling of waste water shall be made mandatory for any building consuming more than 12000 liters per day or having 24 flats or more, whichever is lower.\n58.6.13 Service Ducts shall not be counted in the F.A.R. of building.\n58.6.14 No FAR should be added for parking for any floor except the lockup, garage.\n58.6.15 Minimum 50% of all paving around the building the driveway etc. should be soft paving in the form of interlocking, concrete block (without mortar or solid sub base) or such other systems to insure surface water percolation into the subsoil.\n58.6.16 Minimum 50% of bricks use in the building should be made of fly-ash\n58.6.18 If more than one storey height is covered with fiber glass or like materials which permits light, it should not be counted for covered area and FAR calculations. If covered with unusable/non accessible RCC roof, the covered atrium area will be counted for covered area calculation but not for FAR value. This is done to encourage better standard of planning for bigger shopping malls.\nAtriums open to sky or covered with the light weight roof member which permits light shall also not be used for F.A.R calculations unless the roof top is used as a usable floor space.\n58.6.19 For ventilation of the spaces for water closets and bath rooms, if not opening on to front, rear , side or interior open space these shall open on to the ventilation shaft , the size of which shall not be less than as given in Table below. This shall be limited for natural ventilation only\".\n58.6.20 Ventilation requirements can be met by the mechanical ventilation system like air conditioning etc. Toilets may be permitted without any exterior openings for the buildings like hotels, commercial complexes etc as per N.B.C. but not for apartments and residences.\nSl.\nSl.\nHeight of Building\nHeight of Building\nArea (sqm.)\nArea (sqm.)\nMin. Width (in meter)\nMin. Width (in meter)\n1\nUpto 12.00 meter\n1.2\n0.9\n2\nUpto 16.00 meter\n2.8\n1.2\n3\nUpto 22.00 meter\n4.0\n1.5\n4\nUpto 28.00 meter\n5.4\n1.8\n5\nUpto 34.00 meter\n8.0\n2.4\n6\nAbove 34.00 meter\n9.0\n3.0",
            "footnote": "",
            "is_definition": false,
            "sort_order": 71
        },
        {
            "number": "59",
            "title": "59. Maintenance.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 72
        },
        {
            "number": "60",
            "title": "60. Structural Safety Design, Standards and other Services requirements.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 73
        },
        {
            "number": "1",
            "title": "1. IS: 456:2000 \"Code of Practice for Plain and Reinforced Concrete",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 74
        },
        {
            "number": "2",
            "title": "2. IS: 800-1984 \"Code of Practice for General construction in Steel",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 75
        },
        {
            "number": "3",
            "title": "3. IS: 801-1975 \"Code of Practice for Use of Cold Formal Light Gauge Steel Structural Members in General Building Construction",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 76
        },
        {
            "number": "4",
            "title": "4. IS 875 (Part 2): 1987 Design loads (other than earthquake) for buildings and structures Part 2 Imposed Loads",
            "chapter": "Part 2",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 77
        },
        {
            "number": "5",
            "title": "5. IS 875 (Part 3): 1987 Design loads (other than earthquake) for buildings and structures Part 3 Wind Loads",
            "chapter": "Part 3",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 78
        },
        {
            "number": "6",
            "title": "6. IS 875 (Part 4): 1987 Design loads (other than earthquake) for buildings and structures Part 4 Snow Loads",
            "chapter": "Part 4",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 79
        },
        {
            "number": "7",
            "title": "7. IS 875 (Part 5): 1987 Design loads (other than earthquake) for buildings and structures Part 5 special loads and load combination",
            "chapter": "Part 5",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 80
        },
        {
            "number": "8",
            "title": "8. IS: 883:1966 \"Code of Practice for Design of Structural Timber in Building",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 81
        },
        {
            "number": "9",
            "title": "9. IS: 1904:1987 \"Code of Practice for Structural safety or Buildings: Foundation\"",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 82
        },
        {
            "number": "10",
            "title": "10. IS 1905:1987 \"Code of Practice for Structural Safety of Buildings: Masonry Wall",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 83
        },
        {
            "number": "1",
            "title": "11. IS 2911 (Part I): Section 1: 1979 \"Code of Practice for Design and Construction of Pile Foundation Section 1",
            "chapter": "Part I",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 84
        },
        {
            "number": "12",
            "title": "12. IS: 1893-2002 \"Criteria for Earthquake Resistant Design of Structures (Fifth Revision)\"",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 85
        },
        {
            "number": "13",
            "title": "13. Is: 13920-1993 \"Ductile Detailing of Reinforced concrete Structures subjected to Seismic Forces - Code of Practice\"",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 86
        },
        {
            "number": "14",
            "title": "14. IS:4326-1993 \"Earthquake Resistant Design and Construction of Buildings- Code of Practice (Second Revision)\"",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 87
        },
        {
            "number": "15",
            "title": "15. IS: 13828-1993 \"Improving Earthquake Resistance of Low Strength Masonry Buildings - Guidelines\"",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 88
        },
        {
            "number": "16",
            "title": "16. IS:13827-1993 \"Improving Earthquake Resistance of Earthen Buildings - Guidelines\",",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 89
        },
        {
            "number": "17",
            "title": "17. IS: 13935-1993 \"Repair and Seismic Strengthening of Buildings - Guidelines\"",
            "chapter": null,
            "content": "60.6.1 The Planning design and 'installation of electrical installations, air conditioning installation of lifts and escalators can' be carried out in accordance with Part-8 of Group-4 Building Services, section 1-Lghting and Ventilation, section-2 Electrical and Allied Installations, section-3, Air conditioning and heating, section-4 acoustics, sound insulation and noise control, section-S installation of lifts and escalators of National Building Code of India, 2005.\n60.6.2 The requirements of electric sub-station and the provision of electric sub-station shall also require approval from the concerned Authority.\nChapter- VI\nGroup Housing",
            "footnote": "",
            "is_definition": false,
            "sort_order": 90
        },
        {
            "number": "61",
            "title": "61. Housing Schemes.",
            "chapter": null,
            "content": "61.1\nMinimum Size of the Plot\n-\n3000 sqm.\n61.2\nMaximum Ground Coverage\n-\n35%\n61.3\nMaximum F.A.R\n-\n3.0\n61.4\nHeight Limitation\n61.4.1 No height limitation shall be applicable except in areas near protected monuments and airport, etc.\n61.12.1 In case of Ranchi Municipal Corporation/Dhanbad Municipal Corporation areas, 15% of the total built up area or 35% of the total number of units towards EWS, shall be provided within the site or within the radius of 5 km. of the project site subject to fulfillment of these Rules, with regard to minimum width of access road and other parameters.\n61.12.2 In case of other Urban Local Bodies, 15% of the total built up area or 35% of the total number of units towards EWS shall be provided within the site or within the radius of 2 km of the project site, subject to fulfillment of these Rules, with regard to minimum width of access road and other parameters.\n61.12.3 In Case of Gram Panchayat areas falling in Urban Development Authority Areas and in sanctioned Master Plans, EWS units are to be provided in-situ only.\n61.14.1 The following shelter fee to be levied:\nArea\nArea\nRate for sqm.\nRate for sqm.\nRanchi Regional Development Authortity/Ranchi\n\t\t\t\tMunicipal Corporation/Dhanbad Municipal Corporation\nRs. 13,000.00\nOther Municipal Corporations\nRs. 11,000.00\nMango Notified Area Committee Jamshedpur,\n\t\t\t\tJugsalai Municipality\nRs. 13 000.00\nOther Municipalities, Nagar Panchayats and other\n\t\t\t\tRural Local Bodies falling in Regional Development Authority Area\n\t\t\t\t(Except RRDA)/UDA area/Master Plan areas\nRs. 8,000.00\n61.14.2 The shelter fee shall be collected for 20% of total site area of the project.\n61.14.3 The shelter fee collected shall be utilized for development of EWS housing under Pradhan Mantri Awas Yojna (PMAY) or any other Urban Housing Scheme meant for EWS categories or for undertaking civic amenities in slums and weaker section colonies only for which a separate account shall be maintained by the local body/Urban Development Authority. The shelter fee can also be utilized for re-development/improvement/rehabilitation of slums under Pradhan Mantri Awas Yojna (PMAY) programme as local body share.\nChapter -VII\nRequirement for Special Occupancies",
            "footnote": "",
            "is_definition": false,
            "sort_order": 91
        },
        {
            "number": "62",
            "title": "62. Semi-detached and row housing.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 92
        },
        {
            "number": "63",
            "title": "63. Shop-cum-residence.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 93
        },
        {
            "number": "64",
            "title": "64. Cinema, Multiplex and Theatre building.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 94
        },
        {
            "number": "65",
            "title": "65. Liquefied Petroleum Gas.",
            "chapter": null,
            "content": "Table - 21: Minimum distances required for storage shed of liquefied petroleum gas cylinders\nTable - 21: Minimum distances required for storage shed of liquefied petroleum gas cylinders\nQuantity of Compressed Gas in Cylinders (Kg.)\nQuantity of Compressed Gas in Cylinders (Kg.)\nMinimum Clear Distance to be Kept (meters)\nMinimum Clear Distance to be Kept (meters)\n0-100\n1\n101-1000\n3\n1001-4000\n5\n4001-8000\n7\n8001-12000\n9\n12001-30,000\n12\nOver 30,000\n15",
            "footnote": "",
            "is_definition": false,
            "sort_order": 95
        },
        {
            "number": "66",
            "title": "66. Petrol Pump.",
            "chapter": null,
            "content": "A. For minor roads having less than 30 in. width - 50 m.\nB. For major roads having width 30 m. or more -100 m.\nB. Filling-cum-service station 40 m x 30 m\nC. Frontage of the plot shall not be less than 30 m\n66.6.1\nGround coverage\n-\n20%\n66.6.2\nFAR\n-\n1.0\n66.6.3\nMax Height\n-\n7m\n66.6.4\nCanopy equivalent to permissible ground coverage\n\t\t\twithin setback line,\n66.6.5\nFront set back - minimum 9 m\n66.7.1 NOC from Explosives/Fire Service Department\n66.7.2 License from the District Magistrate\n66.7.3 Ground coverage will exclude canopy area\n66.8.1 Plot size (Max)- 36 m X 30 m\n66.8.2 Maximum ground coverage - 20%\n66.8.3 Maximum height-7m (single storey)\n66.8.4 Building component- control room/office/dispensary, store, pantry and W.C.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 96
        },
        {
            "number": "67",
            "title": "67. Farm House.",
            "chapter": null,
            "content": "Table 22: Maximum coverage and FAR\nTable 22: Maximum coverage and FAR\nA\nMaximum permissible ground coverage for all\n\t\t\t\ttypes of activity\n10 %\nB\nMaximum permissible FAR\n0.20\nC\nResidential accommodation of watch and\n\t\t\t\tward/maintenance staff\n40 sqm.\nD\nMaximum height\n7m.\nE\nSetbacks\nFront/side abutting road 15.0 m. and all other\n\t\t\t\tsides 9.0\n67.5.1 In case of a plot for a farmhouse having dwelling units, the owner thereof shall be responsible to make lawful arrangements for potable water.\n67.5.2 The owner shall be responsible to provide drains in the farm house to be used for rain water and in case of dairy farm open or closed sanitary drains to clean sheds, as may be required by the Authority.\n67.5.3 The owner shall be responsible to provide septic tank with necessary disposal trenches for disposal of human and animal waste in the farmhouse within his own premises.\nChapter-VIII\nDevelopment and Sub-Division of Land",
            "footnote": "",
            "is_definition": false,
            "sort_order": 97
        },
        {
            "number": "68",
            "title": "68. Application.",
            "chapter": null,
            "content": "i. A copy of the title deed of the land in question;\nii. An affidavit with regard to the right, title and interest of land and such other particulars as the Authority may require;\niii. An authenticated copy of the certificate with regard to the payment of development charges, if any.\niv. An authenticated copy of the receipt towards payment of fee to the Authority as prescribed under bye-laws-9.2;\nv. A no-objection certificate, from the lessor in case the land is not leasehold unless the lease deed permits undertaking subdivision as applied for;\nvi. A site plan traced out of revenue village settlement map in operation indicating therein in red colour the lands to which the application relates and surrounding plots;\nvii. An index plan of the site showing adjoining areas within a radius of 150 m. round from the proposed site marking clearly therein the boundaries of the proposed layout in red colour. existing road, structures, burial ground and .high tension or low-tension power line passing through the site of the layout plan and the level of the site;\nviii. A detailed plan to a scale not less than 1:1000 or as required by the authority showing the proposed layout (sub-division) indicating size of plot width of the proposed road, open space and amenities provided;\nix. Land use analysis indicating the survey plot number, the bye-plot number, the detailed dimensions of all the plots, the area of each-plot and the use to which they are proposed to be put;\nx. In case of land originally belonging to any religious endowments, a no-objection certificate from the endowment commissioner or board as the case may be.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 98
