{
    "act_title": "Chhattisgarh State Electricity Supply Code, 2011",
    "act_slug": "chhattisgarh-state-electricity-supply-code-2011",
    "section_label": "Section",
    "section": {
        "number": "4",
        "title": "4. In case the meter became stop/defective from the date of connection or reliable consumption of sufficient period after connection is not available then average consumption of subsequent three billing month/ billing cycle period after installation of good meter, may be considered.",
        "chapter": null,
        "content": "",
        "footnote": "",
        "is_definition": false,
        "sort_order": 6
    },
    "prev_section": "3",
    "next_section": "5"
}