{
    "act_title": "Central Road Fund (State Roads) Rules, 2014",
    "act_slug": "central-road-fund-state-roads-rules-2014",
    "section_label": "Section",
    "section": {
        "number": "9",
        "title": "9. Execution of works.",
        "chapter": null,
        "content": "(a) the design of the road or bridge projects shall be carried out as per the relevant Central Government codes and guidelines;\n(b) the project monitoring and quality control of the works shall be done at regular interval in a methodical manner by adopting the following procedure-\n(i) the measurements shall be checked by the officers of Public Works Departments to the extent specified in their Manual or Code;\n(ii) there should be a quality monitoring system at the State Level or Union territory level, consisting of such experts and supporting staff as may be appointed by the State Government or Union territory, as the case may be;\n(iii) the quality monitoring system referred in item (ii) above shall devise a Quality Assurance (QA) System delineating the requirements of quality, the responsibility of the officers and contractors, conduct independent tests, and examine QA documentation to spot non-conformities and shall have the responsibility of training of PWD staff and recommending laboratory and field testing facilities.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 10
    },
    "prev_section": "8",
    "next_section": "10"
}