    "id": 16605,
    "slug": "gujarat-minor-mineral-concession-rules-2017",
    "title": "Gujarat Minor Mineral Concession Rules, 2017",
    "short_title": "Gujarat Minor Mineral Concession Rules, 2017",
    "act_number": "Published vide Notification No.GU-2017-(21)-MCR-10",
    "act_year": 2017,
    "act_type": "STATE",
    "location": "Gujarat",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Gujarat Minor Mineral Concession Rules, 2017",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(a) \"Act\" means the Mines and Minerals (Development and Regulation) Act, 1957 (67 of 1957);\n(b) \"agent\" when used in relation to a mine, means a person specified under sub-clause(c) of sub-section(1) of section 2 of the Mines Act, 1952 (35 of 1952);\n(c) \"auction premium\" means the premium as specified in sub-rule (3) of rule 5;\n(d) \"bank guarantee\" means a guarantee to be in Form A or Form V by a bank as may be notified by the Government in Finance Department for acceptance of bank guarantees as security deposit and earnest money deposit;\nForm V\n(e) \"beneficiation\" means processing of minerals or ores for the purpose of upgrading the quality, purity or assay grade of the desired product by removing unwanted constituents like gangue minerals or tailings;\n(f) \"Cluster\" means a group of more than one mines formed when the distance between the peripheries of one lease is less than five hundred metres from the periphery of the other lease in a homogeneous mineral area;\n(g) \"Committee\" means a committee constituted under Rule 50 for the purpose of revision under Chapter XIII;\n(h) \"cores\" means the samples of subsurface rocks or mineralized zone obtained during the drilling of boreholes;\n(i) \"Dead rent\" means the amount payable by a quarry lease holder, calculated on the basis of the area leased and not on the quantity of minerals extracted or removed;\n(j) \"financial assurance\" means a bank guarantee or a non-interest bearing security deposit to be furnished by quarry lease holder;\n(k) \"Form\" means a Form appended to these rules;\n(l) \"Government\" means the Government of Gujarat;\n(m) \"illegal mining\" shall have the meaning assigned to such term in the rules made by the Government under section 23C;\n(n) \"landowner\" means the owner of a part of the lands in respect of which a quarry lease is granted under these rules;\n(o) \"manager\" when used in relation to a mine, means a person as specified under section 17 of the Mines Act, 1952 (35 of 1952);\n(p) \"mineral concession\" means a quarry parwana, a quarry permit or a quarry lease, as applicable;\n(q) \"mining plan\" means a mining plan prepared under these rules and duly approved by the Government for the development of mineral deposits in the area concerned and includes a scheme of mining required to be submitted as per the provisions of these rules;\n(r) \"performance security\" means a bank guarantee or a non-interest bearing security deposit, to be provided pursuant to rule 100 and sub-rule (4) of rule 29;\n(s) \"quarry lease\" means a lease granted for mining and quarrying operations in respect of minor mineral(s);\n(t) \"quarry parwana\" means a parwana granted pursuant to the provisions of Chapter VII;\n(u) \"quarry permit\" means a permit granted pursuant to the provisions of Chapter IV;\n(v) \"rules\" means the Gujarat Minor Mineral Concession Rules, 2017;\n(w) \"Schedule\" means a Schedule appended to these rules;\n(x) \"Scheduled Area\" includes tribal areas, and scheduled area and tribal area shall have the same meaning as assigned to them under Article 244 of the Constitution of India;\n(y) \"section\" means a section of the Act;\n(z) \"successful bidder\" means the bidder referred to in sub-rule (2) of rule 8;\n(aa) \"tender document\" means the tender document issued by the Government for conduct of an auction for grant of quarry lease under Chapter II;\n(bb) \"value of estimated resources\" means an amount equal to the product of-\n(i) the estimated quantity of mineral resources for which the mineral block is being auctioned, expressed in metric tonne; and\n(ii) the last available price per metric tonne of such mineral, published by Government; and\nChapter II\nQuarry Lease",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Evidence of mineral resources.",
            "chapter": null,
            "content": "Schedule I.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Grant of quarry lease.",
            "chapter": null,
            "content": "Schedule II.\nSchedule II\n(a) evidence of mineral resources shall have been established in the proposed quarry lease area in accordance with the parameters prescribed in Schedule I;\nSchedule I;\n(b) the quarry lease area shall be identified and demarcated using differential global positioning system and shall have a topographic and geological map prepared using total station. The extent of the area so demarcated shall include the area required for all activities falling under the definition of a 'mine' as defined in clause (j) of sub-section (1) of section 2 of the Mines Act 1952 (35 of 1952), including non-mineralised area;\n(c) the quarry lease area so demarcated shall classified into forest land, land owned by the Government and land not owned by the Government and any Scheduled Area comprised therein shall also be identified;\n(d) an electronic auction portal which meets the minimum technical and security requirements as specified in the guidelines for compliance to quality requirements of e-Procurement Systems issued by the Standardisation Testing and Quality Certification Directorate, Department of Information Technology, Ministry of Communications and Information Technology, Government of India or any other certification/guidelines as specified by the Government shall have been established;\n(e) the price per metric tonne of the mineral(s) shall have been published by the Government at least once in the twelve months immediately preceding the auction;\n(f) the Government shall provide details of the areas over which a quarry lease is proposed to be granted in the following manner, namely:\n(i) in two daily newspapers circulating in such area, of which one shall be in the regional language;\n(ii) in the local language in the Panchayat, Municipality or Municipal Corporation, as the case may be and in the offices of the District Collector, the Sub-divisional Magistrate and the Tehsil, as applicable;\n(iii) on the website of the Government;\n(iv) on the electronic auction portal; and\n(g) if the area over which a quarry lease is proposed to be granted comprises of a Scheduled Area, the prior approval of the gram sabha for such grant shall have been obtained.\nSchedule I\n(a) A quarry lease in the Scheduled Area identified pursuant to this sub-rule shall:\n(i) be granted only to a bidder who belongs to a scheduled tribe and is an inhabitant of the Scheduled Area; and\n(ii) only be transferable to a person who belongs to a scheduled tribe and is an inhabitant of the Scheduled Area.\n(a) the auction subsequent to the first attempt may be for the same area or an enlarged or reduced area, as the Government may deem fit;\n(b) the differential terms specified pursuant to sub-rule (4) shall not be applicable to such auction; and\n(c) the quarry lease granted pursuant to such auction shall be transferable to any person in accordance with the provisions of Chapter XI.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Bidding parameters.",
            "chapter": null,
            "content": "\"base premium\".\n(a) mineral despatched in a month; and\n(b) last available sale price of the mineral as published by the Government and as applicable at the time of dispatch:\n\"auction premium\"\n(i) percentage so quoted; and\n(ii) value of mineral despatched.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Notice Inviting Tender and Tender Document.",
            "chapter": null,
            "content": "(a) brief particulars regarding the area under auction, identified and demarcated in accordance with clauses (b) and (c) of sub-rule (2) of rule 4;\n(b) estimated mineral resources and brief particulars regarding evidence of mineral resources with respect to all minerals discovered in the area in accordance with the provisions of Schedule I;\nSchedule I;\n(c) particulars of reservation of the mineral block for any specified enduse.\n(d) In case of a Scheduled Area, special conditions, if any prescribed pursuant to sub-rule (3) or sub-rule (4) of rule 4;\n(a) A geological report pursuant to Schedule I, specifying particulars and estimated quantities of all minerals discovered in the area;\nSchedule I,\n(b) revenue survey details of the area identified and demarcated in accordance with clauses (b) and (c) of sub-rule (2) of rule 4; and\n(c) list of clearances and permissions already obtained with respect to such area.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Auction Process.",
            "chapter": null,
            "content": "(1) First Round of Auction. - The first round of auction shall be held in the following manner:-\n(1) First Round of Auction.\n(a) the bidders shall submit -\n(i) a technical bid comprising amongst others, documentary evidence to confirm eligibility to participate in the auction, bid security and such other documents and payments as may be specified in the tender document; and\n(ii) an initial premium offer which shall be a percentage of the value of mineral despatched and shall not be lower than the base premium. Notwithstanding anything to the contrary contained in this sub-rule (1), the bidders submitting an initial premium offer less than the base premium shall stand disqualified ab-initio from the bidding process and such bidders shall not be considered as technically qualified bidders. The initial premium offer submitted by such bidders shall also not be valid.\n(b) Subject to clause (a) above, the bidders who are found to be eligible in accordance with sub-rule (1) of rule 4 and the terms and conditions of the tender document shall be referred to as the \"technically qualified bidders\" .\n\"technically qualified bidders\"\n(c) The technically qualified bidders shall be ranked on the basis of the descending initial premium offer submitted by them and technically qualified bidders holding the first fifty per cent of the ranks (with any fraction rounded off to higher integer) or the top five technically qualified bidders, whichever is higher, shall qualify as qualified bidders for participating in the second round of electronic auction:\n(i) the total number of ranks shall be divided in half (rounded off to the higher integer), and the technically qualified bidders holding the top half of the ranks, shall be considered to be qualified bidders; or\n(ii) if sub-clause (i) results in the number of qualified bidders being less than five, then one or more additional rank(s) in the bottom half shall also be considered, until such additional rank where the number of qualified bidders is not less than five.\nCase A:\nCase B:\n(I) TQB1 and TQB2;\n(II) TQB4 and TQB5; and\n(III) TQB7, TQB8 and TQB9,\nCase C:\n(I) TQB 5; TQB6 and TQB7;\n(II) TQB8; TQB9, and TQB10,\n(d) The auction process shall be annulled in situations where the total number of technically qualified bidders or qualified bidders are less than three:\n(2) Second Round of Auction.\n(a) the highest initial premium offer amongst the qualified bidders shall be the floor premium for the second round of the electronic auction;\n(b) the qualified bidders may submit their final premium offer which shall be a percentage of the value of mineral despatched and greater than the floor premium:\n(c) the auction process shall be annulled if none of the qualified bidders submits a final premium offer on the online electronic auction portal;\n(d) the qualified bidder who submits the highest final premium offer shall be declared as the \"preferred bidder\" immediately on conclusion of the auction.\n\"preferred bidder\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Grant procedure.",
            "chapter": null,
            "content": "\"letter of intent\"\n\"successful bidder\".\n(a) continuing to be in compliance with all the terms and conditions of eligibility;\n(b) furnishing performance security as specified in rule 100 read with rule 577;\n(c) satisfying the conditions specified in Chapter VIII with respect to a mining plan (including the mine closure plan);\n(d) furnishing financial assurance as specified in rule 644;\n(e) obtaining all consents, approvals, permits, no-objections, access rights and the like as may be required under applicable laws for commencement of mining operations;\n(f) payment of exploration charges, if any; and\n(g) satisfying such other conditions as may be specified by the Government in the tender document:\nForm B",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Upfront payment for quarry lease.",
            "chapter": null,
            "content": "(a) in case of minerals specified in Part A-II or Part B of Schedule III , an amount equal to one per cent of the value of estimated resources; and\nSchedule III\n(b) in case of minerals specified in Part A-I of Schedule III , the amount specified in rule 577.\nSchedule III\n(a) in case of minerals specified in Part A-II or Part B of Schedule III , it shall be adjusted against the amount paid under sub-rule (3) of rule 5, in the manner specified by the Government in the tender document, within the first five years of commencement of production of the mineral; and\nSchedule III\n(b) in case of minerals specified in Part A-I of Schedule III , such adjustment shall be carried out in the last year of the quarry lease period.\nSchedule III",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Performance security for quarry lease.",
            "chapter": null,
            "content": "Schedule III\nSchedule III",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Payments under quarry lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Period of the quarry lease.",
            "chapter": null,
            "content": "(a) all minor minerals specified in Part A-II or Part B of Schedule III , the period of quarry lease granted or renewed before the date of commencement of these rules, shall be extended and be deemed to have been extended up to a period ending on March 31, 2025 with effect from the date of expiry of the period of renewal last made or till the completion of period of quarry lease, if any, whichever is later, subject to the condition that all the terms and conditions of the lease have been complied with; and\nSchedule III\n(b) minor minerals specified in Part A-I of Schedule III , the period of the quarry leases granted or renewed before the date of commencement of these rules, shall be extended and be deemed to have been extended up to a period ending on March 31, 2020 with effect from the date of expiry of the period of renewal last made or till the completion of period of quarry lease, if any, whichever is later, subject to the condition that all the terms and conditions of the lease have been complied with.\nSchedule III\n(a) five years in case of minor minerals specified in Part A-I of Schedule III ; and\nSchedule III\n(b) thirty years in case of minor minerals specified in Part A-II or Part B of Schedule III .\nSchedule III\n(a) to be eligible to exercise the right of first refusal, the lessee shall comply with the conditions of the quarry lease till its expiry;\n(b) prior to publication of the notice inviting tender, the Government shall provide a written notice to the lessee requiring the lessee to specify its willingness or non-willingness to exercise the right of first refusal in writing, within a period of thirty days of receipt of such notice;\n(c) the notice inviting tender shall specify that the lessee holding the lease prior to expiry of the quarry lease has the right of first refusal and shall also specify his willingness or non-willingness specified pursuant to clause (b), if any;\n(d) upon conclusion of the Second Round of Auction as specified in sub rule (2) of rule 7, the Government shall issue a written notice to the lessee seeking written confirmation of his willingness to exercise the right of first refusal within a period of seven days of conclusion of the Second Round of Auction;\n(e) the notice given under clause (d) shall be acknowledged by the lessee;\n(f) the lessee shall, within a period of fifteen days of receipt of the notice issued under clause (d), exercise the right of first refusal in writing to the Government, failing which it shall be construed that the lessee is not desirous of exercising the right of first refusal and the preferred bidder shall be entitled to a quarry lease in the manner provided in rule 7; and\n(g) if the lessee exercises the right of first refusal in terms of clause (f) and matches the highest final premium offer, the lessee shall be deemed to be the preferred bidder in place of the earlier preferred bidder declared after the Second Round of Auction and shall be entitled to the quarry lease in the manner provided in rule 8.\n\"captive purpose\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Area of a quarry lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Restriction on maximum area.",
            "chapter": null,
            "content": "(a) fifty hectares, in case minerals specified in Part A of Schedule III ; and\nSchedule III\n(b) five square kilometres, in case minerals specified in Part B of Schedule III :\nSchedule III",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. New Discovery.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Lease Period for more than one mineral in an area.",
            "chapter": null,
            "content": "Chapter III\nTerms and Conditions of the Quarry Lease",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Liabilities, powers and privileges of the lessee.",
            "chapter": null,
            "content": "(a) search for, mine, quarry, bore, dig, drill for, win, work, dress, process, convert, carry away and dispose of the minerals in respect of which the quarry lease has been granted;\n(b) sink, drive, make, maintain and use in the lease area, any pits, shafts, inclines, drifts, levels, waterways and other works;\n(c) erect, construct, maintain and use on or under the lease area any engines, machinery, plant, dressing-flowers, furnaces, brick-kilns, workshops, store houses, bungalows, godowns, sheds and other building and other works and convenience of the like nature on or under the lease area;\n(d) make any tramways, railways, roads and other ways in or over the said lands and to maintain and go and trespass with or without horses, cattle, wagons, locomotives or other vehicles over the same (or any existing tramways, railways, roads, and other ways in or over the said lands) on such conditions as may be agreed to;\n(e) quarry and obtain building and road materials and ordinary clay and to use and employ the same and to manufacture such ordinary clay into bricks or tiles and to use such bricks or tiles. The lessee shall not sell any such materials, bricks or tiles except on payment of the royalties prescribed herein;\n(f) appropriate and use, with prior written permission of the officer authorised by the Government, water from any streams, watercourses, spring or other sources in or upon the lease area and to divert, step up or dam any such stream, watercourse and collect or impound any such water and to make, construct and maintain any water course, culverts, drains or reservoirs but not so as to deprive any cultivated lands, villages, buildings or watering places for livestock of a reasonable supply of water as before accustomed nor in any way to foul or pollute any streams or springs:\n(g) use land for purpose of stacking, heaping, storing or depositing thereon any produce of the mines, quarries on works carried on and any tools, equipment, earth and materials and substances dug or raised;\n(h) beneficiate, process, dress, convert the minerals produced from the said lands and carry away such beneficiated/processed, dressed, converted minerals; and\n(i) do any other things as may be specified in the quarry lease deed.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. Duties and obligations of the lessee.",
            "chapter": null,
            "content": "(1) Notice for opening of mine. - (a) The lessee shall send to the lease granting authority, an intimation in Form C of the opening of a mine so as to reach them within fifteen days of such opening.\n(1) Notice for opening of mine.\nForm C\n(b) The intimation in Form C sent under clause (a) shall be accompanied with a copy of the approved mining plan, - when the mine is being opened after expiry of a five year period from the date of approval of the mining plan.\nForm C\n(2) No building etc., upon certain places. - The lessee shall not erect, place or set up any building or thing and shall not carry out any surface operations on, in or upon any public ground, burning or burial ground, house, village site, public road or place held sacred by any class of persons or any or other place which the Government may determine as a public ground.\n(2) No building etc., upon certain places.\n(3) No interference.\n(4) Permission for surface operations in a land not already in use.\n(5) Not to enter upon reserved forest.\n(6) No mining operations in certain areas.\n(a) fifty metres from any road (excluding a village road or other district road), notified reservoirs, canal, national highway, state highway, boundary of any railway line, public works, cities, towns, villages and other approved continuous habitations, if no blasting is involved; or\n(b) two hundred metres from any road, notified reservoirs, canal, national highway, state highway, boundary of any railway line, public works, cities, towns, villages and other approved continuous habitations, if blasting is involved, The aforesaid distance shall be measured (a) in the case of a railway line, horizontally from the outer edge of the cutting, (b) in the case of a canal or reservoir, horizontally from the outer toe of the bank or the outer edge of the cutting, as the case may be, and (c) in case of a building or any other structure for human habitation, horizontally from the plinth thereof. The lessee shall not carry on, or allow to be carried on, any mining operations under or beneath any ropeway or ropeway trestle or station, except under and in accordance with the written permission of the authority owning the ropeway. The written permission of the relevant authority may be conditional upon and subject to terms and conditions, in which case the lessee shall comply with all such terms and conditions.\n(7) To strengthen and support the quarry to necessary extent.\n(8) Facilities for adjoining Government licences, and leases.\n(9) To pay rents, royalties, taxes, etc.\n(10) To maintain and keep boundary marks.\n(a) the lessee shall get the measurement of the lease area by District Inspector of Land Records;\n(b) the lessee shall submit the copy of measurement sheet and shall establish the exact limitation marks as per the measurement sheet on the lease area and take care of the limitation marks/ stones;\n(c) the lessee should maintain a (sign) board with the schematic map, showing the measurements of the lease area. The expenses of this board preparation, arrangement and its maintenance in good condition shall be the responsibility of the lessee;\n(d) the lessee shall maintain the (sign) board at a proper place, in proper manner, easily visible to the visitors, during the whole lease period and should, for facilitating easy visibility of the notice board, remove the hindrances around it, like bushes, tree branches, shelters etc.;\n(e) the lessee must prepare, establish and maintain in good condition, the (sign) board and its facing, to indicate the landmarks of the lease area.\n(f) the lessee shall see that these concrete pillars are maintained in good condition during the entire quarry lease period. These concrete pillars should be painted with yellow colour for good visibility. The number of the pillar and the marks of latitude and longitude measurements of the pillar should be written in black colour;\n(g) except in the case of ordinary sand mineral, in case of all other minerals, the boundary of the lease area should be fenced properly; and\n(h) the District Geologist/ the District Assistant Geologist should provide the coordinates of the lease area and these coordinates should be clearly mentioned on the map of the quarry lease and the map of the quarry lease shall be kept by the lessee within the lease area at all times.\n(11) To commence operations within specified time, not to work in certain areas and to work in a workman like manner -\n(a) The lessee shall commence mining operations within the time period specified herein and in the mining plan. All mining operation shall be conducted by the lessee in a proper, skillful and workman-like manner and the lessee shall reduce waste and do careful storage of waste and removal of all valuable minerals within the quarry:\n(b) The lessee shall not, in the case of village roads (including any track shown in the revenue record as village road) and other district roads, allow any working to be carried on within a distance of ten metres of the outer edge of the cutting except with the previous permission of the Government in this behalf and otherwise than in accordance with such directions, restrictions and additions, either general or special, which may be attached to such permission.\n(12) To secure and keep in good condition pits, shafts.\n(13) Proper Maintenance of Trenches, Working Faces etc.\n(a) the height and width of trenches in open quarries are properly maintained to facilitate easy removal of the mineral and waste;\n(b) the working faces are always kept clean;\n(c) the minerals won are stacked in suitable dimensions and each stack is numbered; and\n(d) proper sanitation of the lease area is maintained.\n(14) To submit progress reports.\n(15) To Allow Inspection by Government.\n(b) The lessee shall also supply on demand of the Government, a composite plan of the lease area showing thickness, dip, inclination, etc., of all the seams as also the quantity of reserves quality-wise for minor minerals specified in Part A-II or Part B of Schedule III .\nSchedule III\n(16) To report accidents.\n(17) To keep record and accounts regarding production and employees etc.\n(a) production and dispatch register, date-wise,\n(b) prices obtained for the minerals,\n(c) names of purchasers,\n(d) receipts for money received,\n(e) quantity of waste material excavated from the mine,\n(f) the number of persons employed and their nationality,\n(g) labour attendance register,\n(h) the wages paid,\n(i) complete plans of the quarry,\n(j) the unutilized or non-saleable subgrade ores or minerals for future beneficiation,\n(k) contributions made to the District Mineral Foundation,\n(l) payments made to the Government in terms of royalty, dead rent, auction premium, surface rent,\n(m) explosives consumption register,\n(n) details of expenditure incurred towards the mine closure activities,\n(o) bore hole logs along with the chemical analysis reports,\n(p) mineral analysis reports,\n(q) details of mining machinery, and\n(r) copies of all notices and returns, plans, sections and schemes submitted to the Government under these rules.\n(18) Machinery and plant.\n(b) The summary of operation of each machine shall be recorded in the log book at the end of each month bringing out the percentage availability and percentage utilization of the machine, average hourly performance and average fuel/energy consumption per hour.\n(c) The log books may be maintained in electronic form or in hard copy and shall be made available to the officer authorised by the Government on demand.\n(19) To maintain plans, etc.\n(20) To keep records of trenches, pits etc.\n(a) the subsoil and strata through which such trenches, pits or drillings pass;\n(b) any mineral encountered; and\n(c) such other particulars as the Government may from time to time require.\n(21) To abide by the provisions of the law in force.\n(b) The lessee has and shall continue to comply with all the terms and conditions of the Act, the rules, the Gujarat Mineral (Prevention of illegal Mining and Transportation and Storage) Rules, 2017, the mining plan and the tender document, as are required to be complied with by the lessee, with respect to lease area and the lessee shall continue to comply with all the eligibility conditions provided in the Act, the rules and the tender document during the quarry lease term.\n(22) To provide weighing machines.\nSchedule III\nSchedule III\n(23) To allow testing of weighing machines.\n(24) Not to light fire.\n(25) Precautions for Protection of Environment and Control of Pollution.\n(26) Restoration of top soil.\n(27) Not to Use Minor Minerals for Major Mineral Purpose or any other purpose.\nSchedule III\n(28) To employ Indian nationals.\n(29) Employment preference.\n(30) To vacate encroached area.\n(31) To reimburse expenses.\n(32) Removal of workings that are not to be delivered to the Government.\n(33) Limited mining rights.\n(34) Authorisations.\n(35) Geological and archaeological finds.\n(36) No Claim against Government.\n(37) Erection of buildings.\n(38) Additional Conditions.\n(a) the time-limit, mode and place of payment of rents, royalties and any other payments payable under the rules;\n(b) compensation for damage to land in respect of which the lease has been granted;\n(c) restrictions regarding felling of trees on unoccupied and unreserved Government land;\n(d) the restriction of surface operations in any area prohibited by any authority;\n(e) the notice by the lessee for surface occupation;\n(f) the provision of proper weighing machines and maintenance of weighing records;\n(g) facilities to be given by the lessee for working other minerals in the leased area or adjacent area;\n(h) the entering and working in a reserved or protected forest;\n(i) the securing of pits and shafts;\n(j) the reporting of accidents;\n(k) indemnity to Government against the claim of a third party for any damage, injury or disturbance caused to him by the lessee;\n(l) the delivery of possession of lands and mines on the surrender, expiration or termination of the lease;\n(m) the time limit for removal of any mineral, plant, machinery and other properties from the lease hold area after expiration, termination, surrender or abandonment of the quarry lease;\n(n) the forfeiture of property left after termination of the lease;\n(o) the power to take possession of the plant, machinery, premises and mines in the event of war or emergency;\n(p) filing of civil suits or petitions relating to disputes arising out of the area under lease:\n(q) the lessee shall abide by the provisions of any law for the time being in force and applicable to him relating to mines and minerals and other matters affecting the safety, health and convenience of the lessee's employees or of the public; and\n(r) such other special conditions which the Government may specify.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "19",
