    "act_title": "Chhattisgarh State Electricity Supply Code, 2011",
    "act_slug": "chhattisgarh-state-electricity-supply-code-2011",
    "section_label": "Section",
    "section": {
        "number": "9",
        "title": "9. To substantiate the assessment wherever required licensee may consider other basis such as connected load, working hour and load factor, consumption of similar type of other connection, production data of industries approved by excise department etc.",
        "chapter": null,
        "content": "Contents of the Energy Bill:\n(a) Service Connection Number (unique consumer number as per clause 9.9)\n(b) Bill number\n(c) Period of bill\n(d) Name and address of the consumer\n(e) Pole Number from which connection is served\n(f) Name, address and telephone number of the distribution centre\n(g) Date of issue of bill\n(h) Tariff category\n(i) Tariff, rate of electricity duty and cess as applicable (j) Contracted/Connected load/ demand\n(k) Single phase or three phase connection\n(I) Identification details of the meter\n(m) Reading date-past and present\n(n) Meter reading-past and present\n(o) Units assessed/consumed\n(p) Credit\n(q) Basis of bill\n(r) Meter rental\n(s) Current month's charges-Energy Charges, fixed/demand charge, Minimum Charges, Variable Cost Adjustment (VCA) Charges, Electricity Duty, Cess, meter rent, welding/capacitor surcharge, security deposit instalment, Rebate allowed, others if any\n(t) Arrear of Electricity Charges, Delayed Payment Surcharge arrears\n(u) Bill delivery charges if applicable\n(v) Total charges\n(w) Delayed payment surcharge\n(x) Due dates of payment-for payment through cheque and cash\n(y) Authority in whose favour cheque/Bank draft is to be issued. (To be printed on reverse of the bill)\n(z) Security deposit held and required\n(aa) Confirmation of last payment received-amount and date of payment.\n(a) The name(s)/address(es) of collection centres.\n(b) Working hours for collection of bills.\n(c) Designation and address of the authority of licensee with whom grievance pertaining to bills, meter, meter reading etc. can be lodged address, phone number of Forum and Electricity Ombudsman.\n(d) Any other message that the Licensee may like to give e.g. requesting the consumer to indicate their phone/mobile number, if available, on the portion of the bill retained by the licensee on receipt of payment. This information can be used for better communication with consumers.\nSupplementary (other than regular) bill:\nChapter 10\nPayment of Bill; Temporary and Permanent Disconnection of Supply\n10.1 Payment of bill.\n(a) Electricity Duty and Cess on the current consumption\n(b) Arrears of Electricity Duty plus arrears of Cess, if any\n(c) Delayed payment surcharge\n(d) Balance of arrears, if any\n(e) Current bill amount\nInstalment facilities.\nDisputed/Erroneous monthly bills :\n(i) an amount equal to the sum claimed from him, or\n(ii) the electricity charges due from him for each month calculated on the basis of average charge for electricity paid by him during the preceding six months,\n(b) A complaint may be lodged with the designated officer in the complaint form available at the licensee's complaint receiving office. In case such form is not available in the office, complaint may be lodged on plain paper along with the following details :\n(i) Name and address of the consumer alongwith telephone number/ mobile no, if any\n(ii) Service connection number\n(iii) Category/purpose of connection\n(iv) Details of complaint in brief.\n(c) If on investigation, the licensee finds the bill to be erroneous, a revised corrected bill shall be furnished to the consumer indicating the revised due date not less than seven days from the date of delivery of revised bill. Excess amount found paid by the consumer, if any, shall be adjusted in the subsequent bill(s).\n(d) In the event if it is established that the original bill was correct, the consumer shall be informed accordingly and notified to pay the balance, if any, with surcharge as applicable within 7 days.\n(e) In case the consumer is not satisfied with the decision on the dispute, he may take further action as provided in the relevant regulation for Redressal of Consumer Grievance.\nResponsibility of legal heir:\nTemporary Disconnection:\nTemporary disconnection on request of consumer:\nPermanent disconnection and termination of agreement:\nUnconnected LT industrial and HT connections :\nFor LT industries up to 50 HP\n-\n10 HP\nFor LT industries more than 50 HP\n-\n20 HP\nFor HT connection 33 and 11KV\n-\n60 KVA\nDisconnected LT industries and HT consumers :\nFor LT industries up to 50 HP\n-\n10 HP\nFor LT industries more than 50 HP\n-\n20 HP\nFor HT connection 33 and 11KV\n-\n60 KVA\nChapter 11\nPrejudicial use of Supply\n11.1\nAccess to consumer premises:\nUnauthorized use of electricity :\n(i) by any artificial means; or\n(ii) by a means not authorised by the concerned person or authority or licensee; or\n(iii) through a tampered meter; or\n(iv) for a purpose other than for which the usage of electricity has been authorized;\n(a) Use of electricity in the premises or areas other than those for which the supply of electricity was authorised; or\n(b) shifting of location of meter.