        },
        {
            "number": "69",
            "title": "69. Use in relation to Development Plans.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 99
        },
        {
            "number": "70",
            "title": "70. Size of the plot and road width.",
            "chapter": null,
            "content": "Table-23: Minimum road widths for sub division in residential area\nTable-23: Minimum road widths for sub division in residential area\nSl.\nSl.\nLength of road in (m)\nLength of road in (m)\nMin. width of road** (m)\nMin. width of road** (m)\n1\nUp to 250\n9.0\n2\nAbove 250 up 500\n12.0\n3\nAbove 500 to 1000\n15.0\n**For EWS housing scheme, the minimum road width may be relaxed.\nNote :- All junction of service roads shall have sufficient weaving angle. In no case it shall be less than the space arrived at drawing a quadrant of a circle of 4.5m. radius at the edge of the actual road lines leaving the width of pedestrian walks (foot path) and the plot boundaries shall be rounded of by drawing a quadrant of the circle of 2.7m radius at the edge of plot boundaries (see figure). It can also be provided but cut in place of rounded corners is to be determined by the Authority.\nTable -24: Minimum road widths for sub division in commercial and industrial area\nTable -24: Minimum road widths for sub division in commercial and industrial area\nClass of Road\nClass of Road\nWidth (m)\nWidth (m)\nMaximum length permissible (m)\nMaximum length permissible (m)\n1\n12\n200\n2\n18\n600\n3\n24\nAbove 600\nNote: If the area to be sub-divided is more than 1 acre in that case, the layout has also to be accorded by the concerned committee authorized by the Authority. If the area to be sub-divided is more than 1 acre or 0.4 hectare, then the minimum width of roads and access ways for internal development shall be 7m. and shall be further subjected to the provisions of bye-law. In case the plot faces a road less than 7m in width, then the plot boundary at the front shall be set back, so than the distance from the centre line to the new plot boundary is not less than 3.5m.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 100
        },
        {
            "number": "71",
            "title": "71. Area for development.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 101
        },
        {
            "number": "72",
            "title": "72. Park and Open Spaces.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 102
        },
        {
            "number": "73",
            "title": "73. Community facilities.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 103
        },
        {
            "number": "74",
            "title": "74. Exemptions.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 104
        },
        {
            "number": "75",
            "title": "75. Submission of layout plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 105
        },
        {
            "number": "76",
            "title": "76. Incentive for solar heating & lighting and waste water recycling.",
            "chapter": null,
            "content": "Chapter IX\nCompounding, Penalties and Compliance",
            "footnote": "",
            "is_definition": false,
            "sort_order": 106
        },
        {
            "number": "77",
            "title": "77. Restriction on Compounding.",
            "chapter": null,
            "content": "7.1.1 Where construction has been undertaken on Government land or land belonging to local body or land not owned by the person undertaking such development;\n77.1.2 Where development has been undertaken un-authorized within the prohibited limits of any ancient or archaeological monuments.\n77.1.3 Where such developments interfere with the natural drainage of the locality;\n77.1.4 Where development has been undertaken un-authorized over the area earmarked/approved for parking; and,\n77.1.5 Where road or drain whether public or private, whether constructed or natural, has been encroached.\n77.1.6 Where number of floors has been increased from permissible limit/sanctioned map.\n77.3.1 Where development has been undertaken without permission, but within the framework of use restrictions and the provisions of these bye laws applicable to the concerned plot;\n77.3.2 Where development has been undertaken in deviation of the approved plan, but within the framework of the use restriction and the provisions, norms, and stipulations of these bye laws; and\n77.3.3 The Authority may however compound deviations beyond the permissible norms of these bye laws up to 10% in respect of side, front and rear setbacks, 10% in respect to FAR and 10% in respect to height. Any deviation beyond the compoundable limit of 10% or addition of extra floor will not be allowed and will be subject to demolition of the offending areas/part of the building. The owner/builder shall carry out the demolition and take all precautions to ensure the structural safety of the remaining part of the building and ensure that no damage is caused to life and property in any way.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 107
        },
        {
            "number": "78",
            "title": "78. Compounding Rate.",
            "chapter": null,
            "content": "Table 25: Compounding rates\nTable 25: Compounding rates\nSl.\nSl.\nSituations\nSituations\nCompounding fees (in Rs.) per sqm. for the\n\t\t\t\tviolated area\nCompounding fees (in Rs.) per sqm. for the\n\t\t\t\tviolated area\nResidential/Institutional\nResidential/Institutional\nOthers\nOthers\n1\nWhere development has been undertaken without\n\t\t\t\tpermission, but within the framework of use restrictions and the\n\t\t\t\tprovisions of the Bye laws applicable to concerned plot\n10000\n15000\n2\nConstructions beyond permission but within the\n\t\t\t\tlimit of 10% as mentioned as in section-77.3.3 in bye-laws of the\n\t\t\t\tgross areas on all floor thus in violation beyond the permitted\n\t\t\t\tsetback line or beyond the permissible limit of FAR\n15000\n25000\nNote:- Where development has been undertaken in deviation to the approved plan. but within the framework of use, restriction and the provision of norms and stipulations of these Bye-Laws. Fees as the provision made in sub-section-9.7.3.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 108
        },
        {
            "number": "79",
            "title": "79. Compounding amount.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 109
        },
        {
            "number": "80",
            "title": "80. System for monitoring.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 110
        },
        {
            "number": "81",
            "title": "81. Telecom Tower Permission.",
            "chapter": null,
            "content": "Chapter - X\nE-Governance and Service Delivery",
            "footnote": "",
            "is_definition": false,
            "sort_order": 111
        },
        {
            "number": "82",
            "title": "82. E-Governance.",
            "chapter": null,
            "content": "Chapter - XI\nAffordable Housing\n83. \"Affordable Housing Project\".\n83.7 Means of access\nLength of road limitation\nLength of road limitation\nSl.\nSl.\nMaximum Length of the road in Meter\nMaximum Length of the road in Meter\nMinimum width of road of street in Meter\n\t\t\t\t(Inclusive of passive Development)\nMinimum width of road of street in Meter\n\t\t\t\t(Inclusive of passive Development)\n(i)\n(i)\n(ii)\n(ii)\n(iii)\n(iii)\n1\nUpto 100 m\n3.6 meter 5.1\n2\nExceeding 100 meter and upto 300 meter\n4.5 meter 6.6\n3\nExceeding 300\n6.6 meter 7.5\n83.8 Minimum setbacks and height of residential buildings\nSl.\nSl.\nAverage Depth of plot (In meters)\nAverage Depth of plot (In meters)\nBuilding height Upto G+2 Maximum-10m\nBuilding height Upto G+2 Maximum-10m\nBuilding Height Upto G+3 Maximum-12m\nBuilding Height Upto G+3 Maximum-12m\nBuilding Height Upto G+4 Maximum-15m\nBuilding Height Upto G+4 Maximum-15m\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back (m)\nMinimum Rear set back (m)\nMinimum Front set back (m)\nMinimum Front set back (m)\nMinimum Rear set back(m)\nMinimum Rear set back(m)\nMinimum Front Rear set back(m)\nMinimum Front Rear set back(m)\nMinimum set back (m)\nMinimum set back (m)\n(i)\n(i)\n(ii)\n(ii)\n(iii)\n(iii)\n(iv)\n(iv)\n(v)\n(v)\n(vi)\n(vi)\n(vii)\n(vii)\n(viii)\n(viii)\n1\nExceeding 15m & upto 33m\n3.0\n1.8\n3.0\n2.0\n3.0\n2.0\n2\nExceeding 33m & upto 45 m\n4.0\n3.0\n4.5\n3.0\n4.5\n3.5\n3\nMore the 45m\n4.0\n3.0\n4.0\n4.0\n5.0\n5.0\n83.9 Minimum side setbacks for residential buildings\nSl.\nSl.\nAverage Width of plot (In meters)\nAverage Width of plot (In meters)\nBuilding Height Upto G+2 Maximum-10m\nBuilding Height Upto G+2 Maximum-10m\nBuilding Height Upto G+3 Maximum-12m\nBuilding Height Upto G+3 Maximum-12m\nBuilding Height Upto G4-4 Maximum-15 m\nBuilding Height Upto G4-4 Maximum-15 m\n(i)\n(i)\n(ii)\n(ii)\n(iii)\n(iii)\n(iv)\n(iv)\n(v)\n(v)\n(vi)\n(vi)\n(vii)\n(vii)\n(viii)\n(viii)\n3\nExceeding 15m & upto 27m\n1.5\n1.5\n1.5\n1.5\n2.0\n2.0\n5\nExceeding 27m & upto 39m\n2.0\n2.0\n2.5\n2.5\n3.0\n3.0\n7\nExceeding 39m & upto 45m\n3.0\n3.0\n3.60\n3.60\n4.50\n4.50\n8\nMore the 45m\n3.60\n3.60\n4.00\n4.00\n5.00\n5.00\n83.10 Minimum exterior open spaces around the buildings for all type of high rise buildings unless otherwise specified\nSl.\nSl.\nHeight of the Building Upto (m)\nHeight of the Building Upto (m)\nExterior open spaces to be left out on all\n\t\t\t\tsides in m.\nExterior open spaces to be left out on all\n\t\t\t\tsides in m.\n(front setback)\n(front setback)\nSide and back\nSide and back\n1\nMore than 15 and upto 18\n6.5\n4.5\n2\nMore than 18 and upto 21\n7.0\n4.5\n3\nMore than 21\n7.5\n4.5\nEWS: car parking for 50% of the units, balance 2 wheeler parking\nLIG & MIG: car parking for 100% of the units\n86.15.1 EWS               -               Carpet Area- 30sqm.\n86.15.2 LIG                 -               Carpet Area- 60sqm.\nEWS\nEWS\nLIG\nLIG\nFlooring and Skirting (100mm-ht)\nLiving Room Dining Room Kitchen Bed Room\n\t\t\t\tVerandah Balcony Passages Lobby\nCeramic Tiles (300mm x 300mm)\nCeramic Tiles (300mm x 300mm)\nFlooring\nToilet\nAnti Skid Ceramic Tiles(300mm x300mm)\nAnti Skid Ceramic Tiles (300mm x300mm)\nWall Tiles/Dado\nKitchen 600mm height on platform\nCeramic wall tiles (300mm x 200mm)\nCeramic wall tiles (300mm x 200mm)\nToilet 2000mm height\nCeramic wall tiles (300mm x 200mm)\nCeramic wall tiles (300mm x 200mm)\nStaircase\nFloor and skirting(100mm)\nKota/marble/concrete paver/mosaic tiles\nKota/arble/concrete paver/mosaic tiles\nParking floor\nPaver Tiles\nPaver Tiles\nWall work\nExternal (200mm thick)\nRed Bricks/Conc. Hollow Blocks/Flyash Bricks\nRed Bricks/Conc. Hollow Blocks/Flyash Bricks\nInternal (150/100mm thick)\nConc. Hollow Blocks\nConc. Hollow Blocks\nExternal Plaster\n20mm thick cement Plaster in 1:4 with proper\n\t\t\t\twaterproofing\n20mm thick cement Plaster in 1:4 with proper\n\t\t\t\twaterproofing\nInternal Plaster\n12/15 mm thick cement Plaster in 1:6\n12/15 mm thick cement Plaster in 1:6\nKitchen Platform\nWidth approx 525mm\nKota Stone with Stainless Steel sink\nPolished Granite Stone with Stainless Steel sink\nWindows\n2 track Aluminium Anodised with 4mm thick glass\n3 track Aluminium Anodised with 2 track -4mm\n\t\t\t\tthick glass and and I track stainless steel mosquito mesh)\nDoors\nExternal-30mm thick Internal-25mm thick\nWooden Commercial Flush Doors\nWooden Commercial Flush Doors\nSanitary ware\nWhite Vitrified/porcelain\nWhite Vitrified/porcelain\nCP Fittings\nAs per ISI Mark\nAs per ISI Mark\nPlumbing\nPVC/uPVC/cPVC Pipes\nPVC/uPVC/cPVC Pipes\nExternal Paint\nCement Based Paint\nCement Based Paint\nInternal Paint\nOil bound distemper over a coat of Plaster of\n\t\t\t\tParis\nOil bound distemper over a coat of Plaster of\n\t\t\t\tParis\nElectrical\nElectrical work with copper wires in concealed\n\t\t\t\tPVC conduits, Provision shall be made for sufficient lighting and\n\t\t\t\tpower points. Required switches and sockets, telephone and TV\n\t\t\t\tpoints. Each bedroom shall have min 3 Nos-5 Amp points and 1No-\n\t\t\t\t15 Amp point, MCB as required\nElectrical work with copper wires in concealed\n\t\t\t\tPVC conduits, Provision shall be made for sufficient lighting and\n\t\t\t\tpower points. Required switches and sockets, telephone and TV\n\t\t\t\tpoints. Each bedroom shall have min 3 Nos-5 Amp points and 1 No-\n\t\t\t\t15 Amp point, MCB as required\nHardware Fittings\nAluminium fittings including Aldrop, tower bolt,\n\t\t\t\thandles as per ISI fittings\nAluminium fittings including Aldrop, tower bolt,\n\t\t\t\thandles as per ISI fittings\nWater Supply\nDeep Bore wells/Shallow wells/Municipal supply\n\t\t\t\tlines through Overhead tanks\nDeep Bore wells/Shallow wells/Municipal supply\n\t\t\t\tlines through Over head tanks\nSl No.\nSl No.\nComponent of Building\nComponent of Building\nRequirements\nRequirements\n3.1\nHabimhle Room\n(i) In case of one\n\t\t\t\troomed house including space for cooking\n(ii) Two roomed house\n(iii) Height in case of sloping roofs\nArea\nWidth\nHeight\nArea\nWidth\nHeight\nAvg. height\nMtn. height at eaves)\n2.5 sq.mt\n2.4 mt.\n2.6 mt.\n6.5 sq.mt\n2.1 tnt.\n2..6 mt.\n2.6 mt\n2.0 nu.\n3.2\nKitchen\n(i) Cook mg alcove\n\t\t\t\tsewing as cooking space\n(ii) Two room-d house\nArea\nWidth\nHeight\nArea\nWidth\nHeight\n2.4 sq.mt\n1.2 mt.\n2.4 mt.\n3.3 sq.mt\n1.5 mt.\n2.4 mt.\n3.3\nBathroom\nArea\nWidth\nHeight\n1.2 sq.mt\n1.0 mt.\n11 mt.\n3.4\nW.O.\nArea\nWidth\nHeight\n0.9 sq.mt\n0.9 mt.\n2.2 mt.\n3.5\nCombined bath and W.O\nArea\nWidth\nHeight\n1.2 sq_mt\n1.0 mt.\n2.2 mt.\n3.6\nBalcony\nMin. width\n0.9 m\n3.7\nStaircase\n(1) 2 storeyed -\n\t\t\t\tStraight Flight Winding\n(ii) 3 storeyed or more Strait Flight Winding\nWidth\nWidth\nMin. tread\nMax riser\nWidth\nWidth\nMin. Tread\nMax riser\n0.60 mt. (min)\n0.75 mt. (min)\n22.5 cm.\n20.0 cm.\n0.75 mt.. (min)\n0.90 int_ (min)\n25.0 cm.\n20 0 cm.\nNotes :- i) die minimum clear head room\n\t\t\t\t:bail be 2.1 rat.\nNotes :-\n3.8\nPlinth\nMin. height 30 cm from the surrounding ground\n\t\t\t\tlevel\n3.9\nLighting and Ventilation\n(a) one - tenth of\n\t\t\t\tthe room floor area for dry hot climate\n(b) one sixth of the room floor area for wet-hot\n\t\t\t\tclimate\nChapter - XII\nSavings/Repeals and Interpretation",