            "title": "19. Liabilities, rights, powers, privileges and obligations of the Government.",
            "chapter": null,
            "content": "(1) Survey and demarcation.\n(2) Right of Pre-emption.\n(3) Right of entry and inspection.\n(a) enter into and upon the lease area and to construct upon, over or through the same, any railways, tramways, roadways or pipelines for any purpose authorised by the Government and to get from the lease area stones, gravel, earth and other materials for making, maintaining and repairing such railways, tramways, roads or any existing railways and roads:\n(b) to pass over or along any such railways, tramways, road lines and other ways, at all times, with or without horses, cattle or other animals, carts, wagons, carriages, locomotives or other vehicles for all purposes:\n(4) War or emergency situations.\n(5) Right to sell workings.\n(6) Acquisition of land of third parties and compensation thereof.\n(7) Changes to demarcation of the lease area.\nChapter IV\nQuarry Permit",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "20",
            "title": "20. Grant of a quarry permit.",
            "chapter": null,
            "content": "Schedule III\n(a) an individual who is an Indian national, for using up to one hundred metric tonnes for construction of a house for dwelling purposes;\n(b) labour co-operative societies registered under the Gujarat Co-operative Societies Act, 1961 as on the date of commencement of these rules and traditionally undertaking manual mining, in accordance with the provisions of this Chapter.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "21",
            "title": "21. Application for quarry permit.",
            "chapter": null,
            "content": "Form D",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "22",
            "title": "22. Procedure for grant.",
            "chapter": null,
            "content": "Form E\n(a) payment of one hundred per cent of the royalty to the Government as specified in the rules;\n(b) payment of a permit premium equivalent to fifty per cent of the royalty to the Government as specified in the rules;\n(c) in addition to the payments made under clauses (a) and (b), payment of a sum equivalent to twenty per cent of the aggregate of royalty and permit premium as a security deposit, which shall be refunded without any interest payments, after any adjustments as may be deemed appropriate by the Government, after ninety days from the date of expiry of the quarry permit;\n(d) contribution of such amounts as may be required under section 15A to designated account of the District Mineral Foundation; and\n(e) payment of such other amounts as may be required under any law for the time being in force to the concerned authorities.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "23",
            "title": "23. Conditions on which the quarry permit shall be granted.",
            "chapter": null,
            "content": "(a) quarry permits for extraction of minor minerals not exceeding twenty thousand metric tonnes for a period of up to ninety days shall be granted by the District Collector:\n(b) the depth of the pit below the surface shall not exceed six metres:\n(c) the mineral shall be used for the specific purpose for which quarry permit is granted;\n(d) the holder of a quarry permit shall commence quarrying operations in accordance with the approved mining plan and after obtaining all applicable environmental clearances for the area; and\n(e) the holder of a quarry permit shall comply with all laws, rules, regulations, notifications, orders and the like, as may be applicable to the activities undertaken pursuant to a quarry permit.\n(a) the time-limit, mode and place of payment of rents and royalties;\n(b) the compensation for damage to land for which the quarry permit is granted;\n(c) the felling of trees;\n(d) entering and working in any reserved or protected forest;\n(e) reporting of all accidents;\n(f) indemnity to Government against claims of third parties;\n(g) the period within which the minor mineral shall be extracted and removed;\n(h) forfeiture of property left on the land for which the quarry permit is granted after cancellation of the permit; and\n(i) plugging of bore holes and filling up or fencing all excavations in the land for which the quarry permit was granted, on the expiry or cancellation of the permit.\nChapter V\nExemptions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "24",
            "title": "24. Departmental Excavation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "25",
            "title": "25. Extraction permitted under the Gujarat Land Revenue Rules, 1972.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "26",
            "title": "26. Chipping of Outcrops.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "27",
            "title": "27. Digging of wells and foundation for building.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "28",
            "title": "28. Removal from agricultural lands.",
            "chapter": null,
            "content": "Chapter VI\nGrant of Quarry Lease Pursuant to Existing Approval",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "29",
            "title": "29. Existing applications and right of holder of letter of intent.",
            "chapter": null,
            "content": "(a) fulfilment of the conditions of the prior approval or the letter of intent;\n(b) the holder of letter of intent having obtained all consents, approvals, permits, no-objections and the like as may be required under applicable laws for commencement of mining operations;\n(c) the holder of letter of intent having satisfied the conditions specified in Chapter VIII with respect to a mining plan (including the mine closure plan);\n(d) furnishing financial assurance as specified in rule 64:\nChapter VII\nGrant of a Quarry Parwana",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "30",
            "title": "30. Reservation of areas for granting quarry parwana.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "31",
            "title": "31. Grant of quarry parwana.",
            "chapter": null,
            "content": "(a) individual families of Khanias, belonging to the Schedule Castes or the Schedule Tribes, who do physical work of excavating the minor mineral themselves in the notified area applied for:\n(b) individual families of Khanias, who do physical work of excavating the minor mineral themselves in the notified area applied for;\n(c) individual Khanias who do physical work in excavating minor minerals themselves in any other areas:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "32",
            "title": "32. Conditions for grant of quarry parwana.",
            "chapter": null,
            "content": "(a) rupees five hundred for an area up to one thousand square metres, and\n(b) rupees one thousand for an area more than one thousand square metres.\n(a) rupees five hundred for an area up to one thousand square metres, and\n(b) rupees one thousand for an area more than one thousand square metres.\nSchedule IV\nSchedule IV",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "33",
            "title": "33. Dimension of area for Quarry Parwana.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "34",
            "title": "34. Security Deposit for Quarry Parwana.",
            "chapter": null,
            "content": "Chapter VIII\nScientific and Systematic Mining",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "35",
            "title": "35. Mining Plan.",
            "chapter": null,
            "content": "(a) the plan of the mineral concession area showing the nature and extent of the mineral body, spot or spots where the mining operations are proposed to be based on the prospecting data provided by the Government or gathered by the bidder or any other person;\n(b) details of the geology and lithology of the area including mineral resource and reserves of the area;\n(c) the extent of manual mining or mining by the use of machinery and mechanical devices;\n(d) the plan of the area showing natural water courses, limits of reserves and other forest areas and density of trees, if any, assessment of impact of mining activity on forest, land surface and environment including air and water pollution, details of scheme of restoration of the area by afforestation, land reclamation, use of pollution control devices and such other measures as may be directed by the Government in writing from time to time;\n(e) a tentative scheme of mining and annual programme and plan for excavation from year to year for five years;\n(f) a progressive mine closure plan as defined under these rules, if applicable;\n(g) tentative estimate about accretion of mine waste and its manner and its manner and mode of disposal and confinement;\n(h) manner of mineral processing and mineral up-gradation including mode of tailing disposal;\n(i) pre-feasibility report prepared in accordance with the Environment Impact Assessment Notification, 2006,; and\n(j) any other information which the Government may require the bidder to provide in the mining plan.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "36",
            "title": "36. Preparation of Mining Plan.",
            "chapter": null,
            "content": "(a) a degree in mining engineering or a post-graduate degree in geology obtained from a university established or incorporated by or under a Central Act, a Provincial Act or a State Act, including any institutions recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification granted by any university or institution outside India and recognised by the Government of India; and\n(b) relevant professional experience of five years of working in a supervisory capacity in the field of mining after obtaining the degree.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "37",
            "title": "37. Procedure for approval of the Mining Plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "38",
            "title": "38. Modification and review of the mining plan.",
            "chapter": null,
            "content": "Schedule III\nSchedule III\nSchedule III",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "39",
            "title": "39. Mining plan to be submitted by existing lessee.",
            "chapter": null,
            "content": "Chapter IX\nExpiry of a Quarry Lease",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "40",
            "title": "40. Auction after expiry of a quarry lease.",
            "chapter": null,
            "content": "Chapter X\nLapse, Surrender or Termination",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "41",
            "title": "41. Lapsing of the quarry leas.",
            "chapter": null,
            "content": "(a) the reasons on account of which it will not be possible for the lessee to undertake or on account of which the lessee failed to undertake quarrying operations or continue such operations;\n(b) the manner in which such reasons are beyond the control of the lessee: and\n(c) the steps that have been taken by the lessee to mitigate the impact of such reasons.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "42",
            "title": "42. Surrender of the quarry lease.",
            "chapter": null,
            "content": "(a) the lessee has submitted documents to evidence implementation of the approved final mine closure plan; and\n(b) all dues with respect to the quarry lease have been settled.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "43",
            "title": "43. Termination of the quarry lease.",
            "chapter": null,
            "content": "(a) The Government may, by an order in writing, terminate the quarry lease at any time if the lessee has, in the opinion of the Government, transferred the quarry lease or any right, title, or interest therein or encumbered the quarry lease otherwise than in accordance with these rules or the terms of the quarry lease deed:\n(b) If the lessee does not allow entry or inspection under sub-rules (15), (17), (20), (22) and (23) of rule 188, the Government shall give notice in writing to the lessee requiring him to show cause within fifteen days of the notice as to why the quarry lease should not be terminated and his performance security forfeited; and if the lessee fails to show cause within the aforesaid time to the satisfaction of the Government, the Government may terminate the quarry lease and forfeit or appropriate the whole or part of the performance security in the manner specified in the quarry lease deed and these rules.\n(c) If the lessee is convicted of illegal mining and there are no interim orders of any court of law suspending the operation of the order of such conviction in appeals pending against such conviction in any court of law, the Government may, without prejudice to any other proceedings that may be taken under the Act, the rules, the Gujarat Mineral (Prevention of Illegal Mining and Transportation and Storage) Rules, 2017, after giving the lessee an opportunity of being heard and for reasons to be recorded in writing and communicated to the lessee, terminate the quarry lease and forfeit or appropriate the whole or part of the performance security in the manner specified in the quarry lease deed and the rules.\n(d) Subject to clause (b) of sub-rule (1) of rule (1)3, if the lessee makes any default in any payment prescribed under these rules or the quarry lease deed or commits a breach of any of the conditions specified in rule 177, 188 or 19, the Government shall give notice in writing to the lessee requiring him to pay such payments and remedy the breach, as the case may be, within sixty days from the date of the receipt of the notice and if such payments are not paid or/and the breach is not remedied within the said period, the Government may, without prejudice to any other proceedings that may be taken against him, terminate the quarry lease and forfeit or appropriate the whole or part of the performance security in the manner provided in the quarry lease deed and these rules.\n(e) If the lessee fails to comply with the production requirements specified in the quarry lease deed and such non-compliance exceeds for more than seven instances in case of minerals specified in Part A-II or Part B of Schedule III or for more than three instances in case of minerals specified in Part A-I of Schedule III , the Government shall have a right to terminate the quarry lease without prejudice to any other proceeding to be taken against the lessee. The Government shall also have the right to terminate the quarry lease in the event that the annual production for minerals specified in Part A-I of Schedule III exceeds the total annual production limit for the mineral as per approved mining plan .\nSchedule III\nSchedule III\nSchedule III\n(f) Notwithstanding anything contained in the foregoing provisions, the Government may terminate the quarry lease at any time by giving to the lessee six months' notice in writing, if the lease area or any part thereof is required by the Government under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (30 of 2013). A declaration in this regard, under the signature of the Government that the lease area, or as the case may be, the part of the area is so required shall, as between the lessee and the Government be conclusive.\n(g) If the lessee fails to comply with of provisions of the Act, the rules or the quarry lease deed.\n(a) all mines, pits, waterways and other works sunk or made on or under the lease area except such as have been abandoned with the sanction of the Government;\n(b) in an ordinary and fair course of working, all engines, machinery, plant, buildings, structures, other works and conveniences which at the commencement of the quarry lease term were upon or under the lease area including all such machinery set up by the lessee below ground which cannot be removed without causing injury to the mines, quarries or works under the lease area; and\n(c) all buildings and structures of bricks or stone erected by the lessee above ground level in good repair order and condition and fit in all respects for further working of the mines and minerals.\nChapter XI\nTransfers",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "44",
            "title": "44. Transfer of quarry lease.",
            "chapter": null,
            "content": "(the transferor)\n(the transferee)\nForm L,\n\"transfer application\"\n(a) make payment of:\n(i) in case of minerals specified in Part A-I of Schedule III : rupees one lakh if residual value of mineral resources is upto rupees one crore and rupees two lakh if residual value of mineral resources is greater than rupees one crore; and\nSchedule III\n(ii) in case of minerals specified in Part A-II or Part B of Schedule III : rupees five lakhs if residual value of mineral resources is upto rupees ten crores and rupees ten lakhs if residual value of mineral resources is greater than rupees ten crores;\nSchedule III\n(b) submit a duly registered deed in the format specified in Form M namely the \"transfer deed\" .\nForm M\n\"transfer deed\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "45",
            "title": "45. Creation of Encumbrances.",
            "chapter": null,
            "content": "(a) assign, sublet, mortgage or otherwise encumber the quarry lease or any right, title or interest therein; or\n(b) enter into or make any arrangement, contract or understanding whereby the quarry lease holder will or may be directly or indirectly financed to a substantial extent by or under which the operations or undertaking of the quarry lease holder will or may be substantially controlled by, any person or body of persons other than the holder of the quarry lease.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "46",
            "title": "46. Transfer void.",
            "chapter": null,
            "content": "Chapter XII\nRegisters and Returns",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "47",
            "title": "47. Register of mineral concessions.",
            "chapter": null,
            "content": "(1) A register of quarry lease, in electronic and physical form, in Form N.\nForm N.\n(2) A register of quarry permit in Form O.\nForm O.\n(3) A register of quarry parwana in Form P.\nForm P.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "48",
            "title": "48. Inspection of register.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "49",
            "title": "49. Returns and statements.",
            "chapter": null,
            "content": "(a) every month, a monthly return in electronic form in Form Q before the tenth day of the succeeding month;\nForm Q\n(b) an annual return in electronic form in Form R for every financial year, before the 30th April of the succeeding year.\nForm R\nForm S\nForm T\n(a) order suspension of all mining operations in the mine and may revoke the order of suspension only after ensuring proper compliance;\n(b) take action to initiate prosecution under these rules; and/ or\n(c) recommend termination of the mineral concession, in case such suppression or misrepresentation of information indicates abetment or connivance of illegal mining.\nChapter XIII\nRevision",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "50",
            "title": "50. Application for revision.",
            "chapter": null,
            "content": "(a) the date of communication of the order to him; or\n(b) the date on which the time period for passing such order expired, apply to the Government in triplicate in the form specified in Form U for revision of the order or passing of an order, as the case may be:\nForm U\n(a) the date of communication of the order to him; or\n(b) the date on which the time period for passing such order expired, apply to the Committee to be constituted by the Government in triplicate in the form specified in Form U for revision of the order or passing of an order, as the case may be.\nForm U",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "51",
            "title": "51. Orders on revision application.",
            "chapter": null,
            "content": "(a) confirm the order; or\n(b) set aside the order and direct the concerned authority or the Government, as the case may be, to reconsider the order on such grounds as it may deem just and proper.\n(7) Protection of action taken in good faith.\nChapter XIV\nPayments",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "52",
            "title": "52. Manner of Payment.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "53",
            "title": "53. Revision of fee and other amounts payable.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "54",
            "title": "54. Payment of interest.",
            "chapter": null,
            "content": "(a) any payment due to Government under rule 111;\n(b) any fee, cess or other sum due to the Government under these rules;\n(c) any other payment under the terms and conditions of mineral concession, the payment of which is delayed beyond thirty days from the due date thereof. Such interest shall be charged from the due date of payment and until payment of such amount.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "55",
            "title": "55. Charging of Royalty in case of minerals subjected to processing.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "56",
            "title": "56. Rate of Royalty, dead rent and surface rent.",
            "chapter": null,
            "content": "Schedule IV\nSchedule IV",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "57",
            "title": "57. Upfront payment and performance security for minerals specified in Part - I of Schedule III.",
            "chapter": null,
            "content": "Schedule III\n(a) fifty per cent of the estimated annual royalty payable for the first year of the lease which shall be a product of the: (i) royalty for the mineral(s) per metric tonne; and (ii) estimated quantity of mineral resources being auctioned expressed in metric tonne divided by the tenure of the lease; and\n(b) fifty per cent of the estimated annual auction premium payable for the first year of the lease which shall be a product of the: (i) highest final premium offer; and (ii) value of estimated resources divided by the tenure of the lease.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "58",
            "title": "58. Sum Due to Be Recovered as Arrears of Land Revenue.",
            "chapter": null,
            "content": "Chapter XV\nEnvironment Management",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "59",
            "title": "59. Environmental clearance.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "60",
            "title": "60. Mine Closure plan.",
            "chapter": null,
            "content": "(a) progressive mine closure plan; and\n(b) final mine closure plan.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "61",
            "title": "61. Submission of progressive mine closure plan.",
            "chapter": null,
            "content": "Schedule III",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "62",
            "title": "62. Submission of Final mine closure plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "63",
            "title": "63. Responsibilities of holder of mineral concession.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "64",
            "title": "64. Financial assurance.",
            "chapter": null,
            "content": "Form V\n(a) for an initial period of five years and thereafter for subsequent periods of five years or the remaining term of the quarry lease, whichever is lower, in case of minerals specified in Part A-II or Part B of Schedule III ; or\nSchedule III\n(b) for the entire duration of the quarry lease term, for minerals specified in Part A-I of Schedule III , as the case may be.\nSchedule III",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "65",
            "title": "65. System of working.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "66",
            "title": "66. Separate stacking of non - saleable mineral.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "67",
            "title": "67. Employment of Qualified officers.",
            "chapter": null,
            "content": "(a) In case of minerals specified in Part A of Schedule III , the part-time mining engineer and geologist can be employed up to a maximum of:\nSchedule III\n(i) eighteen mines/quarries where mining is carried out by manual means; and\n(ii) twelve mines/quarries where mining is carried out by any other means;\n(b) In case of minerals specified in Part B of Schedule III , the part-time mining engineer and geologist can be employed up to a maximum of six mines/quarries; provided that all such mines/quarries are located within a radius of fifty kilometres:\nSchedule III\n(a) Geologist: A postgraduate degree in Geology obtained from a University established or incorporated by or under a Central Act, a Provincial Act or a State Act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification;\n(a) Geologist:\n(b) Mining Engineer:\n(b) Mining Engineer:\n(i) A degree in mining engineering obtained from a University established or incorporated by or under a Central Act, a Provincial Act or a State Act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification; or\n(ii) three years full time diploma certificate in Mining Engineering awarded by the State Technical Education Boards with two years' experience in mining operations.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "68",
            "title": "68. Duties of qualified officer.",
            "chapter": null,
            "content": "(a) be responsible for periodic updating of minerals resources, maintenance of bore cores or samples and bore hole logs;\n(b) plan for conservation of mineral resources and optimal utilisation of the minerals and ores in the mining leases;\n(c) prepare a scheme of prospecting as per the format specified by the Government and to carry out the investigation operation as per the scheme;\n(d) prepare the necessary geological maps, plans and sections which are required to delineate the ore body;\n(e) carry out petrological and mineralogical studies of host rock and mineralized zones;\n(f) calculate reserves and its grade;\n(g) provide all the necessary information required for controlling the quality of the minerals produced;\n(h) maintain proper records of the prospecting operations and records of sinking of shafts and boreholes as provided under these rules;\n(i) work out the appropriate method of sampling and ensure preparation of samples accordingly;\n(j) update the reserve figures, grade-wise and category-wise at the end of every year in case of a working mine;\n(k) identify the associated rocks and minerals and maintain proper records of the stacks of non-salable/sub-grade minerals produced; and\n(l) carry out all such orders and directions as may be given in writing under these rules by the Government and to forward a copy of all such orders or directions to the lease holder.\n(a) take all necessary steps to plan and conduct mining operations, so as to ensure conservation of minerals, systematic development of the mineral deposits and protection of environment in and around the quarry lease area in accordance with these rules;\n(b) prepare and maintain plans, sections, reports and schemes in accordance with these rules;\n(c) carry out the study of the associated rocks and minerals, identify them and stack the various minerals produced separately;\n(d) carry out all such orders and directions as may be given in writing under these rules by the Government and to forward a copy of such orders or directions to the holder of quarry lease;\n(e) ensure that there is sufficient provision of proper materials, appliances and facilities at all times at quarry lease for the purpose of carrying out the provisions of these rules and orders issued thereunder and where he is not the lessee of the quarry lease, he shall make requisition in writing to the lessee for anything required for the aforesaid purpose. A copy of every such requisition shall be recorded in bound paged book kept for the purpose. The lessee shall provide, as soon as possible after receipt of such requisition, the materials and facilities requisitioned by the mining engineer.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "69",
            "title": "69. Environmental Safeguards to be implemented regarding mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "70",
            "title": "70. Environment Impact Mitigating Measures.",
            "chapter": null,
