{
    "id": 16597,
    "slug": "gujarat-irrigation-and-drainage-rules-2014",
    "title": "Gujarat Irrigation and Drainage Rules, 2014",
    "short_title": "Gujarat Irrigation and Drainage Rules, 2014",
    "act_number": "Published vide Notification NO. GER-2013-1-GN-2 (2",
    "act_year": 2014,
    "act_type": "STATE",
    "location": "Gujarat",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Gujarat Irrigation and Drainage Rules, 2014",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(1) \"Act\" means the Gujarat Irrigation and Drainage Act, 2013.\n(2) \"Appellate Authority\" means Canal-Officer of the rank of the Executive Engineer of the concerned project or part of the project;\n(3) \"Canal\" includes-\n(a) all canals, channels, water-courses, pipes and reservoirs constructed, maintained or controlled by the Government for the supply or storage of water;\n(b) all works, embankments, structures and supply and escape- channels connected with such canals, channels, pipes or reservoirs; and all roads constructed for the purpose of facilitating the construction or maintenance of such canals, channels, pipes or reservoirs;\n(c) all field channels, drainage-works and flood embankments;\n(d) river, stream, lake, natural collection of water or natural drainage channels or any part thereof; to which the State Government may apply the provisions of section 4, or the water of which has been applied or used before the passing of this Act for the purpose of any existing canal;\n(e) all lands belonging to the Government which are situated on a bank of any canal, and which have been appropriated under the orders of the Government for the purposes of such canal;\n(f) all tube wells, artesian wells, bore-wells and dug wells, constructed by the Government and maintained or controlled by the Government;\n(g) percolation tank or pond used for recharge of ground water;\n(4) \"Canal Officer\" means any person or an officer not below the rank of Overseer or Additional Assistant Engineer or equivalent cadre appointed as a canal officer under section 3 of the act, for the purposes of the Act,\n(5) \"drainage work\" means any work in connection with a system of irrigation or reclamation made or improved by the Government for the purpose of the drainage, whether under the provisions of section 14 of the Act, or otherwise, and includes escape- channels from a canal, dams, weirs, embankments, sluices, groins and other works connected therewith, but does not include works for the removal of sewage from towns;\n(6) \"Executive Engineer\" means an Executive Engineer in charge of Irrigation in any area and includes any officer duly empowered in that behalf.\n(7) \"Federation\" means a federation of recognized associations;\n(8) \"field channel\" means any channel or pipe, constructed and maintained by the holder of a land either by himself or jointly with other holders of lands or constructed by the Government and maintained by such holder or holders beyond a water-course and includes all subsidiary works connected with any such channel or pipe;\n(9) \"flood-embankment\" means any embankment constructed or maintained by the Government in connection with any system of irrigation or reclamation works for the protection of lands from inundation or which may be declared by the Government to be maintained in connection with any such system, and includes all groins, spurs, dams and other protective works connected with such embankments;\n(10) \"Form\" means a form prescribed under these rules.\n(11) \"Government\" means the State Government;\n(12) \"Hot weather crop\" means a crop grown within the period between the end of the cold weather season and the breaking of the monsoon season.\n(13) \"Hot weather season\" means the period from the 16th February till the 15th June ensuing.\n(14) \"Kharif crop\" means a crop grown within the period from the break of the monsoon season to the beginning of the cold season.\n(15) \"land under irrigation command of a canal\" means such lands as are irrigated or capable of being irrigated from the canal, being under its command and shall includes such lands as are or shall be deemed to be irrigated within the meaning of section 34;\n(16) \"Lift Irrigation Scheme\" means the scheme in which the water is pumped from water body such as river, stream, drain, nalla, kotar, lake, pond, reservoir, bandhara, canal, tube-well, natural collection of water, etc. and supplied to the area situated at higher elevation for the purpose of irrigation or other purpose;\n(17) \"Monsoon season\" means the period from the 16th June till the 15th November ensuing.\n(18) \"outlet\" an opening in a canal through which water is delivered in to water-course, field channel, pipeline or directly to any land;\n(19) \"owner\" includes every person having a joint interest in the ownership in land, building or such other things; and all rights and obligations which attach to an owner under the provisions of this Act shall attach jointly and severally to every person having such joint interest in the ownership;\n(20) \"Perennial crop\" means a crop which is irrigated continuously for a period of more than eight months.\n(21) \"prescribed\" means prescribed by rules made under section 47;\n(22) \"Rabi crop\" means a crop grown between the period 16th October and 15th March ensuing.\n(23) \"Seasonal crop\" means a crop which is sown, cultivated and reaped during a particular season of the year.\n(24) \"Sub-Divisional Officer\" means the Deputy Executive Engineer in charge of irrigation in any area subordinate to the Executive Engineer.\n(25) \"Superintending Engineer\" means the Superintending Engineer in charge of Irrigation in any area.\n(26) \"Two season crop\" means a crop the period of growth of which extends over the whole or part of both the monsoon and Rabi seasons.\n(27) \"Water Conservation Structure\" means any structure permanent or otherwise constructed or maintained for the purpose of impounding or diverting water of any river, stream, lake or any natural collection of water and includes any dam, weirs, bandhara, tidal regulator, check-dam, sluices, head wall, groins, spreading channels or any other works constructed for water conservation;\n(28) \"water-course\" means a channel constructed and maintained at the cost of the Government to supply water from an outlet;\n(29) \"Water Users' Association (WUA)\" means an Association as defined in clause (I) of section 2 of the Gujarat Water Users' Participatory Irrigation Management Act, 2007 (\"PIM Act, 2007\");\n(30) \"Year\" means the period beginning on and from the 16th June of the calendar year and ending on the 15th June of the next calendar year.\nPart I\nConstruction and Maintenance of Field Channel and Water-Courses",
            "footnote": "",
            "is_definition": true,
            "sort_order": 0
        },
        {
            "number": "3",
            "title": "3. Construction of Field Channel.",
            "chapter": null,
            "content": "(b) Maintenance of field channel shall be carried out by individual farmer in whose land field channel passes.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "4",
            "title": "4. Manner of construction of water courses.",
            "chapter": null,
            "content": "Part II\nSupply of Water",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "5",
            "title": "5. Application for supply of water.",
            "chapter": null,
            "content": "(i) Individual application shall not be accepted by the Canal Officer from beneficial area of concerned canal on which Water User' Association is formed.\n(ii) Individual applicants who are not member of the Water User's Association shall require to submit application form to the concerned Water User's Association of that canal.\n(iii) Water User's Association shall accept the application form from individual farmers who are member of Water User' Association but comes under beneficial area of canal system for which Water User's Association is formed.\n(iv) On the basis of forms collected from individual farmers who are not member of Water User's Association and member of Water User's Association, only a single application of consolidated area shall be made in duplicate to the canal officer in Form A-1, along with statement showing details of farmers (member wise and crop wise) and area to be irrigated.\n(i) every application for a supply of water for the purpose of Irrigation shall be made in duplicate to the Canal Officer.\n(ii) such application may be delivered personally or sent by post to the Canal Officer or to any officer authorized by the Executive Engineer to receive it.\n(i) kharif or Rabi or Hot Weather season, in Form A-1,\n(ii) additional watering, in Form A-2,\n(iii) supply of water from Nallas, River, Streams etc. vesting in the Narmada, Water Resource, Water Supply and Kalpsar Department on which Government has not incurred any expenditure, in Form A-3.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "6",
