{
    "act_title": "Chhattisgarh State Electricity Supply Code, 2005",
    "act_slug": "chhattisgarh-state-electricity-supply-code-2005",
    "section_label": "Section",
    "section": {
        "number": "7",
        "title": "7. In case of industries permission of Environment Conservation Department.",
        "chapter": null,
        "content": "[Acknowledgment]\n[Acknowledgment]\n(To be given to the applicant)\nSignature of the authorised Official of the licensee with Name, Seal and Date\nNote. - In case of any difference in the interpretation or understanding of the provisions of the Hindi version of these Regulations with those of the English version (the original version), the later will prevail and in case of any dispute in this regard, the decision of the Commission shall be final.\nNote.\nAnnexure 2\nAnnexure 2\nApplication form - High Tension/EHT Service Connection\nApplication form - High Tension/EHT Service Connection\nNew Connection/Shifting of Premises/Change in Contract Demand/Change of Tariff Category/Change of Name of Consumer\n(Please strike-off the purpose that is not applicable)\n.......................\n.......................\n.......................\n(a) Name of the person/organization : .............................................\n(b) Name of father/husband/Director/Partner/Trustee : ............................\n(c) Full Address of the premises where a new connection is hereby applied for/the existing connection is proposed to be shifted :  ................................................................................................................................\nPin : ...............\nTelephone No.:\nFactory/Premises: ...............\nRegistered Office: ..............\nResidence: ...................\nE-mail: .......................................\nBank A/C No. (optional): .............................\n11 kV\n33 kV\n132 kV\n220 kV\n(Please strike-off category not applicable and tick the category applicable)\n(Please strike-off type not applicable and tick the type applicable)\nIf temporary , specify period - From :............................ To..............:.............\n(a).............................................................................\n(b).............................................................................\n(c).............................................................................\n(d).............................................................................\n(a) Diversity factor assumed: ..................................................\n(b) Total Connected Load: ......................................................\nSl. No.\nCD required (kVA)\nTentative Date from which required\nRemarks\n(Please strike-off category not applicable and tick the category applicable)\n( for serial 15, 16 & 17 if answer is 'Yes' in any case please provide details)\n(a) The information provided in the form above is true to my knowledge.\n(b) I/We have read the Chhattisgarh Electricity Supply Code and agree to abide by the conditions mentioned therein.\n(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.\n(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.\nNote. - The following documents shall be attached with the application form\nNote.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 6
    },
    "prev_section": "6",
    "next_section": "1"
}