            "content": "(1) Removal and utilization of top soil:-\n(a) The top soil collected during mining operations shall be managed to stack systematically at the approved site; and\n(b) Top soil so stacked shall be utilized for plantation or for restoration and rehabilitation of the land no longer required for mining operations or for stabilizing/ landscaping the overburden dumps.\n(2) Storage of overburden, waste rock, etc:-\n(a) The overburden, waste rock and non-saleable mineral generated during mining operations shall be managed to stack separately in properly formed dumps on grounds earmarked in approved environmental clearance;\n(b) The over burden dump shall be properly secured to prevent the degradation of the surrounding land or silting of water courses.\n(c) Wherever possible, the waste rock or overburden or other rejects shall be used for back filling the worked out quarry or mine where the mineral has been recovered up to the optimum depth, with a view to restore the land to its original use or desired alternate use. Where the backfilling is not feasible, the waste dumps shall be scientifically vegetated by suitable native species to prevent erosion and surface run off; and\n(d) The maximum height of the already existing waste dumps shall not exceed five metres and it shall be protected by walls of rubble stones or Geo-green blanket to prevent the flow of fine particles.\n(3) Reclamation and Rehabilitation of lands:- Restoration, reclamation and rehabilitation of land affected by mining operations shall be undertaken in a phased manner so that the work is completed before the conclusion of mining operations and the abandonment of the quarry or mine, with a view to leave a productive and sustainable site.\n(4) Precaution against ground vibrations.-Whenever any damage to public buildings or monuments is apprehended due to their proximity to the quarry lease area, scientific investigations shall be carried out by the holder of the quarry lease so as to keep the ground vibrations caused by blasting operations within safe limit.\n(5) Precaution against air pollution:-(a) Air pollution due to dust, exhaust emissions or fumes during, mining or processing operations for mineral and related activities shall be controlled and kept within permissible limits as specified under any environmental law for the time being in force. Main haulage roads of the mine shall be kept wet by sprinkling of water; and\n(b) Periodical examination of air quality shall be monitored by the association of the cluster and results shall be intimated to concerned District Geologist / District Assistant Geologist as well as the regional officer of the State Pollution Control Board.\n(6) Discharge of toxic liquids:-All possible precautions shall be taken to prevent or reduce to a minimum, the discharge of toxic and objectionable liquid effluents from a quarry or mine, workshop or beneficiation or metallurgical plants, tailing ponds, into surface or ground water bodies, ground water acquifiers and usable lands. These effluents shall conform to the standards laid down in this regard.\n(7) Precaution against noise pollution: - (a) Noise arising out of mining and processing operations for a mineral at the source shall be controlled so as to keep it within the permissible limit; and\n(b) Periodical examination of noise pollution shall be monitored by the association of the cluster and results shall be intimated to concerned District Geologist / District Assistant Geologist as well as the regional officer of the State Pollution Control Board.\n(8) Restoration of fauna/flora: - (a) Effective measures shall be taken for plantation in the area earmarked in the environment management plan. It shall be ensured that plantation shall be done at least five per cent of the total land of the cluster as specified every year;\n(b) The earmarked site for plantation shall be fenced and proper planning of watering and caring the plants shall be implemented. The same shall be looked after during the subsistence of the cluster;\n(c) Suitable trees shall be planted along cluster boundary, on both sides of the major roads, near site office of the mine and over the inactive dumps;\n(d) The lease holder shall not cut or injure any trees in area of his quarry lease without the previous sanction in writing of any officer authorised in this behalf under any law in force; and\n(e) All precautionary measures shall be taken during mining operations for conservation and protection of endangered fauna and flora.\n(9) Water management: - (a) Water collected shall be analyzed and if found potable then it shall be diverted for drinking purpose in consultation with Gujarat Water Supply and Sewerage Board.\n(b) Accumulated unpotable rain water shall be de-watered and diverted to nearby pond / aquifer / river / nallah, catchment area by providing suitable pipe line or drains or link canals, as the case may be, in consultation with Gujarat Water Supply and Sewerage Board;\n(c) The procedure of water harvesting shall be adopted to recharge the ground water table;\n(d) Effective steps shall be taken for setting up of a water treatment plant wherever required to treat the effluents collected in the working pits; and\n(e) For working below ground water level, the quarry lease holder shall carry out a detailed hydro-geological study taking into account the mine water discharge, management of discharged water and shall obtain prior approval of the State Ground Water Department.\n(10) Corporate Social Responsibility: - (a) Regular health check-up camps for the workers engaged in mines shall be organized;\n(b) Occupational health surveillance programme of the workers shall be undertaken periodically to observe any contractions due to exposure to dust and take corrective measures, if needed;\n(c) Insurance cover to all workers engaged in mines shall be provided;\n(d) Common vocational training center shall be setup at a district level; and\n(e) Local needs of habitant like school, creche, hospital, veterinary hospital, sanitation, drinking water etc., shall be considered positively.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "71",
            "title": "71. Open cast working.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        },
        {
            "number": "72",
            "title": "72. Notice of temporary discontinuance of work in mines and obligations of the lease holders.",
            "chapter": null,
            "content": "Form W\nForm W",
            "footnote": "",
            "is_definition": false,
            "sort_order": 71
        },
        {
            "number": "73",
            "title": "73. Intimation of reopening of a mine.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 72
        },
        {
            "number": "74",
            "title": "74. Examination of mineral deposits and taking of samples.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 73
        },
        {
            "number": "75",
            "title": "75. Prohibition of deployment in certain cases.",
            "chapter": null,
            "content": "Chapter XVI\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 74
        },
        {
            "number": "76",
            "title": "76. Exercise of powers on behalf of the Government.",
            "chapter": null,
            "content": "Schedule V\nSchedule V",
            "footnote": "",
            "is_definition": false,
            "sort_order": 75
        },
        {
            "number": "77",
            "title": "77. Power to rectify apparent mistakes.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 76
        },
        {
            "number": "78",
            "title": "78. Special provisions relating to minerals specified in Part B of the First Schedule to the Act.",
            "chapter": null,
            "content": "(1) if the holder of a mineral concession discovers any mineral specified in Part B of the First Schedule to the Act and not specified in such mineral concession, in the area granted under such mineral concession, the discovery of such mineral shall be reported in writing to the Director, Atomic Minerals Directorate for Exploration and Research, Hyderabad within sixty days from the date of discovery of such mineral;\n(2) the holder of such mineral concession shall not win or dispose of any mineral specified in Part B of the First Schedule to the Act unless a separate lease or license for the purpose has been obtained;\n(3) the quantities of any mineral specified in Part B of the First Schedule to the Act recovered incidental to such mining operations shall be collected and stacked separately and a report to that effect shall be sent to the Director, Atomic Minerals Directorate for Exploration and Research, Hyderabad every month for such further action by the lessee or permit holder as may be directed by the Atomic Minerals Directorate for Exploration and Research.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 77
        },
        {
            "number": "79",
            "title": "79. Exploration Obligation.",
            "chapter": null,
            "content": "Schedule III\n(a) if at the time of auction, exploration up to level of inferred mineral resources (333) had been completed and included in geological report forming part of the tender document, within a period of one year from the registration of the relevant lease deed:\n(i) complete exploration to establish indicated mineral resources (332) as per Part I of Schedule I; and\n(ii) prepare and submit a pre-feasibility study report conforming to Part II-B of Schedule I .\nSchedule I\n(b) if at the time of auction, exploration up to level of indicated mineral resources (332) had been completed and included in geological report forming part of the tender document, then the quarry lease holder shall prepare and submit a pre-feasibility study report conforming to Part IIB of Schedule I within a period of fifteen days from the registration of the relevant lease deed.\nSchedule I",
            "footnote": "",
            "is_definition": false,
            "sort_order": 78
        },
        {
            "number": "80",
            "title": "80. Facilities for training of students.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 79
        },
        {
            "number": "81",
            "title": "81. Boundaries below the surface.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 80
        },
        {
            "number": "82",
            "title": "82. Power of the Government to give Direction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 81
        },
        {
            "number": "83",
            "title": "83. Prohibition of Transport of Minerals Beyond Border.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 82
        },
        {
            "number": "84",
            "title": "84. Special Provisions for Mining of Ordinary Sand.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 83
        },
        {
            "number": "85",
            "title": "85. Preservation of cores etc.",
            "chapter": null,
            "content": "(a) preserve intact, until submission of the final geological report, all cores and specimens of different types of rocks and minerals obtained during drilling or sinking operations,\n(b) not destroy any cores or samples generated and preserved as per clause\n(a) above without the prior permission in writing from the Director General, Geological Survey of India and the Government.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 84
        },
        {
            "number": "86",
            "title": "86. Provisions of these rules to be applicable to Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 85
        },
        {
            "number": "87",
            "title": "87. Refund.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 86
        },
        {
            "number": "88",
            "title": "88. Conflict.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 87
        },
        {
            "number": "89",
            "title": "89. Amalgamation of quarry leases.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 88
        },
        {
            "number": "90",
            "title": "90. Change of name, nationality etc. to be intimated.",
            "chapter": null,
            "content": "Chapter XVII\nPenalty",
            "footnote": "",
            "is_definition": false,
            "sort_order": 89
        },
        {
            "number": "91",
            "title": "91. Penalty.",
            "chapter": null,
            "content": "Chapter XVIII\nRepeal and Saving",
            "footnote": "",
            "is_definition": false,
            "sort_order": 90
        },
        {
            "number": "92",
            "title": "92. Repeal and saving.",
            "chapter": null,
            "content": "Schedule I: Evidence of Mineral Resources\n( See rules 3, 4(1), 4(2), 6(1)(b) and 6(2))\n1.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 91
        },
        {
            "number": "2",
            "title": "2. Existence of mineral resources for auction of Quarry Lease:",
            "chapter": null,
            "content": "(1) Part-A of Schedule-III minerals:\n(a) existence of mineral resources has been established after carrying out exploration upto General Exploration (G2) over the area to establish Indicated Mineral Resource (332) as per suggested geological parameters and exploration norms given in Part-I of this Schedule; and\n(b) a geological study report has been prepared conforming to Part-II A of this Schedule;\n(2) Part-B of Schedule-III minerals:\n(a) existence of mineral resources has been established after carrying out exploration upto Preliminary Exploration (G3) over the area to establish Inferred Mineral Resource (333) or General Exploration (G2) over the area to establish Indicated Mineral Resource (332) as per suggested geological parameters and exploration norms given in Part-I of this Schedule;\n(b) a geological study report has been prepared conforming to Part-II A of this Schedule.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 92
        },
        {
            "number": "3",
            "title": "3. Grant of a quarry lease through auction in respect of quarry leases after expiry of the quarry lease period and of leases which have been surrendered, determined or lapsed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 93
        },
        {
            "number": "4",
            "title": "4. Relaxation.",
            "chapter": null,
            "content": "Part - I A\nDefinitions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 94
        },
        {
            "number": "3",
            "title": "3. Reconnaissance Survey (G4)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 95
        },
        {
            "number": "4",
            "title": "4. Preliminary Exploration (G3)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 96
        },
        {
            "number": "5",
            "title": "5. General Exploration (G2)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 97
        },
        {
            "number": "6",
            "title": "6. Detailed Exploration (G1)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 98
        },
        {
            "number": "7",
            "title": "7. Mineral Resource",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 99
        },
        {
            "number": "8",
            "title": "8. Reconnaissance Mineral Resource (334)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 100
        },
        {
            "number": "9",
            "title": "9. Inferred Mineral Resource (333)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 101
        },
        {
            "number": "10",
            "title": "10. Indicated Mineral Resource (332)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 102
        },
        {
            "number": "11",
            "title": "11. Measured Mineral Resource (331)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 103
        },
        {
            "number": "12",
            "title": "12. Mineral Reserve",
            "chapter": null,
            "content": "Probable Mineral Reserve (121 and 122)\nProved Mineral Reserve (111)\nFeasibility Mineral Resource (211)\nPre-Feasibility Mineral Resource (221 and 222)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 104
        },
        {
            "number": "13",
            "title": "13. A Geological Study (F3)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 105
        },
        {
            "number": "14",
            "title": "14. Modifying Factors",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 106
        },
        {
            "number": "15",
            "title": "15. A Pre-Feasibility Study (F2)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 107
        },
        {
            "number": "16",
            "title": "16. A Feasibility Study (F1)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 108
        },
        {
            "number": "17",
            "title": "17. Intrinsically Economic (E3)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 109
        },
        {
            "number": "18",
            "title": "18. Potentially Economic (E2)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 110
        },
        {
            "number": "19",
            "title": "19. Economic (E1)",
            "chapter": null,
            "content": "Part-I B\nGeological Parameters and Exploration Norms",
            "footnote": "",
            "is_definition": false,
            "sort_order": 111
        },
        {
            "number": "2",
            "title": "2. Geological Parameters for exploration:",
            "chapter": null,
            "content": "1\nAerial reconnaissance: Satellite imagery/\n\t\t\t\taerial photograph studies, as per necessity.\nAerial reconnaissance:\n2\nTopographic and Geological survey (Mapping): Reconnaissance / preliminary Exploration stage: 1:50,000 to\n\t\t\t\t1:25000 scale; General and Detailed Exploration stage: larger\n\t\t\t\tthan 1:25000 scale i.e. from 1:500 to less than 1:25000 scale as\n\t\t\t\tper type of mineral deposit. Geological mapping during general\n\t\t\t\tand detailed exploration to be carried out with the help of total\n\t\t\t\tstation. Exploration block to be geo-coordinated and delineate\n\t\t\t\tland details with the help of Differential Global Positioning\n\t\t\t\tSystem.\nTopographic and Geological survey (Mapping):\n3\nGround Geophysical and Geochemical survey: Geophysical and geochemical survey using appropriate techniques\n\t\t\t\tas may be necessary for the style of mineralization as per\n\t\t\t\trequirement.\nGround Geophysical and Geochemical survey:\n4\nTechnological : Exploration and sampling using appropriate techniques from\n\t\t\t\tlocations such as outcrops, trenches, pits, old workings and\n\t\t\t\tdrill holes. The sampling locations are spaced suitably (in a\n\t\t\t\tgrid pattern to the extent possible and may be modified depending\n\t\t\t\ton structural complexity) for establishing existence of\n\t\t\t\tmineralized body and its lateral and vertical continuity. Clause\n\t\t\t\t(4) of Part-I of this Schedule may be referred for further\n\t\t\t\tdetails.\nTechnological :\nThe lateral extension\n\t\t\t\tto be considered for resource assessment shall depend on\n\t\t\t\tgeological considerations supplemented by geological continuity\n\t\t\t\tby mapping or by other means and in any case shall not be more\n\t\t\t\tthan 50% of the grid spacing of the probe points.\nAssessment based on selected information such as\n\t\t\t\tisolated assays, isolated drill holes, assays of panned\n\t\t\t\tconcentrates etc. is not recommended.\n5\nSampling and sub\n\t\t\t\tsampling:\nSampling and sub\n\t\t\t\tsampling:\n(a) Random\n\t\t\t\tgrab/chip/channel sampling from surface exposure/escarpments/\n\t\t\t\tnallah cuttings/ pit/channel etc.\n(b) Systematic\n\t\t\t\tsampling from pits/trenches/outcrops/workings etc. spaced closely\n\t\t\t\tenough to confirm geological and grade continuity for other\n\t\t\t\tstages of geological assessment.\n(c) Geological\n\t\t\t\tlogging and sampling of drill core/chip samples at regular\n\t\t\t\tinterval, preferably metre wise or less for the mineralized\n\t\t\t\tportions.\n(d) The drill\n\t\t\t\ttechnique to be deployed shall depend on the rock type to be\n\t\t\t\tpenetrated and with an aim to achieve maximum sample/core\n\t\t\t\trecovery.\n(e) The exploration samples including surface\n\t\t\t\tsamples, drill core/ chip samples shall be preserved, for future\n\t\t\t\tuse.\n6\nAssay data and Laboratory tests: Analysis\n\t\t\t\tof all samples generated for major radicals appropriate to the\n\t\t\t\tmineral under investigation.\nAssay data and Laboratory tests:\n7\nPetrographic and Mineragraphic studies: Petrographic analysis of mineralized portions to ascertain the\n\t\t\t\trock types and mineral assemblages including grain size, texture,\n\t\t\t\tgaunge and its liberation characteristics etc. if considered\n\t\t\t\tnecessary.\nPetrographic and Mineragraphic studies:\n8\nBulk density study: The bulk density must\n\t\t\t\tbe measured by methods that adequately account for incipient void\n\t\t\t\tspaces (vugs, porosity, etc.) in mineral /ore body.\nBulk density study:\n9\nBulk Sampling for Beneficiation studies: Bulk sampling if necessary for testing processing technology.\nBulk Sampling for Beneficiation studies:\n10\nEnvironmental setting: Details about\n\t\t\t\tlocal infrastructure, host population, historical sites, forests,\n\t\t\t\tsanctuaries, national park and base line information on\n\t\t\t\tenvironmental setting of the area to be collected.\nEnvironmental setting:\n11\nAny other relevant data: Groundwater,\n\t\t\t\tgeotechnical and rock characteristics etc. that may be relevant.\nAny other relevant data:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 112
        },
        {
            "number": "3",
            "title": "3. Suggested Exploration norms (category-wise) for different types of minor mineral deposits/mineralization",
            "chapter": null,
            "content": "Category\nCategory\nType of deposit and Principal Minerals\nType of deposit and Principal Minerals\nReconnais sance Survey (G-4)\nReconnais sance Survey (G-4)\nPreliminary Exploration (G-3)\nPreliminary Exploration (G-3)\nGeneral Exploration (G-2)\nGeneral Exploration (G-2)\nDetailed Explorati on (G-1)\nDetailed Explorati on (G-1)\nA\nA\nI. Bedded\n\t\t\t\tStratiform and tabular deposits of regular and irregular habit:\nI. Bedded\n\t\t\t\tStratiform and tabular deposits of regular and irregular habit:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 113
        },
        {
            "number": "1",
            "title": "1. Blacktrapb (Road Metal), Building Stones\n\t\t\t\t(Building Limestone, Calc-gneiss, Gabbro, Phyllite, Quartzite,\n\t\t\t\tSandstone, Slate, Trachyte, Others), and Ordinary Clay.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 114
        },
        {
            "number": "1",
            "title": "1. Blacktrapb (Road Metal), Building Stones\n\t\t\t\t(Building Limestone, Calc-gneiss, Gabbro, Phyllite, Quartzite,\n\t\t\t\tSandstone, Slate, Trachyte, Others), and Ordinary Clay.",
            "chapter": null,
            "content": "Not necessary\nNot necessary",
            "footnote": "",
            "is_definition": false,
            "sort_order": 115
        },
        {
            "number": "1",
            "title": "1. Geological survey:",
            "chapter": null,
            "content": "i. Mapping on 1:\n\t\t\t\t50,000 scale to 1:25,000 scale as per size of the prospect.\nii. Broad assessment\n\t\t\t\tof lithology, structure, surface extension of mineral.\niii. Recording of\n\t\t\t\tbroad geomorphology, drainage, weather profile.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 116
        },
        {
            "number": "2",
            "title": "2. Geochemical\n\t\t\t\tSurvey: not necessary",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 117
        },
        {
            "number": "3",
            "title": "3. Ground geophysical\n\t\t\t\tsurvey: not necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 118
        },
        {
            "number": "4",
            "title": "4. Technology :",
            "chapter": null,
            "content": "i. Pitting Trenching:\n\t\t\t\tnot necessary\nii. Scout drilling:\n\t\t\t\tnot necessary.\niii. Sampling:\n\t\t\t\tRegional and random grab / chip sample for geotechnical, specific\n\t\t\t\tgravity studies as per necessity.\niv. Bulk\n\t\t\t\tdensity/specific gravity.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 119
        },
        {
            "number": "5",
            "title": "5. Integration of all data and identification of\n\t\t\t\tblocks for further exploration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 120
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:1,000\n\t\t\t\tscale to < 1:25,000 scale Mapping (geological and topographic)\n\t\t\t\tto be carried out with the help of Total station instrument.\nii. Exploration block\n\t\t\t\tto be geocoordinated and land details to be delineated with the\n\t\t\t\thelp of DGPS.\niii. Assessment of\n\t\t\t\tlithology, structure, surface extension of mineral.\niv. Recording of\n\t\t\t\tgeomorphology, drainage, weather profile.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 121
        },
        {
            "number": "2",
            "title": "2. Geochemical\n\t\t\t\tSurvey: not necessary",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 122
        },
        {
            "number": "3",
            "title": "3. Geophysical\n\t\t\t\tsurvey: not necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 123
        },
        {
            "number": "4",
            "title": "4. Technology:",
            "chapter": null,
            "content": "i. Pitting/trenching:\n\t\t\t\t2 to 5 per sq km/per prospect.\nii. Drilling: not\n\t\t\t\tnecessary.\niii. Sampling:\n\t\t\t\tsystematic grab, chip, pit and trench sampling for geotechnical\n\t\t\t\tstudies.\niv. Geotechnical\n\t\t\t\tstudies: measurement of compressive strength, tensile strength\n\t\t\t\tetc., if necessary.\nv. bulk density /specific gravity study.\nNot necessary\nNot necessary",
            "footnote": "",
            "is_definition": false,
            "sort_order": 124
        },
        {
            "number": "2",
            "title": "2. Brick-earth, Ordinary Earth, Soft Murrum,\n\t\t\t\tHard Murrum.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 125
        },
        {
            "number": "2",
            "title": "2. Brick-earth, Ordinary Earth, Soft Murrum,\n\t\t\t\tHard Murrum.",
            "chapter": null,
            "content": "II. Placers and residual refractory mineral\n\t\t\t\tdeposit of hill and valley wash\nII. Placers and residual refractory mineral\n\t\t\t\tdeposit of hill and valley wash",
            "footnote": "",
            "is_definition": false,
            "sort_order": 126
        },
        {
            "number": "1",
            "title": "1. Boulder , Chalcedony pebbles, Kankar,\n\t\t\t\tGravel, Ordinary Sand and Quartzite Pebbles.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 127
        },
        {
            "number": "1",
            "title": "1. Boulder , Chalcedony pebbles, Kankar,\n\t\t\t\tGravel, Ordinary Sand and Quartzite Pebbles.",
            "chapter": null,
            "content": "Not necessary\nNot necessary",
            "footnote": "",
            "is_definition": false,
            "sort_order": 128
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:25,000 or smaller scale as per\n\t\t\t\tprospect size. Broad delineation of ordinary sand, gravel etc.\nii. Recording of geomorphology, landform etc.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 129
        },
        {
            "number": "2",
            "title": "2. Geochemical Survey: not necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 130
        },
        {
            "number": "3",
            "title": "3. Geophysical Survey: not necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 131
        },
        {
            "number": "4",
            "title": "4. Technological:",
            "chapter": null,
            "content": "i. Trenching: not necessary.\nii. Pitting: Test pits as per need for\n\t\t\t\testimating thickness of sediment.\niii. Bulk density/specific gravity.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 132
        },
        {
            "number": "5",
            "title": "5. Integration of all data and identification of\n\t\t\t\tblocks for further exploration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 133
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:1,000 scale to < 1:25,000\n\t\t\t\tscale. Mapping (geological and topographic) to be carried out\n\t\t\t\twith the help of Total station instrument.\nii. Exploration block to be geocoordinated and\n\t\t\t\tland details to be delineated with the help of DGPS.\niii. Assessment of lithology, surface extension\n\t\t\t\tof mineral.\niv. Detailed geomorphology, drainage pattern.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 134
        },
        {
            "number": "2",
            "title": "2. Geochemical Survey: not necessary",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 135
        },
        {
            "number": "3",
            "title": "3. Geophysical survey: not necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 136
        },
        {
            "number": "4",
            "title": "4. Technology:",
            "chapter": null,
            "content": "i. Pitting: 2 to 5 per sq km or per prospect to\n\t\t\t\tknow the depth extension.\nii. Drilling: one or two augur drilling per\n\t\t\t\tprospect to know the depth extension, as per necessity.\niii. Sampling: of pit and trench / Core / sludge\n\t\t\t\tfor Petrographic and geo-technical studies as per necessity.\niv. Bulk density/ specific gravity.\nNot necessary\nNot necessary\nB\nB\nI. Bedded Stratiform and tabular deposits of\n\t\t\t\tregular and irregular habit:\nI. Bedded Stratiform and tabular deposits of\n\t\t\t\tregular and irregular habit:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 137
        },
        {
            "number": "1",
            "title": "1. Ball Clay, Red clay Lithomargic Clay,\n\t\t\t\tPozzolanic Clay, Natural Clay, Diatomaceo us Clay, Bentonite,\n\t\t\t\tChalk, Dolomite, Fireclay, Fuller's Earth, Gypsum, Laterite,\n\t\t\t\tLimekankar , Quartzite, Sand (Others), Moulding Sand and Silica\n\t\t\t\tSand.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 138
        },
        {
            "number": "1",
            "title": "1. Ball Clay, Red clay Lithomargic Clay,\n\t\t\t\tPozzolanic Clay, Natural Clay, Diatomaceo us Clay, Bentonite,\n\t\t\t\tChalk, Dolomite, Fireclay, Fuller's Earth, Gypsum, Laterite,\n\t\t\t\tLimekankar , Quartzite, Sand (Others), Moulding Sand and Silica\n\t\t\t\tSand.",
            "chapter": null,
            "content": "Not necessary\nNot necessary",
            "footnote": "",
            "is_definition": false,
            "sort_order": 139
        },
        {
            "number": "1",
            "title": "1. Aerial Reconnaissance: Remote sensing, aerial\n\t\t\t\tphotographic studies as per necessity.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 140
        },
        {
            "number": "2",
            "title": "2. Geological survey:",
            "chapter": null,
            "content": "i. Mapping on 1:50,000 scale to 1:25,000 scale\n\t\t\t\tas per the size of the prospect.\nii. Assessment of lithology, structure, surface\n\t\t\t\tmineralization extent.\niii. Recording of broad geomorphology.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 141
        },
        {
            "number": "3",
            "title": "3. Geochemical Survey:",
            "chapter": null,
            "content": "i. Grab/chip sampling of rocks.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 142
        },
        {
            "number": "4",
            "title": "4. Ground geophysical survey:",