            "title": "6. Dates for submission of application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "7",
            "title": "7. Acknowledgement of application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "8",
            "title": "8. Application by whom to be made and conditions for sanction.",
            "chapter": null,
            "content": "(a) the occupant or joint occupants of the land,\n(b) the superior holder or joint superior holders of alienated land, (c) any other person or persons having right to cultivate the land under irrigation for the period for which supply of water is to be given,\n(d) President of Water User's Association. or\n(e) any other person duly authorized by any of the persons mentioned in clauses (a), (b), (c) and (d) to receive such supply.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "9",
            "title": "9. Disposal of Application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "10",
            "title": "10. Sanction for the supply of water.",
            "chapter": null,
            "content": "(i) the acreage of such lands is 10 Ares (10 Gunthas )or more.\n(ii) such land, though its acreage is less than l0Ares ( 10 Gunthas ) comprises the entire holding of the applicant.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "11",
            "title": "11. Allotment of available supply.",
            "chapter": null,
            "content": "Part III\nCultivation of crop and use of Water",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "12",
            "title": "12. Cultivation of crop and use of water.",
            "chapter": null,
            "content": "(1) A suitable system of water channels shall be so maintained that the water required for the irrigation of any plot can be supplied directly from a channel.\n(2) The number and location of the inlets necessary for the supply of water to any such system shall be subject to the general or special orders of the Executive Engineer.\n(3) The order in which water is supplied shall be subject to the general or special order of the Executive Engineer.\n(4) No crop shall be grown in the channels leading to the plots when such channels are less than 1.0 meter wide from the top inner edge if the bund and after earthing up there shall be no crop growing in or interfering with the flow of water in the channels.\n(5) No crop shall be planted within 1.0 meter of the edge of a main water- course. If a question arises as to what is a main water course, the Executive Engineer shall decide the matter and his decision shall be final and conclusive.\n(6) No crop shall be grown on the top of any bund.\n(7) (a) Any bund may, immediately after rain, be cut without permission. Such bund shall, however be properly repaired before the next watering is taken.\n(b) Except as provided in clause (a), a bund may be cut only in case of emergency; and if the person on whose application the supply of water is sanctioned under this rule cuts the bund, he shall be liable for any wastage of water unless he shows to the satisfaction of the Executive Engineer that the accumulation of water, if any, was due to cause for which he was not responsible.\n(8) The person on whose application the supply of water is sanctioned under these rule or his servant shall be present during the whole time when water is being taken.\nPart IV\nWater Supply Rates\n13.\n(1) The rates and conditions for supply of water for different purposes shall be as specified in the schedule attached to these rules.\n(2) The dates in each year for payment of water rates shall, ordinarily be :-\nFor Kharif crop\n31st December\nFor Rabi crop\n15th April\nFor Hot Weather crop\n31st July",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "14",
            "title": "14. Method for fixing Water rates.",
            "chapter": null,
            "content": "(a) a rate per hector per watering of land irrigated, fixed with reference to the crop grown, the season of the year during which and the period for which, water is supplied and the method of application of water to the land,\n(b) a rate per unit of quantity of water supplied.\n(c) a rate per hector with reference to the type of crop grown with reference to specified season.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "15",
            "title": "15. Manner of levying water rates.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "16",
            "title": "16. Water rate leviable when mixed crops are grown.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "17",
            "title": "17. Water rate leviable when crop sanctioned is not planted or fails and another crop is grown.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "18",
            "title": "18. Water rate leviable when land intended to be irrigated by canal water is irrigated partly by well water.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "19",
            "title": "19. Water rate leviable when well water and canal water are conveyed in the same channel.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "20",
            "title": "20. Irrigation from escape channel per collations and leakages.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "21",
            "title": "21. Water rates for non-irrigational purposes.",
            "chapter": null,
            "content": "Occasional Rates.\nOccasional Rates.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "22",
            "title": "22. Water rate leviable for supply of water obtained without permission or misused.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "23",
            "title": "23. Record to be maintained for water obtained without permission or misused.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "24",
            "title": "24. Water rates leviable on late applications.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "25",
            "title": "25. Water rate leviable for water used for the irrigation of an area in excess of the sanctioned area.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "26",
            "title": "26. Charges to be imposed when water supplied through a water-course is suffered to run to waste.",
            "chapter": null,
            "content": "(a) if the water has flowed on any land, a rate not exceeding double the rate chargeable for each hector on which water has flowed;\n(b) in any other case a rate not exceeding double the rate chargeable under rule 19, in the volume of water estimated by the Executive Engineer to have been wasted.\nExemption Cancellation and Remissions\nExemption Cancellation and Remissions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "27",
            "title": "27. Cancellation of sanction for supply of water of assessment in respect thereof.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "28",
            "title": "28. Remission of water rates.",
            "chapter": null,
            "content": "(a) from any stoppage diminution or increase of his water supply due to any of the causes stated in clause (d) of section 20 or any act or omission of a canal officer not provided for in the aforesaid clause; or\n(b) due to failure of crops due to any local or general calamity : Provided that output of the crops is not more than one quarter of normal.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "29",
            "title": "29. Claims for remission.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "30",
            "title": "30. Readings maintained of water gauges and meters by the Irrigation Department to be accepted as authoritative.",
            "chapter": null,
            "content": "Part V\nAppeals",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "31",
            "title": "31. Appeals.",
            "chapter": null,
            "content": "(a) passed under rule 9, or\n(b) requiring an applicant who is an occupant or superior holder to give security under rule 8, or\n(c) rejecting a surety tendered under rule 8 as unapproved.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "32",
            "title": "32. Manner of preferring appeals.",
            "chapter": null,
            "content": "33.\nPart VI\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "34",
            "title": "34. Water rates chargeable under section 34.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "35",
            "title": "35. Closing of canal.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "36",
            "title": "36. Passing of persons, animals M vehicles in or across canals.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "37",
            "title": "37. Maintenance of water courses.",
            "chapter": null,
            "content": "(a) such masonry, concrete or other work as in the opinion of the Executive Engineer is necessary to prevent waste of water or damage to the channel, or\n(b) a pipe outlet in masonry, concrete or any other type of outlet arrangement approved by the Executive Engineer for connecting the water-course to the field channel.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "38",