            "footnote": "",
            "is_definition": false,
            "sort_order": 112
        },
        {
            "number": "84",
            "title": "84. Repeal and Savings.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 113
        },
        {
            "number": "85",
            "title": "85. Interim Development Plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 114
        },
        {
            "number": "86",
            "title": "86. Applicability of National Building Code.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 115
        },
        {
            "number": "87",
            "title": "87. Prior Commitments.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 116
        },
        {
            "number": "88",
            "title": "88. Decision of the Government to be final.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 117
        },
        {
            "number": "89",
            "title": "89. Relaxation and modification by the Government.",
            "chapter": null,
            "content": "Annexure-I\nAnnexure-I\nQulification, Experience & Competence of Technical Person and Builder\nQulification, Experience & Competence of Technical Person and Builder\n1) Architect.\ni) All plans and information connected with the building permit subject to section-16.3.1\nii) Certificate of supervision and completion of all buildings,\niii) Preparation of sub-division/layout plans and related information connected with development permit of area upto 4 hectare.\niv) Certificate of supervision for development of land area up to 4 hectare.\n2) Engineer.\ni) All plans and information connected with building permit. Subject to section-16.3.2\nii) Structural details and calculations of buildings on plot up to 500 square meters and up to three storied structure excluding basement/stilt.\niii) Certificate of supervision and completion for all buildings.\niv) Preparation of all service plans and related information.\nv) Issuing certificate of supervision for development of land for all area.\nii) If he/she is found negligent in his/her duties and responsibilities the Authority may black-list an Engineer in case of serious defaults or repeated defaults The registration shall be liable to be revoked temporarily or permanently by the Authority in such cases of negligence and default.\n3) Structural Engineer.\nNote - 5 years experience shall be relaxed to 2 year in the case of Post Graduate degree in Structural Engineering/higher qualification.\nii) To prepare detailed structural design, drawings and specifications and to prescribe the method and technique of its execution strictly on the basis of the National Building Code or relevant BIS specifications.\niii) To supply copies of structural drawings to the site supervisor.\niv) To inspect the works at all important stages and certify that the work being executed is up to the satisfaction of the Architect.\nv) To certify the structural safety and overall structural soundness of the building to the Architect.\nvi) To advise the Owner/Architect/Engineer for arranging for tests and their reports for soil, building material etc. for his evaluation and design consideration.\nvii) To prepare the revised calculations & drawings in case of any revision with reference to the earlier submission of drawing and design in a particular case.\nviii) To submit the certificate of structural safety and over all structural soundness of building to Authority.\nxi) In case of multistoried buildings and buildings of a special nature as identified by the Authority from time to time, the structural Calculations/Drawings shall be got vetted by Indian Institute of Technology/National Institute of Technology or any organization empanelled by the State Disaster Management Authority or the Building Construction Department.\n4) Town Planner.\ni) All plans and related information connected with development of land of all areas including integrated township.\nii) Certificate of supervision for development of land of all areas.\n5) Supervisor/draftsman.\ni) All plans and related information connected with building permit for residential buildings on plot up to 100 sq. m. and up to two storeys,\nii) Certificate of supervision for buildings as per (i).\nii) To follow the provisions of NBC, 2005 or BIS specifications as regards materials, components, quality control and the process of construction.\niii) To bring to the notice of the structural Engineer and Architect/Engineer/any situation or circumstances which in his opinion are liable to endanger the safety of structure.\niv) He shall be in charge of site and responsible for supervision of the work.\nv) He shall ensure that all the works under his charge are carried out in conformity with the approved drawings and as per the details and specifications supplied by the Architect/Engineer.\nvi) He shall take adequate measures to ensure that no damage is caused to the work under construction and the adjoining properties.\nvii) He shall also ensure that no undue inconvenience is caused in the course of his work in the people in neighborhood.\n6) Group Agency\nii) The Authority may also empanel public undertaking/agencies engaged in development work for quick execution of Government/Private projects within its jurisdiction.\nRegistration Fee.\n7) Builder.\ni) A person/firm engaged in construction activities/building activities in an urban area.\nii) A person or group of persons having qualification of Civil Engineering, Architecture and Town Planning.\niii) The Authority may classify the builders into different categories considering their experience, expertise and annual turnover.\nForm of Application For Registration of Builder\nForm of Application For Registration of Builder\nPaste passport size colour photo of applicant\nPaste passport size\ncolour photo of applicant\nAttach one more colour passport\nphoto of applicant with application\n1\nName of the applicant (Builder/Firm/Developer)\n:-\n2\nAddress of Applicant, issued by the officer, not below the\n\t\t\t\trank of Civil SDO/SDM\n:-\n(a) Local Address\n:-\n(b) Permanent Address\n:-\n3\nAcademic/Technical Qualifications\n:-\n(a) Builder/Developer\n:-\n(b) Name, Address and Technical Qualification of Engineer\n\t\t\t\tAssociated with the builder/developer(Engineer should have\n\t\t\t\trecognized Degree/Diploma and 3 years minimum experience in civil\n\t\t\t\tbuilding construction work).\n:-\n(c) Name, Address of Architect and Technical qualification\n\t\t\t\t(Architect associated with builder/developer should have Degree\n\t\t\t\tfrom recognized institution with 3 years minimum experience in\n\t\t\t\tcivil building Planning work)\n:-\n4\nService Tax Registration Number and Latest return of service\n\t\t\t\tTax In case of new builder/developer, Service Tax registration\n\t\t\t\tmust be submitted by him within 3 months from the date of making\n\t\t\t\tinvestment in construction of Building/Apartment etc.\n:-\n5\nCurrent year Income tax return (Certified copy to be attached)\n:-\n6\nAffidavit to be submitted at the time of registration by the\n\t\t\t\tBuilder/Developer that he would submit Labour License either in\n\t\t\t\this own name or in the name of Labour Supplier employed by the\n\t\t\t\tBuilder for construction of that specific project within 3 months\n\t\t\t\tfrom the date of start of construction of the project\n:-\n7\nWork Experience in Civil Construction work (if any)\n:-\n8\n(a) If Building Construction has been done by the applicant,\n\t\t\t\tmention the B.C. No. and Passing Authority with details.\n:-\n(b) Year of Building Construction\n:-\n(c) Name of Land Owner/Building Owner if the Land/Builder is\n\t\t\t\tnot belonging to Builder/Developer by self and certified copy of\n\t\t\t\tMutual contract/agreement to be attached for construction of the\n\t\t\t\tBuilding/Apartment over that land\n:-\n9\nCharacter Certificate issued by the Deputy\n\t\t\t\tCommissioner/District Magistrate of period not earlier than 6\n\t\t\t\tmonths\n:-\n10\nIs any unauthorized construction case pending after the\n\t\t\t\tconstruction of the sanctioned building plan (If yes, mention its\n\t\t\t\tfull details, Name of the Authority/Court, case no. and present\n\t\t\t\tstatus of case) Information to be submitted by affidavit.\n:-\n11\nAnnual Turn Over of not below 50 lacs rupees duly Audited by\n\t\t\t\tChartered Accountant for the last three years. (Certified copy to\n\t\t\t\tbe attached)\n:-\n12\nDetails of the Movable and Immovable Property to be supported\n\t\t\t\tby affidavit containing that the concerned Developer/Builder is\n\t\t\t\thaving property of value not below than 50 lacs rupees.\n:-\n13\nIs applicant registered for work in any department? (If yes,\n\t\t\t\tmention full details with Registration No.)\n:-\n14\nDetails of Registration fee by way of DD payable in favour the\n\t\t\t\tAuthority. For Rs. 50,000/-in case of new registration \nRs. 10,000/- in case of renewal.\n:-\nCost of Application Form 1250.00 Only (Non-Refundable)\nCost of Application Form 1250.00 Only (Non-Refundable)\nFull signature of applicant with Date\nFull signature of applicant with Date\nii) He shall not cause or allow any deviations from the approved drawings in the course of the execution of the project and shall bear responsibility for any irregularity committed in the use and function of the building or its parts for which the approval has been obtained.\niii) He shall not commence the use of building or shall not give the possession to occupy the building to any one before obtaining the occupancy certificate from the Authority.\nv) He shall provide adequate safety measures for structural stability and protection against fire hazards likely form installation of services like electrical installation, plumbing, drainage, sanitation, water supply etc. whenever required under the bye laws.\nvi) He shall provide adequate for safety and welfare of the construction workers at the construction site as required by labour laws.\nvii) He shall submit the completion certificate and obtain occupancy permission from the Authority.\nviii) He shall explain the construction/design and its intended use as per approved plan, to the prospective purchaser of the premises under construction.\n8) Contractor.\ni) A person/firm engaged in construction activities/building activities in the State of Jharkhand/India.\nii) Availability ()f-\na) Ownership/proof of hire/lease.\nb) Equipment/key technical personnel\nc) Credit facility/liquid assets.\nd) Bidding capacity of project.\nii) Any other relevant criteria required as per Standard Bidding Document (SBD) of the project.\niii) Registration with the BCD of Government of Jharkhand or C.P.W.D. or public sector undertakings.\nAnnexure-II\nAnnexure-II\nGuidelines for installation of solar water heating system\ni) Hospitals and Nursing Home\nii) Hotels, Lodges, and Guest Houses, Group Housing with the plot area of 4000 sq m.\niii) Hostels of Schools, Colleges and Training Centres with more than 100 Students.\niv) Barracks of armed forces, paramilitary forces and police\nv) Individual residential buildings having more than 150 sq m. plinth area\nvi) Functional Buildings of Railway Stations and Air Ports like waiting rooms, retiring rooms, rest rooms, inspection bungalows and catering units\nvii) Community Centres, Banquet Halls, Barat Ghars, Kalayana Mandaps and buildings for similar use.\nA. Definitions\n(i)\n\"Solar Assisted Water Heating System\nA device to heat water using solar energy as\n\t\t\t\theat source.\n(ii)\n\"Auxiliary back up\"\nElectricity operated or fuel fired boilers/\n\t\t\t\tsystems to heat water coming out 'from solar water heating system\n\t\t\t\tto meet continuous requirement of hot water.\n(iii)\n\"New Building\"\nSuch buildings of above said categories for\n\t\t\t\twhich construction plans have been submitted to the Authority for\n\t\t\t\tclearance.\n(iv)\n\"Existing building\"\nSuch buildings, which are licensed to perform\n\t\t\t\ttheir respective business.\nB. Guidelines for Installation of Solar Water Heating System\nii. Existing Buildings: Installation of Solar Assisted Water Heating Systems in the existing building shall be made mandatory at the time of change of use to above said category provided there is a system or installation for supplying hot water.\niii. Capacity: The capacity of solar water heating system to be installed on the building of different categories shall be decided in consultation with the local body. The recommended minimum capacity shall not be less than 25 It. per day for each bathroom and kitchen subject to the condition that maximum of 50% of the total roof area is provided with the system.\niv. Specifications: Installation of Solar Assisted Water Heating System shall conform to BIS specification IS 12933. The solar collectors used in the system shall have the BIS certification mark.\nv. Auxiliary System: Wherever hot water requirement is continuous, auxiliary heating arrangement either with electric elements or oil or adequate capacity may be provided.