            "chapter": null,
            "content": "Not Necessary",
            "footnote": "",
            "is_definition": false,
            "sort_order": 143
        },
        {
            "number": "5",
            "title": "5. Technology :",
            "chapter": null,
            "content": "i. Pitting Trenching: One or two to expose\n\t\t\t\tmineralized zone at ideal location.\nii. Drilling: one or two per prospect.\niii. Sampling: Trench/pit/ core sample for\n\t\t\t\tchemical analysis.\niv. Bulk density/ specific gravity measurement.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 144
        },
        {
            "number": "6",
            "title": "6. Petrographic and mineralogical studies, as\n\t\t\t\tper necessity.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 145
        },
        {
            "number": "7",
            "title": "7. Integration of all data and identification of\n\t\t\t\tblocks for further exploration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 146
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:1,000 scale to < 1:25,000\n\t\t\t\tscale. Mapping (geological and topographical) to be carried out\n\t\t\t\twith the help of Total station instrument.\nii. Exploration block to be geocoordinated and\n\t\t\t\tland details to be delineated with the help of DGPS.\niii. Assessment of lithology, structure,\n\t\t\t\tmineralization extent.\n2.Geochemical Survey:\ni. Lithogeochemica l and channel sampling in\n\t\t\t\tgrid pattern.\nii. Recording of deleterious elements.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 147
        },
        {
            "number": "3",
            "title": "3. Geophysical survey: if necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 148
        },
        {
            "number": "4",
            "title": "4. Technology:",
            "chapter": null,
            "content": "i. Pitting: 2 to 5 per sq km or per prospect.\nii. Trenching: at spacing of 200- 500m.\niii. Drilling: The grid spacing of bore holes\n\t\t\t\tmay be 800m or closer for deposits of regular habit and 400m or\n\t\t\t\tcloser for irregular habit. Drilling technique depends on rock\n\t\t\t\ttype.\niv. Sampling: systematic pit and trench\n\t\t\t\tsampling. Core / sludge sampling mineralization wise.\nv. Laboratory scale scanning/ chemical analysis.\nvi. Bulk density /specific gravity study.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 149
        },
        {
            "number": "5",
            "title": "5. Petrographic and minerographic studies: as\n\t\t\t\tper necessity.",
            "chapter": null,
            "content": "Not necessary\nNot necessary",
            "footnote": "",
            "is_definition": false,
            "sort_order": 150
        },
        {
            "number": "2",
            "title": "2. Dimension Stones (ornamental type)\n\t\t\t\tcoloured varieties including:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 151
        },
        {
            "number": "2",
            "title": "2. Dimension Stones (ornamental type)\n\t\t\t\tcoloured varieties including:",
            "chapter": null,
            "content": "i. Granite (Granite means dolerites, granite\n\t\t\t\tgeneisses, migmatites, gabbros, anorthosites, rhyolites,\n\t\t\t\tsyenites, leptynites, charnockites and any other igneous and\n\t\t\t\torthometamo rphic rock types)\ni. Granite (Granite means dolerites, granite\n\t\t\t\tgeneisses, migmatites, gabbros, anorthosites, rhyolites,\n\t\t\t\tsyenites, leptynites, charnockites and any other igneous and\n\t\t\t\torthometamo rphic rock types)\nii. Marble (marble means crystalline\n\t\t\t\tmetamorph osed calcareous or dolomitic rocks and serpentine rock\n\t\t\t\ttypes)\nii. Marble (marble means crystalline\n\t\t\t\tmetamorph osed calcareous or dolomitic rocks and serpentine rock\n\t\t\t\ttypes)\nNot necessary\nNot necessary",
            "footnote": "",
            "is_definition": false,
            "sort_order": 152
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:25,000 or smaller scale as per\n\t\t\t\tprospect size.\nii. Recording of broad geomorphology and weather\n\t\t\t\tprofile.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 153
        },
        {
            "number": "2",
            "title": "2. Geochemical Survey: Not necessary",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 154
        },
        {
            "number": "3",
            "title": "3. Geophysical Survey: Not necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 155
        },
        {
            "number": "4",
            "title": "4. Technological:",
            "chapter": null,
            "content": "i. Pitting/ Trenching/drilling: Not Necessary\nii. Sampling: one grab of fresh rock prospect of\n\t\t\t\tpremium variety for geotechnical and petrographic study.\niii. Geotechnical studies:\na. Joint fracture density study and preliminary\n\t\t\t\tassessment of blockability and polishing index.\nb. Bulk density /specific gravity study.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 156
        },
        {
            "number": "5",
            "title": "5. Petrographic studies:",
            "chapter": null,
            "content": "Texture and microtexture study.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 157
        },
        {
            "number": "6",
            "title": "6. Integration of all data and identification of\n\t\t\t\tblocks for further exploration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 158
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:1,000 scale to < 1:25,000\n\t\t\t\tscale. Mapping (geological and topographic) to be carried out\n\t\t\t\twith the help of Total station instrument.\nii. Exploration block to be geocoordinated and\n\t\t\t\tland details to be delineated with the help of DGPS.\niii. Assessment of lithology, structure, surface\n\t\t\t\textension of mineralization etc.\niv. Recording of geomorphology, drainage,\n\t\t\t\tweather profile.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 159
        },
        {
            "number": "2",
            "title": "2. Geochemical Survey: Identification of\n\t\t\t\tdeleterious constituents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 160
        },
        {
            "number": "3",
            "title": "3. Geophysical survey: if necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 161
        },
        {
            "number": "4",
            "title": "4. Technology:",
            "chapter": null,
            "content": "i. Pitting/trenching: one or two per prospect.\nii. Drilling: one or two per prospect.\niii. Sampling: two to three grabs per prospect.\niv. Geotechnical: further refinement of\n\t\t\t\tblockability data, polishing index measurement, measurement of\n\t\t\t\tcompressive strength, tensile strength etc.\nv. bulk density /specific gravity study.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 162
        },
        {
            "number": "5",
            "title": "5. Petrographic and minerographic studies:\n\t\t\t\tcolour, granularity, inclusion, texture etc. As per necessity.",
            "chapter": null,
            "content": "Not necessary\nNot necessary\nII. Lenticular bodies of all dimensions\n\t\t\t\tincluding bodies occurring en echelon, silicified linear zones of\n\t\t\t\tcomposite veins. Lenses, pockets, stock-works; irregular shaped\n\t\t\t\tmodest to small sized bodies\nII. Lenticular bodies of all dimensions\n\t\t\t\tincluding bodies occurring en echelon, silicified linear zones of\n\t\t\t\tcomposite veins. Lenses, pockets, stock-works; irregular shaped\n\t\t\t\tmodest to small sized bodies",
            "footnote": "",
            "is_definition": false,
            "sort_order": 163
        },
        {
            "number": "1",
            "title": "1. Agate, Calcite, Clay (Others), Feldspar,\n\t\t\t\tOchre, Quartz, Steatite or Talc or Soapstone, China Clay, Kaolin,\n\t\t\t\tand White Clay.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 164
        },
        {
            "number": "1",
            "title": "1. Agate, Calcite, Clay (Others), Feldspar,\n\t\t\t\tOchre, Quartz, Steatite or Talc or Soapstone, China Clay, Kaolin,\n\t\t\t\tand White Clay.",
            "chapter": null,
            "content": "Not required\nNot required",
            "footnote": "",
            "is_definition": false,
            "sort_order": 165
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:50,000 to 1:25,000 scale.\nii. Assessment of lithology, mineral extension,\n\t\t\t\tstructure etc.\niii. Broad study of geomorphology and landforms.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 166
        },
        {
            "number": "2",
            "title": "2. Geochemical Survey: Sampling of rock chip,\n\t\t\t\tgrab.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 167
        },
        {
            "number": "3",
            "title": "3. Geophysical Survey: if required.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 168
        },
        {
            "number": "4",
            "title": "4. Technological:",
            "chapter": null,
            "content": "i. Pitting and scout drilling: up to 5 test\n\t\t\t\tpits/boreholes on 400m grid pattern.\nii. Sampling: sampling of pit and cores for\n\t\t\t\tdeciphering the mineralized zone.\niii. Bulk density/ specific gravity measurement.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 169
        },
        {
            "number": "5",
            "title": "5. Petrographic and mineragraphic studies, If\n\t\t\t\tnecessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 170
        },
        {
            "number": "6",
            "title": "6. Integration of all data and identification of\n\t\t\t\tblocks for further exploration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 171
        },
        {
            "number": "1",
            "title": "1. Geological Survey:",
            "chapter": null,
            "content": "i. Mapping on 1:1,000 scale to < 1:25,000\n\t\t\t\tscale. Mapping (geological and topographic) to be carried out\n\t\t\t\twith the help of Total station instrument.\nii. Block to be geo-coordinated and delineate\n\t\t\t\tland details with the help of DGPS.\niii. Assessment of lithology, structure, surface\n\t\t\t\taerial extent of /mineralization.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 172
        },
        {
            "number": "2",
            "title": "2. Geochemical Survey:",
            "chapter": null,
            "content": "i. Detailed lithogeochemical and channel\n\t\t\t\tsampling in grid pattern for further refining of data.\nii. Identification of deleterious elements.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 173
        },
        {
            "number": "3",
            "title": "3. Geophysical survey: only if necessary.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 174
        },
        {
            "number": "4",
            "title": "4. Technology:",
            "chapter": null,
            "content": "i. Pitting / trenching: at spacing of 200- 500m.\nii. Drilling: The grid spacing of bore holes may\n\t\t\t\tbe 200m or closer\niii. Sampling: systematic pit and trench\n\t\t\t\tsampling. Core / sludge sampling mineralization wise.\niv. Laboratory scale scanning/ chemical\n\t\t\t\tanalysis.\nv. Bulk density /specific gravity study.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 175
        },
        {
            "number": "5",
            "title": "5. Petrographic and minerographic studies, as\n\t\t\t\tper necessity.",
            "chapter": null,
            "content": "Not required\nNot required\nPart-II A\nReporting of Minor Mineral Resources\nContents\nContents\nExplanation\nExplanation\n1\nTitle and - Ownership.\n(a) Title of Report.\n(b) Details of period\n\t\t\t\tof prospecting/mineral right, if any.\n(c) Details of exploration agency,\n\t\t\t\tqualification, experience of associated technical persons engaged\n\t\t\t\tin exploration.\n2\nDetails of the area.\n(a) Village, Post\n\t\t\t\tOffice, Taluka, District, State.\n(b) Survey of India\n\t\t\t\tToposheet Number and Geo-coordinates of the area of all corner\n\t\t\t\tpoints.\n(c) Cadaster details\n\t\t\t\tof the area with land use, area under forest with type of forest.\n(d) Mineral(s) under investigation.\n3\nInfrastructure and Environment.\nLocal infrastructure, host population,\n\t\t\t\thistorical sites, forests, sanctuaries, national park and\n\t\t\t\tenvironmental settings of the area.\n4\nPrevious exploration.\n(a) Details of\n\t\t\t\tprevious exploration carried out by other agencies or parties.\n(b) In case the area forms part of the area\n\t\t\t\tcovered under earlier exploration then the same should be shown\n\t\t\t\tin a map with proper scale.\n5\nGeology.\n(a) Brief regional\n\t\t\t\tgeology of the area outlining the broad geological and structural\n\t\t\t\tframe work.\n(b) Local Geology:\n\t\t\t\tDeposit/mineralization type, geological setting and details of\n\t\t\t\tdip, strike, old workings, surface exposures etc. of the area\n\t\t\t\tunder study also of adjoining nearby areas if the Contents\n\t\t\t\tExplanation information is likely to have an impact on the area\n\t\t\t\tunder study.\n(c) Reliable\n\t\t\t\tgeological map of appropriate scale with geocoordinates showing\n\t\t\t\tmajor lithological units, structural features; extent of surface\n\t\t\t\tmineralization, location of boreholes, pits, trenches, old\n\t\t\t\tworkings etc.\n(d) Cross sections at\n\t\t\t\tsuitable intervals showing vertical projections of litho-units\n\t\t\t\tand mineralization.\n(e) The extent and variability of the\n\t\t\t\tmineralization expressed as length (along strike or otherwise),\n\t\t\t\tplan width, and depth below surface to the upper and lower limits\n\t\t\t\tof the Mineral Resource.\n6\nAerial/ground geophysical/geochemical data.\nDetails of aerial, geophysical and geochemical\n\t\t\t\tsurvey results taken up if any and their results.\n7\nTechnological investigation.\n(a) Details of\n\t\t\t\ttechnological investigation (pitting/trenching/drilling etc.).\n(b) Data spacing for reporting of exploration\n\t\t\t\tresults.\n8\nSampling Technique.\nNature and quality of sampling (e.g. cut\n\t\t\t\tchannels, random chips etc.) and measures taken to ensure\n\t\t\t\trepresentative sample.\n9\nDrilling technique and drill sampling employed.\n(a) Drill type and\n\t\t\t\tdetails like core diameter, collar R.L, azimuth, inclination,\n\t\t\t\tco-ordinates of bore holes etc.\n(b) Whether core and\n\t\t\t\tchip sample recoveries have been properly recorded and results\n\t\t\t\tassessed.\n(c) Measures taken to\n\t\t\t\tmaximize sample recovery and ensure representative nature of the\n\t\t\t\tsamples.\n(d) Whether a\n\t\t\t\trelationship exists between sample recovery and grade.\n(e) Logging:- Whether core and chip samples have\n\t\t\t\tbeen logged to a level of detail to support appropriate Mineral\n\t\t\t\tResource estimation, mining studies.\n10\nSub-sampling techniques and sample preparation.\n(a) If core, whether\n\t\t\t\tcut or sawn and whether quarter, half or all core taken.\n(b) For all sample\n\t\t\t\ttypes, the nature, quality and appropriateness of the sample\n\t\t\t\tpreparation technique.\n(c) Measures taken to ensure that the sampling\n\t\t\t\tis representative of the in situ material collected.\n11\nQuality of assay data and laboratory tests.\nThe nature, quality and appropriateness of the\n\t\t\t\tassaying and laboratory procedures used and whether the technique\n\t\t\t\tis considered partial or total. Nature of quality control\n\t\t\t\tprocedures adopted (e.g. standards, blanks, duplicates, external\n\t\t\t\tlaboratory checks) and whether acceptable levels of accuracy\n\t\t\t\t(i.e. lack of bias) and precision have been established.\n12\nBulk Density / Specific Gravity.\nWhether assumed or determined.\n13\nResource estimation techniques.\n(a) Discussion on\n\t\t\t\tsufficient data density to assure continuity of mineralization\n\t\t\t\tand synthesis adequate data base for estimation procedure used.\n(b) The nature and\n\t\t\t\tappropriateness of the estimation technique(s) applied and key\n\t\t\t\tassumptions, including treatment of extreme grade values, maximum\n\t\t\t\tdistance of extrapolation from data points.\n(c) The basis for the\n\t\t\t\tclassification of the Mineral Resources into varying confidence\n\t\t\t\tcategories.\n(d) Data verification and /or validation\n\t\t\t\tprocedures used.\n14\nGeotechnical Studies (For Dimensional stone\n\t\t\t\treport).\n(a) Assessment of\n\t\t\t\tBlockability.\n(b) Polishing Index.\n(c) measurement of compressive strength, tensile\n\t\t\t\tstrength etc.\n15\nAnnexures/ enclosures to the report.\nThe report shall include all relevant data\n\t\t\t\tincluding maps, sections, logs, analysis reports, photographs\n\t\t\t\tetc. in support of the estimates made.\n16\nAny other information.\nAny other information as may be available or\n\t\t\t\trequired by any authority as may be prescribed.\nPart-II B\nContents of Prefeasibility Report\nContents\nContents\nExplanation\nExplanation\n1\nMineral Resource estimate for conversion to\n\t\t\t\tMineral Reserve.\n(a) Description of\n\t\t\t\tMineral Resource estimate used as a basis for the conversion to a\n\t\t\t\tMineral reserve.\n(b) Clear statement\n\t\t\t\tas to whether the Mineral Resources are reported additional to,\n\t\t\t\tor inclusive of, the Mineral Reserves.\n(c) The type and level of study undertaken to\n\t\t\t\tenable Mineral Resources to be converted to Mineral Reserves i.e.\n\t\t\t\tPrefeasibility/Feasibility level.\n2\nCut off Parameters.\nThe basis of the adopted cut-off grade(s) or\n\t\t\t\tquality parameters applied, including the basis.\n3\nMining factors or assumptions.\n(a) The method and\n\t\t\t\tassumptions used to convert the Mineral Resource to a Mineral\n\t\t\t\tReserve (i.e. either by application of appropriate factors by\n\t\t\t\toptimization or by preliminary or detailed design supported with\n\t\t\t\tConceptual plan for mining).\n(b) Anticipated Ore\n\t\t\t\tto OB ratio, mine recoveries, dilutions etc.\n(c) The choice of,\n\t\t\t\tthe nature and the appropriateness of the selected mining\n\t\t\t\tmethod(s), the size of the selected mining unit (length, width,\n\t\t\t\theight) and other mining parameters including associated design\n\t\t\t\tissues such as pre-strip, access, etc.\n(d) The assumptions\n\t\t\t\tmade regarding geotechnical parameters (eg. pit slopes, stope\n\t\t\t\tsizes, etc.), grade control and pre-production drilling.\n(e) The major\n\t\t\t\tassumptions made and Mineral Resource model used for pit\n\t\t\t\toptimization (if appropriate).\n(f) The mining\n\t\t\t\tdilution factors, mining recovery factors, and minimum mining\n\t\t\t\twidths used.\n(g) The infrastructure requirements of the\n\t\t\t\tselected mining methods. Where available, the historic\n\t\t\t\treliability of the performance parameters.\n4\nCost and revenue factors.\n(a) The derivation\n\t\t\t\tof, or assumptions made, regarding projected capital and\n\t\t\t\toperating costs.\n(b) The assumptions\n\t\t\t\tmade regarding revenue including head grade, metal or commodity\n\t\t\t\tprice(s) exchange rates, transportation and treatment charges,\n\t\t\t\tpenalties, etc.\n(c) The allowances\n\t\t\t\tmade for royalties payable, both Government and private.\n(d) Basic cash flow\n\t\t\t\tinputs for a stated period.\n(e) Yearly planned production, Net Present Value\n\t\t\t\t(NPV) and Internal Rate of Return (IRR) of the deposit, intrinsic\n\t\t\t\tvalue of the deposit based on annual projected production.\n5\nMarket assessment.\n(a) The demand,\n\t\t\t\tsupply and stock situation for the particular commodity,\n\t\t\t\tconsumption trends and factors likely to affect supply and demand\n\t\t\t\tinto the future.\n(b) For industrial minerals the customer\n\t\t\t\tspecification, testing and acceptance requirements prior to a\n\t\t\t\tsupply contract.\n6\nOther modifying factors.\n(a) The effect, if\n\t\t\t\tany, of natural risk, infrastructure, environmental, legal,\n\t\t\t\tmarketing, social or governmental factors on the likely viability\n\t\t\t\tof a project and/or on the estimation and classification of the\n\t\t\t\tMineral Reserves.\n(b) The status of\n\t\t\t\ttitles and approvals critical to the viability of the project,\n\t\t\t\tsuch as quarry leases, discharge permits, government and\n\t\t\t\tstatutory approvals.\n(c) Environmental descriptions of anticipated\n\t\t\t\tliabilities. Location plans of mineral rights and titles.\nSchedule II: Eligibility Conditions\n( See rule 4(1))",
            "footnote": "",
            "is_definition": false,
            "sort_order": 176
        },
        {
            "number": "2",
            "title": "1. The bidder shall be an individual who is an Indian national or company as defined in clause (20) of section 2 of the Companies Act, 2013.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 177
        },
        {
            "number": "2",
            "title": "2. The bidder shall satisfy such conditions as may be prescribed by the Government in the tender document.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 178
        },
        {
            "number": "3",
            "title": "3. The bidder, including an individual, must have a net worth which is equal to or more than one per cent. of the value of estimated resources, as may be specified by the Government in the tender document.",
            "chapter": null,
            "content": "(1) In case a bidder is a subsidiary of another company incorporated in India, the net worth of such holding company may also be considered:\n(2) In case of a company, the net worth shall be the sum of paid up share capital and the free reserves as per the audited balance sheet of the immediately preceding financial year.\n(3) In case of an individual, the net worth shall be the closing cash balance on the last date for submission of the application and such amount may include amount in savings bank accounts in scheduled bank/ post office, free and unencumbered fixed deposits in scheduled banks, post office, listed companies/government organisation/public sector undertaking of state and central government, Kisan Vikas Patra, National Saving Certificate, bonds, shares of listed companies, listed mutual funds, unit linked insurance plan, Public Provident Fund, surrender value of life insurance policies in the name of bidder.\nSchedule III\nMinor Minerals\nMinor Minerals\nCategorization of Minor Minerals for conditions relating to grant of Mineral Concessions\nCategorization of Minor Minerals for conditions relating to grant of Mineral Concessions\n( See rules 9(1), 9(2), 10(1), 10(2), 12(1), 12(3), 14, 188(15), 188(22), 188(27), 20, 388(1), 388(2), 388(3), 433(1), 444(4), 577, 611, 644(2), 677(1) and 79(1))\nPart A\nPart A\nPart A-I\nPart A-I\nPart A-II\nPart A-II",
            "footnote": "",
            "is_definition": false,
            "sort_order": 179
        },
        {
            "number": "1",
            "title": "1. Brick-earth",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 180
        },
        {
            "number": "1",
            "title": "1. Blacktrap (Road Metal)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 181
        },
        {
            "number": "2",
            "title": "2. Chalcedony pebbles / Quartzite Pebbles",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 182
        },
        {
            "number": "2",
            "title": "2. Building Stones",
            "chapter": null,
            "content": "(a) Building Limestone\n(b) Calc-gneiss\n(c) Gabbro\n(d) Phyllite\n(e) Quartzite\n(f) Sandstone\n(g) Slate\n(h) Trachyte\n(i) Others",
            "footnote": "",
            "is_definition": false,
            "sort_order": 183
        },
        {
            "number": "3",
            "title": "3. Ordinary Clay / Soft Murrum / Ordinary Earth",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 184
        },
        {
            "number": "4",
            "title": "4. Ordinary Sand / Gravel / Kankar / Boulder",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 185
        },
        {
            "number": "5",
            "title": "5. Hard Murrum",
            "chapter": null,
            "content": "Part B\nPart B",
            "footnote": "",
            "is_definition": false,
            "sort_order": 186
        },
        {
            "number": "1",
            "title": "1. Agate",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 187
        },
        {
            "number": "12",
            "title": "12. Limekankar",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 188
        },
        {
            "number": "2",
            "title": "2. Ball Clay / China Clay / White Clay / Kaolin",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 189
        },
        {
            "number": "13",
            "title": "13. Ochre",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 190
        },
        {
            "number": "3",
            "title": "3. Bentonite / Fuller's Earth",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 191
        },
        {
            "number": "14",
            "title": "14. Quartz",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 192
        },
        {
            "number": "4",
            "title": "4. Calcite",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 193
        },
        {
            "number": "15",
            "title": "15. Red Clay",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 194
        },
        {
            "number": "5",
            "title": "5. Chalk",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 195
        },
        {
            "number": "16",
            "title": "16. Sand (Others) / Moulding Sand",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 196
        },
        {
            "number": "6",
            "title": "6. Clay (Others) / Lithomargic Clay/ Pozzolanic\n\t\t\t\tClay / Natural Clay / Diatomaceous Clay",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 197
        },
        {
            "number": "17",
            "title": "17. Silica Sand",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 198
        },
        {
            "number": "7",
            "title": "7. Dolomite",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 199
        },
        {
            "number": "18",
            "title": "18. Steatite or Talc or Soapstone",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 200
        },
        {
            "number": "8",
            "title": "8. Feldspar",
            "chapter": null,
            "content": "Dimensional Stones\nDimensional Stones",
            "footnote": "",
            "is_definition": false,
            "sort_order": 201
        },
        {
            "number": "9",
            "title": "9. Fireclay",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 202
        },
        {
            "number": "19",
            "title": "19. Granite (Granite means dolerites, granite\n\t\t\t\tgeneisses, migmatites, gabbros, anorthosites, rhyolites,\n\t\t\t\tsyenites, leptynites, charnockites and any other igneous and\n\t\t\t\torthometamorphic rock types)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 203
        },
        {
            "number": "10",
            "title": "10. Gypsum",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 204
        },
        {
            "number": "20",
            "title": "20. Marble (marble means crystalline\n\t\t\t\tmetamorphosed calcareous or dolomitic rocks and serpentine rock\n\t\t\t\ttypes)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 205
        },
        {
            "number": "11",
            "title": "11. Laterite",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 206
        },
        {
            "number": "21",
            "title": "21. Any other minor mineral not mentioned in\n\t\t\t\tPart A and Part B above.",
            "chapter": null,
            "content": "Schedule IV\nRoyalty Rate / Dead Rent\nRoyalty Rate / Dead Rent\n( See rules 322(5), 566(1) and 566(2)]\nTable A\nTable A\nRate of Royalty\nRate of Royalty\nSr. No.\nSr. No.\nName of minor minerals\nName of minor minerals\nRate of royalty per metric tonne (in rupees)\nRate of royalty per metric tonne (in rupees)\n1.\nQuartzite\n40\n2.\nSand stone\n50\n3.\n(i) Granite/dolerite (In block)\n210\n(ii) Granite/dolerite (In Rubble)\n50\n4.\nBuilding stone (Slate/Phyllite/Trachyte/\n\t\t\t\tGabbro/Limestone and other building stone mineral)\n50\n5.\nBlacktrape / Hard murrum\n45\n6.\nBentonite / Fuller's earth\n110\n7.\n(i) Marble (In block)\n230\n(ii) Marble (In Rubble)\n90\n8.\nOrdinary clay / Soft murrum\n25\n9.\nOrdinary sand / Gravel\n40\n10.\nRed clay\n40\n11.\nQuartzite pebble / Chalcedony pebble\n60\n12.\nAgate\n100\n13.\nBall clay\n60\n14.\nCalcite\n60\n15.\nChalk\n95\n16.\nChina clay / White clay(Crude)\n45\nChina clay / White clay(Processed)\n200\n17.\nDolomite\n75\n18.\nFeldspar\n40\n19.\nFireclay (Plastic, Pipe, Lithomargic,\n\t\t\t\tPozzolanic, Natural Clay, Clay Others, Ochre)\n45\n20.\nGypsum\n45\n21.\nLaterite\n70\n22.\nQuartz\n60\n23.\nSilica sand / Moulding sand / sand others\n45\n24.\nSoapstone\n45\n25.\nAny other minor minerals not mentioned above\n45\nTable B\nTable B\nRate of Dead Rent\nRate of Dead Rent\nSr. No.\nSr. No.\nName of minor minerals\nName of minor minerals\nRate of dead rent per square metre (in rupees)\nRate of dead rent per square metre (in rupees)\n1.\nQuartzite\n5\n2.\nSand stone\n5.50\n3.\n(i) Granite/dolerite (In block)\n8\n(ii) Granite/dolerite (In Rubble)\n4.\nBuilding stone (Slate/Phyllite/Trachyte/\n\t\t\t\tGabbro/Limestone and other building stone mineral)\n5\n5.\nBlacktrap/ Hard Murrum\n10\n6.\nBentonite/Fuller's earth\n10\n7.\n(i) Marble (In block)\n10\n(ii) Marble (In Rubble)\n8.\nOrdinary clay / Soft Murrum\n3\n9.\nOrdinary sand / Gravel\n5\n10.\nRed clay\n4\n11.\nQuartzite pebble / Chalcedony pebble\n3\n12.\nAgate\n3\n13.\nBall clay\n3\n14.\nCalcite\n3\n15.\nChalk\n3\n16.\nChina clay / White clay(Crude)\n3\nChina clay / White clay(Processed)\n17.\nDolomite 3\n18.\nFeldspar 3\n19.\nFireclay (Plastic, Pipe, Lithomargic,\n\t\t\t\tPozzolanic, Natural Clay, Clay Others, Ochre)\n3\n20.\nGypsum\n3\n21.\nLaterite\n3\n22.\nQuartz\n3\n23.\nSilica sand / Moulding sand / sand others\n3\n24.\nSoapstone\n3\n25.\nAny other minor minerals not mentioned above\n3\nSchedule V\nAuthorised officers for Respective Jurisdictions\nAuthorised officers for Respective Jurisdictions\n( See rule 76)\nDesignated Officer\nDesignated Officer\nApplicability\nApplicability\nRule Number\nRule Number\nRule Name\nRule Name\nRule Reference\nRule Reference",