            "title": "38. Maintenance of Record of Rights and Register of Mutation.",
            "chapter": null,
            "content": "Part VII\nSupply of Water Free of Charge for Agricultural Purposes From Canal on Which Government has not Incurred any Expenditure\n39.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "40",
            "title": "40. Sanction for the use of water free of charge.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "41",
            "title": "41. Construction of channels for taking water.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "42",
            "title": "42. Demarcation of Crops irrigated by the water supplied under this part.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "43",
            "title": "43. No interference with the natural drainage.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "44",
            "title": "44. Separation of irrigation and lift channels.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "45",
            "title": "45. Crossing of canal and lift channel.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "46",
            "title": "46. Location of pumping plant.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "47",
            "title": "47. Marking of sanctioned area on plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "48",
            "title": "48. Claims for compensation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "49",
            "title": "49. Water rates leviable for breach of condition.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "50",
            "title": "50. No other canal water shall be granted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "51",
            "title": "51. Water rates leviable on crops grown in excess of sanctioned area.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "52",
            "title": "52. No water supply before sanction of application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "53",
            "title": "53. Repeal and Saving.",
            "chapter": null,
            "content": "Form A-1\nForm A-1\n( See rule 5)\nApplication for water for irrigation in Kharif or Rabi or Hot-weather Season\nApplication for water for irrigation in Kharif or Rabi or Hot-weather Season\nName of village\nName of canal\nOutlet No.\nSurvey /Block No.\nTotal Area of Survey/Block No.\nTotal Area of the holding in Survey No. or Block\n\t\t\t\tNo.\nTotal Area Applied for.\nName of crop.\nPeriod/ Season for which water is required\nNo. of watering\nRemark\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\nHa. Are\nHa. Are\nHa. Are\nTotal amount to be paid:-\nSr. No.\nName of crop\nArea to be irrigated in Ha. Are.\nWater Rate chargeable per hector per watering\nTotal Amount in Rs.\nName:-\nAddress:-\nDate :- / /20\nSignature or left hand thumb impression of the\n\t\t\t\tapplicant.\nForwarded for sanction as follows :-\nForwarded for sanction as follows :-\nDate :- / /20\nSub- Divisional officer,\n_____________ Sub-Division _____________\nDate :- / /20\nSanctioned, Executive Engineer,\n_____________ Division, _____________\nNote. - (1) Details of Security bond to be invariably furnished by non-Owner applicant as per instruction 6. (As per Form C 1.)\nNote.\n(2) Name of sureties\n(1) _____________________\n(2) _____________________\nApproval of Application received as per\nApproval of Application received as per\nForm No. A-1\nForm No. A-1\nCanal :-\nApplication No. :-\nName of Village:-\nSurvey No./Block No. :-\nName of Applicant:-\nHectare\nAre\nNos. of watering\nCrop\nKharif\nRabi\nTwo season\nHot weather\nPerennial\nSanctioned date and endorsement Canal officer\nInstruction\nInstruction",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "5",
            "title": "1. This form is to be used for irrigation for Kharif, Rabi and Hot Weather seasons prescribed in rule 5 of the Gujarat Irrigation and Drainage Rules, 2014.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "2",
            "title": "2. The application is to be submitted in duplicate form to the Canal Officer or to any officer authorized by him to receive such applications. It may be sent by hand, presented personally or sent by post.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "3",
            "title": "3. When order is passed the duplicate form will be returned to the applicant endorsed with the Canal Officer's final order.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "4",
            "title": "4. No sanction will ordinarily be given for the irrigation of any land to any person other than (1) the sole occupant or all joints occupants, (2) the sole superior holder or all joint superior holders, (3) a person having the right to carry on irrigated cultivation of the land for the period of the sanction or (4) a person duly authorized on half any these to receive such sanction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "5",
            "title": "5. The applicant must state at No. 2 on the form nature of his interest in the land or of his authority to apply for sanction for carrying on irrigated cultivation in the land. He must also state at No. 3 on the form the season up to and including which he has paid arrears of water. If lie owes any water rates he must state the season or year for which he does so.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "6",
            "title": "6. Any application may required to furnish a Bond in Form C-1 executed by two suitable sureties or execute a mortgage bond in Form C-2 as security for the payment of all amount which may become due in respect of the water to be supplied under the sanction. And he may also be required to obtain the assent of any person having an interest in the land to the grant of sanction to him.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "7",
            "title": "7. Sanction will be refused for the irrigation of any land which is found to be unsuitable for this form of irrigation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "8",
            "title": "8. Executive Engineer will ordinarily sanction areas which are multiple of ares.",
            "chapter": null,
            "content": "Conditions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "1",
            "title": "1. After the application has been sanctioned, full water rates shall be payable for the area and period sanctioned, whether the area is irrigated or not, provided water was available during the period. No water rate shall be charged in the case of perennial crops when the applicant gives a written intimation to the Executive Engineer within one month from the date of sanction to the applicants that water is not required, provided such sanction for perennial crops was granted for a period of one ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "2",
            "title": "2. Each type of crop(namely, sugarcane, pan, ordinary perennial, two season and seasonal) shall be grown only the extent of the sanction given by the Canal officer but an equal area of any lower rated type may be substituted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "3",
            "title": "3. The area sanctioned shall not be exceeded.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "4",
            "title": "4. The sanction is liable to be cancelled, or the supply to any crop irrigated under the sanction is liable to be withheld or stopped entirely without notice for breach of any rule to the Gujarat Irrigation and Drainage Rules, 2014 or of the conditions of this form of application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "5",
            "title": "5. Water shall be given for the whole season, if available, or at the discretion of the Executive Engineer, for as many watering as may be possible.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "6",
            "title": "6. Full water supply is not guaranteed but an intimation of the possibility of a shortage of water during the season for which application is made shall be given at the earliest date possible.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "7",
            "title": "7. Where no permanent water channel exist, the irrigator shall allow the construction of a temporary channel through his land, if necessary along a line fixed by the Executive Engineer or his representative, for the benefit of irrigators whose fields are situated below his land.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "8",
            "title": "8. Water for any area of sugarcane sanctioned is subject to the condition that water is liable to be withheld from new sugarcane area after 31\" May, if necessary. Each consecutive watering after 31' May shall require the sanction of the Executive Engineer. Such sanction shall be accorded if water is available for agricultural purposes but if it is insufficient at an any time of the season all further watering may be stopped and the irrigator shall not in that case claim compensation for any dama",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "9",