\nAnnexure-III\nAnnexure-III\nMaximum Permissible FAR for Different ULBs\nMaximum Permissible FAR for Different ULBs\nSl.\nSl.\nName of ULB\nName of ULB\nMaximum Permissible FAR\nMaximum Permissible FAR\nResidential\nResidential\nCommercial\nCommercial\n1\nRanchi Municipal Corporation\nAs per Master Plan\n2\nDhanbad Municipal Corporation & MADA Area\n2.5\n2.5\n3\nChirkunda Nagar Panchayat\n2.0\n2.0\n4\nGiridih Nagar Parishad\n2.5\n2.5\n5\nHazaribagh Nagar Parishad\n2.5\n2.5\n6\nJhumritilya Nagar Parishad\n2.0\n2.0\n7\nKoderma Nagar Panchayat\n2.0\n2.0\n8\nChas Municipal Corporation\n2.5\n2.5\n9\nPhusaro Nagar Parishad\n2.0\n2.0\n10\nChatra Nagar Parishad\n2.0\n2.0\n11\nBundu Nagar Panchayat\n2.0\n2.0\n12\nGumla Nahgar Panchayat\n2.0\n2.0\n13\nLohardaga Nagar Parishad\n2.0\n2.0\n14\nSimdega Nagar Parishad\n2.0\n2.0\n15\nKhunti Nagar Panchayat\n2.0\n2.0\n16\nRamgarh Nagar Parishad\n2.0\n. 2.5\n17\nDumka Nagar Parishad\n2.5\n2.5\n18\nBasukinath Nagar Panchayat\n2.0\n2.0\n19\nDeoghar Municipal Corporation\n2.5\n2.5\n20\nMadhupur Nagar Parishad\n2.0\n2.0\n21\nGodda Nagar Panchayat\n2.0\n2.0\n22\nPakur Nagar Panchayat\n2.0\n2.0\n23\nSahebganj Nagar Parishad\n2.0\n2.0\n24\nRajmahal Nagar Panchayat\n2.0\n2.0\n25\nMihijham Nagar Parishad\n2.0\n2.0\n26\nJamtara Nagar Panchayat\n2.0\n2.0\n27\nChaibasa Nagar Parishad\n2.0\n2.0\n28\nChakaradharpur Nagar Parishad\n2.0\n2.0\n29\nJamshedpur NAC\n2.5\n3.0\n30\nMango NAC\n2.5\n3.0\n31\nJugsalai Municipality\n2.5\n3.0\n32\nChakuliya Nagar Panchayat\n2.0\n2.0\n33\nSaraikela Nagar Panchayat\n2.0\n2.0\n34\nAdityapur Nagar Parishad\n2.5\n3.0\n35\nMedininagar Nagar Parishad\n2.5\n2.5\n36\nHussianabad Nagar Panchayat\n2.0\n2.0\n37\nVishrampur Nagar Panchayat\n2.0\n2.0\n38\nGarhwa Nagar Panchayat\n2.0\n2.0\n39\nNagar Untari Nagar Panchayat\n1.5\n1.5\n40\nManjhiaon Nagar Panchayat\n1.5\n1.5\n41\nLatehar Nagar Panchayat\n1.5\n2.0\n42\nRanchi Regional Development Authority. Ranchi\nAs per Master Plan\nNote: - (1) For other occupancy the FAR value shall be as per these Bye-laws.\nNote:\n(2) The FAR value may be altered/modified according to the respective up coming Master Plan of Towns. The Urban Development & Housing Department can altered/modified FAR value as and when required.\nAnnexure-IV\nAnnexure-IV\nForm For Mobile Tower Permission\nForm For Mobile Tower Permission\n1\nName of the Firm\n-\nPhoto\n2\nRegistration of the Firm\n-\n3\nDetails of land on\n\t\t\t\twhich tower is to be installed (land related paper):\n(a) Photocopy of sale\n\t\t\t\tdeed/lease\n(b) Photocopy of\n\t\t\t\tKhatiyan\n(c) Photocopy of\n\t\t\t\tMutation\n(d) Photocopy of Rent receipt\n-\n4\nLand/Building Owner of Consent Paper/Agreement\n-\n5\nCertificate satisfy that proposed tower shall\n\t\t\t\t\tbe able to carry wind pressure.\n-\n6\nProposed tower is not in a air traffic zone a\n\t\t\t\t\tcertificate from Airport Authority has been attached for the\n\t\t\t\t\tsame.\n-\n7\nA certificate that the concern building is\n\t\t\t\t\tcapable of carrying load of the proposed tower.\n-\n8\nPhotocopy of structural design of propose\n\t\t\t\t\ttower.\n-\n9\nHeight of the proposed tower shall be measured\n\t\t\t\t\tform ground floor of the building on which tower is going to be\n\t\t\t\t\tinstalled.\n_\n-------------------------------------------------------------------m\n10\n(a) If height is less than 40m. and outside 7km.\n\t\t\t\tthan whether online application has been made or not. A oath with\n\t\t\t\tdetailing out that in case of any objection/rejection correction\n\t\t\t\tmeasures shall be taken out by TSPs/IPs. OR\n-\n(b) If height is above 40m. and under 7km. then\n\t\t\t\ta certificate of SACFA/Airport Authority of India is available or\n\t\t\t\tnot.\n11\nAcknowledgement receipt has been enclosed or\n\t\t\t\t\t\tnot by TSPs/lPs in context of self certificate produced before\n\t\t\t\t\t\tTERM CELL of DOT with regard to EMR. OR\n-\nAffidavit enclosed or not by TSPs/IPs in\n\t\t\t\t\t\tcontext of self certificate produced before TERM CELL of DOT\n\t\t\t\t\t\twith regard to EMR.\n12\nFee as per Jharkhand Communication Tower and\n\t\t\t\t\tRelated Structures Policy, 2015 for 8m. height/more than 8m.\n\t\t\t\t\theight (Non refundable).\n-\nBank Draft No\n\t\t\t\t\t................................................... Name of\n\t\t\t\t\tBank .................................................... Date \n\t\t\t\t\t......................................................\nAnnexure V\nAnnexure V\nInspection Checklist During the Construction\nInspection Checklist During the Construction\nConstruction Stage\nConstruction Stage\nElement\nElement\nAs Per Building Plan\nAs Per Building Plan\nRemark\nRemark\nYes\nYes\nNo\nNo\nPlan check\nAll, specially structural calculation, fire\n\t\t\t\tsafety, area of glazing\nCommencement\nAssessment of existing lintels, foundations,\n\t\t\t\tbeams\nTrial Hole\nCheck for encroaching trees, made up of ground,\n\t\t\t\tetc\nAccess for tire service\nFoundation & Excavations\nExcavations (Depth/width, distance to tree &\n\t\t\t\tdrain)\nMovement of Joints, anti-heave protection,\n\t\t\t\tclearance to drain\nPiling\nSteel Enforcement\nGround Preparation for raft\nBasement/tanking\nTanking for below ground walls & floor\nRetaining wall\nOver site\nGround Floor preparation (hardcore etc.)\nSuspended timber ground floor preparation\nPre cast concrete beams/floor (ventilation &\n\t\t\t\tDPC )\nDPC\nDBM\nGas Protection - landfill, radon etc\nFloor insulation\nSite level for disabled access\nDrainage (before back fill)\nSewer branches to the site\nDrainage laid prior to coverage\nGround percolation's tests ( septic tanks and/or\n\t\t\t\tsoak-aways )\nExcavated Soak-away pits\nExposure of main sewer\nRerouting of main sewer/relocation of main\n\t\t\t\tsewer\nSuper Structure\nFrame-concrete reinforcement or steel or timber\nFloor joists and beams and connections\nConstruction at first floor level. cg block work\n\t\t\t\tand wall ties\nConstruction at 2\"d and subsequent floor\n\t\t\t\tlevels\nDormer framework prior to boarding over\nRoof timbers, restrains straps, bracing\nRoof breather membrane\nStaircase installed\nVehicle Barriers/bay\nSuper Structure\nFire protection applied to structural members\nCavity barriers/fire stopping\nFire dampers and fire collars\nMeans of escape\nSpace separation & compartmentation\nGlazing\nOpening to conservatories etc\nArea of Glazing\nThermal elements (cavity walls etc)\nAccess\nPre Plaster\nSound insulation in walls, floors and stairs\nInsulation in walls and roof\nBare walls, beams. lintels\nFire door\nFirst fix electrical (dwellings only)\nVentilation system\nHygiene (sanitary convenience & washing\n\t\t\t\tfacilities - pipes etc )\nCompletion\nDrainage water tightness test\nInternal lighting, appliance (CO2 emission rate\n\t\t\t\t(DER/BER)\nHeating system, incl thermostatic control\nSound insulation test\nGas tightness test to flues\nElectrical installations (dwellings only)\nCombustion appliance & fuel system storage\nAir leakage test\nHygiene (sanitary conveniences & washing\n\t\t\t\tfacilities)\nTest of emergency lighting and fire alarms\nAnnexurc VI\nAnnexurc VI\nForm For Completion Certificate\nForm For Completion Certificate\nNote - In case the building has been constructed with deviation a statement of such deviation together with line drawings indicating the extent of deviation shall be submitted along with the completion certificate, duly signed by the technical personnel and the builder/owner/applicant.\nAnnexure VII\nAnnexure VII\nForm For Occupancy Certificate\nForm For Occupancy Certificate\nAnnexure-VIII\nAnnexure-VIII\nInformation for Intimation of Completion of Work up to Plinth Level\nInformation for Intimation of Completion of Work up to Plinth Level\nYours faithfully,\nSignature of Licensed Architect/Engineer/Supervisor\nName .............................................................\n(in Block letters)\nAddress .............................................................\nRegistration No .....................................................\nDate .............................................................\nSignature of Builder/Owner/Applicant\nName .............................................................\n(In Block letters)\nAddress .............................................................\nRegistration No .....................................................\nDate .............................................................\nAnnexure-IX\nAnnexure-IX\nChecklist for Structural Safety\nChecklist for Structural Safety\nItem\nItem\nAs Per Buildin Plan\nAs Per Buildin Plan\nRemark by authorized representative\nRemark by authorized representative\nYes\nYes\nNo\nNo\nNon applicable\nNon applicable\nApplicable\nApplicable\n1) Structural Safety",
            "footnote": "",
            "is_definition": false,
            "sort_order": 118
        },
        {
            "number": "1",
            "title": "1. Provide Design Basis Report as per the\n\t\t\t\tdocument",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 119
        },
        {
            "number": "2",
            "title": "2. Provide description of Sub-structure and\n\t\t\t\tSuper structure as per the format given in the Ref(5&6)\n\t\t\t\tenclosed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 120
        },
        {
            "number": "3",
            "title": "3. Provide brief Description of Structural\n\t\t\t\tSystem with sketches, images of drawing. etc. with specific focus\n\t\t\t\ton Lateral load resisting system'.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 121
        },
        {
            "number": "4",
            "title": "4. Provide brief note on modeling, software used\n\t\t\t\tetc. Clear mention whether infill/partition wall is idealized\n\t\t\t\tas part of lateral load system?",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 122
        },
        {
            "number": "5",
            "title": "5. Provide the height of building in meters.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 123
        },
        {
            "number": "6",
            "title": "6. Provide plan dimensions of the building (mt x\n\t\t\t\tmt)",
            "chapter": null,
            "content": "EQ Loading Details",
            "footnote": "",
            "is_definition": false,
            "sort_order": 124
        },
        {
            "number": "7",
            "title": "7. Provide following EQ loading details.",
            "chapter": null,
            "content": "a) Zone Factor\nb) Importance factor\nc) Response Reduction factor\nd) Soil Type\ne) % LL considered in seismic\nf) Time Period in the horizontal X- direction\n\t\t\t\t(sec)\ng) Time Period in the horizontal Z-direction\n\t\t\t\t(sec)\nh) Total Seismic weight (Sw) of building (kN)\ni) Static Base-shear in X-direction (as % of Sw)\nj) Static Base-shear in Z-direction (as % of Sw)\nk) Table of distribution for static base shear\nl) Max. deflection at roof level. (mm)\nm) Max. inter storey drift./Height\nVertical Elements Details",
            "footnote": "",
            "is_definition": false,
            "sort_order": 125
        },
        {
            "number": "8",
            "title": "8. Provide following data regarding Vertical\n\t\t\t\tElements.",
            "chapter": null,
            "content": "a) Size of maximum loaded column\nb) Gravity load on max. loaded column\nc) Axial stress in max. loaded column (Gravity\n\t\t\t\tloads)\nd) Grade of max. loaded column\ne) Axial settlement in max. loaded column\nf) Axial settlement in min. loaded column\ng) % Base-shear resisted by all columns along X\n\t\t\t\t(static)\nh) % Base-shear resisted by all columns along Z\n\t\t\t\t(static)\nDynamic Analysis",
            "footnote": "",
            "is_definition": false,
            "sort_order": 126
        },
        {
            "number": "9",
            "title": "9. Provide following data from Dynamic Analysis",
            "chapter": null,
            "content": "a) Total gravity load on floating column\n\t\t\t\t(provide table if there are multiple floating columns)\nb) Size and span of girders supporting floating\n\t\t\t\tcolumns\nc) Number of floors supported by floating\n\t\t\t\tcolumns\nd) Deflection of girder under column (from\n\t\t\t\tmodel)\ne) Deflection of girder under column (from s/s\n\t\t\t\taction)\nf) Specific details about floating columns on\n\t\t\t\tcantilevergirders (Refer Table below)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 127
        },
        {
            "number": "10",
            "title": "10. Provide, if applicable, following data for\n\t\t\t\teachcantilever.",
            "chapter": null,
            "content": "a) Cantilever span\nb) Structural system\nc) Nature of usage\nd) Maximum elastic deflection under gravity\n\t\t\t\tloads",
            "footnote": "",
            "is_definition": false,
            "sort_order": 128
        },
        {
            "number": "11",
            "title": "11. Provide stability calculations for uplift\n\t\t\t\tand overturning(model extract in case of model)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 129
        },
        {
            "number": "12",
            "title": "12. Typical design calculations for footings",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 130
        },
        {
            "number": "13",
            "title": "13. Typical design calculations for RCC columns\n\t\t\t\tComposite Columns",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 131
        },
        {
            "number": "14",
            "title": "14. Typical design calculations for RCC walls",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 132
        },
        {
            "number": "15",
            "title": "15. Typical design calculations for RC beams (Or\n\t\t\t\tSteel Beams)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 133
        },
        {
            "number": "16",
            "title": "16. Typical design calculations for RCC Girders\n\t\t\t\t(Or Steel Girders/Truss)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 134
        },
        {
            "number": "17",