            "footnote": "",
            "is_definition": false,
            "sort_order": 207
        },
        {
            "number": "1",
            "title": "1. Commissioner of Geology and Mining. (CGM)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 208
        },
        {
            "number": "1",
            "title": "1. Commissioner of Geology and Mining. (CGM)",
            "chapter": null,
            "content": "For minor minerals mentioned in Central\n\t\t\t\tGovernment notification No.S.O.423(E) dated February 10, 2015,\n\t\t\t\tMarble and Granite\n4\nGrant of Quarry Lease\nSub-rule (1), sub-rule (2)(f), sub-rule Error!\n\t\t\t\tReference source not found.\nError!\n\t\t\t\tReference source not found.\n5\nBidding Parameters\nSub-rule (1) with prior approval of the\n\t\t\t\tGovernment\n6\nNotice Inviting Tender and Tender Document\nrule 6 with prior approval of the Government\n7\nAuction Process\nSub-rule (1)(d)\n8\nGrant Procedure\nSub-rule (2), sub-rule (3) with prior approval\n\t\t\t\tof the Government, sub-rule (4) and sub-rule (5)\n9\nUpfront Payment for Quarry Lease\nSub-rule (2)(a) with prior approval of the\n\t\t\t\tGovernment\n122\nPeriod of the quarry lease\nrule 122\n13\nArea of a Quarry Lease\nrule 13 with prior approval of the Government\n15\nNew Discovery\nSub-rule (1), sub-rule (2), sub-rule (5) with\n\t\t\t\tprior approval of the Government\n18\nDuties and obligations of the lessee\nSub-rule (4), sub-rule (8) proviso with prior\n\t\t\t\tapproval of the Government, sub-rule (11)(b), sub-rule (12),\n\t\t\t\tsubrule (15), sub-rule (16), subrule (17), sub-rule (18)(c),\n\t\t\t\tsub-rule (20), sub-rule (22), sub-rule (23), sub-rule (26),\n\t\t\t\tsub-rule (30), sub-rule (31), sub-rule (32), sub-rule (38) with\n\t\t\t\tprior approval of the Government.\n19\nLiberties, rights, powers, privileges and\n\t\t\t\tobligations of the Government\nSub-rule (1), sub-rule (2) and sub-rule (7) with\n\t\t\t\tprior approval of the Government\n29\nExisting applications and right of holder of\n\t\t\t\tletter of intent\nSub-rule (3) except proviso\n35\nMining Plan\nSub-rule (5)\n41\nLapsing of the quarry lease\nSub-rule (2) with prior approval of the\n\t\t\t\tGovernment, sub-rule (4) with prior approval of the Government,\n\t\t\t\tsub-rule (5) with prior approval of the Government, sub-rule (6),\n\t\t\t\tsub-rule (7), sub-rule (8)\n42\nSurrender of the quarry lease\nSub-rule (1), sub-rule (2), sub-rule (5)\n43\nTermination of the quarry lease\nSub-rule (1) (a) to (e) and (g), sub-rule (1)(f)\n\t\t\t\twith prior approval of the Government, sub-rule (3), sub-rule (4)\n44\nTransfer of quarry lease\nSub-rule (1), sub-rule (2), sub-rule (3),\n\t\t\t\tsub-rule (4), sub-rule (7)\n49\nReturns and statements\nSub-rule (5)\n64\nFinancial Assurance\nSub-rule (6)\n74\nExamination of mineral deposits and taking of\n\t\t\t\tsamples\nrule 74\nFor all minor minerals\nFor all minor minerals\n45\nCreation of Encumbrances\nrule 45",
            "footnote": "",
            "is_definition": false,
            "sort_order": 209
        },
        {
            "number": "2",
            "title": "2. District Collector.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 210
        },
        {
            "number": "2",
            "title": "2. District Collector.",
            "chapter": null,
            "content": "For minor minerals other than Marble, Granite\n\t\t\t\tand the minor minerals mentioned in Central Government\n\t\t\t\tnotification No.S.O.423(E) dated February 10, 2015\n4\nGrant of Quarry Lease\nSub-rule (1), sub-rule (2)(f), sub-rule Error!\n\t\t\t\tReference source not found.\nError!\n\t\t\t\tReference source not found.\n5\nBidding Parameters\nSub-rule (1) with prior approval of the CGM\n6\nNotice Inviting Tender and Tender Document\nrule 6 with prior approval of the CGM\n7\nAuction Process\nSub-rule (1)(d)\n8\nGrant Procedure\nSub-rule (2), sub-rule (3) with prior approval\n\t\t\t\tof the CGM, sub-rule (4) and subrule (5)\n99\nUpfront Payment for Quarry Lease\nSub-rule (2)(a) with prior approval of the CGM\n1212\nPeriod of the quarry lease\nrule 12\n13\nArea of a Quarry Lease\nrule 13 with prior approval of the CGM\n15\nNew Discovery\nSub-rule (1), sub-rule (2), sub-rule (5) with\n\t\t\t\tprior approval of the CGM\n18\nDuties and obligations of the lessee\nSub-rule (4), sub-rule (8) proviso with prior\n\t\t\t\tapproval of the Government, sub-rule (11) (b), sub-rule (12),\n\t\t\t\tsubrule (15), sub-rule (16), subrule (17), sub-rule (18)(c),\n\t\t\t\tsub-rule (20), sub-rule (22), sub-rule (23), sub-rule (26),\n\t\t\t\tsub-rule (30), sub-rule (31), sub-rule (32), , sub-rule (38) with\n\t\t\t\tprior approval of the Government.\n19\nLiabilities, rights, powers, privileges and\n\t\t\t\tobligations of the Government\nSub-rule (1), sub-rule (2) with prior approval\n\t\t\t\tof the Government, Sub-rule (7) with prior approval of the CGM\n29\nExisting applications and right of holder of\n\t\t\t\tletter of intent\nSub-rule (3) except proviso\n35\nMining Plan\nSub-rule (5)\n41\nLapsing of the quarry lease\nSub-rule (2) with prior approval of the CGM,\n\t\t\t\tsubrule (4) with prior approval of the CGM, sub-rule (5) with\n\t\t\t\tprior approval of the CGM, sub-rule (6), sub-rule (7), sub-rule\n\t\t\t\t(8)\n42\nSurrender of the quarry lease\nSub-rule (1), sub-rule (2), sub-rule (5)\n43\nTermination of the quarry lease\nSub-rule (1) (a) to (e) and (g), sub-rule (1)\n\t\t\t\t(f) with prior approval of the Government, sub-rule (3), sub-rule\n\t\t\t\t(4)\n44\nTransfer of quarry lease\nWith prior approval of Commissioner of Geology\n\t\t\t\tand Mining - sub-rule (1), sub-rule (2), sub-rule (3), sub-rule\n\t\t\t\t(4), sub-rule (7)\n49\nReturns and statements\nSub-rule (5)\n64\nFinancial Assurance\nSub-rule (6)\n74\nExamination of mineral deposits and taking of\n\t\t\t\tsamples\nrule 74\nFor all minor minerals\n29\nExisting applications and right of holder of\n\t\t\t\tletter of intent\nSub-rule (5), Sub-rule (6)\n47\nRegister of mineral concessions\nRule 477",
            "footnote": "",
            "is_definition": false,
            "sort_order": 211
        },
        {
            "number": "3",
            "title": "3. District Geologist or District Assistant\n\t\t\t\tGeologist, as the case may be.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 212
        },
        {
            "number": "3",
            "title": "3. District Geologist or District Assistant\n\t\t\t\tGeologist, as the case may be.",
            "chapter": null,
            "content": "For all minor minerals\n18\nDuties and obligations of the lessee\nSub-rule (15), sub-rule (18)(c)\nFor minerals specified in Part A-I of Schedule\n\t\t\t\tIII\n35\nMining Plan\nSub-rule (1)\n37\nProcedure for approval of the Mining Plan\nrule 37\n39\nMining plan to be submitted by existing lessee\nrule 39\n61\nSubmission of progressive mine closure plan\nSub-rule (3), sub-rule (4), sub-rule (5) and\n\t\t\t\tsub-rule (6)\n62\nSubmission of Final mine closure plan\nSub-rule (3)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 213
        },
        {
            "number": "4",
            "title": "4. Officer authorised by Commissioner of\n\t\t\t\tGeology and Mining.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 214
        },
        {
            "number": "4",
            "title": "4. Officer authorised by Commissioner of\n\t\t\t\tGeology and Mining.",
            "chapter": null,
            "content": "For minerals specified in Part A-II or Part B of\n\t\t\t\tSchedule III\n35\nMining Plan\nSub-rule (1)\n37\nProcedure for approval of the Mining Plan\nrule 37\n39\nMining plan to be submitted by existing lessee\nrule 39\n61\nSubmission of progressive mine closure plan\nSub-rules (3), (4), (5) and (6)\n62\nSubmission of Final mine closure plan\nSub-rule (3)\nForm A\nForm A\nFormat of Performance Security/ Bank Guarantee\nFormat of Performance Security/ Bank Guarantee\n( See rules 2(1)(d), 2(1)(r), 100 and 29(4))\n[Reference number of the bank]\n[date]\n[The Commissioner, Office of Geology and Mining, Block Number 1, 7th Floor, Udhyog Bhavan, Sector 11, Gandhinagar, Gujarat - 382011 / District Collector, Collector Office, Concern District]\nWhereas\n[Name of the [Successful Bidder/ holder of letter of intent]\nOr\n[Successful Bidder/ LOI Holder]\n(\"Expiry Date\")\n[the Commissioner of Geology and Mining / the District Collector]\n\"State\"\nDeed.\n[name of the bank]\n\"Bank\"\n(\"Guarantee Amount\")\nNow Therefore\n\"Guarantee\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 215
        },
        {
            "number": "1",
            "title": "1. The Bank for the purpose hereof unconditionally and irrevocably undertakes to pay to the State without any demur, reservation, caveat, protest or recourse, immediately on receipt of first written demand from the State, a sum or sums (by way of one or more claims) not exceeding the Guarantee Amount in the aggregate without the State needing to prove or to show to the Bank grounds or reasons for such demand for the sum specified therein and notwithstanding any dispute or difference between the ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 216
        },
        {
            "number": "2",
            "title": "2. The Bank acknowledges that any such demand by the State of the amounts payable by the Bank to the State shall be final, binding and conclusive evidence in respect of the amounts payable by [Successful Bidder/ LOI Holder] to the State under the Deed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 217
        },
        {
            "number": "3",
            "title": "3. The Bank hereby waives the necessity for the State from demanding the aforesaid amount or any part thereof from the [Successful Bidder/ LOI Holder] and also waives any right that the Bank may have of first requiring the State to pursue its legal remedies against the [Successful Bidder/ LOI Holder] , before presenting any written demand to the Bank for payment under this Guarantee.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 218
        },
        {
            "number": "4",
            "title": "4. The Bank further unconditionally agrees with the State that the State shall be at liberty, without the Bank's consent and without affecting in any manner the Bank's obligation under this Guarantee, from time to time to: (i) vary and/or modify and of the terms and conditions of the Deed; (ii) extend and / or postpone the time for performance of the obligations of the [Successful Bidder/ LOI Holder] under the Deed, or (iii) forbear or enforce any of the rights exercisable by the State against t",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 219
        },
        {
            "number": "5",
            "title": "5. Any payment made hereunder shall be made free and clear of and without deduction for, or on account of, any present or future taxes, levies, imposts, duties, charges, fees, commissions, deductions or withholdings of any nature whatsoever.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 220
        },
        {
            "number": "6",
            "title": "6. The Bank agrees that State at its option shall be entitled to enforce this Guarantee against the Bank, as a principal debtor in the first instance without proceeding at the first instance against the [Successful Bidder/ LOI Holder] .",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 221
        },
        {
            "number": "7",
            "title": "7. The Bank further agrees that the Guarantee herein contained shall remain in full force and effect during the period specified in the Deed and that it shall continue to be enforceable till all the obligations of the [Successful Bidder/ LOI Holder] under or by virtue of the said Deed with respect to the Performance Security have been fully paid and its claims satisfied or discharged or till the State certifies that the terms and conditions of the Deed with respect to the Performance Security ha",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 222
        },
        {
            "number": "8",
            "title": "8. The payment so made by the Bank under this Guarantee shall be a valid discharge of Bank's liability for payment thereunder and the State shall have no claim against the Bank for making such payment.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 223
        },
        {
            "number": "9",
            "title": "9. This Guarantee is subject to the laws of India. Any suit, action, or other proceedings arising out of this Guarantee or the subject matter hereof shall be subject to the exclusive jurisdiction of courts at the State of Gujarat.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 224
        },
        {
            "number": "10",
            "title": "10. The Bank has the power to issue this Guarantee in favour of the State. This Guarantee will not be discharged due to the change in the constitution of the Bank",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 225
        },
        {
            "number": "11",
            "title": "11. The Bank undertakes not to revoke this Guarantee during its currency except with the previous consent of the State in writing.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 226
        },
        {
            "number": "12",
            "title": "12. The State may, with prior intimation to the Bank, assign the right under this Guarantee to any other departments, ministries or any local agencies, which may act in the name of the [Commissioner of Geology and Mining, Industries and Mines Department of Gujarat/ District Collector] . Save as provided in this clause, this Guarantee shall not by assignable or transferable.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 227
        },
        {
            "number": "13",
            "title": "13. Notwithstanding anything contained herein,",
            "chapter": null,
            "content": "(a) the liability of the Bank under this Guarantee shall not exceed the Guarantee Amount; and\n(b) this Guarantee shall be valid up to the Expiry Date.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 228
        },
        {
            "number": "14",
            "title": "14. The Bank is liable to pay the Guaranteed Amount or any part thereof under this Guarantee only and only if the State serves upon the Bank a written claim or demand on or before the Expiry Date.",
            "chapter": null,
            "content": "(Signature)\n(Name and Designation)\n(Bank Seal)\nForm B\nForm B\nFormat of Quarry Lease Deed\nFormat of Quarry Lease Deed\n( See rule 8(5))\n(\"Lease\")",
            "footnote": "",
            "is_definition": false,
            "sort_order": 229
        },
        {
            "number": "1",
            "title": "1. The Governor of the State of Gujarat",
            "chapter": null,
            "content": "\"Government\"\nAnd\n2. [Name of the Lessee]\n\"Lessee\"\nOr\n[Name of the Lessee]\n\"Lessee\"\nOr\n[Name of the Individual]\n[Name of the Individual]\n\"Lessee\"\n[Name of the Individual]\n[Name of the Individual]\n[Name of the firm or syndicate]\n\"Lessee\"\nBackground:\n(\"Rules\")\n(\"Rules\")",
            "footnote": "",
            "is_definition": false,
            "sort_order": 230
        },
        {
            "number": "1",
            "title": "1. Definitions.",
            "chapter": null,
            "content": "(\"Act\")\n(a) \"Control\" shall include the right to appoint majority of the directors or to control the management or policy decisions exercisable by a person or persons acting individually or in concert, directly or indirectly, including by virtue of their shareholding or management rights or shareholders agreements or voting agreements or in any other manner;\n\"Control\"\n(b) \"Force Majeure\" means act of God, war, insurrection, riot, civil commotion, strike, earth quake, tide, storm, tidal wave, flood, lightning, explosion, fire, earthquake and any other happening which the Lessee could not reasonably  prevent or control;\n\"Force Majeure\"\n(c) \"Good Industry Practice\" means, in relation to any undertaking and any circumstances, the exercise of that degree of skill, diligence, prudence and foresight which would reasonably and ordinarily be expected from a skilled and experienced person engaged in the same type of undertaking under the same or similar circumstances; and\n\"Good Industry Practice\"\n(d) \"Tender Document\" means the tender document issued by the Government for conduct of an auction under Chapter II of the Rules.\n\"Tender Document\"",
            "footnote": "",
            "is_definition": true,
            "sort_order": 231
        },
        {
            "number": "2",
            "title": "2. Grant of Lease :",
            "chapter": null,
            "content": "(\"Lease Area\")\n(\"Minerals\")\n(\"Landowner\")",
            "footnote": "",
            "is_definition": false,
            "sort_order": 232
        },
        {
            "number": "3",
            "title": "3. Duties, Obligations and Covenants of the Lessee.",
            "chapter": null,
            "content": "[4. Utilization of Mineral:]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 233
        },
        {
            "number": "5",
            "title": "5. Performance Security and Appropriation:",
            "chapter": null,
            "content": "5.1 Performance Security\n(\"Performance Security\")\n5.2 Events for appropriation of the Performance Security\n(\"Appropriation Event\")\n5.3 Manner of appropriation of the Performance Security\nS. No.\nS. No.\nAppropriation Event\nAppropriation Event\nAmount of the Performance Security to be\n\t\t\t\tappropriated\nAmount of the Performance Security to be\n\t\t\t\tappropriated\n1\nFailure of the Lessee to comply with the\n\t\t\t\tProduction Requirement as required under clause 6.\nSuch amount of the Performance Security as would\n\t\t\t\tbe equal to payment due to the Government under rule 100\n\t\t\t\tcorresponding to the percentage of shortfall in the Production\n\t\t\t\tRequirement, for each failure to comply with the Production\n\t\t\t\tRequirement as specified in Schedule II\n2\nAny change in Control or transfer of right,\n\t\t\t\ttitle or interest in the Lease Area which is not in conformity\n\t\t\t\tthe Act and the Rules\nEntire Performance Security\n3\nAny failure to make any payments under the Act\n\t\t\t\tand the Rules, this quarry lease deed and the Tender Document\nThe amount of shortfall (in the relevant\n\t\t\t\tpayment) together with simple interest at the rate of 18%\n\t\t\t\t(eighteen per cent.) per annum\n4\nAny breach or non-compliance with any of the\n\t\t\t\tprovisions of the Act and the Rules (including provisions of the\n\t\t\t\tRules specifically providing for appropriation of performance\n\t\t\t\tsecurity by the Government), this quarry lease deed and the\n\t\t\t\tTender Document.\nSuch proportion as may be specified in the\n\t\t\t\trelevant Rule or if no such proportion is specified in the Rule,\n\t\t\t\tsuch proportion as may be determined by the Government in its\n\t\t\t\tsole discretion.\n5\nIn case of lapse of the quarry lease, to carry\n\t\t\t\tout protective, reclamation and rehabilitation measures in the\n\t\t\t\tleased area.\nSuch proportion as may be determined by the\n\t\t\t\tGovernment in its sole discretion.\n6\nIn case of surrender of the entire area of the\n\t\t\t\tquarry lease by the lessee prior to exhaustion of mineral\n\t\t\t\tresources.\nEntire Performance Security",
            "footnote": "",
            "is_definition": false,
            "sort_order": 234
        },
        {
            "number": "6",
            "title": "6. Production Requirement.",
            "chapter": null,
            "content": "(\"Production Requirement\")",
            "footnote": "",
            "is_definition": false,
            "sort_order": 235
        },
        {
            "number": "7",
            "title": "7. General Provisions:",
            "chapter": null,
            "content": "7.1 Notices;\n7.2 Revision of orders of the Government;\n7.3 Force Majeure;\n7.4 Penalty;\n7.5 Stamp Duty and Registration Fee;\n7.6 Insurance;\n7.7 Accounts and Audit;\n7.8 Performance Audit;\n7.9 Indemnification.\n\"Indemnified Party\"\n(a) The Lessee's breach or negligent performance or non-performance of this quarry lease deed;\n(b) any claim made against the Indemnified Party for actual or alleged infringement of a third party's rights arising out of or in connection with mining operations at the Lease Area or performance or non-performance of any of the duties or obligations under this quarry lease deed to the extent that such claim arises out of the breach, negligent performance or failure or delay in performance of this quarry lease deed by the Lessee, its employees, agents or contractors;\n(c) any claim made against the Indemnified Party by a third party for death, personal injury or damage to property arising out of or in connection with mining operations at the Lease Area or performance or non-performance of any of the obligations under this quarry lease deed;\n(d) any loss or damages caused on account of breach of any applicable laws by the Lessee, including without limitation any costs incurred by the Government in cleaning or rectifying of any environmental damages caused by the Lessee on account of lack of Good Industry Practice; breach, negligent performance or failure or delay in performance of the provisions of this quarry lease deed; or\n(e) any non-compliance with applicable laws (including the Act, Rules and Tender Document) by the Lessee.\n\"Claim\"\nSeverability;\nFurther Assurance;\nLegal and prior rights;\nWaiver;\nAmendments;\nEntire Agreement;\nSpecific performance of obligations;",
            "footnote": "",
            "is_definition": false,
            "sort_order": 236
        },
        {
            "number": "8",
            "title": "8. Governing Law and Dispute Resolution:",
            "chapter": null,
            "content": "1.\n2.\n1.\n2.\nSchedule I\nDetails of Lease Area\nDetails of Lease Area\nBoundaries\nBoundaries\nCo-ordinates\nCo-ordinates\nOn North\nOn South\nOn West\nOn East\n\"the Lease Area\"\n\"the said lands\"\nSchedule II\nProduction Requirements\nProduction Requirements\nName of Block:\nName of Block:\nYear\nYear\nProduction Capacity (Million Metric Tonne\n\t\t\t\t/Year)\nProduction Capacity (Million Metric Tonne\n\t\t\t\t/Year)\nMinimum Annual Production (percentage of\n\t\t\t\tapproved Mining Plan)\nMinimum Annual Production (percentage of\n\t\t\t\tapproved Mining Plan)\nMaximum Annual Production (percentage of\n\t\t\t\tapproved Mining Plan)*\nMaximum Annual Production (percentage of\n\t\t\t\tapproved Mining Plan)*\nYear 1\n80.00%\n100.00%\nYear 2\n80.00%\n100.00%\nYear 3\n80.00%\n100.00%\nYear 4\n80.00%\n100.00%\nYear 5\n80.00%\n100.00%\nYear\nYear\nProduction Capacity (Million Metric Tonne\n\t\t\t\t/Year)\nProduction Capacity (Million Metric Tonne\n\t\t\t\t/Year)\nMinimum Annual Production (percentage of\n\t\t\t\tapproved Mining Plan)\nMinimum Annual Production (percentage of\n\t\t\t\tapproved Mining Plan)\nYear 1\n40.00%\nYear 2\n50.00%\nYear 3\n60.00%\nYear 4 onwards\n60.00%\nForm C\nForm C\nNotice of Intimation of Opening/reopening of Mine\nNotice of Intimation of Opening/reopening of Mine\n( See rule 18(1) and 733]\nImportant\nTo\nNotice in this Form shall be sent so as to reach\n\t\t\t\tconcerned authorities within fifteen days of the date of opening\n\t\t\t\t/reopening",
            "footnote": "",
            "is_definition": false,
            "sort_order": 237
        },
        {
            "number": "1",
            "title": "1. Government of\n\t\t\t\tGujarat",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 238
        },
        {
            "number": "2",
            "title": "2. The Commissioner\n\t\t\t\tGeology and Mining, Gandhinagar - 382017",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 239
        },
        {
            "number": "3",
            "title": "3. Concerned District Collector",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 240
        },
        {
            "number": "1",
            "title": "1. Name of the mineral:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 241
        },
        {
            "number": "2",
            "title": "2. Name of the mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 242
        },
        {
            "number": "3",
            "title": "3. Name and address of the lessee:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 243
        },
        {
            "number": "4",
            "title": "4. Date of opening/reopening of mine: _________________________",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 244
        },
        {
            "number": "4A",
            "title": "4A. In case of reopening, date of discontinuation: _________________________",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 245
        },
        {
            "number": "5",
            "title": "5. Particulars of the Quarry Lease (QL):",
            "chapter": null,
            "content": "(i) Date of registration:\n(ii) Period: ____________ Years, from _____________ to_______________\n(iii) Areas under lease:_________________ hectares",
            "footnote": "",
            "is_definition": false,
            "sort_order": 246
        },
        {
            "number": "6",
            "title": "6. Location of Mine:",
            "chapter": null,
            "content": "(i) Village:\n(ii) Post Office:\n(iii) Taluka:\n(iv) District:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 247
        },
        {
            "number": "7",
            "title": "7. Area in hectare of lease",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 248
        },
        {
            "number": "8",
            "title": "8. Name and address of Agent:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 249
        },
        {
            "number": "9",
            "title": "9. Particulars of Mining Engineer employed in the mines:",
            "chapter": null,
            "content": "(i) Name and address:\n(ii) Qualification :\n(iii) Date of appointment :\n(iv) Status of employment: Whole time / Part time",
            "footnote": "",
            "is_definition": false,
            "sort_order": 250
        },
        {
            "number": "10",
            "title": "10. Particulars of the Manager of the mine:",
            "chapter": null,
            "content": "Name:\nAddress:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 251
        },
        {
            "number": "11",
            "title": "11. Letter No. and date through which the mining plan was approved by the [District Geologist/ District Assistant Geologist/ Officer authorised by CGM]",
            "chapter": null,
            "content": "Letter No.\nDate:\nSignature:\nName in full:\nDesignation:\n(Lessee)\nForm D\nForm D\nApplication for Grant of a Quarry Permit\nApplication for Grant of a Quarry Permit\n( See rule 21(1))\nDated the....................\nThe .......................................\nRecent Photograph of Applicant",
            "footnote": "",
            "is_definition": false,
            "sort_order": 252
        },
        {
            "number": "1",
            "title": "1. I/We submit an application for a quarry permit for (name of mineral) for the area described below.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 253
        },
        {
            "number": "21",
            "title": "2. A sum of non-refundable fee at the rate of Rs.1,000 for every 100 metric tonnes or part thereof payable for the permit under rule 21 of Gujarat Minor Mineral Concession Rules, 2017 has been paid in the government treasury at ------------ and the receipted Challan is enclosed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 254
        },
        {
            "number": "3",
            "title": "3. The required particulars are given below.",
            "chapter": null,
            "content": "i. Name of applicant stating whether he is an individual or it is a company............................\nii. Nationality of the individual or place of registration or incorporation of the company..........................\niii. Profession or nature of business of the applicant..........................................................\niv. Address of the applicant....................................\nv. Quantity of the mineral to be removed under the permit......................\nvi. Whether applicable payments have been paid? If so, give details.\nvii. Details of the area from which the mineral is to be removed\n(a) Village: ......................\n(b) Taluka: ......................\n(c) District: ......................\n(d) Survey Number: ......................\n(e) Area in hectare: ......................\nviii. Period for which the quarry permit is required.\nix. Whether the applicant has any quarry lease or quarry permit in force? If so, please give details.\nx. Purpose for which the mineral is to be used, give full details along with the contract order.\nxi. Is the plan of the area enclosed? .......................\nxii. The plan should be on the relevant portion of the cadastral village map so as to enable the area to be identified from surface features etc.\nxiii. If the land is an occupied land by another person, has the occupant's willingness been ascertained and his letter of consent enclosed?\nxiv. If the land is an agricultural land, has the permission of the revenue authorities been obtained for converting the same for non-agricultural purpose? If so, please give details\nYours Faithfully\nSignature of applicant\nNote. - If the application is signed by an authorised agent of the applicant, the power of attorney/ board resolution along with the self-attested copy of identity and address proof of the authorised agent should be attached.\nNote.\n(To be filled in the office of the Officer granting the permit)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 255
        },
        {
            "number": "1",
            "title": "1. Date of grant/refusal of permit ......................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 256
        },
        {
            "number": "2",
            "title": "2. Period of grant...........................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 257
        },
        {
            "number": "3",
            "title": "3. Quantity of mineral for which the permit is valid ...............................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 258