            "title": "9. The water charges due from the applicant shall be directly deducted by the CO-operative Sugar Factory of which he is a member, from the amount that may be due to him for sale of sugarcane. The Co-operative Sugar Factory shall pay the amount so deducted to the concerned Executive Engineer for crediting the same in to the applicant's account and receipt for payment of the same shall have to be obtained by the applicants from the said Co-operative Sugar Factory. If under any circumstances, it is",
            "chapter": null,
            "content": "Name of WUA :-\nName of Canal:-\nName of Village:-\nSeason or period:-\nSr.No.\nName of crop\nNos. of farmer\nTotal area to be irrigated Ha. Ares.\nWater Rate per Ha. per watering in Rs.\nProbable No. of watering\nTotal Amount ,in\nSr. No.\nName of Farmer/Member\nSurvey/block No.\nTotal area of Survey/Block No.\nArea to irrigated in Ha. Ares.\nName of crop\nProbable No. of watering\n1\n2\n3\nReceipt to be given to Applicant for Application received as per Form No. A-1\nReceipt to be given to Applicant for Application received as per Form No. A-1\nCanal :-\nApplication No.:-\nName of Village:-\nSurvey No./Block No.:-\nName of Applicant:-\nCrop\nSeason and period\nArea\nNos. of watering\nKharif\nHectare Are\nRabi\nTwo season\nHot weather\nPerennial\nDate of Application :-\nDate of Application received and endorsement\nSignature of application receiver Canal officer\nForm A-2\nForm A-2\n( see rule 5)\nForm of application for Additional watering\nForm of application for Additional watering\nNo. of application:-\nTo,\nThe Executive Engineer/ Canal Officer\n____________________ Division,\n___________________________________\nName of village\nName of canal\nOutlet No.\nSurvey /Block No.\nTotal Area of Survey/Block No.\nTotal Area of the holding in Survey No. or Block\n\t\t\t\tNo.\nTotal Area Applied for.\nName of crop.\nPeriod/Season for which Additional watering is\n\t\t\t\trequired\nNo. of Additional watering\nRemark\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\nHa. Are\nHa. Are\nHa. Are\nTotal amount to be paid:-\nSr. No.\nName of crop\nArea to be irrigated in Ha. Are.\nWater Rate chargeable per hector per watering for\n\t\t\t\tadditional watering\nTotal Amount in Rs.\nDate :- / /20_____.\nSignature or left hand thumb impression of the applicant.\n(1) Area to be sanctioned ________________________________\n(2) Period of sanction :- From ___________________ to ___________________\n(3) Water rate to charged:- Rs. ________________ per Ha. per watering, and total amount is Rs. ________________ for additional watering,\nDate:- / /20 Sub- Divisional officer,\n______________ Sub-Division\nSanctioned,\nDate:- / /20 Executive Engineer,\nDivision,\nNote. - (1) Details of Security bond to be invariably furnished by non-owner as per instruction 5.\nNote.\n(2) Name of sureties given as security as per Form C-1.\nName of sureties (1)\n(2)\nApproval of Application received as per Form No. A-2\nApproval of Application received as per Form No. A-2\nCanal :-\nApplication No.:-\nName of Village:-\nSurvey No./Block No. :-\nName of Applicant:-\nCrop, Season and Area as per demand\nCrop\nSeason and period\nArea\nKharif\nHectare\nAre\nRabi\nTwo season\nHot weather\nPerennial\nSanctioned date and endorsement\nDate:- / / 20.\nCanal officer\nInstruction",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "5",
            "title": "1. This from is to used for irrigation for Kharif, Rabi and Hot Weather seasons prescribed in rule 5 of the Gujarat Irrigation and Drainage Rules, 2014.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "2",
            "title": "2. The application is to be submitted in duplicate form to the Canal Officer or to any officer authorized by him to receive such applications. It may be sent by hand, presented personally or sent by post.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "3",
            "title": "3. When order is passed the duplicate form will be returned to the applicant endorsed with the Canal Officer's final order.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "4",
            "title": "4. No sanction will ordinarily be given for the irrigation of any land to any person other than (1) the sole occupant or all joints occupants, (2) the sole superior holder or all joint superior holders, (3) a person having the right to carry on irrigated cultivation of the land for the period of the sanction or (4) a person duly authorized on half any these to receive such sanction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "5",
            "title": "5. Any application may required to furnish a Bond in Form C-I executed by two suitable sureties or execute a mortgage bond in Form C-2 as security for the payment of all amount which may become due in respect of the water to be supplied under the sanction. And he may also be required to obtain the assent of any person having an interest in the land to the grant of sanction to him.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        },
        {
            "number": "6",
            "title": "6. Sanction will be refused for the irrigation of any land which is found to be unsuitable for this form of irrigation.",
            "chapter": null,
            "content": "Conditions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 71
        },
        {
            "number": "1",
            "title": "1. After the application has been sanctioned, full water rates shall be payable for the area and period sanctioned, whether the area is irrigated or not, provided water was available during the period. No water rate shall be charged in the case of perennial crops when the applicant gives a written intimation to the Executive Engineer within one month from the date of sanction to the applicants that water is not required, provided such sanction for perennial crops was granted for a period of one ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 72
        },
        {
            "number": "2",
            "title": "2. The area sanctioned shall not be exceeded.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 73
        },
        {
            "number": "3",
            "title": "3. The sanction is liable to be cancelled, or the supply to any crop irrigated under the sanction is liable to be withheld or stopped entirely without notice for breach of any rule to the Gujarat Irrigation and Drainage Rules,2014 or of the conditions of this form of application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 74
        },
        {
            "number": "4",
            "title": "4. The water charges due from the applicant shall be directly deducted by the Co-operative Sugar Factory of which he is a member, from the amount that may be due to him for sale of sugarcane. The Co-operative Sugar Factory shall pay the amount so deducted to the concerned Executive Engineer for crediting the same in to the applicant's account and receipt for payment of the same shall have to be obtained by the applicants from the said CO-operative Sugar Factory. If under any circumstances, it is",
            "chapter": null,
            "content": "Receipt to be given to Applicant for Application received as per Form No. A-2\nCanal :-\nApplication No. :-\nName of Village:-\nSurvey No./Block No.:-\nName of Applicant:-\nCrop, Season and Area included in approval\nCrop\nSeason and period\nArea\nNos. of watering\nKharif\nHectare Are\nRabi\nTwo season\nHot weather\nPerennial\nDate of Application :-\nDate of Application received and endorsement\nSignature of application receiver Canal officer\nForm A-3\nForm A-3\n( see rule - 5)\nApplication for supply of water free of charge for irrigation from Nallas, Rivers, Stream etc, vesting in the Narmada, Water Resource, Water Supply and Kalpsar Department has not incurred any expenditure.\nApplication for supply of water free of charge for irrigation from Nallas, Rivers, Stream etc, vesting in the Narmada, Water Resource, Water Supply and Kalpsar Department has not incurred any expenditure.\nNo. of application:-\nTo,\nThe Executive Engineer/ Canal Officer\n______________ Division,\n________________________\nDate :- / /20.\nSignature or left hand thumb Impression of the\n\t\t\t\tapplicant.\na. Area to be sanctioned Ha Are\nb. Name of sanctioned crop\nc. Period of sanction :- From to\nDate :- / /20.\nSub- Divisional officer,\n____________ Sub-Division _________________\nSanctioned,\nDate:- / /20 __________\nExecutive Engineer,\n_______________ Division, _______________\nNote. - (1) Details of Security bond as per Form C-1 to be invariably furnished by non owner as per details below.\nNote.\n(2) Name of sureties (1)\n(2) __________________________________\nInstruction",
            "footnote": "",
            "is_definition": false,
            "sort_order": 75
        },
        {
            "number": "1",
            "title": "1. This form is to be used for the permission to supply water from Rivers, Nallas, Sreams, Bhudkies, Drains Tanks vesting in the Narmada Water Resource Water Supply and Kalpsar Department has not incurred any expenditure.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 76