            "title": "17. Typical design calculations for Steel\n\t\t\t\tBracings",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 135
        },
        {
            "number": "18",
            "title": "18. Provide a note on special provisions\n\t\t\t\tsuggested for the building (like dampers etc.)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 136
        },
        {
            "number": "19",
            "title": "19. Soft copy of model including input and\n\t\t\t\toutput.",
            "chapter": null,
            "content": "Provide following data from Dynamic Analysis\nProvide following data from Dynamic Analysis\nModes\nModes\nFrequency\nFrequency\nTime Period in Sec\nTime Period in Sec\nX-Participation\nX-Participation\nZ-Participation\nZ-Participation\nMode 1\nMode 2\nMode 3\nMode 4\nMode 5\nMode 6\nMode 7\nMode 8\nMode 9\nMode 10\nMode 11\nMode 12\nMode 13\nMode 14\nMode 15\nSummation\nProvide Table for lateral deflections (mm) at\n\t\t\t\tTerrace Level in the following format.\nProvide Table for lateral deflections (mm) at\n\t\t\t\tTerrace Level in the following format.\nLoad Case\nDxmax\nH/Dx\nDrift-x\nDzmax\nH/Dz\nDrift-z\nProvide Corner displacements (mm) for\n\t\t\t\tTorsional Irregularity(along x-direction) in the following\n\t\t\t\tformat.\nProvide Corner displacements (mm) for\n\t\t\t\tTorsional Irregularity(along x-direction) in the following\n\t\t\t\tformat.\nLoad Case\nCorner- I\nCorner- 2\nCorner-2\nCorner-4\nAvg - x\n%Max./Avg,\nEq-x\nWI-x\nProvide Corner displacements (mm) for\n\t\t\t\tTorsional Irregularity(along z-direction) in the following\n\t\t\t\tformat.\nProvide Corner displacements (mm) for\n\t\t\t\tTorsional Irregularity(along z-direction) in the following\n\t\t\t\tformat.\nLoad Case\nCorner- 1\nCorner-2\nCorner- 2\nCorner- 4\nAvg - x\n%Max./Avg.\nEq-z\nWI-z\nProvide acceleration (mg) values in the\n\t\t\t\tfollowing format.\nProvide acceleration (mg) values in the\n\t\t\t\tfollowing format.\nEq-x\nEq-z\nWL-x\nWL-z\nRef 5\nRef 5\nDescription of Sub-Structure\nDescription of Sub-Structure\nNo. of basement\nNo. of basement\nMinimum clearance between outermost basement\n\t\t\t\tretaining wall and compound wall\nHas a Shoring system been installed ? Submit\n\t\t\t\tsectional detail of the shoring system\nGive details of methodology used to resist\n\t\t\t\tuplift pressure due to ground water for tower portion as well as\n\t\t\t\tthe portion outside the tower.\nDescription of the foundation for the tower\n\t\t\t\tblock\nNature of Foundation\nSBC assumed T/sq.mt.\nSub-grade Elastic Modulus\nIntended Use of basements\nIf rock anchors are used, arc they grouted after\n\t\t\t\tinstallation and stressing?\nIs structural steel used in the construction of\n\t\t\t\tthe sub-structure?\nIf yes, what are the measures taken for its lire\n\t\t\t\tproofing and corrosion resistance?\nWhether Expansion/\nSeparation joints provided?\nWhether expansion joint/separation joint\n\t\t\t\tcontinues through basement?\nIf yes, detail at Basement level & retaining\n\t\t\t\twall junction\nRef 6\nRef 6\nDescription of Super Structure\nDescription of Super Structure\nNo. of Floors & height of building in m\nShape of Building, Plan, Elevation, Whether\n\t\t\t\tSymmetric in Elevation\nMaximum plan dimension in either direction.in m.\nRatio of plan dimension\nTypical Floor to floor height in in Maximum\n\t\t\t\tfloor to floor height in entire height of building in m.\nAspect ratio ( Height of Building till Terrace/\n\t\t\t\tMinimum Dimension of Building)\nType of floor slab\nAverage thickness of floor slab in mm\nWhether column are RCC, Composite or In\n\t\t\t\tstructural steel\nAnnexure-X\nAnnexure-X\nConstruction Quality Checklist/Testing\nConstruction Quality Checklist/Testing\nThe materials to be tested on site include\n\t\t\t\tcement, water, aggregates for concrete, bricks and stones, soil\n\t\t\t\tfor embankments, and aggregates for construction works. The list\n\t\t\t\tof materials to be tested on site is given in the Table 1 below.\nTable 1 List of Materials Tested on Site\nTable 1 List of Materials Tested on Site\nMaterial\nMaterial\nSl.No.\n1\nCement\n2\nSand/Fine Aggregates.\n3\nWater for Construction Works (can be tested in\n\t\t\t\tapproved lab)\n4\nBricks\n5\nSize Stone\n6\nCoarse Aggregate for Concrete Work\n7\nSoil/Earth/Sub-grade Material\n8\nGranular Sub-base (GSB) Material\n9\nMaterial for WBM/WMM\n10\nMetal for BM/DBM/BC/Surface Dressing/MSS/Premix\n\t\t\t\tCarpet\n11\nBinder for WBM\n12\nFine Aggregate for DBM/BC\n13\nLime\n14\nBorrow Material\n15\nSteel (to be procured directly form manufacture\n\t\t\t\talong with test certificate\nAnnexure-XI\nAnnexure-XI\nChecklist of Occupancy\nChecklist of Occupancy\nItem\nItem\nAs Per Building Plan\nAs Per Building Plan\nRemark by authorized representative\nRemark by authorized representative\nYes\nYes\nNo\nNo\nNon applicable\nNon applicable\nApplicable\nApplicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 137
        },
        {
            "number": "1",
            "title": "1. Number of floors",
            "chapter": null,
            "content": "Building height\n2.External Setbacks",
            "footnote": "",
            "is_definition": false,
            "sort_order": 138
        },
        {
            "number": "3",
            "title": "3. Building Line, if any",
            "chapter": null,
            "content": "4.Parking space provision",
            "footnote": "",
            "is_definition": false,
            "sort_order": 139
        },
        {
            "number": "5",
            "title": "5. Abutting road width",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 140
        },
        {
            "number": "6",
            "title": "6. FAR",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 141
        },
        {
            "number": "7",
            "title": "7. Coverage percentage",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 142
        },
        {
            "number": "8",
            "title": "8. Tree Cover",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 143
        },
        {
            "number": "9",
            "title": "9. Water harvesting structures",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 144
        },
        {
            "number": "10",
            "title": "10. Land if required to be surrendered",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 145
        },
        {
            "number": "11",
            "title": "11. Lift/s, water pumps and storage tanks",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 146
        },
        {
            "number": "12",
            "title": "12. Internal roads/paving",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 147
        },
        {
            "number": "13",
            "title": "13. Parking areas and external lighting",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 148
        },
        {
            "number": "14",
            "title": "14. Lightening arrestors",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 149
        },
        {
            "number": "15",
            "title": "15. Fire Fighting installations",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 150
        },
        {
            "number": "16",
            "title": "16. Lifts",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 151
        },
        {
            "number": "17",
            "title": "17. Water pump",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 152
        },
        {
            "number": "18",
            "title": "18. Drainage and arrangement for waste water and\n\t\t\t\tsewage disposal",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 153
        },
        {
            "number": "19",
            "title": "19. Copy of agreement with the apartment Owners'\n\t\t\t\tAssociation/Society",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 154
        },
        {
            "number": "20",
            "title": "20. Implementation of Life Safety provisions as\n\t\t\t\tmentioned in National Building Code 2005(Group-I Part-W Fire and\n\t\t\t\tLife Safety-4)",
            "chapter": null,
            "content": "21.NOC from Fire Service Department\nQuality Checklists for Building Works\nQuality Checklists for Building Works\nItem\nItem\nAs Per Building Plan\nAs Per Building Plan\nRemark by authorized representative\nRemark by authorized representative\nYes\nYes\nNo\nNo\nNon applicable\nNon applicable\nApplicable\nApplicable\n1) Excavation & PCC\n1) Excavation & PCC\nA. Pre Excavation\nA. Pre Excavation",
            "footnote": "",
            "is_definition": false,
            "sort_order": 155
        },
        {
            "number": "1",
            "title": "1. Construction Drawings",
            "chapter": null,
            "content": "indicating levels available at Site",
            "footnote": "",
            "is_definition": false,
            "sort_order": 156
        },
        {
            "number": "2",
            "title": "2. Proper safety precautions taken",
            "chapter": null,
            "content": "for site and public",
            "footnote": "",
            "is_definition": false,
            "sort_order": 157
        },
        {
            "number": "3",
            "title": "3. Precautions taken for dewatering",
            "chapter": null,
            "content": "and protecting site from flooding",
            "footnote": "",
            "is_definition": false,
            "sort_order": 158
        },
        {
            "number": "4",
            "title": "4. Dumping ground established",
            "chapter": null,
            "content": "Setting out and levels as per\ndrawings",
            "footnote": "",
            "is_definition": false,
            "sort_order": 159
        },
        {
            "number": "5",
            "title": "5. Intermediate levels checked",
            "chapter": null,
            "content": "B. Post Excavation\nB. Post Excavation",
            "footnote": "",
            "is_definition": false,
            "sort_order": 160
        },
        {
            "number": "1",
            "title": "1. Characteristics of excavated strata",
            "chapter": null,
            "content": "noted and deviations informed",
            "footnote": "",
            "is_definition": false,
            "sort_order": 161
        },
        {
            "number": "2",
            "title": "2. Appropriate shoring and",
            "chapter": null,
            "content": "shuttering done",
            "footnote": "",
            "is_definition": false,
            "sort_order": 162
        },
        {
            "number": "3",
            "title": "3. Final excavation levels, surface",
            "chapter": null,
            "content": "inspected and approved",
            "footnote": "",
            "is_definition": false,
            "sort_order": 163
        },
        {
            "number": "4",
            "title": "4. Anti-Termite Treatment has been done post\n\t\t\t\texcavation",
            "chapter": null,
            "content": "2) Plain Cement Concrete Works\n2) Plain Cement Concrete Works\nA . Pre-concreting\nA . Pre-concreting",
            "footnote": "",
            "is_definition": false,
            "sort_order": 164
        },
        {
            "number": "1",
            "title": "1. All levels and dimensions checked for\n\t\t\t\tcorrectness",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 165
        },
        {
            "number": "2",
            "title": "2. Shuttering is as per plan and has no gaps in\n\t\t\t\tbetween",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 166
        },
        {
            "number": "3",
            "title": "3. All materials are of specified brand and\n\t\t\t\tgrade",
            "chapter": null,
            "content": "B. During Concreting\nB. During Concreting",
            "footnote": "",
            "is_definition": false,
            "sort_order": 167
        },
        {
            "number": "1",
            "title": "1. Mixing of concrete has been done as specified",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 168
        },
        {
            "number": "2",
            "title": "2. Slump and other tests carried out as\n\t\t\t\tspecified",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 169
        },
        {
            "number": "3",
            "title": "3. Slump and other tests carried out as\n\t\t\t\tspecified",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 170
        },
        {
            "number": "4",
            "title": "4. Required number of Samples have been taken\n\t\t\t\tfor carrying out slump tests, cube tests etc",
            "chapter": null,
            "content": "C. Post Concreting\nC. Post Concreting\n1 Concreting has been done as per specified line\n\t\t\t\tand level\n2 Curing has been done as specified\n3 Compaction has been done Properly\n4 Remedial measures taken for removal of defects\n3) Anti Termite Treatment (ATT)\n3) Anti Termite Treatment (ATT)\n1 Chemicals for ATT are as per Specifications\n2 Chemicals in use are within the expiry date.\n3 Sufficient quantities of chemicals are\n\t\t\t\tavailable at site for ATT.\n4 Safety precautions have been taken for\n\t\t\t\tcarrying out ATT and storage of Chemicals\n5 Record of consumption maintained at site\n4) Backfilling\n4) Backfilling",
            "footnote": "",
            "is_definition": false,
            "sort_order": 171
        },
        {
            "number": "1",
            "title": "1. Filling material/earth is as per\n\t\t\t\tspecification",
            "chapter": null,
            "content": "2 Anti-termite treatment has been carried nut\n\t\t\t\tbefore commencement of back filling\n3 Filling has been done in layers of 300 mm.\n\t\t\t\twatered and compacted as per specifications\n4 Proper compaction method has been adopted\n5 Filling has been done to the required levels\n5) Reinforced Cement Concrete Works\n5) Reinforced Cement Concrete Works\nA. Pre-concreting\nA. Pre-concreting",
            "footnote": "",
            "is_definition": false,
            "sort_order": 172