        },
        {
            "number": "4",
            "title": "4. Details of entry in the quarry permit Register....................................",
            "chapter": null,
            "content": "_________________________________________\nSignature and designation of the officer authorised of the Government.\nForm E\nForm E\nFormat of Quarry Permit\nFormat of Quarry Permit\n( See rule 22(1))\n.................................. Office\nDate ............................\nBoundaries\nBoundaries\nCo-ordinates\nCo-ordinates\nOn North\nOn South\nOn West\nOn East\n(as shown in the detailed plan along with the co-ordinates annexed with the application)\nS. No.\nS. No.\nVillage\nVillage\nTaluka\nTaluka\nDistrict\nDistrict\nSurvey number\nSurvey number\nField area (Approx. in Hectares)\nField area (Approx. in Hectares)\nMineral\nMineral\nQuantity (metric tonne)\nQuantity (metric tonne)\n1\n2\n3\n4\n5\n6\n7\n8\nParticulars\nParticulars\nAmount (in Rs.)\nAmount (in Rs.)\nChallan No.\nChallan No.\nDate of Payment\nDate of Payment\n1\n2\n3\n4\nApplication Fee\nRoyalty\nPermit Premium\nSecurity Deposit\nDistrict Mineral Foundation Contribution",
            "footnote": "",
            "is_definition": false,
            "sort_order": 259
        },
        {
            "number": "1",
            "title": "1. This permit shall be valid for ................ days only.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 260
        },
        {
            "number": "2",
            "title": "2. The depth of the pit below the surface shall not exceed six metres.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 261
        },
        {
            "number": "3",
            "title": "3. This permit is non-transferable. No other mineral except that for which the permit is granted shall be excavated or removed without proper sanction being obtained from the officer authorised of the Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 262
        },
        {
            "number": "4",
            "title": "4. When the mining of ninety per cent of the quantity of the mineral is finished, the quarry permit holder shall inform the District Geologist/ District Assistant Geologist and then, the District Geologist/ District Assistant Geologist shall carry out an inspection of the mining area. Even the quarry permit holder should be vigilant enough to be alert to get the inspection on time. The quarry permit holder should be careful to take precautions not to dig or to mine more mass than what is permitt",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 263
        },
        {
            "number": "5",
            "title": "5. The quarry permit holder should adhere to all terms and conditions pertaining to quarry permit stated under the Gujarat Minor Mineral Concession Rules 2017.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 264
        },
        {
            "number": "6",
            "title": "6. The quarry permit holder should dig out and transport the allowed mineral only from the permitted areas of the quarry within the limits of quantity endorsed under this permit.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 265
        },
        {
            "number": "7",
            "title": "7. The quarry permit holder should implement and maintain the procedure of transit permit or the equivalent mandatorily.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 266
        },
        {
            "number": "8",
            "title": "8. If any other minor or major mineral is found during quarrying operations, it shall be reported to the officer authorised of the Government within a week's time after such discovery.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 267
        },
        {
            "number": "9",
            "title": "9. The permit holder shall maintain complete and correct accounts of the minerals excavated, quantity removed from the permit area, wages paid and royalty and other charges leviable for this purpose.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 268
        },
        {
            "number": "10",
            "title": "10. The permit holder shall allow the District Geologist/ District Assistant Geologist to verify the books of accounts maintained in relation to the mining of the said mineral. The District Geologist/ District Assistant Geologist should also visit the site in question, to tally the amount of quantity actually dug out with the amount of quantity mentioned in the books of accounts of the permit holder. Then, the facts found during the inspection shall be reported to the Commissioner of Geology and",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 269
        },
        {
            "number": "11",
            "title": "11. In the event that the royalty rates are increased by the Government during the tenure of the quarry permit, the permit holder shall pay to the Government, within fifteen days of the date of such notification, the additional royalty, permit premium, security deposit and district mineral foundation contribution amounts.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 270
        },
        {
            "number": "12",
            "title": "12. The permit holder shall not commence any quarrying operations without obtaining all applicable environmental clearances for the area.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 271
        },
        {
            "number": "13",
            "title": "13. The permit holder shall allow the District Geologist/ District Assistant Geologist to enter and inspect, at any time, the quarrying and mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 272
        },
        {
            "number": "14",
            "title": "14. The permit holder shall immediately report all accidents to the officer authorised of the Government and the District magistrate and the District Superintendent of police of the district in which the permit area is situated.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 273
        },
        {
            "number": "15",
            "title": "15. The permit holder shall have no right over the quarry material and other property lying in the permit area after the expiry of the permit.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 274
        },
        {
            "number": "16",
            "title": "16. The permit holder shall not cut or damage any trees without prior sanction and without payment of compensation therefore as may be fixed by the Divisional forest Officer or such officer authorised by him in this behalf.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 275
        },
        {
            "number": "17",
            "title": "17. If any excess quantity over that permitted quantity is found to be removed, the permit holder shall be liable to pay the amount equal to the value of mineral so removed and shall be liable for punishment under the provisions of the Indian Penal Code, 1860 and the Gujarat Minor Mineral Concession Rules, 2017.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 276
        },
        {
            "number": "15",
            "title": "18. If any breach of these conditions or the provisions of section 15 and section 23C is detected, this permit shall be terminated and the material lying on the site will be seized and dealt with in accordance with applicable laws.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 277
        },
        {
            "number": "19",
            "title": "19. Every transportation vehicle of the said mineral should have to be weighed and the receipt of weighing should have to be kept safely on record, mandatorily by the permit holder.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 278
        },
        {
            "number": "20",
            "title": "20. As soon as the removal of the material granted under the permit is over, the permit holder shall furnish to the District Geologist/ District Assistant Geologist a complete statement showing the quantities removed, details of transport and usage, parties to whom this material has been sold and prices obtained therefor, and shall produce any details, books etc., for the scrutiny to the District Geologist/ District Assistant Geologist as may be called for by him.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 279
        },
        {
            "number": "21",
            "title": "21. After submission of the information contemplated vide para 20 above, District Geologist/ District Assistant Geologist shall visit the area for which permit was given within fifteen days and conduct such survey as may be deemed appropriate to check compliance with the terms of the relevant quarry permit. The said officer shall thereafter submit his report within fifteen days of aforesaid survey to the Commissioner of Geology and Mining.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 280
        },
        {
            "number": "22",
            "title": "22. The findings pursuant to para 21 above shall be factored in for determining the final settlement with the quarry permit holder.",
            "chapter": null,
            "content": "Signature of the officer authorised by the Government\nTo\n(The permit holder)\nShri/Messers.................................\n......................................................\n......................................................\n(1) The Royalty Inspector/Mines Supervisor....................................\n(2) The Mamalatdar, Taluka.............\n(3) The Taluka Development Officer, Taluka............................ (in case of private land)\nForm F\nForm F\nFormat of Quarry Lease Deed\nFormat of Quarry Lease Deed\n( See rule 29(6))\nBlock Notification No. and Date:\nTender Document No. and Date:\nLetter of Intent No. and Date:\nGrant Order No. and Date:\nBlock Name and Address:\n(\"Lease\")\n\"The Government\"\n\"the Lessee\"\nBoundaries\nBoundaries\nBoundaries\nBoundaries\nCo-ordinates\nCo-ordinates\nOn North\nOn South\nOn West\nOn East",
            "footnote": "",
            "is_definition": false,
            "sort_order": 281
        },
        {
            "number": "1",
            "title": "1. The Lease shall be valid for a period of [three/ five] years only from the date of its registration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 282
        },
        {
            "number": "2",
            "title": "2. Payments:",
            "chapter": null,
            "content": "(a) The Lessee shall make following payments to the Government:\n(i) royalty or dead rent as specified in the Act and the rules made thereunder. The amount payable as royalty or dead rent may change upon revision in rates by the Government of Gujarat from time to time;\n(ii) premium i.e. the highest bid as quoted by the Lessee;\n(iii) such contribution as may be required under section 15A to designated account of the District Mineral Foundation, as prescribed by the Government from time to time;\n(iv) surface rent as may be prescribed under the Gujarat Minor Mineral Concession Rules, 2017; and\n(v) other such amounts as may be required under applicable law, including the Act and the rules made thereunder.\n(b) All payments for each year shall be paid in advance and at least [15 (fifteen)] days prior to expiry of the previous year. The contributions to the District Mineral Foundation shall however be payable based on the actual production at such intervals as may be specified by the Government.\n(c) All payments required to be made by the Lessee shall be made net of all applicable Taxes. In the event, Taxes are payable, the Lessee shall gross-up the amount payable and make payment of the aggregate amount.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 283
        },
        {
            "number": "3",
            "title": "3. The Lessee shall extract, collect, gather and remove the ordinary sand from the area specified in the Lease in such a manner that no damage is done to any highway, road, agricultural land, trees or other place of public utility or property. No quarrying operation shall be done within a distance of 50 metres of public utility/properties and 10 metres of the river bank. The mining should be done up to 03 metres depth.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 284
        },
        {
            "number": "4",
            "title": "4. The Lessee shall not remove any other mineral except the mineral mentioned in this Lease. If during removal of particular mineral as per the Lease, any other mineral appears to have been excavated or found, the Lessee shall report the said findings immediately in writing to the Commissioner, Geology and Mining, Gandhinagar and the officer authorised by the Government within fifteen days.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 285
        },
        {
            "number": "5",
            "title": "5. In the event of any violation of any of the clauses of this Lease and/ or any provisions of the Gujarat Minor Mineral Concession Rules, 2017 or the amended rules hereafter Commissioner, Geology and Mining, Gandhinagar or officer authorised by the Government shall cancel the Lease forthwith.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 286
        },
        {
            "number": "21",
            "title": "6. On or after the expiry of the period of the Lease or in the event of the Lease being cancelled before the date of its expiry, the Lessee shall not carry on any quarrying operations or remove any mineral that may have been quarried or collected or gathered. If he is found to be carrying out any quarrying operation or removing minerals after expiry or cancellation of the Lease, he shall be liable for punishment as provided in Section 21 of the Mines and Minerals (Development and Regulations) Ac",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 287
        },
        {
            "number": "7",
            "title": "7. The Lessee shall immediately report all accidents to the officer authorised by the Government or the Commissioner, Geology and the Mining, Gandhinagar or the District Magistrate and District Superintendent of Police of the concerned district.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 288
        },
        {
            "number": "8",
            "title": "8. The Lessee shall maintain boundary marks and pillars on the land in proper order and at their proper places.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 289
        },
        {
            "number": "9",
            "title": "9. The Lessee shall keep the Lease with himself and see that no encroachment takes place beyond the area given or any other area occupied by some other Lessee/s on the Government land. If any trespass, encroachment, injury, disturbance or damage is caused to any person or in respect of Government land or the private land by the Lessee in exercise of its powers under this Lease, the Lessee shall pay an amount determined by the officer authorised by the Government , by way of damage and shall inde",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 290
        },
        {
            "number": "10",
            "title": "10. The Lessee shall have no right to assign, sublet or transfer the possession of the area or any part thereof or any right therein to anyone otherwise than in accordance with the Gujarat Minor Mineral Concession Rules, 2017.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 291
        },
        {
            "number": "11",
            "title": "11. The Lessee shall deposit as security, a sum of Rs. 10,000/- (Rupees ten thousand only) by Challan at the concerned District Treasury. No interest shall be payable on the deposit. It shall refunded at the end of the tenure of the Lease, only if the Lessee is found to have fulfilled the terms and conditions of the Lease during the tenure of the Lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 292
        },
        {
            "number": "12",
            "title": "12. The Lessee shall maintain proper accounts of ordinary sand excavated or collected or gathered and removed from the area mentioned above, as may be prescribed under the Gujarat Minor Mineral Concession Rules, 2017 and shall submit such information and returns as required by the officer authorised by the Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 293
        },
        {
            "number": "13",
            "title": "13. The Lessee shall allow reasonable facilities and access thereto to the existing and/or future holder of leases over any land which is comprised in or adjoins or is reached by the land held by the Lessee.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 294
        },
        {
            "number": "14",
            "title": "14. The Lessee shall obtain an e-royalty passes (issued by Government) or a transit permit under the Gujarat Mineral (Prevention of Illegal Mining and Transportation and Storage) Rules, 2017, for the removal of ordinary sand from the said area.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 295
        },
        {
            "number": "15",
            "title": "15. Any lease money, tax, fees or other sum due to the Government under the Gujarat Minor Mineral Concession Rules, 2017 or the rules applicable or under the terms and conditions of this Lease shall be recoverable as an arrear of land revenue.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 296
        },
        {
            "number": "16",
            "title": "16. The Lessee shall be bounded by the provisions of any law in force for the time being relating to labour welfare and safety measures.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 297
        },
        {
            "number": "17",
            "title": "17. The Lessee shall abide by all the written directions, orders or rules issued from time to time by the Government and the officer authorised by the Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 298
        },
        {
            "number": "18",
            "title": "18. The Lessee shall allow any officer authorised by the Central Government or the State Government or the Commissioner of Geology and Mining to enter upon the lease area including any building, tent, enclosure etc., for the purpose of inspecting, examining, surveying and other duties and agent, servants and workmen of the Lessee shall afford, such officers, all facilities and information connected with the working of this Lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 299
        },
        {
            "number": "19",
            "title": "19. In case of violation by the Lessee of the Mines and Minerals (Development and Regulations) Act, 1957 and/ or rules made thereunder, provisions and instructions laid down by the State Government or the officer authorised by the Government and/or in case failure by the Lessee to deposit the amount of bidding within the stipulated time limit, the officer authorised by the Government will have right to cancel this Lease after giving proper opportunity to the Lessee to represent his/her case.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 300
        },
        {
            "number": "20",
            "title": "20. The Industries and Mines Department Resolution No. [ • ] dated [ • ] will be part and parcel of this Lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 301
        },
        {
            "number": "21",
            "title": "21. The Lessee shall abide all the written guidelines issued by Government of Gujarat vide resolution no. PIL/2011/MC-M(6)/CHH dated 27/12/12 and IMD Notification no. MCR/102013/3117/CHH dated 13/12/2013 and Ministry of Environment, Forest and Climate Change notification dated 15/01/2016.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 302
        },
        {
            "number": "22",
            "title": "22. Save as otherwise provided in terms and conditions of aforementioned Grant Order, all the applicable rules, regulations and notifications including current rules and future rules issued by the Government and redirect judgment governed by Government will be strictly followed by the Lessee.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 303
        },
        {
            "number": "23",
            "title": "23. Notwithstanding anything to the contrary contained herein, in the event of any conflict between the provisions of this Lease, Tender Document, Letter of Intent, Grant Order and the Gujarat Minor Mineral Concession Rules, 2017, the provisions of the Gujarat Minor Mineral Concession Rules, 2017, shall prevail.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 304
        },
        {
            "number": "24",
            "title": "24. In witness whereof Shri [Name and Designation of Officer], the officer authorised by the Government in this behalf, hereby sets his/her hand hereto and the Lessee hereby sets his/her hand hereto on the day and year and at the place mentioned above.",
            "chapter": null,
            "content": "1. _____________________________\n2. _____________________________\n1. ___________________________\n2. ___________________________\nForm G\nForm G\nApplication for Grant/renewal of a Quarry Parwana\nApplication for Grant/renewal of a Quarry Parwana\n( See rules 311(1) and 322(3))\nThe .......................................\nRecent Photograph of Applicant",
            "footnote": "",
            "is_definition": false,
            "sort_order": 305
        },
        {
            "number": "1",
            "title": "1. I/We submit an application for grant/renewal of Quarry Parwana for (name of mineral) for the area described below.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 306
        },
        {
            "number": "2",
            "title": "2. A non-refundable fee at the rate of Rs.__________ (rupees five hundred for an area upto 1000 sq mts. and rupees one thousand for an area above 1000 sq.mts) has been paid in the government treasury at ___________ and the receipted Challan is enclosed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 307
        },
        {
            "number": "3",
            "title": "3. The required particulars are given below.",
            "chapter": null,
            "content": "i. Name of applicant............................\nii. Nationality of the individual..........................\niii. Address of the applicant....................................\niv. Details of the area from which the mineral are to be removed\n(a) Village: ......................\n(b) Taluka: ......................\n(c) District: ......................\n(d) Survey Number: ......................\n(e) Area in square metres: ......................\nv. Whether the applicant has any quarry lease?\n(Only in case of renewal)\nvi. Has application for renewal been made on or prior to January 31, 20[ • ] (Yes/No).\nYours Faithfully\nSignature of applicant\nNote. - A self attested copy of the identity and address proof of the applicant should be enclosed along with the application.\nNote.\nForm H\nForm H\nFormat of Quarry Parwana\nFormat of Quarry Parwana\n( See rule 322(1))\n[Name of the Minerals]\nConditions\nConditions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 308
        },
        {
            "number": "1",
            "title": "1. The quarry parwana holder shall only quarry, extract and remove________________ from the above mentioned land and he shall have no right to remove any other minor minerals except those mentioned herein. If during extraction, any other mineral appears to have been excavated or found, he shall report the finding in writing to the relevant District Collector concerned within fifteen days.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 309
        },
        {
            "number": "2",
            "title": "2. The quarry parwana holder shall pay in advance, royalty on the mineral to be extracted at fifty per cent. of the rate mentioned in Table A of Schedule IV or fifty per cent. of the dead rent mentioned in Table B of Schedule IV , whichever is higher.",
            "chapter": null,
            "content": "Schedule IV\nSchedule IV",
            "footnote": "",
            "is_definition": false,
            "sort_order": 310
        },
        {
            "number": "3",
            "title": "3. The quarry parwana holder shall pay rupees five per hundred square metres or part thereof as surface rent in advance annually.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 311
        },
        {
            "number": "15A",
            "title": "4. The quarry parwana holder shall also contribute such amounts as may be required under section 15A to designated account of the District Mineral Foundation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 312
        },
        {
            "number": "5",
            "title": "5. The quarry parwana holder shall immediately report all accidents to the District Collector, the Commissioner the District Magistrate and the District Superintendent of police of the District in which the land is situated.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 313
        },
        {
            "number": "6",
            "title": "6. This quarry parwana shall remain in force upto 31st March 20__ and shall be renewable on a yearly basis on payment of Rs_________ (rupees five hundred for an area upto 1000 sq. mts and rupees one thousand for an area above 1000 sq mts at the option of the District Collector.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 314
        },
        {
            "number": "7",
            "title": "7. The quarry parwana holder shall not commence any quarrying operations without obtaining all applicable environmental clearances for the area.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 315
        },
        {
            "number": "8",
            "title": "8. The quarry parwana holder shall extract and remove the minor minerals from the notified area specified in the quarry parwana in such a manner that no damage is done to any high ways, road, agricultural lands, trees or other places of public utility or property. The quarry parwana holder shall not carry on any quarrying operations:",
            "chapter": null,
            "content": "(a) within a distance of fifty metres from any road; or\n(b) within a distance of hundred metres from any state/ national highway or the boundary of any railway line.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 316
        },
        {
            "number": "9",
            "title": "9. The quarry parwana holder shall not remove any other minor mineral except that mentioned in the quarry parwana. If during extraction, any other mineral appears to have been excavated or found, he shall report the finding in writing to the relevant District Collector within fifteen days.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 317
        },
        {
            "number": "10",
            "title": "10. The holder of the quarry parwana shall, at all times, comply with the provisions of the Gujarat Minor Mineral Concession Rules, 2017. In the event of any contravention of any of the terms and conditions of this quarry parwana or the provisions of the Gujarat Minor Mineral Concession Rules, 2017, the Commissioner/District Collector may terminate this quarry parwana.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 318
        },
        {
            "number": "11",
            "title": "11. If the payment of any amount recoverable under this quarry parwana is not made within thirty days from the due date the same together with simple interest due thereon at the rate of eighteen per cent per annum, shall be recoverable as an arrears of land revenue and the quarry parwana shall be terminated.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 319
        },
        {
            "number": "12",
            "title": "12. The quarry parwana holder shall maintain the boundary marks and pillars of the land in proper order and on their proper places.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 320
        },
        {
            "number": "13",
            "title": "13. The quarry parwana holder shall work the notified area systematically, as far as possible, so as to avoid waste. The quarry parwana holder shall comply with any direction or advice given by the District Collector or an officer authorised by him for the systematic working of the mineral.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 321
        },
        {
            "number": "14",
            "title": "14. The quarry parwana holder shall not encroach the area which is not granted to him or an area which is occupied by any other person or which is Government land. If any trespass, encroachment or damage is caused on the area of any other person or on Government land, the quarry parwana holder shall be liable to pay an amount as may be determined by the District Collector. The quarry parwana holder shall indemnify the Government from and against all suits and demands which may be brought by any ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 322
        },
        {
            "number": "15",
            "title": "15. In case no quarrying operations are carried out in the notified area specified in the quarry parwana, for a period of ninety days without any reasonable cause or without permission of the District Collector, the quarry parwana shall be liable to be terminated after giving the quarry parwana holder an opportunity to state his case.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 323
        },
        {
            "number": "16",
            "title": "16. On or after expiry of the period of the quarry parwana or when the quarry parwana is terminated before the date of expiry of the period, after the date of such termination, the quarry parwana holder shall not carry on any quarry operation or remove any mineral that may have been excavated. If such quarry parwana holder is found to carry out any quarry operation or removing minerals, the quarry parwana holder shall be liable for punishment under the provisions of the Gujarat Minor Mineral Con",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 324
        },
        {
            "number": "17",
            "title": "17. The Commissioner or the District Collector or any of the officers authorised by him or any of the officers of the Government of India shall be allowed to inspect the notified area at a reasonable time.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 325
        },
        {
            "number": "18",