        },
        {
            "number": "2",
            "title": "2. This application shall be submitted in duplicate to the Canal Officer or any officer authorized by him to receive such application, It may be sent by hand, presented personally or sent by post.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 77
        },
        {
            "number": "3",
            "title": "3. The application shall be tendered three months ago in advance for the season in which the supply of water is required by the applicant.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 78
        },
        {
            "number": "4",
            "title": "4. No sanction will ordinarily be given for the irrigation of any land to any person other than (1) the sole occupant or all joints occupants, (2) the sole superior holder or all joint superior holders, (3) a person having the right to carry on irrigated cultivation of the land for the period of the sanction or (4) a person duly authorized on half any these to receive such sanction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 79
        },
        {
            "number": "5",
            "title": "5. The applicant should submit a plan of the land in the survey No. or survey Nos. concerned along with the application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 80
        },
        {
            "number": "6",
            "title": "6. The applicant must state at No. 2 on the form nature of his interest in the land or of his authority to apply for sanction for carrying on irrigated cultivation in the land.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 81
        },
        {
            "number": "7",
            "title": "7. On completion of the application and after due enquiry in to the application, The Executive Engineer having regard to the existing riparian rights of the cultivation on the source of water may either sanction it fully or partly or reject it. In case the application is sanctioned a pass for the use of water shall be issued to the applicant. Such pass shall be valid only for the period specified in it. In case the application is rejected, the duplicate copy of the application shall be returned ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 82
        },
        {
            "number": "8",
            "title": "8. Sanction shall be refused for the supply of water for growing crops where there is a danger of canal water being taken surreptitiously.",
            "chapter": null,
            "content": "Condition",
            "footnote": "",
            "is_definition": false,
            "sort_order": 83
        },
        {
            "number": "1",
            "title": "1. Sanction will be granted for the use of water free of charge for growing food and fodder crops including onions.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 84
        },
        {
            "number": "2",
            "title": "2. The applicants shall make a channel or channels for taking water to his lands at his own cost and responsibility.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 85
        },
        {
            "number": "3",
            "title": "3. Crops irrigated by the water supplied under Part VII of the Gujarat Irrigation and Drainage Rules,2014, shall be separated from all crops irrigated by water supplied otherwise under the Act by at least 15 meter at all places.",
            "chapter": "Part VII",
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 86
        },
        {
            "number": "4",
            "title": "4. The applicant shall not interfere with the natural drainage or artificial channels in utilizing the water sanctioned for his lands.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 87
        },
        {
            "number": "5",
            "title": "5. When irrigation channels from canal run parallel to lift channels, they shall have an uncultivated dry strip of less thanl5 meter between the outer toes of the inner banks of the channels.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 88
        },
        {
            "number": "6",
            "title": "6. When canal water is crossed by lift channels, the crossing shall be of pacca masonry or concrete and pipe crossing shall be to the entire satisfaction of the Canal Officer.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 89
        },
        {
            "number": "7",
            "title": "7. When water is allowed to be used by means of a pumping plant, the pumping Or \"Take Off' arrangement shall be beyond the radius of 5.0 meter from the edge of the canal boundary or Distributary limit.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 90
        },
        {
            "number": "8",
            "title": "8. The area for which the water has been sanctioned by the Canal Officer shall be marked on a plan which shall be signed by the applicant.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 91
        },
        {
            "number": "9",
            "title": "9. No claim for compensation on account of damage to crop due to the failure or deficiency of water shall be entertained.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 92
        },
        {
            "number": "10",
            "title": "10. For using water after the expiry of sanction limit/ No. of watering or without submitting application for use of water or for breach of any of the aforesaid conditions the applicant shall be charged full water rates leviable, and shall also be liable to the penalties imposed under the provision of the Gujarat Irrigation and Drainage Act, 2013, and the Rules framed there under. In such a case, the permission granted to him shall also be cancelled if the period of its validity has not already ",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 93
        },
        {
            "number": "11",
            "title": "11. No other canal water shall be granted to or utilized for the area brought under cultivation under the sanctioned permitted area under this part.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 94
        },
        {
            "number": "12",
            "title": "12. Areas of crops grown in excess of the sanctioned area shall be liable to be charged at full water rates leviable for using canal water and in addition the applicant shall be liable to penalties imposed for unauthorized irrigation under the Gujarat Irrigation and Drainage Act, 2013, and Rules frame thereunder.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 95
        },
        {
            "number": "13",
            "title": "13. No water shall be taken by the applicant before his application has been sanctioned.",
            "chapter": null,
            "content": "Form A-4\nForm A-4\n(see rule - 23 )\nEkararnama\nEkararnama\nForm of Agreement for payment of penal water rate for Unauthorized Irrigation\nSignature of Land Owner\nForm B-1\nForm B-1\n(see rule - 5)\nOrdinary application for water for irrigation from Government tube-wells.\nOrdinary application for water for irrigation from Government tube-wells.\nNo. of application:-\nTo,\nThe Executive Engineer,\n_____________________ Division,\nName of village\nDistributing Channel No./Out let No. Tube Well\nSurvey No./Block No.\nTotal area of survey No./B\n1\n2\n3\n4\n5\nTotal area of the holding In survey No. or Plot\n\t\t\t\tNo.\nTotal area applied for\nName of crop\nPeriod for which water is required\n6\n7\n8\n9\nDate :- / /20_.\nSignature or left hand thumb impression of the\n\t\t\t\tapplicant.\nSignature of Witness.\nForwarded for sanction as follows :-\n(1) Area to be sanctioned ________________________________\n(2) Period of sanction: - From _____________________ to ____________________________\n(3) Water rate to charged: -Rs. ________________________ per Ha. per watering, and total amount is Rs. ________________________\n______________________ Sub-Division ______________________\nDate :- / /20_.\nSanctioned Executive Engineer,\n______________________ Division, ______________________\nNote. - (1) Details of Security bond in form C-1 to be invariably furnished by non-Owner applicant as per instruction 7.\nNote.\n(2) Name of sureties(1) ___________________\n(2) ___________________\nApproval of Application received as per Form No. B-1\nApproval of Application received as per Form No. B-1\nCanal :-\nApplication No.:-\nName of Village:-\nSurvey No./Block No.:-\nName of Applicant:-\nCrop\nSanctioned Area\nKharif\nHectare\nAre\nRabi\nTwo season\nHot weather\nPerennial\nDate:- / /\nCanal officer\nInstruction\nInstruction",
            "footnote": "",
            "is_definition": false,
            "sort_order": 96
        },
        {
            "number": "5",
            "title": "1. This from is to used for irrigation for Kharif, Rabi and Hot Weather seasons prescribed in rule 5 of the Gujarat Irrigation and Drainage Rules, 2014.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 97