        },
        {
            "number": "1",
            "title": "1. All specified materials available at site",
            "chapter": null,
            "content": "2 Cement is of the required grade and not more\n\t\t\t\tthan three months old.\n3 Shuttering checked for Staging & Propping.\n\t\t\t\tline & level, dimensions cleaning etc and its quality\n\t\t\t\tapproved\n4 Application of oil & grease carried out\n5 Mixer/Vibrator as specified available at site\n\t\t\t\twith adequate means to run them during concreting\n6 Cut-out & Sleeves/Inserted\n7 Surface of reinforcement is clean and free\n\t\t\t\tfrom rust\n8 Bars have been provided as per structural\n\t\t\t\tdrawings\n9 Lap length & dowels provided as per codal\n\t\t\t\tprovisions\n10 Pin bars & chairs/cover blocks provided\n\t\t\t\tas per requirements\n11 Tying of bars has been done Correctly\n12 Service lines(Electrical. Plumbing, Others)\n\t\t\t\tif any. provided before commencement of concrete\nB. General Arrangement\nB. General Arrangement",
            "footnote": "",
            "is_definition": false,
            "sort_order": 173
        },
        {
            "number": "1",
            "title": "1. Availability/Arrangement of pumps etc.\n\t\t\t\tproper access & walkway checked",
            "chapter": null,
            "content": "2 Adequacy of vibrators/needle including diesel\n\t\t\t\tvibrator\n3 Slump cone & test cubes made\n4 Safety and health measures taken before\n\t\t\t\tcommencement\nC. During Concreting\nC. During Concreting\n1 All necessary precautions taken before\n\t\t\t\tcommencement of concreting\n2 Samples of taken for slump, cube tests etc for\n\t\t\t\teach batch\n3 Proper Compaction done and checks on Staging &\n\t\t\t\tScaffolding carried out\n4 Covering of green concrete carried out\n5 Surface finish checked\n6 Construction joints provided\nD. Post Concreting\nD. Post Concreting\n1 De-shuttering started on Vertical faces/Other\n\t\t\t\tfaces carried out as per codal provisions\n2 Proper curing of concrete carried Out\n3 Line& Level of surface checked for\n\t\t\t\tcorrectness\n4 Defects, notified and removed\n5 Cube and other test results will be intimated\n\t\t\t\tto the engineer in charge for further action\n6) Masonry, Mortar and Plaster\n6) Masonry, Mortar and Plaster\nA. Pre-Masonry Work\nA. Pre-Masonry Work\n1 Availability of material as per daily\n\t\t\t\trequirement checked\n2 Quality check for bricks/blocks/sand/cement\n\t\t\t\tcarried out\n3 Provisions kept for electrical and other\n\t\t\t\tservices\nB. During masonry work\nB. During masonry work\n1 Checking for line/level/right angle carried\n\t\t\t\tout\n2 Mortar checked for mix proportion\n3 Proper raking of joints\n4 Seismic bands provided as per zonal\n\t\t\t\trequirements\nC. Post masonry\nC. Post masonry\nCheck cleaning of dead mortar and broken bricks/\n\t\t\t\tblocks etc.\n2 Curing carried out as per requirements\nD. Plastering/Pointing\nD. Plastering/Pointing\n1 Mortar for plastering as specified for each\n\t\t\t\tside of wall\n2 Quality of cement and sand checked\n3 Curing work done as per requirement\n4 Preparation of surface\nE. During Plastering\nE. During Plastering\n1 Mortar mixing in tray\n2 Addition of water proofing compound\n3 Proper roughing of first coat\n4 Check for collection of mortar Spills\n5 Cleaning of dead mortar\n6 Check of waviness\n7 Check for grooves/drip moulds\n8 Application of cement slurry on concrete\n\t\t\t\tsurface\nF. After Plastering\nF. After Plastering\n1 Curing\n2 Check for hollowness\n3 Check for cracks\n4 Check for diagonal\n5 Lime wash aller 3 days (within 5 days in case\n\t\t\t\tof neeru application)\n6 Safety and health measures\n7) Water Proofing\n7) Water Proofing\n1 Surface for waterproofing has been prepared\n\t\t\t\tand cleaned\n2 Safety measures/precautions taken before\n\t\t\t\tcommencement of works\n3 Specified type of water proofing Used\n4 Specified material used for waterproofing\n5 The material used was as per specification\n6 Work has been carried out as per\n\t\t\t\tspecifications by the department/specialized agency\n8) IPS/Till Flooring and Dado\n8) IPS/Till Flooring and Dado\n1 Layout of floor checked and proper slopes for\n\t\t\t\tdraining water are maintained specially in bath room and toilet.\n2 Thickness bases at Gl. checked of different\n\t\t\t\tfloor\n3 Check fOr proper back filling under floor done\n4 Metal/glass strips laid properly in IPS\n\t\t\t\tflooring\n5 Curing of IPS Flooring done as per\n\t\t\t\trequirements\n6 Dado provided as per required height\n7 Cleaning and finishing done\n9) Plumbing & Water Supply\n9) Plumbing & Water Supply\n1 GI/Cl/HDPE pipes etc. confirms to relevant IS\n\t\t\t\tcodes\n2 Pipes of required diameter and their fittings\n\t\t\t\tused\n3 Plumbing and Water Supply work carried out\n\t\t\t\tthrough a licensed plumber\n4 Works done as per specification\n5 Plumbing and Water Supply I works tested on\n\t\t\t\tcompletion -\n6 Defects rectified\n10) Internal\n\t\t\t\tElectrical Works\n10) Internal\n\t\t\t\tElectrical Works\nA .General\nA .General\n1 Layout plans: showing the position of L.T\n\t\t\t\tPanels/distribution board, lighting fixtures, lighting\n\t\t\t\tdistribution, scheme, receptacles, etc available before\n\t\t\t\tcommencement of work\n2 All the following items are as per\n\t\t\t\tspecification and of approved makes\nL T Panels/Distribution Boards Lighting Fixtures Conduits, including accessories Receptacles Junction Boxes Cables/Wires Any other item\nB . Surface Conduit Wiring/Concealed Conduit\n\t\t\t\tWiring\n. Surface Conduit Wiring/Concealed Conduit\n\t\t\t\tWiring\n1 Conduit and accessories are of specified make,\n\t\t\t\tgauge and diameter\n2 Proper installation of all conduit wiring and\n\t\t\t\tconcealed wiring.\nC. Check List For Earthing\nC. Check List For Earthing\n1 Earth electrode provided as specified.\nB. Surface Conduit Wiring/concealed Conduit\n\t\t\t\tWiring\nB. Surface Conduit Wiring/concealed Conduit\n\t\t\t\tWiring\n1 Conduit and accessories are of specified make,\n\t\t\t\tgauge and diameter\n2 Proper installation of all conduit wiring and\n\t\t\t\tconcealed wiring.\nC. Check List For Earthing\nC. Check List For Earthing\n1 Earth electrode provided as specified\nB. Surface Conduit Wiring/Concealed Conduit\n\t\t\t\tWiring\nB. Surface Conduit Wiring/Concealed Conduit\n\t\t\t\tWiring\n1 Conduit and accessories are of specified make,\n\t\t\t\tgauge and diameter\n2 Proper installation of all conduit wiring and\n\t\t\t\tconcealed wiring.\nC. Check List For Earthing\nC. Check List For Earthing\n1 Earth electrode provided as specified.\nCheck List For External Electrical Works\nCheck List For External Electrical Works\nA. Check List For O.H. Lines\nA. Check List For O.H. Lines\n1 Poles used arc of approved make as specified\n\t\t\t\tand conform to relevant BIS codes\n2 Test certificate as applicable.\n3 Pole embedded below ground level as specified.\n4 Metallic poles are adequately earthed with\n\t\t\t\tspecified size of earth conductor.\n5 Strays struts, insulators, conductors used\n\t\t\t\tconform to relevant BIS Code.\n6 Earth wire conductor used as specified\n7 Lightning arrestors used as specified\nB. Cable Laying\nB. Cable Laying\n1 Trenches of specified dimensions excavated and\n\t\t\t\tprepared\n2 Required quantity of sand cushioning provided;\n\t\t\t\tcable laid; another layer of sand and brick protective covering\n\t\t\t\tprovided. Refilling done earth ramming and dressing done\n3 Cables entry point in building or crossing\n\t\t\t\troads path protected by providing Hume pipes or PVC Pipe\n4 Cable tested before and after laying and\n\t\t\t\tbefore emerging\nC. Check List For Earthing\nC. Check List For Earthing\n1 Earth electrode provided as specified\n2 Types and size of main/sub main and circuit\n\t\t\t\tearthing conductors provided as specified.\n11) Drainage Works\n11) Drainage Works\n1 Excavation for drains carried out as per the\n\t\t\t\tapproved lay-out\n2 Bed Concrete laid as per specifications with\n\t\t\t\tproper slopes and cuttings\n3 All pipes procured and laid as per requirement\n4 Jointing of pipes\n\t\t\t\tdone as per specifications\n5 Manholes provided as per design\n6 Materials for construction of manhole as\n\t\t\t\tspecified\n7 End of the pipes plugged\n8 Drainage line tested before putting to use\n13) Others\n13) Others\n1 Whether the provision for adequate ventilation\n\t\t\t\tand natural lighting has been made as per National Building code?\n2 Whether facility for storage in terms of\n\t\t\t\tAlmirah/Shelves/Lofts/Platform has been made ?\n3 Whether Sanitary fittings have been provided?\nForm-I\nForm-I\nApplication for Land Development\nApplication for Land Development\nApplication No ..................................\nApplication For Development/Re-Development of Land for Obtainng Development Permit\nApplication For Development/Re-Development of Land for Obtainng Development Permit\nFrom\nfor office use only\nName and address (in Block letters)\nRegd No. ............. Date .....................\n...............................................\n...............................................\n...............................................\nSignature of Authorised Person\n...............................................\nTel No/Mobile No\n\t\t\t\t...............................................\nEmail id\n\t\t\t\t...............................................\nTo\n...............................................\n...............................................\n...............................................",
            "footnote": "",
            "is_definition": false,
            "sort_order": 174
        },
        {
            "number": "1",
            "title": "1. Four/Eight sets of the building plan:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 175
        },
        {
            "number": "2",
            "title": "2. Ownership document:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 176
        },
        {
            "number": "3",
            "title": "3. Supervision Certificate in form-V:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 177
        },
        {
            "number": "4",
            "title": "4. Affidavit or peaceful possession of the land:",
            "chapter": null,
            "content": "Yes/No/Not applicable\n5 Certificate for Structural stability in form-TV:\nYes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 178
        },
        {
            "number": "6",
            "title": "6. NOC from lease case of lease hold:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 179
        },
        {
            "number": "7",
            "title": "7. NOC from Fire Authority:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 180
        },
        {
            "number": "8",
            "title": "8. NOC from Airport Authority:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 181
        },
        {
            "number": "9",
            "title": "9. Environmental clearance:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 182
        },
        {
            "number": "10",
            "title": "10. Details Fee :",
            "chapter": null,
            "content": "Yes/No/Not applicable\n11 . Checklist:\nYes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 183
        },
        {
            "number": "12",
            "title": "12. Any other certificate/NOC(please specify):",
            "chapter": null,
            "content": "Yes/No/Not applicable\nSignature of Owner(s) Name of Owner(s)\nForm-II\nForm-II\nBuilding Plan Application Form\nBuilding Plan Application Form\nApplication For Permission to Erect/Re-Erect, Demolish or to Make Addition or Alteration in a Building\nApplication For Permission to Erect/Re-Erect, Demolish or to Make Addition or Alteration in a Building\nFrom\nfor office use only\nName and address (in Block letters)\nRegd No. ............. Date .....................\n...............................................\n...............................................\n...............................................\nSignature of Authorised Person\n...............................................\nTel No/Mobile No\n\t\t\t\t...............................................\nEmail id\n\t\t\t\t...............................................\nTo\n...............................................\n...............................................\n...............................................\na) Construction of ................................................................ storey(Stories) building\nb) Re-construction of an existing building\nc) Alteration/addition to the existing buildings\nd) Revalidation renewal of plan for construction of all Storied building\ne) Demolition\nf) ..................................................... (if any other please specify)\nIn respect of plot No.(CS) ...................................................................... Plot No(MSP) .......................................................................... .khata No ............................................................................ Holding No .................................................................................. Village/Mauza ............................................................................ Ward No .............................................................................. of Municipal Corporation/Municipal Council/Nagar Panchayats/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act the said land shall be used for ................................................................. purpose.\nDocuments furnished",
            "footnote": "",
            "is_definition": false,
            "sort_order": 184
        },
        {
            "number": "1",
            "title": "1. Four/Eight sets of the building plan:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 185
        },
        {
            "number": "2",
            "title": "2. Ownership document:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 186
        },
        {
            "number": "3",