            "title": "18. If the quarry parwana holder fails to carry out the instructions issued by the District Collector or the Commissioner or any officers authorised by him and violates any, terms of this quarry parwana and/ or the provisions of the Gujarat Minor Mineral Concession Rules, 2017, as modified from time to time, the District Collector shall terminate this quarry parwana after giving a notice of thirty days.",
            "chapter": null,
            "content": "Authority\nEndorsement\nEndorsement\nAuthority\nForm I\nForm I\nApplication for Prospecting Permit\nApplication for Prospecting Permit\n( See rule 366(4))\nDated the....................\n(1) I/We submit an application for a prospecting permit for (name of mineral) for the area described below.\n(2) The required particulars are given below.\ni. Name of applicant stating whether he is an individual or it is a company............................\nii. Nationality of the individual or place of registration or incorporation of company..........................\niii. Profession or nature of business of the applicant..........................................................\niv. Address of the applicant....................................\nv. Details of the area where the prospecting operations are to be carried out:\n(a) Village: ......................\n(b) Taluka: ......................\n(c) District: ......................\n(d) Survey Number: ......................\n(e) Area in hectare: ......................\nvi. Period for which prospecting permit is required.\nvii. Details of LOI pursuant to which such prospecting permit is required.\nviii. If the land is an occupied land by another person, has the occupant's willingness been ascertained and his letter of consent enclosed?\nYours Faithfully\nSignature of applicant\n(To be filled in the office of the Officer granting the prospecting permit)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 326
        },
        {
            "number": "1",
            "title": "1. Date of grant/refusal of prospecting permit ......................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 327
        },
        {
            "number": "2",
            "title": "2. Period of grant...........................",
            "chapter": null,
            "content": "Signature and designation of the officer authorised of the Government.\nForm J\nForm J\nFormat of Prospecting Permit\nFormat of Prospecting Permit\n( See rule 36(4))\n.................................. Office\nDate ....................................\n(as shown in the detailed plan annexed with the application)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 328
        },
        {
            "number": "1",
            "title": "1. This permit shall be valid for the area described in the Schedule hereof (\"Permit Area\") for conducting prospecting operations for a period of [time period], commencing from the date of the execution of the permit with respect to following minerals(s), [name of the minerals]. It is clarified that the sole purpose of this permit is to facilitate preparation of mining plan with respect to [ • ].",
            "chapter": null,
            "content": "(\"Permit Area\")",
            "footnote": "",
            "is_definition": false,
            "sort_order": 329
        },
        {
            "number": "2",
            "title": "2. The rights and obligations of the Government and the prospecting permit holder shall be as specified in the Mines and Minerals (Development and Regulation) Act, 1957 (\"Act\") and the Rules.",
            "chapter": null,
            "content": "(\"Act\")",
            "footnote": "",
            "is_definition": false,
            "sort_order": 330
        },
        {
            "number": "3",
            "title": "3. Without prejudice to the generality of the foregoing.",
            "chapter": null,
            "content": "(a) The prospecting permit holder shall:\ni. at all times comply with the provisions of the Act, the Rules, other applicable laws and such instructions as may be issued by the Government;\nii. make prompt payment of royalty and any other payment required to be made by the permit holder;\niii. weigh or cause to be measured or weighed all minerals from time to time won pursuant to this permit, with [number of days] prior notice being given to the Officer Authorised by Commissioner of Geology and Mining or District Collector , in order that he or some person on his behalf may be present thereat;\niv. submit to the Government a full report of the work done by the prospecting permit holder and disclose all information acquired by the prospecting permit holder in the course of the operations carried on under this permit regarding the geology and mineral resources of the area covered by the permit.\n(b) The Government shall:\ni. have the right to appropriate any performance security or bid security, as the case may be, provided by the prospecting permit holder in accordance with terms of such performance security and require the prospecting permit holder to replenish the performance security. In case the performance security has been provided through a security deposit, the security deposit shall not carry any interest; and\nii. have the right to carry out or perform any work or matters which in accordance with the covenants in that behalf are to be carried out or performed by the prospecting permit holder, but have not been so carried out or performed within the time specified in that behalf, and the prospecting permit holder shall pay the Government on demand all expenses which shall be incurred in such carrying out or performance of the same.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 331
        },
        {
            "number": "4",
            "title": "4. If in any event this permit/ the orders of the Government are revised, reviewed or cancelled in pursuance of proceedings under the Act or the Rules, the prospecting permit holder shall not be entitled to compensation for any loss sustained by the prospecting permit holder in exercise of the powers and privileges conferred upon the prospecting permit holder by these presents.",
            "chapter": null,
            "content": "Signature of the officer authorised by the Government\nTo\n(The permit holder)\nShri/Messers.................................\n......................................................\n......................................................\nSchedule\nArea of Prospecting Permit\nArea of Prospecting Permit\n(Description of area, including Geo-coordinates, to be provided.)\nForm K\nForm K\nApplication for Surrender of Quarry Lease\nApplication for Surrender of Quarry Lease\n( See rule 422(1))",
            "footnote": "",
            "is_definition": false,
            "sort_order": 332
        },
        {
            "number": "1",
            "title": "1. Name of lease holder",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 333
        },
        {
            "number": "2",
            "title": "2. Name and designation of authorised person (if applicable)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 334
        },
        {
            "number": "3",
            "title": "3. Address of lease holder",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 335
        },
        {
            "number": "4",
            "title": "4. Order No. of lease",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 336
        },
        {
            "number": "5",
            "title": "5. Date of registration of quarry lease deed",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 337
        },
        {
            "number": "6",
            "title": "6. Period of lease",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 338
        },
        {
            "number": "7",
            "title": "7. Details of Area",
            "chapter": null,
            "content": "Details of area to be surrendered with map and measurement:\nDistrict\nTaluka\nVillage\nSurvey No.\nArea (hectares)\nName of mineral",
            "footnote": "",
            "is_definition": false,
            "sort_order": 339
        },
        {
            "number": "8",
            "title": "8. Details, for the last 3 years, of production, dispatch and all applicable payments with respect to the lease area to be surrendered (attach copy of last Challan)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 340
        },
        {
            "number": "9",
            "title": "9. Submit documents to evidence for implementation of the approved final mine closure plan",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 341
        },
        {
            "number": "10",
            "title": "10. Reason for surrender",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 342
        },
        {
            "number": "11",
            "title": "11. Other necessary details",
            "chapter": null,
            "content": "(Signature)\nDeclaration\n(Signature)\nForm L\nForm L\nTransfer Application\nTransfer Application\n(See rule 444(2))\nS. No.\nS. No.\nItem Detail\nItem Detail\nParticulars\nParticulars\n1\nName of the transferor / Lessee\n2\nAddress of the transferor / Lessee\n3\nName of the transferee\n4\nAddress of the transferee\n5\nDate of registration of quarry lease deed\n6\nRegistration Number\n7\nArea in hectare\n8\nName of Mineral\n9\nWhether the transferee is eligible to hold the\n\t\t\t\tquarry lease in accordance with the provisions of the Act and the\n\t\t\t\trules made thereunder?\nYes/No\n10\nWhether the transferee is agreeable to accept\n\t\t\t\tall the conditions and liabilities under any law for the time\n\t\t\t\tbeing in force which the transferor was subject to in respect of\n\t\t\t\tsuch a quarry lease.\nYes/No\n11\nBalance reserve in a mine as per the Mining Plan\n12\nDetails of the payment to be made to the\n\t\t\t\tGovernment on transfer by the transferor (amount in Rs.)\n13\nConsideration payable by transferee for the\n\t\t\t\ttransfer including consideration in respect of work already\n\t\t\t\tundertaken\n14\nReports and data generated during operations\nYours faithfully,\nTransferor\n........................\nTransferee\n..........................\nInstructions to applicants:\n(a) The application must be signed by a duly authorised representative of the applicants, in case the applicant is a company, partnership, association of persons. In case the applicant is an individual, the applicant must personally sign the application.\n(b) The corporate authorisation of the authorised signatory of the applicant (which is a company) must be enclosed with the application. Any change in such corporate authorisation must be immediately intimated to the Government.\n(c) A self-attested copy of Identity and address proof of authorised signatory of the applicant should be enclosed along with the application.\n(d) Documentary evidence to confirm eligibility of the transferee to hold the quarry lease in accordance with the provisions of these rules, must be submitted along with the application.\nForm M\nForm M\nFormat of Transfer Deed\nFormat of Transfer Deed\n( See rule 444(4))\n(Deed)\n1. (Name of the person with address and occupation) (hereinafter referred to as the \"Transferor\" which expression shall where the context so admits be deemed to include his heirs, executors, administrators, representatives and permitted assigns); or\n\"Transferor\"\n\"Transferor\"\n2. (Name of person with the address and occupation) (hereinafter referred to as the \"Transferee\" which expression shall where the context so admits be deemed to include his heirs, executors, administrators, representatives and permitted assigns; or\n\"Transferee\"\n\"Transferee\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 343
        },
        {
            "number": "3",
            "title": "3. The Governor of Gujarat (hereinafter referred to as the \"Government\" which expression shall where the context so admits be deemed to include the successors and assigns) of the third part.",
            "chapter": null,
            "content": "A. The Transferor has been granted a quarry lease by the Government in respect of which the Government and the Transferor have executed a quarry lease deed dated [date] and registered as no. [number] in connection with the quarry lease (collectively - Concession Documents) and the same is attached hereto as Annexure A.\nB. In terms of the Concession Documents, the Transferor is entitled to search for, win and work mines and minerals in respect of (Name of minerals) in the lands described in the schedules to the Concession Documents (more particularly set out in Schedule), for the term and subject to the payment of the rents, royalties and premium and observance and performance of the Transferor's covenant and conditions in the Concession Documents including a covenant not to transfer the quarry lease in violation of applicable laws.\nC. The Transferor has, pursuant to its transfer application letter dated [date], requested the Government for its approval in connection with transfer of the quarry lease to the Transferee.\nD. The Government has, pursuant to its letter dated [date] approved the transfer application of the Transferor subject to compliance by the Transferee of the terms and conditions contained in this Deed.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 344
        },
        {
            "number": "1",
            "title": "1. Capitalised terms used but not defined in this Deed shall, unless the context otherwise requires, have the respective meanings ascribed thereto in the Concession Documents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 345
        },
        {
            "number": "2",
            "title": "2. The Transferee hereby covenants with the Government that from and after the transfer of the quarry lease, the Transferee shall be bound by, and be liable to perform, observe and conform with and be subject to all the provisions of all the covenants, stipulations and conditions contained in the Concession Documents in the same manner in all respects as if the quarry lease had been granted to the Transferee as the lessee thereunder and he/ it had originally executed the Concession Documents as ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 346
        },
        {
            "number": "3",
            "title": "3. It is further hereby agreed and declared by the Transferor of the one part and the Transferee of the other part that:",
            "chapter": null,
            "content": "3.1. The Transferee meets and shall continue to meet all the eligibility conditions which were required to be met by the Transferor for grant of the quarry lease.\n3.2. The Transferor and the Transferee have ensured that the mineral rights over the area for which the quarry lease is being transferred vest with the Government.\n3.3. The Transferee acknowledges that he/ it has received a copy of, and has read and understands the Concession Documents, and covenants, agrees and confirms that it shall be bound by all provisions of the Concession Documents as if it was an original party thereto.\n3.4. The Transferor hereby declares that he/ it has not assigned or in any other manner transferred the quarry lease now being transferred and that no other person or persons has any right, title or interest where under in the present quarry lease being transferred.\n3.5. The Transferee hereby declares that he/ it has accepted all the conditions and liabilities which the Transferor was having in respect of such quarry lease including those relating to provision of performance security etc.\n3.6. The Transferor has supplied to the Transferee the original or certified copies of all plans.\n3.7. The Transferee hereby further declares that as a consequence of this transfer, the total area while held by him/ it under mineral concessions is not in contravention of the provisions of the Gujarat Minor Mineral Concession Rules, 2017.\n3.8. The Transferor has paid all the rent, royalties, and other dues towards the Government till date, in respect of the quarry lease.\n3.9. The Transferor has paid the sum of Rs. .................... on transfer, that he is liable to pay at the time of the transfer as per the Gujarat Minor Mineral Concession Rules, 2017.\n3.10. The Transferor undertakes to hand over to the Transferee, within a period of seven days of execution of this Deed, borehole cores along with records and samples preserved, if any, all plans, sections, reports, registers and other records maintained in pursuance of the provisions of the Gujarat Minor Mineral Concession Rules, 2017 rules or orders made thereunder, and all correspondence relevant thereto relating to the quarry lease. When the requirements in this regard have been duly complied with, both the Transferor and the Transferee shall forthwith send to the Government, a detailed list of borehole cores, plans, sections, reports, registers and other records that have been transferred.\nForm N\nForm N\nRegister of Quarry Leases\nRegister of Quarry Leases\n( See rule 47(1))\nSr. No.\nName and Address of lessee\nVillage\nArea in hectares\nSurvey No.\nNo. and date of the order granting the lease\nDate of registration of lease deed\nPeriod of lease\nMinerals\nRate of surface rent\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\nRate of Royalty\nRate of dead rent\nRate of Premium\nRate of DMF\nDetails of Performance Security\nDetail s of Upfront Payment\nDate of commencement of quarry operation\nDate of expiry of lease\nRemarks\nSignature of officer\n11\n12\n13\n14\n15\n16\n17\n18\n19\n20\nForm O\nForm O\nRegister of Quarry Permit\nRegister of Quarry Permit\n( See rule 477(2))\nName and address of permit holder\nDate of application\nName of mineral\nVillage\nTaluka\nSurvey No.\nArea\n1\n2\n3\n4\n5\n6\n7\nQuantity permitted\nDate on which Permit is granted\nPeriod of Permit\nDetails of royalty, security deposit, permit\n\t\t\t\tpremium and district mineral foundation contribution received\nDate of expiry of permit\nSignature of the officer\n8\n9\n10\n11\n12\n13\nForm P\nForm P\nRegister of Quarry Parwana\nRegister of Quarry Parwana\n( See rule 477(3))\nName and address of parwana holder\nDate of application\nName of mineral\nVillage\nTaluka\nSurvey No. and Plot No.\nArea\n1\n2\n3\n4\n5\n6\n7\nDate on which Parwana is granted\nPeriod of Parwana\nDetails of royalty, security deposit and district\n\t\t\t\tmineral foundation contribution received\nDate of expiry of parwana\nSignature of the officer\n8\n9\n10\n11\n12\nForm Q\nForm Q\nMonthly Return for the Month of.... (Quarry Lease)\nMonthly Return for the Month of.... (Quarry Lease)\n( See rule 49(1))\nMine Code:- Ql\n(To be submitted before the tenth of month following the month of report)\nPart - I (General and Labour)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 347
        },
        {
            "number": "1",
            "title": "1. Name of the Mineral(s):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 348
        },
        {
            "number": "2",
            "title": "2. Name and Address of lessee:",
            "chapter": null,
            "content": "Email Address:\nMobile Number:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 349
        },
        {
            "number": "3",
            "title": "3. Name of Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 350
        },
        {
            "number": "4",
            "title": "4. Registration Number of the Mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 351
        },
        {
            "number": "5",
            "title": "5. Location of the quarry:",
            "chapter": null,
            "content": "Survey Number:\nVillage:\nTaluka:\nDistrict:\nPin Code:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 352
        },
        {
            "number": "6",
            "title": "6. Number of Days mine worked:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 353
        },
        {
            "number": "7",
            "title": "7. Payment Details",
            "chapter": null,
            "content": "Payment Type\nPayment Type\nAmount (Rs.)\nAmount (Rs.)\nPayment Date\nPayment Date\nChallan / UTR No\nChallan / UTR No\nRoyalty/Dead Rent\nAuction Premium\nDMF\nSurface Rent\nOthers (please specify)\n8. (i) Average Daily Employment of Labour/Wages Paid:\nWork Place\nWork Place\nDirect Labour\nDirect Labour\nContract Labour\nContract Labour\nTotal Salary / Wages (Rs.)\nTotal Salary / Wages (Rs.)\nMale\nFemale\nMale\nFemale\nDirect\nContract\nOpen Cast\nAbove ground\nBelow ground\nTotal\nTotal\n(ii) Total Salaries paid to technical and supervisory staff during the month:\nWork Group\nWork Group\nTotal No of Persons\nTotal No of Persons\nTotal Monthly Amount (Rs.)\nTotal Monthly Amount (Rs.)\nTechnical\nSupervisor\nAdministrator\nTotal\nTotal\nPart-II (Production, Despatches And Stocks)\nPart-II (Production, Despatches And Stocks)\n(Unit of quantity in Metric Tonnes)\n(Unit of quantity in Metric Tonnes)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 354
        },
        {
            "number": "1",
            "title": "1. Grade-wise Production, Dispatches and Stocks of Run-of-Mine Mineral:",
            "chapter": null,
            "content": "Grade\nOpening Stock\nProduction\nDispatch\nClosing Stock\nPMV (Rs./Metric tonne)\nEx-mine price (Rs./Metric tonne)\nTotal\n2. (i) Details of processing plant or mineral is being pulverized inside the lease area or in own factory, (if yes):\nMineral Processed\nQuantity of Run of Mine Mineral\n\t\t\t\tProcessed/Pulverized\nQuantity of Processed/Pulverized Mineral\nReasons (in case, mineral being\n\t\t\t\tprocessed/pulverized is less than 50%)\nTotal\n(ii) Grade-wise Production, Dispatches and Stocks of Processed/Pulverized Mineral:\nGrade\nOpening Stock\nProduction\nDispatch\nClosing Stock\nEx-mine/ Factory Gate price (Rs./Metric tonne )\nTotal\n(iii)Average cost of pulverization (*) : L _______ per tonne.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 355
        },
        {
            "number": "3",
            "title": "3. Details of Deductions used for computation of Ex-Mine price (Rs/Metric Tonne):",
            "chapter": null,
            "content": "Deduction claimed\nDeduction claimed\nUnit (in Rs/unit)\nUnit (in Rs/unit)\nRemarks\nRemarks\n(a) Cost of transportation (indicate Loading\n\t\t\t\tstation and Distance from mine in remarks)\n(b) Loading and Unloading charges\n(c) Railway freight ,if applicable (indicate\n\t\t\t\tdestination and distance)\n(d) Port Handling charges/export duty(indicate\n\t\t\t\tname of port)\n(e) Charges for Sampling and Analysis\n(f) Rent for the plot at Stocking yard\n(g) Other charges(specify clearly)\nTotal (a) to (g)\nTotal (a) to (g)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 356
        },
        {
            "number": "4",
            "title": "4. Sales/ Dispatches effected for Domestic Consumption and for Exports:",
            "chapter": null,
            "content": "Grade*\nNature of Dispatch (indicate whether for Sale or\n\t\t\t\tCaptive consumption or Export)\nFor Domestic Consumption\nFor export\nConsignee name and Registration number as\n\t\t\t\tallotted by the Government to the buyer ##\nQuantity\nSale value\nCountry\nQuantity\nF.O.B Value (Rs.)\nTotal\nNote. - (a) Indicate reasons for work stoppage and number of days of work stoppage.\n(b) Give reasons for increase/decrease in production, if any, during the month compared to the previous month.\n(c) Give reasons for increase/decrease in grade wise ex-mine price, if any, during the month compared to the previous month.\nSignature:\nName in full:\nDesignation: Lessee\nForm R\nForm R\nAnnual Return for the Year Ending 31st March 20 ...\nAnnual Return for the Year Ending 31st March 20 ...\n(Quarry Lease)\n(Quarry Lease)\n( See rule 49(1))\n(1) The Commissioner,\nOffice of Geology and Mining,\nBlock Number 1,\n7th Floor, Udhyog Bhavan,\nGandhinagar-382011\n(2) The District Geologist\nCollector Office,\nConcern District\nPart-I (General)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 357
        },
        {
            "number": "1",
            "title": "1. Details of the Mine :-",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 358
        },
        {
            "number": "1",
            "title": "1. Details of the Mine :-",
            "chapter": null,
            "content": "(a) Registration number\n(b) Mine Code\n(c) Name of the Mineral\n(d) Name of Mine\n(e) Name(s) of other mineral(s), if any,\n\t\t\t\tproduced from the same mine\n(f) Area under lease (hectares):\n(g) Date of registration of quarry lease deed\n(g) Period of lease",
            "footnote": "",
            "is_definition": false,
            "sort_order": 359
        },
        {
            "number": "2",
            "title": "2. Location of the Mine",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 360
        },
        {
            "number": "2",
            "title": "2. Location of the Mine",
            "chapter": null,
            "content": "Village\nSurvey Number\nTehsil/Taluka\nDistrict\nState and PIN Code\nFax No.\nPhone No.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 361
        },
        {
            "number": "3",
            "title": "3. Name and Address(s) of Lessee (along with\n\t\t\t\tfax no. and e-mail) :-",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 362
        },
        {
            "number": "3",
            "title": "3. Name and Address(s) of Lessee (along with\n\t\t\t\tfax no. and e-mail) :-",
            "chapter": null,
            "content": "Name of Person\nVillage\nPost Office\nTaluka\nDistrict\nPin Code\nFax No.\nPhone No.\ne-mail address",
            "footnote": "",
            "is_definition": false,
            "sort_order": 363
        },
        {
            "number": "4",
            "title": "4. Lease area (surface area) utilisation as\n\t\t\t\tat the end of year (hectares):",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 364
        },
        {
            "number": "4",
            "title": "4. Lease area (surface area) utilisation as\n\t\t\t\tat the end of year (hectares):",
            "chapter": null,
            "content": "(i) Already exploited and abandoned by opencast\n\t\t\t\t(O/C) mining\n(ii) Covered under current (O/C) Workings\n(iii) Reclaimed/rehabilitated\n(iv) Used for waste disposal\n(v) Occupied by plant, buildings, residential,\n\t\t\t\twelfare buildings and roads\n(vi) Used for any other purpose (specify)\n(vii) Work done under progressive mine closure\n\t\t\t\tplan during the year",
            "footnote": "",
            "is_definition": false,
            "sort_order": 365
        },
        {
            "number": "13",
            "title": "13. Ownership/exploiting Agency of the mine:\n\t\t\t\t(Public Sector/Private Sector/Joint Sector)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 366
        },
        {
            "number": "13",
            "title": "13. Ownership/exploiting Agency of the mine:\n\t\t\t\t(Public Sector/Private Sector/Joint Sector)",
            "chapter": null,
            "content": "Part-II (Employment And Wages)\n1.Number of technical and supervisory staff\n\t\t\t\temployed at the mine\n1.Number of technical and supervisory staff\n\t\t\t\temployed at the mine\nDescription\nWholly employed\nPartly employed\nGraduate Mining Engineer\nDiploma Mining Engineer\nGeologist\nTotal\n2.Days Worked\n2.Days Worked\n(i) Number of days the mine worked:\n(ii) No. of shifts per day:\nReasons\nNo of days\n(iii) Indicate reasons for work stoppage in the\n\t\t\t\tmine during the year (due to strike, lockout, heavy rain,\n\t\t\t\tnonavailability of labour, transport bottleneck, lack of demand,\n\t\t\t\tuneconomic operations, etc.) and the number of days of work\n\t\t\t\tstoppage for each of the factors separately.\n3. (i) Employment of\n\t\t\t\tLabour and wages paid*:-\nMaximum number of\n\t\t\t\tpersons employed on any one day during the year:\n(i) In workings on\n\t\t\t\t(date)..........................(a) ( number)..................\n(ii) In all in the mine on\n\t\t\t\t(date)..........................(a) ( number)..................\n(ii) Total salaries\n\t\t\t\tpaid to technical and supervisory staff employed in the mine\n\t\t\t\tduring the year (in Rs.)\n(iii)\nTotal number of man days worked during the\n\t\t\t\t\t\t\t\tyear\nNo. of days worked during the year\nAverage daily number of persons employed\nTotal Wages / Salary for the year (Rs)\nDirect\nContract\nTotal\nMale\nFemale\nTotal\n* To include all\n\t\t\t\temployees exclusive to the mine and attached factory, workshop or\n\t\t\t\tmineral dressing plant at the mine site\nPart-III (Consumption of Materials)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 367
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed\n\t\t\t\tduring the year",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 368
        },
        {
            "number": "1",
            "title": "1. Quantity and cost of material consumed\n\t\t\t\tduring the year",
            "chapter": null,
            "content": "Description\nUnit\nQuantity\nValue (Rs.)\n(i) Fuel\n(ii) Lubricant\n(iii) Electricity\n(iv) Explosives\nPart-IV (General Geology and Mining)\n(Items 2 and 3 to be submitted separately for each mineral)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 369
        },
        {
            "number": "1",
            "title": "1. Exploration",
            "chapter": null,
            "content": "1(i) Exploration activities during the year.\nAt the beginning of the year\nDuring the year\nCumulative\nGrid spacing/ Dimension\nDrilling\nNo of holes\nMetrage\nPitting\nNo of pits\nExcavation (in m3)\nTrenching\nNo of trenches\nExcavation (in m3)\nLength covered (in metre)\nExpenditure on exploration (Rs)\n1 (ii). Any other exploration activity during the year:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 370
        },
        {
            "number": "2",
            "title": "2. Reserves and Resources estimated (in tonnes).",
            "chapter": null,
            "content": "Classification\nClassification\nCode\nCode\nAt the beginning of the year 1.4.20___\nAt the beginning of the year 1.4.20___\nAssessed during the year\nAssessed during the year\nDepletion of reserves during the year\nDepletion of reserves during the year\nBalance resources as on 31.3.20____\nBalance resources as on 31.3.20____\n(1)\n(1)\n(2)\n(2)\n(3)\n(3)\n(4)\n(4)\n(5)\n(5)\n(6)=(3+4-5)\n(6)=(3+4-5)\nA. Mineral Reserve\nA. Mineral Reserve",
            "footnote": "",
            "is_definition": false,
            "sort_order": 371
        },
        {
            "number": "1",