        },
        {
            "number": "2",
            "title": "2. The application is to be submitted in duplicate form to the Canal Officer or to any officer authorized by him to receive such applications. It may be sent by hand, presented personally or sent by post.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 98
        },
        {
            "number": "3",
            "title": "3. When order is passed the duplicate form will be returned to the applicant endorsed with the Canal Officer's final order.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 99
        },
        {
            "number": "4",
            "title": "4. No sanction will ordinarily be given for the irrigation of any land to any person other than (1) the sole occupant or all joints occupants, (2) the sole superior holder or all joint superior holders, (3) a person having the right to carry on irrigated cultivation of the land for the period of the sanction or (4) a person duly authorized on half any these to receive such sanction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 100
        },
        {
            "number": "5",
            "title": "5. The applicant must state at No. 2 on the form nature of his interest in the land or of his authority to apply for sanction for carrying on irrigated cultivation in the land. He must also state at No. 3 on the form the season up to and including which he has paid arrears of water. If he owes any water rates he must state the season or year for which he does so.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 101
        },
        {
            "number": "6",
            "title": "6. Any application may required to furnish a Bond in Form C-I executed by two suitable sureties or execute a mortgage bond in form C-2 as security for the payment of all amount which may become due in respect of the water to be supplied under the sanction. And he may also be required to obtain the assent of any person having an interest in the land to the grant of sanction to him.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 102
        },
        {
            "number": "7",
            "title": "7. Sanction will be refused for the irrigation of any land which is found to be unsuitable for this form of irrigation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 103
        },
        {
            "number": "8",
            "title": "8. Sanction will be refused for the irrigation of any land which is found to be unsuitable for this form of application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 104
        },
        {
            "number": "9",
            "title": "9. Executive Engineer will ordinarily sanction areas which are multiple of ares.",
            "chapter": null,
            "content": "Conditions\nConditions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 105
        },
        {
            "number": "1",
            "title": "1. After the application has been sanctioned, full water rates shall be payable for the area and period sanctioned, whether the area is irrigated or not, provided water was available during the period.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 106
        },
        {
            "number": "2",
            "title": "2. Each type of crop (namely, sugarcane, pan, ordinary perennial, two season and seasonal) shall be grown only the extent of the sanction given by the Canal Officer but an equal area of any lower rated type may be substituted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 107
        },
        {
            "number": "3",
            "title": "3. The area sanctioned shall not be exceeded.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 108
        },
        {
            "number": "4",
            "title": "4. The sanction is liable to be cancelled, or the supply to any crop irrigated under the sanction is liable to be withheld or stopped entirely without notice for breach of any rule to the Gujarat Irrigation and Drainage Rules,2014 or of the conditions of this form of application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 109
        },
        {
            "number": "5",
            "title": "5. Water shall be given for the whole season, if available, or at the discretion of the Executive Engineer, for as many watering as may be possible.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 110
        },
        {
            "number": "6",
            "title": "6. Full water supply is not guaranteed but an intimation of the possibility of a shortage of water during the season for which application is made shall be given at the earliest date possible.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 111
        },
        {
            "number": "7",
            "title": "7. Where no permanent water channel exist, the irrigator shall allow the construction of a temporary channel through his land, if necessary along a line fixed by the Executive Engineer or his representative, for the benefit of irrigators whose fields are situated below his land.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 112
        },
        {
            "number": "8",
            "title": "8. The standing charges and variable charges fixed by the State Government from time to time shall be leviable, from each irrigator.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 113
        },
        {
            "number": "9",
            "title": "9. The standing charges and minimum variable charges shall have to be paid if the application is sanctioned even though no water is taken, so long as water was available.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 114
        },
        {
            "number": "10",
            "title": "10. The water charges due from the applicant shall be directly deducted by the Co-operative Sugar Factory of which he is a member, from the amount that may be due to him for sale of sugarcane. The Co-operative Sugar Factory shall pay the amount so deducted to the concerned Executive Engineer for crediting the same in to the applicant's account and receipt for payment of the same shall have to be obtained by the applicants from the said Co-operative Sugar Factory. If under any circumstances, it i",
            "chapter": null,
            "content": "Form C-1\nForm C-1\n(see rule - 8)\nForm of Security Bond\nForm of Security Bond\nVillage\nTaluka\nSurvey No.\nPlot no./Block No./\nArea of field to be irrigated\nName of crop or block\nPeriod of Irrigation\nHa. Are.\n(Signature of witness )(Signature of surety.)\n(1) _____________________________\n(2) _____________________________\nForm C-2\nForm C-2\n( see rule - 8)\nForm of Mortgage\nForm of Mortgage\nVillage\nTaluka\nSurvey No.\nPlot no./Block No.\nArea of field to be irrigated\nName of crop or block\nPeriod of Irrigation\nHa. Are.\nDistrict\nTaluka\nVillage\nSurvey no./Block No./\nPlot No.\nArea of holding in the Survey No.\nRemark\nHa Are\nIn presence of\n(1) Name ___________________ and\n(2) Name ____________________________\n(Signature of witness) (1) __________________________ and (2) ____________________________\nForm C- 3\nForm C- 3\n(See rule - 8)\nVillage\nTaluka\nSurvey No./Block No.\nArea of field to be irrigated\nName of crop\nPeriod of Irrigation\nHa. Are.\nDistrict\nTaluka\nVillage\nSurvey No./ Block No.\nArea of holding in the survey No.\nRemark\nSchedule\nSchedule\n(see rule 13)\n(1) For Kharif, Ravi and two-season crops\n(1) For Kharif, Ravi and two-season crops\nRs. 265.45 per watering per hector\n(2) For perennial / all-weather crops :\n(2) For perennial / all-weather crops :\nRs. 497.71 per watering per hector.\n(3) Rates for lift irrigation :\n(3) Rates for lift irrigation :\n(3.1) In cases where water is lifted by the farmer at his own cost :-\nFor lift irrigation, in cases where lifting is at own cost by the farmers the charges shall be applicable at the rate of 1/3 (one-third) of rates prevailing for Flow Irrigation.\n(3.2) When water is provided by lifting by the Government:-\nIn cases where water is supplied for irrigation from all the lift irrigation schemes (including Narmada-based) of the State where water is supplied from canal or ponds by pipeline or otherwise by lifting at the cost of Government, rates for supply of water shall be Rs. 544.17 per watering per hector. (Since these rates include 20% Local Fund Cess, no Local Fund Cess shall be calculated separately).\n(3.3) When the water collected in reservoirs through natural flow and the water flows through pipelines by lifting is mixed, detailed calculation of charges to be collected for supply of water is difficult. In such cases, the rates applicable shall be Rs. 265.45 per watering per hector for Kharif, Ravi, Summer and Two-season crops and in case of perennial crops, the rates applicable shall be Rs. 497.71 per watering per hector.\n(3.4) In cases where farmers fetch water through lifting from reservoirs or river in down stream of check dams, no charges will be levied, however, prior approval of the competent officer shall be obtained.