            "title": "3. Supervision Certificate in form-V:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 187
        },
        {
            "number": "4",
            "title": "4. Affidavit or peaceful possession of the land:",
            "chapter": null,
            "content": "Yes/No/Not applicable\n5 Structural stability certificate:\nYes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 188
        },
        {
            "number": "6",
            "title": "6. NOC from lease case of lease hold:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 189
        },
        {
            "number": "7",
            "title": "7. NOC from Fire Authority:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 190
        },
        {
            "number": "8",
            "title": "8. NOC from Airport Authority:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 191
        },
        {
            "number": "9",
            "title": "9. Environmental clearance:",
            "chapter": null,
            "content": "Yes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 192
        },
        {
            "number": "10",
            "title": "10. Details Fee :",
            "chapter": null,
            "content": "Yes/No/Not applicable\n11 . Checklist of the proposed building:\nYes/No/Not applicable",
            "footnote": "",
            "is_definition": false,
            "sort_order": 193
        },
        {
            "number": "12",
            "title": "12. Any other certificate/NOC(please specify):",
            "chapter": null,
            "content": "Yes/No/Not applicable\nSignature of Owners(s) Name of Owner(s)\nForm-III\nForm-III\nCertificate of Execution of Work as per Structural Safety Requirements\nCertificate of Execution of Work as per Structural Safety Requirements",
            "footnote": "",
            "is_definition": false,
            "sort_order": 194
        },
        {
            "number": "1",
            "title": "1. That the building has been constructed according to the structural design and specification prepared by me, which incorporates the provisions of structural safety norms as specified in part 6 (Structural Design) of the national building code of India, 2005 and other relevant codes and the design complies with the Earthquake safety requirement.",
            "chapter": "part 6",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 195
        },
        {
            "number": "2",
            "title": "2. That the construction has been done under my supervision and guidance and adheres to the structural drawings and specifications prepared by me and records of supervision have been maintained.",
            "chapter": null,
            "content": "Any subsequent changes or deviation from the structural drawings and specifications shall be the responsibility of the owner/builder.\nName and signature of competent\nTechnical Person\nRegistration no.\nDate:\nAddress:\nName and Signature of Owner/Builder/Applicant\nRegistration no.\nDate:\nAddress:\nForm-IV\nForm-IV\nCertificate For Structural Stability\nCertificate For Structural Stability\nForm-V\nForm-V\nForm For Supervision\nForm For Supervision\nSignature of Empanelled Technical Person\nName of the Technical Person with Registration number\nAddress ................................. ............................................... ..............................................\nDate .................................\nForm VI\nForm VI\nCheck List\nCheck List\nAs per Document\nAs per Building Plan\nAs per Possession\n(i) Name of Lesser:\n(ii) Purpose of lease:\n(iii) Duration of lease:\n(a) Road\n(b) Sewerage\n(c) Drainage\n(d) Water facility\n(e) Availability of drain\n(f) Telephone\n(g) Electricity\n(ii) Covered area on all floors\nUse applied\nPrescribed Land use in the development plan(if\n\t\t\t\tany)\nWhether permissible/not permissible/special\n\t\t\t\tconsideration\n(ii) No of floor(s) .......................................................\n(i) Site plan\n(ii) Lay out plan\n(iii) All floor plan\n(iv) Elevations Front/Rear/Right/Left/Cross section\n(v) Plan of foundation\n(vi) Septic tank and Soak pit\n(vii) recharging pit & Rain Water harvesting Plan\n(viii) Drain Section\n(ix) Schedule of doors and windows\n(i) Nature of road\n(ii) Width of road\nAs per site/key plan\nSite inspection report\n(iii) Whether the approach road as shown connected to an existing public road in the site plan ...........................................\n(iv) Whether such connection is available in settlement sheets or Cadastral Map: Yes/No\n(v) If private, whether\n(a) transferred to the Authority: Yes/No\n(b) indicated in the final settlement plan: Yes/No\n(c) mentioned in the ownership document: Yes/No\nCategory\nCategory\nRequirement as per norm\nRequirement as per norm\nApproved building plan\nApproved building plan\nProposal\nProposal\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\nBasement/stilsqmt\n1 st floor sqmt\n2 nd floor sqmt\n3 rd floor sqmt\n4 th floor sqmt\nOther Floors\nSociety room\nFront set back\nRear set back\nLeft/Right side set back\nFAR\nParking\nHeight\nNo. of dwelling unit\nPopulation density\nNo. of staircase\nNo. of lift\nRecharging pit\nFee deposited\nAny other item\nExemptions\n(i) height\n(ii) setback\n(iii) FAR\n(i) Water Supply:-\n(ii) Sewerage:-\n(iii) Drainage:-\n(iv) Electrical Installation:-\n(i) General Affidavit:-\n(ii) Structural Stability Certificate:-\n(iii) Form of Supervision:-\n(iv) NOC from Fire Authority:-\n(v) Undertakings with regard to quality construction/Water Supply/Sewerage/Drainage/Waste disposal/firefighting (wherever applicable)\nN:B: (RS Required and Submitted, RNS: Required not Submitted, NR: Not Required)\n(i) Architect/Engineer:-\nName:-\nCoA registration no.(for Architects)\nEmpanelment no:\nSignature\n(ii) Engineer/Structural Engineer:-\nName\nEmpanelment No:\nSignature\n(iv) Builder/Owner/Applicant\nName:\nRegistration no.\nSignature\nForm-VII (A)\nForm-VII (A)\nFor Empanelment of Technical Person (Artchetect, Engineer, Structural Engineer, Town Planner, Supervisor)\nFor Empanelment of Technical Person (Artchetect, Engineer, Structural Engineer, Town Planner, Supervisor)\nSelf-Attested passport size photo of the application\nSelf-Attested passport size photo of the application",
            "footnote": "",
            "is_definition": false,
            "sort_order": 196
        },
        {
            "number": "1",
            "title": "1. Name .....................................................................................",
            "chapter": null,
            "content": "(In block letter)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 197
        },
        {
            "number": "2",
            "title": "2. Father's/Husband's Name ...................................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 198
        },
        {
            "number": "3",
            "title": "3. Date of Birth ..............................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 199
        },
        {
            "number": "4",
            "title": "4. Nationality ...............................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 200
        },
        {
            "number": "5",
            "title": "5. Educational Qualification .............................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 201
        },
        {
            "number": "6",
            "title": "6. Professional Experience ...................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 202
        },
        {
            "number": "7",
            "title": "7. Registration No. With Council of Architecture, New Delhi ..................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 203
        },
        {
            "number": "8",
            "title": "8. Registration with other relevant Institutions/ULBs .........................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 204
        },
        {
            "number": "9",
            "title": "9. Details of other Academic & Professional Achievements .......................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 205
        },
        {
            "number": "10",
            "title": "10. Details of Certificate relating to qualifications/testimonials, if any as per column 5 & 6 with self attested copies .........................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 206
        },
        {
            "number": "11",
            "title": "11. Details of Bank Draft/Postal Order (separately for empanelment Rs. 500/ ............................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 207
        },
        {
            "number": "12",
            "title": "12. Permanent Address - ..........................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 208
        },
        {
            "number": "13",
            "title": "13. Address for Correspondence - ...................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 209
        },
        {
            "number": "14",
            "title": "14. Tel. No./Mob. No - ..........................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 210
        },
        {
            "number": "15",
            "title": "15. Email id - ..................................................................................",
            "chapter": null,
            "content": "Declaration\nDeclaration\nName and Signature of the Applicant\nNote:- Self Attested copies of supporting documents shall be submitted along with the form.\nForm-VII (B)\nForm-VII (B)\nFor Registration of Builder\nFor Registration of Builder\nTo, The Authority ….............................. …..............................\nSelf-Attested passport Size photo of the application\n1 Name of the Firm",
            "footnote": "",
            "is_definition": false,
            "sort_order": 211
        },
        {
            "number": "2",
            "title": "2. Type of Firm-(Partnership/Company) (In block letters)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 212
        },
        {
            "number": "3",
            "title": "3. Name of Partner/Directors ....................................................",
            "chapter": null,
            "content": "(In block letters)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 213
        },
        {
            "number": "4",
            "title": "4. Father's/Husband's Name ...............................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 214
        },
        {
            "number": "5",
            "title": "5. Date of Birth ....................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 215
        },
        {
            "number": "6",
            "title": "6. Nationality .........................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 216
        },
        {
            "number": "7",
            "title": "7. Registration No .............................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 217
        },
        {
            "number": "8",
            "title": "8. PAN/DIN .......................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 218
        },
        {
            "number": "9",
            "title": "9. Sales Tax No ...............................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 219
        },
        {
            "number": "10",
            "title": "10. VAT No .....................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 220
        },
        {
            "number": "11",
            "title": "11. Income Tax Statement of Last Three consecutive Financial Year ..........................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 221
        },
        {
            "number": "12",
            "title": "12. Category applied for .......................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 222
        },
        {
            "number": "13",
            "title": "13. Details of fee ...........................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 223
        },
        {
            "number": "14",
            "title": "14. Permanent Address ..........................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 224
        },
        {
            "number": "15",
            "title": "15. Address for Correspondence - ................................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 225
        },
        {
            "number": "16",
            "title": "16. Tel. No./Mob. No .............................................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 226
        },
        {
            "number": "17",
            "title": "17. Email id ................................................................",
            "chapter": null,