            "title": "1. Proved Mineral Reserve",
            "chapter": null,
            "content": "111",
            "footnote": "",
            "is_definition": false,
            "sort_order": 372
        },
        {
            "number": "2",
            "title": "2. Probable mineral Reserve",
            "chapter": null,
            "content": "121\n122",
            "footnote": "",
            "is_definition": false,
            "sort_order": 373
        },
        {
            "number": "3",
            "title": "3. Total Reserves",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 374
        },
        {
            "number": "3",
            "title": "3. Total Reserves",
            "chapter": null,
            "content": "B. Remaining Resources",
            "footnote": "",
            "is_definition": false,
            "sort_order": 375
        },
        {
            "number": "1",
            "title": "1. Feasibility mineral Resource",
            "chapter": null,
            "content": "211",
            "footnote": "",
            "is_definition": false,
            "sort_order": 376
        },
        {
            "number": "2",
            "title": "2. Prefeasibility mineral resource",
            "chapter": null,
            "content": "221\n222",
            "footnote": "",
            "is_definition": false,
            "sort_order": 377
        },
        {
            "number": "3",
            "title": "3. Measured mineral resource",
            "chapter": null,
            "content": "331",
            "footnote": "",
            "is_definition": false,
            "sort_order": 378
        },
        {
            "number": "4",
            "title": "4. Indicated mineral resource",
            "chapter": null,
            "content": "332",
            "footnote": "",
            "is_definition": false,
            "sort_order": 379
        },
        {
            "number": "5",
            "title": "5. Inferred mineral resource",
            "chapter": null,
            "content": "333",
            "footnote": "",
            "is_definition": false,
            "sort_order": 380
        },
        {
            "number": "6",
            "title": "6. Reconnaissance mineral resource",
            "chapter": null,
            "content": "334",
            "footnote": "",
            "is_definition": false,
            "sort_order": 381
        },
        {
            "number": "7",
            "title": "7. Total remaining Resources",
            "chapter": null,
            "content": "Total (A+B)\nTotal (A+B)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 382
        },
        {
            "number": "3",
            "title": "3. Subgrade/Mineral Reject (in tonnes)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 383
        },
        {
            "number": "3",
            "title": "3. Subgrade/Mineral Reject (in tonnes)",
            "chapter": null,
            "content": "(Information to be given in respect of mineral fractions generated and stacked/dumped below cut-off grade and above threshold value, if prescribed, having no immediate sale value)\nGeneration of sub-grademineral reject (in\n\t\t\t\ttonnes)\nGeneration of sub-grademineral reject (in\n\t\t\t\ttonnes)\nAt the beginning of the year\nAt the beginning of the year\nGenerated during the year\nGenerated during the year\nDisposed during the year\nDisposed during the year\nTotal stacked at the end of the year\nTotal stacked at the end of the year\nAverage grade of the mineral reject generated\nAverage grade of the mineral reject generated\nfrom unprocessed ore\nfrom processed ore",
            "footnote": "",
            "is_definition": false,
            "sort_order": 384
        },
        {
            "number": "4",
            "title": "4. Overburden and Waste (in m3)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 385
        },
        {
            "number": "4",
            "title": "4. Overburden and Waste (in m3)",
            "chapter": null,
            "content": "(Information to be given in respect of overburden/ waste and mineral fractions generated below threshold value, if prescribed)\nAt the beginning of the year\nGenerated during the year\nDisposed during the year\nBackfilled during the year\nTotal at the end of the year",
            "footnote": "",
            "is_definition": false,
            "sort_order": 386
        },
        {
            "number": "5",
            "title": "5. Trees planted/ survival rate",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 387
        },
        {
            "number": "5",
            "title": "5. Trees planted/ survival rate",
            "chapter": null,
            "content": "Description\nDescription\nWithin lease area\nWithin lease area\nOutside lease area\nOutside lease area\n(i) Number of trees planted during the year\n(ii) Survival rate in percentage\n(iii) Total no. of trees at the end of the year",
            "footnote": "",
            "is_definition": false,
            "sort_order": 388
        },
        {
            "number": "6",
            "title": "6. Type of Machinery: Give the following information for the types of machinery in use such as hoist, fans, drills, loaders, excavators, dumpers, haulages, conveyors, pumps, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 389
        },
        {
            "number": "6",
            "title": "6. Type of Machinery:",
            "chapter": null,
            "content": "Type of machinery\nCapacity of each type of machinery\nUnit (in which capacity is reported)\nNo. of machinery\nElectrical/ Nonelectrical (specify) machinery\nUsed in opencast/underground (specify)\n7 (i) Details of mineral Treatment Plant, if any: Give a brief description of the process capacity of the machinery deployed and its availability. (Submit Flow Sheet and Material Balance of the Plant separately).\n7 (i) Details of mineral Treatment Plant, if any:\n7 (ii) Furnish following information:\n7 (ii) Furnish following information:\nItem\nItem\nTonnage\nTonnage\nAverage Grade\nAverage Grade\nFeed:\nConcentrates/processed products :\n(mention name)\nBy-products/Co-products:\n(mention name)\nTailings:\nPart-V (Payments)\nPayment Type\nPayment Type\nOpening balance (Rs.)\nOpening balance (Rs.)\nPaid during the year\nPaid during the year\nAmount required to be paid as per mineral\n\t\t\t\tdispatched / minimum production requirement\nAmount required to be paid as per mineral\n\t\t\t\tdispatched / minimum production requirement\nClosing balance\nClosing balance\nRoyalty\nDMF\nDead Rent\nSurface Rent\nAuction\nPremium\nPenalty\nAny other payment (please specify)\nPart-VI (Production, Despatches and Stocks)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 390
        },
        {
            "number": "1",
            "title": "1. Grade-wise Production, Dispatches and Stocks of Run-of-Mine Mineral:",
            "chapter": null,
            "content": "Grade\nOpening Stock\nProduction\nDispatch\nClosing Stock\nPMV (Rs./Metric tonne )\nEx-mine price (Rs./Metric tonne )\nTotal\n2. (i) Details of processing plant or mineral is being pulverized, inside the lease area or in own factory, (if yes):\nMineral Processed\nQuantity of Run of Mine Mineral\n\t\t\t\tProcessed/Pulverized\nQuantity of Processed /Pulverized Mineral\nReasons (in case, mineral being\n\t\t\t\tprocessed/pulverized is less than 50%)\nTotal\n(iii) Grade-wise Production, Dispatches and Stocks of Processed/Pulverized Mineral:\nGrade\nOpening Stock\nProduction\nDispatch\nClosing Stock\nExmine/Factory Gate price (Rs./Metric tonne )\nTotal\n(iv)Average cost of pulverization (*) : L _______ per tonne.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 391
        },
        {
            "number": "3",
            "title": "3. Stocks of mineral at the beginning of the year.",
            "chapter": null,
            "content": "At Quarry\nAt Quarry\nAt any other place (to be specified)\nAt any other place (to be specified)\nCrude / ROM\nProcessed\nGrand Total\nGrand Total",
            "footnote": "",
            "is_definition": false,
            "sort_order": 392
        },
        {
            "number": "4",
            "title": "4. Stocks at the end of the year:",
            "chapter": null,
            "content": "At Quarry\nAt Quarry\nAt any other place (to be specified)\nAt any other place (to be specified)\nCrude / ROM\nProcessed\nGrand Total\nGrand Total",
            "footnote": "",
            "is_definition": false,
            "sort_order": 393
        },
        {
            "number": "5",
            "title": "5. Details of Deductions used for computation of Ex-Mine price (Rs/Metric Tonne):",
            "chapter": null,
            "content": "Deduction claimed\nDeduction claimed\nUnit ( in Rs/unit)\nUnit ( in Rs/unit)\nRemarks\nRemarks\n(a) Cost of transportation (indicate Loading\n\t\t\t\tstation and Distance from mine in remarks)\n(b) Loading and Unloading charges\n(c) Railway freight ,if applicable (indicate\n\t\t\t\tdestination and distance)\n(d) Port Handling charges/export duty(indicate\n\t\t\t\tname of port)\n(e) Charges for Sampling and Analysis\n(f) Rent for the plot at Stocking yard\n(g) Other charges(specify clearly)\nTotal (a) to (g)\nTotal (a) to (g)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 394
        },
        {
            "number": "6",
            "title": "6. Sales/ Dispatches effected for Domestic Consumption and for Exports:",
            "chapter": null,
            "content": "Grade*\nNature of Dispatch (indicate whether for Sale\n\t\t\t\tor Captive consumption or Export)\nFor Domestic Consumption\nFor export\nConsignee name and Registration number as\n\t\t\t\tallotted by the Government to the buyer ##\nQuantity\nSale value\nCountry\nQuantity\nF.O.B Value (Rs.)\nTotal\nNote. - (a) Indicate reasons for work stoppage and number of days work stoppage.\nNote.\n(b) Give reasons for increase/decrease in production, if any, during the month compared to the previous month.\n(c) Give reasons for increase/decrease in grade wise ex-mine price, if any, during the month compared to the previous month.\nPart-VII: Cost of Production\nCost of production per metric tonne of\n\t\t\t\tmineral produced\nCost of production per metric tonne of\n\t\t\t\tmineral produced\nSr. No.\nSr. No.\nItem\nItem\nCost Per metric tonne\nCost Per metric tonne\n1\nDirect Cost\n(a) Exploration\n(b) Mining\n(c) Beneficiation (Mechanical Only)\n2\nOver-head cost\n3\nDepreciation\n4\nInterest\n5\nRoyalty\n6\nTaxes\n7\nDead Rent\n8\nAuction Premium\n9\nDMF\n10\nOthers (specify)\nTotal\nTotal\n(Self-Appraisal form)\n(Self-Appraisal form)\n1\nDetails of Mining Plan/Scheme of Mining Approved on last\n\t\t\t\tOccasion\nReference No. of Approval Letter\nApproving Authority\nFive year Implementation Period (Financial Year)\nFrom\nTo\n2\nDetails of Modification sought/approved\nWhether modification sought?\nYes\nNo\nIf yes, state reasons of seeking such modifications\n3\n3\nCompliance of Salient Features of the Mining Plan / Scheme\n\t\t\t\tof Mining During the Year\nCompliance of Salient Features of the Mining Plan / Scheme\n\t\t\t\tof Mining During the Year\nActivity\nActivity\nProposal made in approved MP for the reporting year\nActual Implementation During the year\nMining\nMining\nCategory A / B\nSite of Mining (Mention position of working and R.L.)\nQuantum of Waste\nROM Production\nGrade wise Mineral Production\nBench Formation with R.L.\nStripping ratio\nTop RL\nBottom RL\nSolid Waste Management\nSolid Waste Management\nSite of Waste Disposal (Mention position and R.L.)\nMode of Waste Disposal and waste Dump Configuration\n\t\t\t\t(Advancing/Retreating method with number of lifts)\nWaste Dump Stabilization/Garland drain/ Retaining wall\nCheck dams/settling tanks\nBlasting\nBlasting\nMode of Blasting (J/H Pop, Plaster shooting and Deep Hole)\nExplosive Storage\nPrecaution against flying fragments, ground vibration\nMine Drainage\nMine Drainage\nLikely depth of mining below water table\nExpected pumping of subsurface water\nMode of disposal of subsurface water\nMineral Beneficiation\nMineral Beneficiation\nFeed quantity and Grade\nProduct quantity and Grade\nTailing quantity and Grade\nSite of Tailing Disposal\nTailings Dam Management\nPreventive measures envisaged\nEnvironment Management\nEnvironment Management\nAfforestation with type of species\nReclamation and Rehabilitation of Land\nAmbient air quality\nWater quality\nNoise Level\nPrecautions undertaken for temporary Closure of mine\nCommunity Social Responsibility\nCommunity Social Responsibility\nDrinking water (In Rupees)\nTransport (In Rupees)\nHealth (In Rupees)\nSanitation (In Rupees)\nEducation (In Rupees)\nSports (In Rupees)\nRecreation Facility (In Rupees)\nEmployment (In Rupees)\nHousing(In Rupees)\nInfrastructure((In Rupees) Roads/Public\n\t\t\t\ttransport/communication/electricity\n4\nConstraints faced at the mines during reporting year while\n\t\t\t\timplementing the salient features of the mining plan/ scheme of\n\t\t\t\tmining\n5\nCorrective action envisaged by mine management for\n\t\t\t\trectification of the deviation in implementation of salient\n\t\t\t\tfeature of the mining plan/scheme of mining\n6\nAny other information to be included\nSignature:\nName in full:\nDesignation: Lessee\nForm S\nForm S\nMonthly Return for the Month of.....\nMonthly Return for the Month of.....\n(Quarry Permit)\n(Quarry Permit)\n( See rule 49(2))\nMine Code:- Qp\n(To be submitted before the tenth of month following the month of report)\nPart - I (General and Labour)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 395
        },
        {
            "number": "1",
            "title": "1. Name of the Mineral:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 396
        },
        {
            "number": "2",
            "title": "2. Name and address of permit holder:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 397
        },
        {
            "number": "3",
            "title": "3. Location of the quarry.",
            "chapter": null,
            "content": "Village:\nPost Office:\nTaluka:\nDistrict:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 398
        },
        {
            "number": "4",
            "title": "4. Number of Days mine worked:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 399
        },
        {
            "number": "5",
            "title": "5. Quantity for which Permit is granted:",
            "chapter": null,
            "content": "6. (i) Average Daily Employment of Labour/Wages Paid :\nWork Place\nWork Place\nDirect Labour\nDirect Labour\nContract Labour\nContract Labour\nWages (Rs.)\nWages (Rs.)\nMale\nFemale\nAdolescent\nMale\nFemale\nAdolescent\nDirect\nContract\nOpen\nCast\nAbove ground\nBelow ground\n(ii) Total Salaries paid to technical and supervisory staff during the month:\nWork Group\nWork Group\nTotal No of Persons\nTotal No of Persons\nTotal Monthly\n\t\t\t\tAmount (Rs.)\nTotal Monthly\n\t\t\t\tAmount (Rs.)\nTechnical\nSupervisor\nAdministrator\nTotal\nTotal\nPart-II (Production, Despatches and Stocks)\n(Unit of quantity in Metric Tonnes)\n(Unit of quantity in Metric Tonnes)\nGrade\nGrade\nOpening Stock\nOpening Stock\nProduction\nProduction\nDispatch and Used\nDispatch and Used\nClosing Stock\nClosing Stock\nPMV (Rs./Metric tonne )\nPMV (Rs./Metric tonne )\nEx-mine price (Rs./Metric tonne )\nEx-mine price (Rs./Metric tonne )\nTotal\nMineral\nCapacity\nType of operation\nConversion rate\nOperational or not\nRemarks\n(ii) In case the Mineral is processed/pulverized\nMineral Processed\nQuantity of Run of Mine Mineral\n\t\t\t\tProcessed/Pulverized\nQuantity of Processed / Pulverized Mineral\nReasons (in case, mineral processed / pulverized\n\t\t\t\tis less than 50%)\nTotal\n(iii) Grade-wise Production, Dispatch and Stocks of Processed/ Pulverized Mineral:\nGrade\nOpening Stock\nProduction\nDispatch\nClosing Stock\nEx-mine/ factory gate price (Rs./Metric tonne )\nTotal\nForm T\nForm T\nMonthly Return for the Month of.....\nMonthly Return for the Month of.....\n(Quarry Parwana)\n(Quarry Parwana)\n( See rule 49(3))\nMine Code:- Qpw\n(To be submitted before the tenth of month following the month of report)\nPart - I (General and Labour)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 400
        },
        {
            "number": "1",
            "title": "1. Name of the Mineral:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 401
        },
        {
            "number": "2",
            "title": "2. Name and address of parwana holder:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 402
        },
        {
            "number": "3",
            "title": "3. Location of the quarry.",
            "chapter": null,
            "content": "Village:\nPost Office:\nTaluka:\nDistrict:\nSurvey No.:\nPlot No.:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 403
        },
        {
            "number": "4",
            "title": "4. Number of Days mine worked:",
            "chapter": null,
            "content": "Part-II (Production, Despatches and Stocks)\n(Unit of quantity in Metric Tonnes)\n(Unit of quantity in Metric Tonnes)\nGrade\nOpening Stock\nProduction\nDispatch and Used\nClosing Stock\nEx-mine price (Rs./Metric tonne)\nTotal\nForm U\nForm U\nFormat of Revision Application or Passing of order\nFormat of Revision Application or Passing of order\n( See Rule 50(1) and 50(2))\nS. No.\nS. No.\nItem Detail\nItem Detail\nParticulars\nParticulars\n1\nName and address of applicant\n(In case of a firm or other association of individuals,\n\t\t\t\tprovide names and addresses of each person constituting the firm\n\t\t\t\tor the association of individuals, as the case may be.)\n2\nPurpose of the application\n(Revision of an order passed / Request for passing of an order\n\t\t\t\twhere such an order has not been passed within the time period\n\t\t\t\tprescribed)\n3\nFull details of the order of the officer authorised by the\n\t\t\t\tGovernment or Government, as the case may be, against which the\n\t\t\t\trevision application is made (copy to be enclosed)\n4\nIn case of application for revision\n\t\t\t\tof an order, date of communication of the order to the applicant.\nOr\nIn case of request for passing of an order, the date on which\n\t\t\t\tthe date on which the time period for passing such order expired.\n5\nApplication fee payable\n6\nName of bank, demand draft or challan number with date,\n\t\t\t\tthrough which application fee has been paid.\n7\nMineral or minerals for which the application is filed\n8\nDetails of area with respect to\n\t\t\t\twhich the application in filed\n(a) District\n(b) Taluka\n(c) Village\n(d) Survey\n\t\t\t\tNo.\n9\nWhether the application is filed within the prescribed time\n\t\t\t\tperiod.\n10\nIf not, the reasons for not presenting it within the\n\t\t\t\tprescribed limit and seeking condonation of delay.\n11\nName and complete address of the party/parties impleaded.\n\t\t\t\tReasons for impleading him/them should also be mentioned.\n12\nNumber of copies of petition\n\t\t\t\tattached\n(Petition is to be submitted in triplicate if no party is\n\t\t\t\timpleaded. Besides these, for each party impleaded one additional\n\t\t\t\tcopy is to be enclosed)\n13\nGrounds of revision\n14\nAny additional information the revisionist desires to furnish\nYours faithfully,\nSignature of the applicant\nInstructions to applicants:\n(a) The application must be signed by a duly authorised representative of the applicant, in case the applicant is a company. In case the applicant is an individual, the applicant must personally sign the application. In case of a firm or association of individuals, all the persons constituting the firm or association of individuals shall sign the application.\n(b) The corporate authorization of the authorised signatory of the applicant (which is a company) must be enclosed with the application. Any change in such corporate authorization must be immediately intimated to the Government.\n(c) The application must be filed in triplicate.\nForm V\nForm V\nFormat of Financial Assurance\nFormat of Financial Assurance\n( See rule 2(1)(d), 2(1)(j), 8(3), 29(3) and 644(2)]\n[Reference\n\t\t\t\tnumber of the bank]\n[date]\n[District Geologist/ District Assistant Geologist]\nWhereas\n[Name of the [Successful Bidder/ holder of a letter of intent]\nOr\n[\"Successful Bidder\"/ \"LOI Holder\"]\n(\"Expiry Date\")\n[District Geologist/ District Assistant Geologist]\n\"State\"\n\"Deed\n[name of the bank]\n\"Bank\"\n[Successful Bidder/ LOI Holder]\nNow Therefore,\n\"Guarantee\"",
            "footnote": "",
            "is_definition": false,
            "sort_order": 404
        },
        {
            "number": "1",
            "title": "1. The Bank for the purpose hereof unconditionally and irrevocably undertakes to pay to the State without any demur, reservation, caveat, protest or recourse, immediately on receipt of first written demand from the State, a sum or sums (by way of one or more claims) not exceeding the Guarantee Amount in the aggregate without the State needing to prove or to show to the Bank grounds or reasons for such demand for the sum specified therein and notwithstanding any dispute or difference between the ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 405
        },
        {
            "number": "2",
            "title": "2. The Bank acknowledges that any such demand by the State of the amounts payable by the Bank to the State shall be final, binding and conclusive evidence in respect of the amounts payable by [Successful Bidder/ LOI Holder] to the State under the Deed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 406
        },
        {
            "number": "3",
            "title": "3. The Bank hereby waives the necessity for the State from demanding the aforesaid amount or any part thereof from the [Successful Bidder/ LOI Holder] and also waives any right that the Bank may have of first requiring the State to pursue its legal remedies against the [Successful Bidder/ LOI Holder] , before presenting any written demand to the Bank for payment under this Guarantee.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 407
        },
        {
            "number": "4",
            "title": "4. The Bank further unconditionally agrees with the State that the State shall be at liberty, without the Bank's consent and without affecting in any manner the Bank's obligation under this Guarantee, from time to time to: (i) vary and/or modify and of the terms and conditions of the Deed; (ii) extend and / or postpone the time for performance of the obligations of the [Successful Bidder/ LOI Holder] under the Deed, or (iii) forbear or enforce any of the rights exercisable by the State against t",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 408
        },
        {
            "number": "5",
            "title": "5. Any payment made hereunder shall be made free and clear of and without deduction for, or on account of, any present or future taxes, levies, imposts, duties, charges, fees, commissions, deductions or withholdings of any nature whatsoever.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 409
        },
        {
            "number": "6",
            "title": "6. The Bank agrees that State at its option shall be entitled to enforce this Guarantee against the Bank, as a principal debtor in the first instance without proceeding at the first instance against the [Successful Bidder/ LOI Holder] .",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 410
        },
        {
            "number": "7",
            "title": "7. The Bank further agrees that the Guarantee herein contained shall remain in full force and effect during the period specified in the Deed and that it shall continue to be enforceable till all the obligations of the [Successful Bidder/ LOI Holder] under or by virtue of the said Deed with respect to the financial assurance have been fully paid and its claims satisfied or discharged or till the State certifies that the terms and conditions of the Deed with respect to the financial assurance have",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 411
        },
        {
            "number": "8",
            "title": "8. The payment so made by the Bank under this Guarantee shall be a valid discharge of Bank's liability for payment thereunder and the State shall have no claim against the Bank for making such payment.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 412
        },
        {
            "number": "9",
            "title": "9. This Guarantee is subject to the laws of India. Any suit, action, or other proceedings arising out of this Guarantee or the subject matter hereof shall be subject to the exclusive jurisdiction of courts at the State of Gujarat.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 413
        },
        {
            "number": "10",
            "title": "10. The Bank has the power to issue this Guarantee in favour of the State. This Guarantee will not be discharged due to the change in the constitution of the Bank",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 414
        },
        {
            "number": "11",
            "title": "11. The Bank undertakes not to revoke this Guarantee during its currency except with the previous consent of the State in writing.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 415
        },
        {
            "number": "12",
            "title": "12. The State may, with prior intimation to the Bank, assign the right under this Guarantee to any other departments, ministries or any governmental agencies, which may act in the name of the To be retained in case of minerals specified in [District Geologist/ District [Geologist / Officer authorised by the Commissioner of Geology and Mining, Gujarat] ] . Save as provided in this Clause 12, this Guarantee shall not by assignable or transferable.",
            "chapter": null,
            "content": "[District Geologist/ District [Geologist / Officer authorised by the Commissioner of Geology and Mining, Gujarat]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 416
        },
        {
            "number": "13",
            "title": "13. Notwithstanding anything contained herein,",
            "chapter": null,
            "content": "(a) the liability of the Bank under this Guarantee shall not exceed the Guarantee Amount; and\n(b) this Guarantee shall be valid up to the Expiry Date.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 417
        },
        {
            "number": "14",
            "title": "14. The Bank is liable to pay the Guaranteed Amount or any part thereof under this Guarantee only and only if the State serves upon the Bank a written claim or demand on or before the Expiry Date.",
            "chapter": null,
            "content": "(Signature)\n(Name and Designation)\n(Bank Seal)\nForm W\nForm W\nNotice of Temporary Discontinuance of mine\nNotice of Temporary Discontinuance of mine\n( See rule 722(2) and 722(3))\nImportant\nTo\nNotice shall reach the concerned authorities\n\t\t\t\twithin seventy five days of temporary discontinuance of work in\n\t\t\t\tthe mine. If the discontinuance is due to natural calamity beyond\n\t\t\t\tthe control of the lessee or Government Orders, this notice shall\n\t\t\t\tbe sent within fifteen days of such discontinuance.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 418
        },
        {
            "number": "1",
            "title": "1. Government of Gujarat",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 419
        },
        {
            "number": "2",
            "title": "2. The Commissioner Geology and Mining,\n\t\t\t\tGandhinagar - 382017",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 420
        },
        {
            "number": "3",
            "title": "3. Concerned District Collector",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 421
        },
        {
            "number": "1",
            "title": "1. Name of the mineral:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 422
        },
        {
            "number": "2",
            "title": "2. Name of the mine:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 423
        },
        {
            "number": "3",
            "title": "3. Name and address of the Lessee:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 424
        },
        {
            "number": "4",
            "title": "4. Particulars of Quarry Lease (QL):",
            "chapter": null,
            "content": "(i) Date of Registration:\n(ii) Period:______________ Years, from_____________ to ______________\n(iii) Area under lease: ___________________ hectares.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 425
        },
        {
            "number": "5",
            "title": "5. Location of Mine",
            "chapter": null,
            "content": "(i) Village:\n(ii) Post Office:\n(iii) Taluka:\n(iv) District:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 426
        },
        {
            "number": "6",
            "title": "6. Name and address of Agent:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 427
        },
        {
            "number": "7",
            "title": "7. Name and address of Mining Engineer:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 428
        },
        {
            "number": "8",
            "title": "8. Date of temporary discontinuance:",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 429
        },
        {
            "number": "9",
            "title": "9. Reasons for temporary discontinuance: [Please tick whichever is applicable]",
            "chapter": null,
            "content": "(i) Lack of demand\n(ii) Non-availability of labour\n(iii) Rains\n(iv) Transport bottleneck\n(v) Strike/Lockout\n(vi) Operations becoming un-economic\n(vii) Other reasons (specify)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 430
        },
        {
            "number": "10",
            "title": "10. Probable date of re-opening of the mine:",
            "chapter": null,
            "content": "Signature\nName in full:\nDesignation:\n(Lessee)",
            "footnote": "",
            "is_definition": false,
            "sort_order": 431
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 15th October, 2019 [guj368]",
        "Act Number": "Published vide Notification No.GU-2017-(21)-MCR-102017-MM-524-CHH, dated 24.5.2017",
        "Enactment Date": "",
        "Act Year": "2017",
        "Short Title": "Gujarat Minor Mineral Concession Rules, 2017",
        "Type": "STATE",
        "Location": "Gujarat"
    },
    "updated_at": "2026-09-29 21:55:19"
}