\n(4) Rates for drip irrigation and sprinkler irrigation :\n(4) Rates for drip irrigation and sprinkler irrigation :\nDrip and sprinkler irrigations are the methods which require constant water supply hence in this case, number of hose drains (paan) cannot be determined in traditional manner. Therefore, in cases of drip or sprinkler irrigations, the rates applicable for drip irrigation shall be 35% of the rates applicable for flow irrigation and at the rate of 65% of flow irrigation in case of sprinkler irrigation after calculating number of watering (paan) required for respective crop in respective season and thereby considering total amount derived by calculating the rates as such.\n(5) Rates for water supplied from check dams :\n(5) Rates for water supplied from check dams :\nCheck dams are being constructed under various schemes in the State at the cost of exchequer, partnership with farmers/group of people and industrial houses and voluntary organization/Trusts.\nAs the small check dams on culverts/streams are being constructed by the farmers/group of people under Sardar Patel Sahabhagi Jal Sanchay Yojana are being constructed for water harvesting, if water is drawn only for agricultural purposes from such small check dams constructed on culverts/streams by the farmers/group of people by maintaining the objective of such schemes, no rates will be assessed for such water drawn.\nHowever, if water is drawn from the check dams constructed on rivers under any scheme with assistances or partnership by the Government/industrial houses/ non-governmental organizations/ Trusts, the rates shall be assessed/recovered at the prescribed rates for respective purpose (agriculture, non-agricultural or portable water).\n(6) Rates for filling village ponds/releasing water from river for irrigation purposes :\n(6) Rates for filling village ponds/releasing water from river for irrigation purposes :\n(a) Whenever the State augment water supply on public demand to fill village ponds and farmers draw water there from by lifting at their own cost for irrigation purposes, the rates of charge leviable shall be at the rate of 1/3g1 (one-third) of rates for lift irrigation as prescribed at Rs. 544.17 per watering per hector for area actually irrigated. Gradual increase as may be effective in case of rates of lift irrigation shall be applicable in this case also. Similarly, in case water is drawn for other purposes with prior permission from the Government, the rates prescribed for such purposes shall be applicable.\n(b) In cases where permission is granted for release of water to the river, the charges shall be assessed/recovered from the users at the rates prescribed for respective purpose for which water is drawn.\nConditions for water supplied for agricultural purpose :\n(1) These rates will be gradually escalated at the rate of 7.5% per irrigation year.\n(2) Local Fund Cess as determined from time to time under the Gujarat Panchayats Act, 1993 shall be leviable. At present, this rate shall be levied at the rate of 20 paise per rupee (at the rate of 20%). However, in case where rate for lift irrigation is fixed at Rs. 544.17, no separate local fund cess shall be charged as the local fund cess is included in the said rate.\n(3) Simple Interest on outstanding dues shall be recovered at the rate of 12% per annum.\n(4) Additional 25% assessment will be there in cases of unauthorized irrigation.\n(5) Concerned provisions of the Gujarat Irrigation and Drainage Act, 2013 and the Gujarat Irrigation and Drainage Rules, 2014 shall be applicable.\n(6) The horticulturists whose irrigation charges are outstanding does not make payment of full amount of irrigation charges while making application for irrigation during respective season, such applications for irrigation for said season are not being sanctioned at ordinary rates. However, new applications are accepted only if he make payment of entire outstanding amount in addition to the prevalent charges for flow irrigation.\n(B) Rates for supply of water from reservoirs, canals, tube wells, notified rivers and culverts for non-agricultural purpose or purposes other than irrigation :-\n(1) Rates for row water (un-treated water) for drinking purpose:\n(1) Rates for row water (un-treated water) for drinking purpose:\n(For the year 2013-14)\nThe rates for water supply shall be Rs. 1.95 per 1,000 liters.\nThis rate shall be applicable to all the local self government bodies and all other units in addition to Gujarat Water Supply and Sewerage Board.\nThe rates for drinking water shall be increased gradually at the rate of 10% every financial year.\n(2) Rates of water supplied for industrial purpose :\n(2) Rates of water supplied for industrial purpose :\n(For the year 2013-14)\n(Private industries, Central and State Government Public Undertakings, Gujarat Industrial Development Corporation, Gujarat State Electricity Corporation and all non-agricultural water users)\nThe rates for water supply shall be Rs. 16.11 per 1,000 liters. Rates for water supplied for industrial purposes shall be gradually increased by 10% every financial year.\nConditions for Water Supplied For Non-Agricultural Purposes :-\n(1) The Superintending Engineer/Executive Engineer shall not issue permission for drawl of water for non-agricultural purposes. Such permissions shall be obtained from the Government only.\n(2) Earlier, fixed charges and usage charges were separate for the water supplied non-agricultural purposes which have now been clubbed and the rates as stipulated here in above shall be effective. Thus, separate fixed charges will not be applicable henceforth.\n(3) The rates shall have to be applied from the point from where the licensee (user) starts drawing water.\n(4) The licensee institute/unit/industry will have to get sanctioned in writing the annual volume of water required, from the concerned Superintending Engineer before of April every year.\nIn case of failure to do so, reserved water supply of concerned institute/unit/industry shall be considered on the basis of the volume so sanctioned to them during previous year and charges shall be levied thereon.\nThe annual quantum of water required to be sanctioned for a respective year is less than the volume sanctioned originally by the Government to concerned institute/unit/industry, concerned Superintending Engineer may sanction the same. However, if the quantum required to be sanctioned for a particular year is more than the originally sanctioned quantum, concerned Superintending Engineer shall have to forward proposal to the Government before of April of concerned year and obtain sanction at an early date.\n(5) Several financial complications take place due to obtaining permission for water supply unnecessarily or much prior than actual requirement or getting reservation for water. Therefore, the industries/unit/institution which find it necessary to obtain permission before the time limit of 12 months for drawing water, such industries/unit/institution shall have to pay in advance as security deposit the amount equivalent to water charges for a period of 3 months. Such deposit shall be forfeited if they do not start drawing water within 12 months from the date of permission and the permission granted shall be deemed to have been cancelled automatically. However, if they start drawing water within time limit of 12 months, the amount of deposit paid shall be adjusted in the next bills without interest.\n(6) In case of unauthorized drawal of water i.e.-\n(a) Without obtaining permission,\n(b) Without signing agreement, or\n(c) Without installing water meter,\nthe penalty shall be assessed to an extent of additional 25% instead of one-and-a-half time of the existing rates and 12% simple interest thereon shall be charged henceforth whereas no service charge will be collected. Otherwise, it will be personal responsibility of the Superintending Engineer/Executive Engineer.\nHowever, the concerned Superintending Engineer/Executive Engineer shall not allow anybody to draw unauthorized water so as to see that in any case water is not drawn unauthorized or such activity is not encouraged.\nFurther, no additional penalty shall be assessed in case of drawl of water upto 25% more or less than the reserved quantum of water. In cases where there is no prior permission is obtained for decrease in the reserved quantum and actual drawl is less than 75%, penalty shall be assessed at the rate of 25% on the quantum of water which is used less than 75%.\nHowever, if drawl of water is 25% in excess of the reserved quantum, additional penalty at the rate of 25% shall be levied on the volume drawn in excess of originally reserved quantum.\n(7) While preparing the bills, measurements and assessments of the volume of water released or lifted from the reservoir shall be carried out and not that of water received by the user agency or industry.