    "act_title": "The Electricity Act 2003",
    "act_slug": "electricity-act-2003",
    "section_label": "Section",
    "section": {
        "number": "29",
        "title": "Section 29. (1)  The Regional Load Despatch Centre may give such directions",
        "chapter": null,
        "content": "and exercise such supervision and control as may be required for ensuring stability \nof grid operations and for achieving the maximum economy and efficiency in the \noperation of the power system in the region under its control.\n  \n \n (2)  Every licensee, generating company, generating  station, sub-\nstation and any other person connected with the operation of the power system shall \ncomply with the direction issued by the Regional Load  Despatch  Centres under \nsub-section (1).   \n \n (3) All directions issued by the Regional Load Despatch Centres to \nany transmission  licensee  of  State transmission lines or any other licensee of the \nState or generating company (other than those connected to inter State transmission \nsystem)  or sub-station in the State shall be issued through the State Load Despatch \nCentre and the State Load Despatch Centres shall ensure that such directions are \nduly complied with the licensee  or generating company or sub-station. \n \n (4)  The Regional Power Committee in the region may, from time to \ntime, agree on matters concerning the stability and  smooth operation of the \nintegrated grid and economy and efficiency in the operation of the power system in \nthat region.  \n \n (5)  If any dispute arises with reference to the quality of electricity or \nsafe, secure and integrated operation of the regional grid or in relation to any \ndirection given under  sub-section (1), it shall be referred to the Central \nCommission for decision : \n \n          Provided that pending the decision of the Central Commission, the \ndirections of the Regional Load Despatch Centre shall be complied with by the \nState Load Despatch Centre or  the licensee or the generating company, as the case \nmay be.  \n \n (6) If  any licensee,  generating company or  any other person fails to \ncomply with the directions issued  under sub-section (2)  or sub-\nsection (3), he  \nshall be  liable  to penalty not exceeding  rupees fifteen  lacs. \n \n \nIntra-State transmission",
        "footnote": "",
        "is_definition": false,
        "sort_order": 38
    },
    "prev_section": "28",
    "next_section": "30"
}