{
    "act_title": "Granite Policy, 2002",
    "act_slug": "granite-policy-2002",
    "section_label": "Section",
    "section": {
        "number": "17",
        "title": "17. Supersession",
        "chapter": null,
        "content": "18.\nAnnexure 1\nAnnexure 1\nMine Machinery to be Deployed\nMine Machinery to be Deployed\n1.\nWhere one or more plots having total area upto 6.00 hectares\n is sanctioned, following machinery shall be deployed:-\n(i) Composer\nOne\n(ii) Rock Drill Machine\nTwo\n(iii) Chain Pully Block\nOne\n(iv) Wedge and feathers\nAs per requirement\n(v) Jib Crane\nOne\n2.\nWhere plots having total area more than 6.00 hectares and upto\n 15.00 hectares are sanctioned, following machinery shall be\n deployed:-\n(i) Composer\nTwo\n(ii) Rock Drill Machine\nFour\n(iii) Derrick Jib Crane\nOne per 3 Hect.\n(iv) Chain Pully Block/Mechanical Winches\nAs per requirement\n(v) Mechanical Excavator cum loader\nOne\n(vi) Flame jet burners\nAs per requirement\n(vii) Dumper/Trucks\nTwo for each excavators\n3.\nWhere plots having total area more than 15.00 hectares are\n sanctioned, following machinery shall be deployed:-\n(i) Composer\nThree\n(ii) Rock Drill Machine\nSix\n(iii) Deisel/Eletric Operated Crane\nOne per 3 hect.\n(iv) Chain Pully Block/Mechanical Winches\nAs per requirement\n(v) Mechanical Excavator cum loader\nTwo\n(vi) Flame jet burners\nAs per requirement\n(vii) Dumper/Trucks\nTwo for each excavators\n[Form A, Form B, Form C, Form D, Form E, Form F, and Form G Delete\\d by GSR 114 dated 23-3-2011]",
        "footnote": "",
        "is_definition": false,
        "sort_order": 9
    },
    "prev_section": "16",
    "next_section": null
}