\n(8) It shall be sole responsibility of the concerned Executive Engineer to ensure that measurements of quantum of water is carried out with accuracy, it is properly verified and assessed and the bills are prepared in time and issued to the users and regular recovery thereof. Constant monitoring for recovery shall be at the level of Superintending Engineer.\n(9) The amount of water supply for a period of one month at the rates prescribed for respective user shall be collected in advance before 10th of every month.\n(10) Simple interest at the rate of 12% shall be charged in case amount of water supplied is not paid within 2 months from the billing date. No service charge will be collected.\n(11) In case outstanding amount of water bill is not paid within six months from the date of assessment, water supply will be discontinued in such cases. This procedure will be equally applicable in case of public undertakings of the Central and State Government.\n(12) These rates are for the quantum of water being drawn by respective institution at their own cost from the reservoirs/pond/river/culvert/ canal/check dams etc.\nIn case of a user who intend to draw water through canal, concerned S.E. shall carry out additional assessment in addition to the rates so prescribed, with respect to expenditure as may be required to be made for canals/structures etc. and obtain permission from the Government in this regard and the work shall be commenced only after advance recovery of such expenditure.\nIf purified water is to be supplied at the site of user by lifting and flowing through pipelines or canal, charges for the same shall be calculated after taking into consideration the actual expenditure required to be made, if any, for the same in addition to the charges as prescribed here in above.\n(13) Local self-government organizations - Village Panchayats, Nagar Panchayats, Municipalities, Municipal Corporations, Gujarat Industrial Development Corporation, Gujarat Water supply and Sewerage Board, Gujarat State Electricity Corporation or other individual users shall not divert from their sanction volume of water to any industry or for drinking water purposes from the volume sanctioned for industrial purpose, without obtaining permission from the Government. Even if it is done so after permission from the Government, the concerned Superintending Engineer shall obtain information in this regard and forward same to the Government and after recovering at the rates accordingly, deposit with the Government such amount recovered.\n(14) Assessment in case of Gujarat State Electricity Corporation shall be to an extent of actual consumption of water. Meaning thereby, if a part of quantum of water is surrendered out of the allocated quantum of water which can be utilized for irrigation purposes, the assessment in such case will be for the actual quantum of water consumed after deducting the quantum of water returned.\n(15) In individual cases where the rates fixed are less than the rates prescribed under these Rules, revised rates shall be applicable in all such cases. In individual cases where different rates are prescribed and validity of such rates are not still over, concerned Superintending Engineer shall have to furnish proposals separately.\n(16) While signing agreements, Bank Guarantee from Nationalized Banks can be accepted as Security Deposit in all the cases. Such Bank Guarantees should have been obtained only from the Nationalized Banks based in Gujarat. Bank Guarantees of other banks shall not be acceptable.\n(17) Amount of Rs. 501/- (Rupees Five Hundred one only) shall be charged towards license fee while signing agreement with users procuring water for non-agricultural usage.\n(18) Relevant provisions of the Gujarat Irrigation and Drainage Act, 2013 and the Gujarat Irrigation and Drainage, Canal Rules, 2014 shall also be applicable.\n(19) The rates for quantum of supply of water for a specific quantum shall be mentioned in respective clause of provision in the Agreement by institution/industry/unit which gets reserve in writing the quantum of water with the concerned Superintending Engineer before 1st of April every year. In case the user reserve nil volume for a particular year, rates shall be mentioned accordingly in relevant clause in the agreement and not as per the original quantum sanctioned.\n(20) In agreement also, the amount equivalent to three months' water charges shall be mentioned as a security deposit considering the normal rates for supply of water for respective year, i.e. to say the amount shall be mentioned in the agreement by calculating as \"equivalent to three months' water chares\". Even if consumption is less than the quantum as reserved as on ls` of April of the year, the user shall be made to deposit in advance the charges as per quantum as reserved by the user on 1st of April of that year. In case if user wish during the year to have increase in the quantum than the quantum reserved, prior permission shall be obtained from the Government as a special case and the charges and security deposit amount for whole of the year shall be got deposited as per rule corresponding with the increased quantum.\n(21) Local fund cess under the Gujarat Panchayats Act, 1993 shall not be collected on the charges of water supplied for non-agricultural purposes.\n(22) In case of industrial units, charges on supply of water by the Water Resources Department for their workers and other residents shall be assessed on the basis of 70 liters per person per day according to their population at the rates so fixed for drinking water supply whereas for remaining supply, the assessment of charges shall be on industrial rates as mentioned herein above.\nWhenever such licensee institution seek permission for drinking water out of their sanctioned quota for industrial purpose, the concerned Superintending Engineer must verify number of persons/statistics of users of drinking water and forward a proposal along with certificate in this regard to the government for approval for drinking water usage and obtain permission from the Government. Such population shall not include floating population.\nFor such permission, the industry must install separate scientific meters with permission from the Department for measuring volume for both the purposes. The water supplied for drinking water purpose shall be filtered one hence the volume supplied shall be measured by installing meters at the colonies/village/towns as may be supplied water beyond such filter plants. Wherever arrangement for installation of meters is not possible, rates for entire volume shall be charged as per schedule of charges for industrial purpose.\nSeparate permissions for quantum of water for industrial use and drinking water purpose shall be obtained from the level of Government.\nAlthough it will require permission from the Government in case it is for the first time. After sanction from the Government level, no separate permission from the Government will be necessary at the time of annual reservation of water where same quantum of water is proposed to be reserved for both the use or in case there is decrease in the originally sanctioned quantum of water. However, if there is increase in quantum, permission from the Government shall be essential. After the quantum is sanctioned, no fresh agreement shall be required if there is already an agreement signed with such industry. However, the letter of sanction shall be considered to be part of such agreement.\n(1) For filling the ponds for fisheries industry, rate for supply of water through flow from canals of flow irrigation schemes shall be Rs. 6.60 per 10,000 liters This rate is for filling the ponds during the ongoing irrigation.\n(2) Gradual price escalation shall be considered at the rate of 7.5% every financial year.\n(3) Measurements of volume of water shall be taken at the respective canal only. There shall be no exclusive water supply for filling ponds for fisheries industries purposes.\n(4) Concerned institution/unit shall procure water only after getting necessary permission from the Government and after signing agreement with the concerned Executive Engineer Procurement of water without following such process shall be deemed to be unauthorized act and the assessment/recovery shall be at the penal rates with interest.\n(5) If amount of water bill is not paid within six months, water supply will be discontinued. Amount of bill is not paid within two months from the date of bill, simple interest at the rate of 12% shall be charged.\n(6) The amount equivalent to charges for one month's supply of water at the prescribed rates shall be recovered in advance from the users before 10th of every month.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 115
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 5th November, 2019 [guj364]",
        "Act Number": "Published vide Notification NO. GER-2013-1-GN-2 (2014)-P, dated 1.2.2014",
        "Enactment Date": "",
        "Act Year": "2014",
        "Short Title": "Gujarat Irrigation and Drainage Rules, 2014",
        "Type": "STATE",
        "Location": "Gujarat"
    },
    "updated_at": "2026-09-29 21:55:19"
}