            "content": "Declaration\nDeclaration\nName and Signature of the Applicant\nNote:- Self Attested copies of supporting documents shall be submitted along with the form.\nForm-VIII (A)\nForm-VIII (A)\nFor Approval of Building Permit\nFor Approval of Building Permit\na) Construction of a .................................... building\nb) Reconstruction of .................................... building\nc) Alteration of .................................... building\nd) Alteration or additions in the existing building\ne) Institution of change of the use of building .................................... (Specify)\na) The land/Building shall be used exclusively for .......................................... purpose and the uses shall not be changed to any other use without prior approval of this Authority.\nb) The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement.\nc) Parking space measuring .......................................... sq. m. as shown in the approved plan shall be kept open and no part of it will be built upon.\nd) The land over which construction is proposed is accessible by an approved means of access of .......................................... m. width.\ne) The land in question must be in lawful ownership and peaceful possession of the applicant.\nf) The applicant shall free gift .......................................... m. wide strip of land of the road in the name of the authority for the purposes as mentioned in these Byelaws.\ng) The permission is valid for period of three years with effect from the date of issue.\nh) Permission accorded under the provision cannot be construed as evidence in respect of right title interest of the plot over which the plan is approved.\ni) Any dispute arising out of land record or in respect of right/title/interest after this approval the plan shall be treated automatically cancelled during the period of dispute.\nj) Any other conditions.\nBy Order\nAuthorised Officer ..........................................\nAuthority Officer/Authority\nAuthority Officer/Authority ..............................\nForm-VIII (B)\nForm-VIII (B)\nFor Approval of Land Development Permit\nFor Approval of Land Development Permit\na) For layout plan of land development\nb) Institution of change of the use of land (Specify)\na) The land shall be used exclusively for .......................................... purpose and the uses shall not be changed to any other use without prior approval of this Authority.\nb) The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement.\nc) Parking space measuring .......................................... sq. m. as shown in the approved plan shall be kept open and no part of it will be built upon.\nd) The land over which construction is proposed is accessible by an approved means of .......................................... access of m. width. e) The land in question must be in lawful ownership and peaceful possession of the applicant. f) The applicant shall free gift .......................................... m. wide ..........................................strip of land in the Municipal Corporations/Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act for the further widening of the road to the standard width. g) The permission is valid for period of three years with effect from the date of issue. h) Permission accorded under the provision cannot be construed as evidence in respect of right title interest of the plot over which the plan is approved. i) Any dispute arising out of land record or in respect of right/title/interest after this approval the plan shall be treated automatically cancelled during the period of dispute. j) Any other conditions. By Order Authorised Officer Memo No .......................................... , Date .......................................... Copy along with .......................................... copies of the approved plans to Smt./Shri ..........................................\ne) The land in question must be in lawful ownership and peaceful possession of the applicant. f) The applicant shall free gift .......................................... m. wide ..........................................strip of land in the Municipal Corporations/Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act for the further widening of the road to the standard width. g) The permission is valid for period of three years with effect from the date of issue. h) Permission accorded under the provision cannot be construed as evidence in respect of right title interest of the plot over which the plan is approved. i) Any dispute arising out of land record or in respect of right/title/interest after this approval the plan shall be treated automatically cancelled during the period of dispute. j) Any other conditions. By Order Authorised Officer Memo No .......................................... , Date ..........................................\nf) The applicant shall free gift .......................................... m. wide ..........................................strip of land in the Municipal Corporations/Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act for the further widening of the road to the standard width.\ng) The permission is valid for period of three years with effect from the date of issue.\nh) Permission accorded under the provision cannot be construed as evidence in respect of right title interest of the plot over which the plan is approved.\ni) Any dispute arising out of land record or in respect of right/title/interest after this approval the plan shall be treated automatically cancelled during the period of dispute.\nj) Any other conditions.\nBy Order Authorised Officer\nAuthorised Officer/ Authority\nAuthorised Officer/ Authority\nForm-IX\nForm-IX\nForm of Refusal of Building Permit/Development Permit\nForm of Refusal of Building Permit/Development Permit\n1 ............................................................................................\n2 ............................................................................................\n3 ............................................................................................\n4 ............................................................................................\nAuthorised Officer/ Authority ..............................................\nAuthorised Officer/ Authority ..........................\nForm-X\nForm-X\nForm of Notice For Commencement of Work\nForm of Notice For Commencement of Work\n(To Be Furnished by the Plot Owner(S) and the Builder/developer)\n(Name and address of the applicant in block letters)\nYours faithfully,\nName and Signature of Owner/Builder/Applicant Registration no.\nPhone/Mobile no.-\nDate:\nAddress:\nForm-XI\nForm-XI\nPeriodic Progress Report\nPeriodic Progress Report\n(To be submitted by the Empanelled Structure/Architect/Engineer)\n(i) Architect/Engineer:-\nName:-\nCoA registration no.(for Architects)\nEmpanelment no:\nSignature\n(ii) Engineer/Structural Engineer:-\nName\nEmpanelment No:\nSignature\n(iv) Builder/Owner/Applicant\nName:\nRegistration no.\nSignature\nForm-XII\nForm-XII\nMaintenance of Register\nMaintenance of Register\nSl.\nName and address of the applicant\nDate of receipt of application\nDate of permission/refusal with letter No.\nDate of Submission of commencement\nSubmission of notice of completion\nDate of issue/refusal of occupancy permission\n\t\t\t\twith letter no.\nRemarks\nSignature of the Aurthorised Person\n(i)\n(ii)\n(iii)\n(iv)\n(v)\n(vi)\n(viii)\n(ix)\n(x)\nForm-XIII (A)\nForm-XIII (A)\nIndemnity Bond For Basement\nIndemnity Bond For Basement",
            "footnote": "",
            "is_definition": false,
            "sort_order": 227
        },
        {
            "number": "1",
            "title": "1. That in consideration of the sanction of the plans by .................................................... Authority for construction of the basement the executant undertakes that he/she shall at all times keep .................................................... Authority free from any liability, loss or damages/flowing from any injury or damage caused to the adjoining built up properties or to any person as a consequence of the construction of at the time of digging of its foundations or du",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 228
        },
        {
            "number": "2",
            "title": "2. The owner agreed and undertakes that in the event of any claim being made by any person or persons against the concerned Authority either in respect of the sanction granted by the concerned Authority to the owner for the construction of basement or in respect of the construction or manner of construct ion of the basement .by the owner of the consequences flowing from the said sanction the executant shall be responsible and liable and not .................................................... Au",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 229
        },
        {
            "number": "3",
            "title": "3. The executant agrees and undertake to indemnify the concerned Authority fully in respect of any amount which the concerned Authority may be required to pay to any person either by way of compensation or on any other account as a result of any claim or suit or any other proceedings concerning the sanctioning of the construction of the basement of the making there of and also in respect of the costs and expenses which the concerned Authority may incur on defending any action.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 230
        },
        {
            "number": "4",
            "title": "4. Without prejudice to the above undertaking the executant hereby binds itself to pay to .................................................... Authority to the full extent any amount which .................................................... Authority may be required to pay to any person in connection with relating to or concerning the sanctioning or the basement o the making thereof.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 231
        },
        {
            "number": "5",
            "title": "5. The owner agrees and undertakes that this bond shall remain in full force and effect till the executant faithfully observes/performs the undertaking here in before contained. In witness where of the executant above named has signed this bond on this .................................................... of .................................................... at .................................................... day",
            "chapter": null,
            "content": "Indemnifier\nName and Signature of Owner/Builder/Applicant\nRegistration no.\nPhone/Mobile no.-\nDate:\nAddress:\nWitness:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 232
        },
        {
            "number": "1",
            "title": "1. Name \n\t\t\t..............................................",
            "chapter": null,
            "content": "Full Address \n\t\t\t............................................\nDate\n\t\t\t..............................................\n(Signatures)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 233
        },
        {
            "number": "2",
            "title": "2. Name\n\t\t\t..................................................",
            "chapter": null,
            "content": "Full Address\n\t\t\t..............................................\nDate \n\t\t\t..................................................\n(Signatures)\nForm-XIII (B)\nForm-XIII (B)\nAffidavit\nAffidavit",
            "footnote": "",
            "is_definition": false,
            "sort_order": 234
        },
        {
            "number": "1",
            "title": "1. That I am the Owner/Power of Attorney Holder of land having R.S./M.S. Plot No. ........................................................................... khata No. ........................................................................... Khewat No. ........................................................................... Thana No. ........................................................................... corresponding to holding No. ......................................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 235
        },
        {
            "number": "2",
            "title": "2. That the land mentioned above is a freehold property and does not belong to Khas Mahal Estate of Government. It is not either Gair Mazarua Aam Khas, Kaisare Hind, District Board or Acquired Land.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 236
        },
        {
            "number": "3",
            "title": "3. That the land stated above is a tribal land/not a tribal land for tribal land; permission for transfer has been obtained vide Case No. Year from SAR/DC/Commissioner Court.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 237
        },
        {
            "number": "4",
            "title": "4. That I have applied a building Plan vide B.C. Case No.................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 238
        },
        {
            "number": "5",
            "title": "5. That further declare that in future, if it will be found that property mentioned above are Gair Mazarua Aam Khas, Kaisare Hind, District Board or Acquired Land property of Government the sanctioned map will be deemed to be cancelled due to misrepresentation and suppression of facts.",
            "chapter": null,
            "content": "Sworn & Signed this Affidavit on this the ........................................................................... day of 200 ........................................................................... at Name of the place ...........................................................................\nDeponent\nIdentified by :\n(Advocate, Name of the place ........................................)\nForm-XIV\nForm-XIV\nCertificate of Undertaking for Hazard Safety Requirement\nCertificate of Undertaking for Hazard Safety Requirement",
            "footnote": "",
            "is_definition": false,
            "sort_order": 239
        },
        {
            "number": "1",
            "title": "1. Certified that the building plans submitted for approval will satisfy the safety requirements as stipulated under Building Bye-laws 59 and the information given there in is factually correct to the best of our knowledge and understanding .",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 240
        },
        {
            "number": "2",
            "title": "2. It also certified that the structural design including safety from hazards based on soil conditions shall be duly incorporated in the design of the building and these provisions shall be adhered to during the construction as per Annexure-IX & X.",
            "chapter": null,
            "content": "(ii) Engineer/Structural Engineer:-\nName\nEmpanelment No:\nSignature with date\n(iii) Builder/Owner/Applicant\nName:\nRegistration no.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 241
        }
    ],
    "metadata": {
        "Act ID": "jhr279",
        "Act Number": "",
        "Enactment Date": "",
        "Act Year": "2016",
        "Short Title": "Jharkhand Building Byelaws 2016",
        "Type": "STATE",
        "Location": "Jharkhand"
    },
    "updated_at": "2026-09-29 21:55:19"
}