\nAssessment:\nProvisional and final assessment:\n(i)\nOfficers of rank of Asstt. Engineer\n-\nFor all LT connections up to 15KW\n(ii)\nOfficers of rank of Executive Engineer\n-\nFor all LT connections more than 15KW\n(iii)\nOfficers of rank of Superintending Engineer and\n\t\t\t\tabove.\n-\nFor all HT & EHT connection :\nAppeal against final assessment:\n(i)\nNext immediate officer-Executive Engineer\n-\nFor all LT connection up to 15KW\n(ii)\nNext immediate officer-Superintending Engineer\n-\nFor all LT connection above 15KW\n(iii)\nNext immediate officer-Chief Engineer\n-\nfor HT & EHT consumer.\nMaximum demand exceeding of contract demand/load found increased:\nTheft of Electricity:\n(i) taps, makes or causes to be made any connection with overhead, underground or underwater lines or cables, or service wires or service facilities of a licensee or supplier, as the case may be; or\n(ii) tampers a meter, installs or uses a tampered meter, current reversing transformer, loop connection or any other device or method, which interferes with accurate or proper registration, calibration or metering of electric current or otherwise results in a manner whereby electricity is stolen or wasted; or\n(iii) damages or destroys an electric meter, apparatus, equipment, or wire or causes or allows any of them to be so damaged or destroyed as to interfere with proper or accurate metering of electricity, so as to abstract or consume or use electricity; or\n(iv) uses electricity through a tampered meter; or\n(v) uses electricity for the purpose other than for which the usage of electricity was authorised;\nshall be punishable under the provision of section 135 of the Act.\nPeriod of Assessment:\n(1) Actual period from the date of commencement of supply to the date of detection of theft;\n(2) Actual period from the date of replacement of component of metering system in which the evidence is detected to the date of detection of theft;\n(3) Actual period from the date of previous checking of installation to date of detection of theft;\n(4) Meter Reading Instrument (MRI) data should be considered wherever available.\nResponsibility on consumer to prove otherwise:\nThe methodology for assessment of consumption in case of theft of energy :\n(A) In respect of existing connection:\nUnits assessed = L X D X H X F Where\nL = Load (connected load found in the consumer's premises during the course of inspection in KW.\nD = Period of assessment in days:\nH = is hours of use per day,\nF = Load factor, which shall be taken for different categories of use as given below :-\nS. No.\nParticulars\nLoad factor\n1.\nHT industries\n100%\n2.\nHT connection other than industries (Residential, General\n\t\t\t\tpurpose) water work\n75%\n3.\nLT Industry\n75%\n4.\nLT Non domestic and Agriculture allied\n50%\n5.\nLT Domestic\n40%\n6.\nLT Agriculture\n50%\n7.\nLT Water supply\n50%\n8.\nStreet light\n50%\n9.\nDirect theft-AU categories (without availing connection)\n100%\nH = 8 hours all consumers (other than domestic and street light)\n6 hours for domestic\n12 hours for street light\nFor industries period of working to be decided based on its normal functioning but shall not be less than 8 hours.\n(B) Assessment of energy in case of direct theft (without availing) connection :\nUnits assessed = L x D x FI\nWhere,\nL = Load (found connected at the time of inspection) in KW\nD= Period of assessment in days; and\nH= is hours per day, which shall be taken as 8 hours for all consumers except industrial consumers in respect of whom the hours of use shall be as per the hours the industry generally operates in a day which in any case shall not be less than 8 hours.\nTheft of electricity in premises having no connection (direct hooking):\nProcedure in case of suspected theft:\nAbetment:\nCompounding of offences:\nNature of Service\nRate at which the sum of money for compounding to be collected\n\t\t\t\tper Kilowatt (KW)/Horse Power (HP) or part thereof for Low\n\t\t\t\tTension (LT) supply and per Kilo Volt Ampere (KVA) of contracted\n\t\t\t\tdemand for High Tension (IIT)/ Extra High Tension (EHT).",
        "footnote": "",
        "is_definition": false,
        "sort_order": 11
    },
    "prev_section": "8",
    "next_section": "1"
}