    "act_title": "Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008",
    "act_slug": "delhi-electricity-regulatory-commission-state-grid-code-regulations-2008",
    "section_label": "Section",
    "section": {
        "number": "14",
        "title": "14. Connection Agreement.",
        "chapter": null,
        "content": "(a) A condition requiring both parties to comply with the DGC;\n(b) Details of connection, technical requirements and commercial arrangements;\n(c) Details of any capital expenditure arising from necessary reinforcement or extension of the system, data communication etc. and demarcation of the same between the concerned parties;\n(d) Site Responsibility Schedule;\n(e) General philosophy and guidelines on protection (i.e., in accordance with the STU's Protection Plan finalised under Regulation 16.3.2);\n(f) Protection systems (i.e., in consonance with the System Protection Schemes prepared/updated under Regulation 22.21);\n(g) System recording instruments;\n(h) Communication facilities; and\n(i) Any other information considered appropriate by the STU or the Commission.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 13
    },
    "prev_section": "13",
    "next_section": "15"
}